SlideShare une entreprise Scribd logo
1  sur  5
POORANAM KIRUBHAKAR 
Mobile: ,+91 99524 76796 
E-Mail: pooranamkirubakar@yahoo.co.in/ poornam.kirubhakar@gmail.com 
In pursuit of career enhancing opportunities in the field of: 
~ Welding Operations ~ QA/ QC ~ Fabrication ~ Auditing ~ 
PROFESSIONAL SNAPSHOT 
 ASNT Level–III & American Welding Society – Certified ISO 9001 Lead Auditor, Nace Certified Level – I Coating 
Inspector, Professional with 18 years of overall experience across various Petroleum Refineries. 
 Scope of work experience includes: 
- Fabrication of Pressure Vessels - Welding Operations - Quality Assurance 
- Hook Up & Commissioning - Design Verification - Static Inspectional Activities 
- NDT Co-ordination - Auditing - RT Film Interpretation 
 ARAMCO Approved Welding Inspector (SAP :70009834)- with wide experience of working as QA & QC 
Engineer with reputed National Companies across India. 
 Expertise in heading welding inspection, construction pre-commissioning & maintenance of Refinery and 
Thermal Power Plant & Nuclear Power Plants. 
 Demonstrated abilities in handling the following: 
o Rotating and static inspectional activities. 
o Factory acceptance test. 
o Inspection during construction of Pressure Vessels, Boiler, LPG Cylinders, Heat Exchangers, etc. 
o Material identification. 
o MDR review, punch list review, spot check of stress relieve, etc. 
 Proficient in leading spot inspectional activities for quality surveillance & assurance, welding inspection, training, 
evaluation of test results & reports, RT film interpretation, review of hydro-test packages & final dossier. 
 An effective communicator with excellent relationship management skills and strong analytical abilities. 
CORE COMPETENCIES 
Welding Operations: 
 Conducting: 
o Destructive & Non-Destructive Testing. 
o Weld visual inspection of piping/ equipment for both pressure and non-pressure parts. 
 Witnessing/ approving welder qualification Tests as per ASME Section IX. 
 Verifying job clearance cards and ensuring proper allocation of welders/ welding consumables. 
 Controlling: 
o Pre-heating activities as per project specification. 
o PWHT activities for carbon steel and alloy steel as per project specification. 
o Hardness check of carbon steel and alloy steel material after PWHT completion. 
o Traceability based on heat/ lot number for pipe/ plate (verify using Material Receiving Report 
(MRR)/ Delivery note) and also visual acceptance to standards. 
o RT requirement as per Joint wise, Welder wise, Line class wise on a weekly basis. 
 Verifying and controlling welding consumables received as per lot number. 
 Interpreting radiography, radiographic standards & acceptance as per construction code. 
Quality Assurance: 
 Inspecting equipment and performing preventative maintenance, which requires initiative in the fitter. 
 Providing an efficient site maintenance service working as part of a team, covering both planned preventative 
maintenance and machinery breakdowns as required. 
 Ensuring that all equipment is maintained to high standards. 
 Identifying areas of obstruction and taking steps to rectify it. Conducting technical audits; reviewing existing 
processes and re-designing the same to enhance operational efficacy. 
 Performing predictive / breakdown / preventive maintenance for reducing machinery downtime to minimum. 
Studying the down time of machines due to major breakdown & finding out the alternative solution to reduce it. 
 Preparing breakdown reports, remarks and equipment history. Taking stringent quality measures including 
preparation / maintenance of necessary documents and conducting audits to ensure compliance with standards.
CAREER RECITAL 
May ’2014 to Till date Aveon Offshore , QC Supervisor RT Level-III 
Client : FMC technologies Norway, Total 
Project : Total Egina project- Nigeria 
 Fabrication of Egina Project Subsea Production System (SPS) Equipment; that include: 
 6 Manifolds (PMM) 
 6 Manifold Support Structures(MSS) 
 6 Closed Caisson Foundations(CCF) 
 16 UTA Modules & Foundations 
 5 SDU Modules & Foundations 
 33 Christmas Trees(XT) 
 44 Gasmat weldment 
 44 Permanent Guide Base(PGB) 
 Reviewing relevant Qualification / Manufacturing / Fabrication / testing documents throughout yard construction 
phase of the project. This includes typically material selection, specifications, welding procedures, welding 
qualifications, testing procedures, ITP, technical reports, test NDE and Mechanical test results reports etc ... 
 To be involved in incident investigation and follow-up actions implementation 
 Follow up NCR / CAR processes as required 
 Developing and preparing as need be technical reports. 
 Ensure that the work is executed in full compliance with the COMPANY General Specification, and EGINA 
particular specifications / requirements. 
 Prepared written procedures for various NDE methods and revised the same whenever required. 
 Conducted in-house and outside agency training in various NDT methods. 
 Arranged & scheduled examinations for technicians in various NDT methods. 
Apr’2011 to May 2013 Tecnimont , RT Level-III 
Habshan V project Abu Dhabi 
Client : GASCO 
Key Highlights: 
Conducted material receipt inspection and ensured effective welding consumable control. 
 Led weld visual inspection of steel structures, piping as per ASME B31.3, ASME & other codes & standards. 
 Looked after radiographic film interpretations of welds as per ASME B 31.3. 
 Monitored and reviewed PWHT charts. Checked NDT requirement and prepared efficient material take number 
report during the assigned project. 
 Carried out NDT as per specifications and costumer requirement. 
 Interfaced with clients and resolved all Quality related matters. 
 Coordinated with Sub Contractors, Group Engineers and other discipline Engineers for achieving set objectives. 
 Ensured achievement of all preset commitments and provided timely report to the higher management. 
Jun’10 to Dec’10 Korean Techno Inspection Middle East Co., RT Level-III 
LLC, Abu Dhabi, UAE 
Client: S.K. Engineering for the “Bab Gas Compression Project” 
Key Tasks Handled: 
 Technical Support: 
o Prepared written procedures for various NDE methods and revised the same whenever required. 
o Looked after RT film interpretation as per ASME Section IX, ASME B 31.3, API 1104, ADCO and S.K 
engineering specification. 
o Spearheaded pre-mobilization arrangements such as procedure approval & isotope storage bunker 
approval (co-ordination for inspection and follow up). 
o Provided purchase request advice for available stock. 
o Led calibration of radiation survey meters, densitometers & other equipment. 
o Attended ASME audits for various clients for their ASME coded works. 
o Conducted quality audits on NDE requirements and implemented them on behalf of EPC 
Contractors.
o Developed procedures for RT for equipment for pipeline testing. 
 Training & Certification: 
o Conducted in-house and outside agency training in various NDT methods. 
o Arranged & scheduled examinations for technicians in various NDT methods. 
o Maintained the complete database pertaining to training & certification. 
o Conducted training & certification for clients. 
 Radiation Safety: 
o Ensured consistent improvement in service standards & safety awareness. 
o Conducted radiation safety audits on project sites on a regular basis. 
o Developed emergency plans/ safety procedures & issued radiation safety advisories. 
o Gave response to incidents involving radiation. Imparted radiation safety training to Technicians. 
o Gained experience in handling: 
- Radiation emergencies in Industrial Radiography and Import/ Export of radioactive 
materials. 
- Maintenance & repair of Radiographic Devices (Tech-Ops-660 models & 880 models). 
o Controlled issuance & collection of TLD to project sites. 
 Contract & Planning: 
o Organised meetings with clients and led manpower recruitment, if required 
o Prepared equipment purchase order/ hiring request & co-ordination with logistics and stores. 
o Arranged storage bunker, darkroom & storeroom at project. 
 Mobilization: 
o Gave positive orientation to Project Supervisors & Technicians before mobilization for effective 
communication at head office and clients end. 
Key Highlights: 
 Gained conversance with the codes in Oil, Gas & Petrochemicals domain. 
Nov’08 – Jul’09 Bethtel Technip Joint Venture, Saudi Arabia Welding Inspector 
Client: Saudi Aramco 
Key Highlights: 
 Conducted material receipt inspection and ensured effective welding consumable control. 
 Led weld visual inspection of steel structures, piping as per ASME B31.3, ASME & other codes & standards. 
 Looked after radiographic film interpretations of welds as per ASME B 31.3. 
 Monitored and reviewed PWHT charts. Checked NDT requirement and prepared efficient material take number 
report during the assigned project. 
 Carried out NDT as per specifications and costumer requirement. 
 Interfaced with clients and resolved all Quality related matters. 
 Coordinated with Sub Contractors, Group Engineers and other discipline Engineers for achieving set objectives. 
 Ensured achievement of all preset commitments and provided timely report to the higher management. 
May’06 - Apr’08 Shaw Nass M.E W.L.L., Bahrain Mechanical & Welding 
Inspector 
Client: Dolphin Up compression Project -Japan gas corporation, Dolphin Energy Ltd., etc. 
Key Highlights: 
 Led Quality Control & Assurance activities involving: 
o Thorough study on various Structural and Piping drawings 
o Monitoring Weld joints preparation 
o Inspection of Fit-up and Tack Welds 
o Verification of Structure and Piping Dimensions 
o Before Welding, check proper parameters as per Pre-Welding checklist 
o During Welding, check proper parameters as per In-Process checklist 
o After Welding, check proper parameters as per post- Weld checklist 
o Co-ordinate dimension checks before and after Welding as per special Requirements 
o Review of the welder qualification test report 
o Make reports and update inspection summary 
o Witnessed NDT and review the NDT test report 
o Carried out Raw material inspection, verification of the mill certificates 
o Prepare Weekly welder Repair rate reports and monitoring reports 
o Prepare Weekly Welder’s Repair Assessment & Tracer Welds. 
o Conversant with Quality Assurance techniques NDE { UT,RT,MT & PT} 
o Evaluating ultrasonic Examination (Butt, ‘T’, ‘K’ & ‘Y’ joints) in panels,
o NDT Co-ordination and weld repair rate calculation. Documentation and Reporting. 
o Evaluating Radiographic Films & Co-ordination with Third party external agencies ion. Exposing 
Radiographic films in pipelines, Headers, Tubes & Valves Casting. 
o Evaluating ultrasonic Examination in Pressure parts as well as Non-pressure parts, Boiler drum circems, 
long seams, tie rod scanning etc., & also doing special project job scanning lik e heat exchangers 
cladding, Buttering & Valves casting. 
o Evaluating Real time Radiography for welder Qualification pipe, tube & plates etc 
o Inspecting Magnetic Particle Examination in hand cock Valves production, Header cirseam, long seam in 
Dry method as well as wet method. 
o Inspecting penetrant examination in all welds like super heater, Heat exchanger, tube and modules 
o Carried out Ultrasonic Thickness Measurements and visual Inspections on 
o Structures, Piping & Turbo charger Etc., 
Oct’05 – Apr’06 Nasser AL Hajri, Qatar Mechanical & Welding Inspector 
Clients: Japan Gas Corporation, Dolphin Energy Ltd., etc. 
Key Highlights: 
 Led NDT work performance, film interpretation, training of local NDT personnel; conducted and supervised 
audits at sites. 
 Conducted non-destructive testing, particularly in the field of Ultrasonic examination of welds for clients. 
 Checked welding activities and ensured the same to be in Compliance as per applicable codes & standards & 
 Coordinated with NDE, PWHT for facilitating HT requirements. 
 Resolved technical queries with Project Management Superiors. 
 Reviewed material certificates, consumable test certificates, & calibration certificates of equipments. 
 Controlled electrode handling on daily basis. 
 Reviewed hydro-test packages. 
Jul’05 – Sep’05 Reliance associates Engineering Ltd., Jam Nagar Inspection Engineer 
Client: Reliance Petroleum Ltd., Jam Nagar Refinery, etc. 
Key Highlights: 
 Led shut down NDT work performance, film interpretation, training of local NDT personnel. 
 Conducted and supervised audits, non-destructive testing particularly in the field of Ultrasonic examination of 
welds for client. 
 Checked welding activities in compliance with applicable codes, standard & specifications. 
 Spearheaded welding procedures. Coordinated with: 
o NDE, PWHT for HT requirements. 
o Project Management Superiors for resolving technical issues. 
 Reviewed material certificates, consumable test certificates, & calibration certificates of equipment. 
 Controlled electrode handling on daily basis. 
 Reviewed hydro-test packages. 
 Carried out inspectional activities (calculation of corrosion rate, joint categories MAWP calculations, Pneumatic 
testing & Hydrostatic testing calculations). 
PREVIOUS ROLES 
Mar’03 – Jun’05 Ragmet Engineers, Mumbai QA & QC Engineer 
Client: Hindustan Petroleum Ltd., Mumbai Refinery, etc. 
Key Highlights: 
 Worked as a Site QA/QC Engineer/ Inspector and supervised site erection, commission and maintenance of 
Piping, Static and Rotary Equipment. 
 Led the work of local and NDT personnel, overseen all NDT work performance, film interpretation, training of 
local NDT personnel, procedures preparation, etc. 
 Conducted and supervised audits and site non-destructive testing, particularly field ultrasonic examination of 
welds for clients. 
 Looked after inspection of fabrication and welding work during projects covering pressure piping in accordance 
with section IX, API 1104, API510, ASMESEC-V, etc. 
o Approved quality control plan and inspection, test &plan in pipeline/ plan job. 
 Checked welding activities and ensured that the same were in compliance with applicable codes, standard & 
specifications. Approved welding procedures as and when required. 
 Coordinated with NDE, PWHT for HT requirements. 
 Resolved technical queries in coordination with Project Management Superiors. 
 Reviewed material certificates, consumable test certificates, & calibration certificates of equipment. 
 Ensured that only approved Electrodes, Wires, Fluxes & Gas are used. 
 Controlled Electrode handling on daily basis. Led daily checking of Welders I.D., WPS copy, Heating Torch, 
Tempil Stick, etc. Reviewed hydro- test packages.
Nov’96 – Feb’03 L.G. Balakrishnan & Bros. Ltd., Madurai Inspection Engineer 
Clients: ELGI Equipment, JK Tyres, Fenner India Ltd., etc. 
Key Highlights: 
 Performed structural integrity and maintenance of static equipment (Pressure Vessels, Heat Exchangers, 
Columns, Boilers & its associated connections, etc.) and carried out visual, hydro & other applicable tests. 
 Led visual & survey assessment (Blisters, Cracks, Spalling, other forms of Deterioration Gasket, Nozzle, 
Manhole, Head Shell Conditions, Leaks, Shell Distortions, Signs of Settlements Corrosion, Conditions of the 
foundations, Paint Coatings, Insulation Systems and Appurtenances, etc. 
 Checked and maintained proper records of various safety conditions. 
 Looked after final vessels certification & documentation in accordance with requirements of API-510,572,576. 
ACADEMIC CREDENTIALS 
 Diploma in Mechanical Engineering from Tamil Nadu Technical Board, Madurai in 1994. 
 Bachelor of Technology in Mechanical Engineering 
CERTIFICATIONS 
 Successfully completed the following certifications: 
o ASNT Level – III in Radiographic Inspection (ASNT Certificate No. 169161). 
o American Welding Society –Senior Certified Welding Inspector (AWS- SCWI Certificate No. is 
13120178 
o American Welding Society – Certified Welding Inspector (AWS- CWI Certificate No. 05042111). 
o Certified Scheme of Welding Inspection Personnel CSWIP 3.1 (TWI-CSWIP 3.1, Certificate No. 
25048). 
o Nace Certified Level – I Coating Inspector (Certificate No. 18965). 
o ASNT Level–II in MT, PT, UT & RTFI. 
o ISO 9001 Lead Auditor. 
IT PROFICIENCY 
 Well versed with: 
o 2D & 3D Drafting involving AutoCAD 2008, PRO–E, Solid Works 2009, Auto Desk-Inventor, etc. 
o MS Office including Word, Excel, PowerPoint, ACCESS, FoxPro, SQL, Visual Basic, etc. 
PERSONAL DETAILS 
Date of Birth 14th April 1975 
Languages Known: English, Tamil, Malayalam and Hindi 
Address: 251 Ram Nagar 6th Street, Bye Pass Road, S.S. Colony, Madurai – 625016, 
Passport No.: J5655041 ( 28-01-2011 TO 27-01-2021)

Contenu connexe

Tendances

Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
qc welding inspector resume
qc welding inspector resumeqc welding inspector resume
qc welding inspector resumeshahwaz siddique
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 

Tendances (20)

Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
qc welding inspector resume
qc welding inspector resumeqc welding inspector resume
qc welding inspector resume
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 

Similaire à QA/QC Engineer Pooranam Kirubhakar resume

Similaire à QA/QC Engineer Pooranam Kirubhakar resume (20)

Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
jaynt singh (CV) (5)
jaynt singh (CV) (5)jaynt singh (CV) (5)
jaynt singh (CV) (5)
 
Mohamad Elyaas CV & Certf
Mohamad Elyaas CV & CertfMohamad Elyaas CV & Certf
Mohamad Elyaas CV & Certf
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
javed_C.V.
javed_C.V.javed_C.V.
javed_C.V.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 

QA/QC Engineer Pooranam Kirubhakar resume

  • 1. POORANAM KIRUBHAKAR Mobile: ,+91 99524 76796 E-Mail: pooranamkirubakar@yahoo.co.in/ poornam.kirubhakar@gmail.com In pursuit of career enhancing opportunities in the field of: ~ Welding Operations ~ QA/ QC ~ Fabrication ~ Auditing ~ PROFESSIONAL SNAPSHOT  ASNT Level–III & American Welding Society – Certified ISO 9001 Lead Auditor, Nace Certified Level – I Coating Inspector, Professional with 18 years of overall experience across various Petroleum Refineries.  Scope of work experience includes: - Fabrication of Pressure Vessels - Welding Operations - Quality Assurance - Hook Up & Commissioning - Design Verification - Static Inspectional Activities - NDT Co-ordination - Auditing - RT Film Interpretation  ARAMCO Approved Welding Inspector (SAP :70009834)- with wide experience of working as QA & QC Engineer with reputed National Companies across India.  Expertise in heading welding inspection, construction pre-commissioning & maintenance of Refinery and Thermal Power Plant & Nuclear Power Plants.  Demonstrated abilities in handling the following: o Rotating and static inspectional activities. o Factory acceptance test. o Inspection during construction of Pressure Vessels, Boiler, LPG Cylinders, Heat Exchangers, etc. o Material identification. o MDR review, punch list review, spot check of stress relieve, etc.  Proficient in leading spot inspectional activities for quality surveillance & assurance, welding inspection, training, evaluation of test results & reports, RT film interpretation, review of hydro-test packages & final dossier.  An effective communicator with excellent relationship management skills and strong analytical abilities. CORE COMPETENCIES Welding Operations:  Conducting: o Destructive & Non-Destructive Testing. o Weld visual inspection of piping/ equipment for both pressure and non-pressure parts.  Witnessing/ approving welder qualification Tests as per ASME Section IX.  Verifying job clearance cards and ensuring proper allocation of welders/ welding consumables.  Controlling: o Pre-heating activities as per project specification. o PWHT activities for carbon steel and alloy steel as per project specification. o Hardness check of carbon steel and alloy steel material after PWHT completion. o Traceability based on heat/ lot number for pipe/ plate (verify using Material Receiving Report (MRR)/ Delivery note) and also visual acceptance to standards. o RT requirement as per Joint wise, Welder wise, Line class wise on a weekly basis.  Verifying and controlling welding consumables received as per lot number.  Interpreting radiography, radiographic standards & acceptance as per construction code. Quality Assurance:  Inspecting equipment and performing preventative maintenance, which requires initiative in the fitter.  Providing an efficient site maintenance service working as part of a team, covering both planned preventative maintenance and machinery breakdowns as required.  Ensuring that all equipment is maintained to high standards.  Identifying areas of obstruction and taking steps to rectify it. Conducting technical audits; reviewing existing processes and re-designing the same to enhance operational efficacy.  Performing predictive / breakdown / preventive maintenance for reducing machinery downtime to minimum. Studying the down time of machines due to major breakdown & finding out the alternative solution to reduce it.  Preparing breakdown reports, remarks and equipment history. Taking stringent quality measures including preparation / maintenance of necessary documents and conducting audits to ensure compliance with standards.
  • 2. CAREER RECITAL May ’2014 to Till date Aveon Offshore , QC Supervisor RT Level-III Client : FMC technologies Norway, Total Project : Total Egina project- Nigeria  Fabrication of Egina Project Subsea Production System (SPS) Equipment; that include:  6 Manifolds (PMM)  6 Manifold Support Structures(MSS)  6 Closed Caisson Foundations(CCF)  16 UTA Modules & Foundations  5 SDU Modules & Foundations  33 Christmas Trees(XT)  44 Gasmat weldment  44 Permanent Guide Base(PGB)  Reviewing relevant Qualification / Manufacturing / Fabrication / testing documents throughout yard construction phase of the project. This includes typically material selection, specifications, welding procedures, welding qualifications, testing procedures, ITP, technical reports, test NDE and Mechanical test results reports etc ...  To be involved in incident investigation and follow-up actions implementation  Follow up NCR / CAR processes as required  Developing and preparing as need be technical reports.  Ensure that the work is executed in full compliance with the COMPANY General Specification, and EGINA particular specifications / requirements.  Prepared written procedures for various NDE methods and revised the same whenever required.  Conducted in-house and outside agency training in various NDT methods.  Arranged & scheduled examinations for technicians in various NDT methods. Apr’2011 to May 2013 Tecnimont , RT Level-III Habshan V project Abu Dhabi Client : GASCO Key Highlights: Conducted material receipt inspection and ensured effective welding consumable control.  Led weld visual inspection of steel structures, piping as per ASME B31.3, ASME & other codes & standards.  Looked after radiographic film interpretations of welds as per ASME B 31.3.  Monitored and reviewed PWHT charts. Checked NDT requirement and prepared efficient material take number report during the assigned project.  Carried out NDT as per specifications and costumer requirement.  Interfaced with clients and resolved all Quality related matters.  Coordinated with Sub Contractors, Group Engineers and other discipline Engineers for achieving set objectives.  Ensured achievement of all preset commitments and provided timely report to the higher management. Jun’10 to Dec’10 Korean Techno Inspection Middle East Co., RT Level-III LLC, Abu Dhabi, UAE Client: S.K. Engineering for the “Bab Gas Compression Project” Key Tasks Handled:  Technical Support: o Prepared written procedures for various NDE methods and revised the same whenever required. o Looked after RT film interpretation as per ASME Section IX, ASME B 31.3, API 1104, ADCO and S.K engineering specification. o Spearheaded pre-mobilization arrangements such as procedure approval & isotope storage bunker approval (co-ordination for inspection and follow up). o Provided purchase request advice for available stock. o Led calibration of radiation survey meters, densitometers & other equipment. o Attended ASME audits for various clients for their ASME coded works. o Conducted quality audits on NDE requirements and implemented them on behalf of EPC Contractors.
  • 3. o Developed procedures for RT for equipment for pipeline testing.  Training & Certification: o Conducted in-house and outside agency training in various NDT methods. o Arranged & scheduled examinations for technicians in various NDT methods. o Maintained the complete database pertaining to training & certification. o Conducted training & certification for clients.  Radiation Safety: o Ensured consistent improvement in service standards & safety awareness. o Conducted radiation safety audits on project sites on a regular basis. o Developed emergency plans/ safety procedures & issued radiation safety advisories. o Gave response to incidents involving radiation. Imparted radiation safety training to Technicians. o Gained experience in handling: - Radiation emergencies in Industrial Radiography and Import/ Export of radioactive materials. - Maintenance & repair of Radiographic Devices (Tech-Ops-660 models & 880 models). o Controlled issuance & collection of TLD to project sites.  Contract & Planning: o Organised meetings with clients and led manpower recruitment, if required o Prepared equipment purchase order/ hiring request & co-ordination with logistics and stores. o Arranged storage bunker, darkroom & storeroom at project.  Mobilization: o Gave positive orientation to Project Supervisors & Technicians before mobilization for effective communication at head office and clients end. Key Highlights:  Gained conversance with the codes in Oil, Gas & Petrochemicals domain. Nov’08 – Jul’09 Bethtel Technip Joint Venture, Saudi Arabia Welding Inspector Client: Saudi Aramco Key Highlights:  Conducted material receipt inspection and ensured effective welding consumable control.  Led weld visual inspection of steel structures, piping as per ASME B31.3, ASME & other codes & standards.  Looked after radiographic film interpretations of welds as per ASME B 31.3.  Monitored and reviewed PWHT charts. Checked NDT requirement and prepared efficient material take number report during the assigned project.  Carried out NDT as per specifications and costumer requirement.  Interfaced with clients and resolved all Quality related matters.  Coordinated with Sub Contractors, Group Engineers and other discipline Engineers for achieving set objectives.  Ensured achievement of all preset commitments and provided timely report to the higher management. May’06 - Apr’08 Shaw Nass M.E W.L.L., Bahrain Mechanical & Welding Inspector Client: Dolphin Up compression Project -Japan gas corporation, Dolphin Energy Ltd., etc. Key Highlights:  Led Quality Control & Assurance activities involving: o Thorough study on various Structural and Piping drawings o Monitoring Weld joints preparation o Inspection of Fit-up and Tack Welds o Verification of Structure and Piping Dimensions o Before Welding, check proper parameters as per Pre-Welding checklist o During Welding, check proper parameters as per In-Process checklist o After Welding, check proper parameters as per post- Weld checklist o Co-ordinate dimension checks before and after Welding as per special Requirements o Review of the welder qualification test report o Make reports and update inspection summary o Witnessed NDT and review the NDT test report o Carried out Raw material inspection, verification of the mill certificates o Prepare Weekly welder Repair rate reports and monitoring reports o Prepare Weekly Welder’s Repair Assessment & Tracer Welds. o Conversant with Quality Assurance techniques NDE { UT,RT,MT & PT} o Evaluating ultrasonic Examination (Butt, ‘T’, ‘K’ & ‘Y’ joints) in panels,
  • 4. o NDT Co-ordination and weld repair rate calculation. Documentation and Reporting. o Evaluating Radiographic Films & Co-ordination with Third party external agencies ion. Exposing Radiographic films in pipelines, Headers, Tubes & Valves Casting. o Evaluating ultrasonic Examination in Pressure parts as well as Non-pressure parts, Boiler drum circems, long seams, tie rod scanning etc., & also doing special project job scanning lik e heat exchangers cladding, Buttering & Valves casting. o Evaluating Real time Radiography for welder Qualification pipe, tube & plates etc o Inspecting Magnetic Particle Examination in hand cock Valves production, Header cirseam, long seam in Dry method as well as wet method. o Inspecting penetrant examination in all welds like super heater, Heat exchanger, tube and modules o Carried out Ultrasonic Thickness Measurements and visual Inspections on o Structures, Piping & Turbo charger Etc., Oct’05 – Apr’06 Nasser AL Hajri, Qatar Mechanical & Welding Inspector Clients: Japan Gas Corporation, Dolphin Energy Ltd., etc. Key Highlights:  Led NDT work performance, film interpretation, training of local NDT personnel; conducted and supervised audits at sites.  Conducted non-destructive testing, particularly in the field of Ultrasonic examination of welds for clients.  Checked welding activities and ensured the same to be in Compliance as per applicable codes & standards &  Coordinated with NDE, PWHT for facilitating HT requirements.  Resolved technical queries with Project Management Superiors.  Reviewed material certificates, consumable test certificates, & calibration certificates of equipments.  Controlled electrode handling on daily basis.  Reviewed hydro-test packages. Jul’05 – Sep’05 Reliance associates Engineering Ltd., Jam Nagar Inspection Engineer Client: Reliance Petroleum Ltd., Jam Nagar Refinery, etc. Key Highlights:  Led shut down NDT work performance, film interpretation, training of local NDT personnel.  Conducted and supervised audits, non-destructive testing particularly in the field of Ultrasonic examination of welds for client.  Checked welding activities in compliance with applicable codes, standard & specifications.  Spearheaded welding procedures. Coordinated with: o NDE, PWHT for HT requirements. o Project Management Superiors for resolving technical issues.  Reviewed material certificates, consumable test certificates, & calibration certificates of equipment.  Controlled electrode handling on daily basis.  Reviewed hydro-test packages.  Carried out inspectional activities (calculation of corrosion rate, joint categories MAWP calculations, Pneumatic testing & Hydrostatic testing calculations). PREVIOUS ROLES Mar’03 – Jun’05 Ragmet Engineers, Mumbai QA & QC Engineer Client: Hindustan Petroleum Ltd., Mumbai Refinery, etc. Key Highlights:  Worked as a Site QA/QC Engineer/ Inspector and supervised site erection, commission and maintenance of Piping, Static and Rotary Equipment.  Led the work of local and NDT personnel, overseen all NDT work performance, film interpretation, training of local NDT personnel, procedures preparation, etc.  Conducted and supervised audits and site non-destructive testing, particularly field ultrasonic examination of welds for clients.  Looked after inspection of fabrication and welding work during projects covering pressure piping in accordance with section IX, API 1104, API510, ASMESEC-V, etc. o Approved quality control plan and inspection, test &plan in pipeline/ plan job.  Checked welding activities and ensured that the same were in compliance with applicable codes, standard & specifications. Approved welding procedures as and when required.  Coordinated with NDE, PWHT for HT requirements.  Resolved technical queries in coordination with Project Management Superiors.  Reviewed material certificates, consumable test certificates, & calibration certificates of equipment.  Ensured that only approved Electrodes, Wires, Fluxes & Gas are used.  Controlled Electrode handling on daily basis. Led daily checking of Welders I.D., WPS copy, Heating Torch, Tempil Stick, etc. Reviewed hydro- test packages.
  • 5. Nov’96 – Feb’03 L.G. Balakrishnan & Bros. Ltd., Madurai Inspection Engineer Clients: ELGI Equipment, JK Tyres, Fenner India Ltd., etc. Key Highlights:  Performed structural integrity and maintenance of static equipment (Pressure Vessels, Heat Exchangers, Columns, Boilers & its associated connections, etc.) and carried out visual, hydro & other applicable tests.  Led visual & survey assessment (Blisters, Cracks, Spalling, other forms of Deterioration Gasket, Nozzle, Manhole, Head Shell Conditions, Leaks, Shell Distortions, Signs of Settlements Corrosion, Conditions of the foundations, Paint Coatings, Insulation Systems and Appurtenances, etc.  Checked and maintained proper records of various safety conditions.  Looked after final vessels certification & documentation in accordance with requirements of API-510,572,576. ACADEMIC CREDENTIALS  Diploma in Mechanical Engineering from Tamil Nadu Technical Board, Madurai in 1994.  Bachelor of Technology in Mechanical Engineering CERTIFICATIONS  Successfully completed the following certifications: o ASNT Level – III in Radiographic Inspection (ASNT Certificate No. 169161). o American Welding Society –Senior Certified Welding Inspector (AWS- SCWI Certificate No. is 13120178 o American Welding Society – Certified Welding Inspector (AWS- CWI Certificate No. 05042111). o Certified Scheme of Welding Inspection Personnel CSWIP 3.1 (TWI-CSWIP 3.1, Certificate No. 25048). o Nace Certified Level – I Coating Inspector (Certificate No. 18965). o ASNT Level–II in MT, PT, UT & RTFI. o ISO 9001 Lead Auditor. IT PROFICIENCY  Well versed with: o 2D & 3D Drafting involving AutoCAD 2008, PRO–E, Solid Works 2009, Auto Desk-Inventor, etc. o MS Office including Word, Excel, PowerPoint, ACCESS, FoxPro, SQL, Visual Basic, etc. PERSONAL DETAILS Date of Birth 14th April 1975 Languages Known: English, Tamil, Malayalam and Hindi Address: 251 Ram Nagar 6th Street, Bye Pass Road, S.S. Colony, Madurai – 625016, Passport No.: J5655041 ( 28-01-2011 TO 27-01-2021)