Assuring Our
Assessments, Leaders
 and Team Member’s
     Quality and
Qualification Process
     and Quality
            Kobi Vider
         K.V.P Consulting
      Kobi.vider@hotmail.com
         kobivp@aol.com
         +972522946676
Agenda and Topics
•   Opening
•   The Internal and External Assessors Community
•   The Challenge Statement
•   The ‘Project’ Goals / Success Factors
•   Tool DEMO And Short Walkthrough
•   Results and Benefits
•   Conclusions and Recommendations
•   Future Plans
•   Discussion Points
Opening
• As for today most of major industries mainly defense and
  aerospace, as well as armed forces
• Which runs and mange large and complex programs
• Need to comply with more than just one quality standards
  in many disciplines (e.g. HW, optics, software)
• They use large groups of internal and external assessors
  that perform implementation checks, progress checks,
  readiness reviews and formal appraisals.
• These communities are typically composed from groups of
  very experienced and professional individuals
• These individuals have the best knowledge in their
  professional domain but not necessarily on how to conduct
  an efficient and effective appraisal which provide
  meaningful results.
The Internal and External
          Assessors Community
•   ~450 auditors (internal military staff and externals reserves)
•   ~80 externals (contractors, that perform audits for and on the XYZ
    ORG)
•   Few tens that are the contractors internal audits and assessments teams
    (quality wise)
•   ~200 quality engineers (full time)
•   ~150 quality practitioners / trustees (part time)
•   ~X00 project / program and acquisitions officers
The Challenge Statement
• The combination of the effort and expected
  resources increase the risks on qualification
  of auditors, domain knowledge, and
  calibration of results and findings
  effectiveness.
• When I have initial try to map the risks and
  challenges, I have discovered that the main
  ones are:
The Challenge Statement
• Large diversity in tailoring the methods for ‘of the
  same’ appraisal (such as scope, coverage, rating
  understanding)
• Inconsistency in ratings
• Inconsistency of interpretations
• Reports calibration for the same unit / group and
  on organizational level is very difficult if not
  impassible
• Performing quality assurance of the performed
  process is very challenging
The ‘Project’ Goals / Success
               Factors
•   Role based profile and criteria
•   Role development path
•   Calibration mechanism and criteria
•   Evaluation mechanism and criteria
•   Leveling the different quality engineers and
    ‘auditors’ in the XYZ ORG by specific
    performances and graduations
The ‘Project’ Goals / Success
             Factors
• Flowing specific trainings (on different levels) as
  personal development and qualification criteria
• Listing specific performances as indicators for
  leveling justifications
• Structuring the different audits and reporting
  guidelines in a single mandatory to follow (based
  on MDD and SLA-BOK) process, to increase
  calibration and quality of professional conduct and
  results (for process and meaningfully
  improvements)
3/14/2013
ISO 9000:2008 Correlation Snapshot
                                                                      20 are covered
                             Management
                             Responsibility

                       Measurement
                        Analysis &
                       Improvement

               Product
              Realization

        Resource
       Management

  Quality
Management
  System




                            REQM               SSD         OPP        DAR      RSKM

                       CAM              OT           QPM     M&A            IRP

              SAM             OPD              SST        PPQA        SCON

       PMC             OPF            IPM           OID          SD

 PP           CM             STSM             CAR
PMBOK Correlation Snapshot
                                                                           15 PAs are covered

                            Integration    Procurement       Risk    Communications    Human
                                                                                       Resource
                         Scope


                 Time


          Cost


Quality




                          REQM             SSD         OPP        DAR        RSKM

                        CAM          OT          QPM     M&A            IRP

             SAM              OPD          SST        PPQA          SCON

     PMC                OPF        IPM          OID          SD

PP               CM           STSM        CAR
ITIL           – CMMI Correlation Snapshot
                                    Service Delivery
                                   Financial Management
                                             for
                                        IT Services

                              Capacity
                             Management

                      IT Service
                Continuity Management


        Availability
        Management

Service Level
 Management




                                        REQM               SSD         OPP        DAR     RSKM

                                   CAM              OT           QPM     M&A            IRP

                          SAM              OPD             SST        PPQA        SCON

                 PMC              OPF             IPM           OID          SD

       PP                 CM              STSM            CAR
ITIL – CMMI Correlation Snapshot
                                               Service Support

                                               The Service Desk



                                     Incident Management



                          Problem Management


                     Configuration
                     Management


        Change Management



Release Management

                                     REQM                    SSD        OPP         DAR     RSKM

                                CAM               OT              QPM      M&A            IRP

                      SAM               OPD                SST          PPQA        SCON

           PMC                  OPF             IPM               OID          SD

    PP                 CM              STSM             CAR
ISO 20000 – CMMI
                                                 Correlation Snapshot
                                            Control processes          Planning and   Resolution processes    Release process
                                                                      implementing
                                                                service management
                               new or changed
                                  services

                         Service delivery
                             process


         Requirements for a
         management system


Relationship processes




                                      REQM                      SSD              OPP            DAR             RSKM

                                CAM                  OT                QPM            M&A                    IRP

                     SAM                    OPD                 SST           PPQA                SCON

           PMC                  OPF                IPM               OID                  SD

    PP                   CM             STSM              CAR
Supporting Tools for
   High Maturity
HLM ATM Training agenda
High Level Maturity Appraisal
  Team Member References
Statistical Methods
High Level Maturity   Chi-Square ..................................................................................................................................................... 4

                         Chi-Square Test for Goodness of Fit ......................................................................................................... 4

  Appraisal Team         Chi-Square Test for Independence ........................................................................................................... 5

                         Assumptions and Accuracy of the Chi-Square Test .................................................................................. 7

     Member           Common Cause of Variation ......................................................................................................................... 8

                      Continuous Probability Distribution ........................................................................................................... 11

    References        Control Chart ............................................................................................................................................... 14

                         Control Charts for Variables .................................................................................................................... 15

                      Design of Experiments (DOE) ...................................................................................................................... 19

                         Description .............................................................................................................................................. 19

                         When to Use DOE.................................................................................................................................... 19

                         DOE Procedure ........................................................................................................................................ 20

                      Discrete Probability Distributions ............................................................................................................... 22

                      One-sided Test ............................................................................................................................................ 22

                         Example ................................................................................................................................................... 23

                         Example ................................................................................................................................................... 24

                      One Sample t-test ....................................................................................................................................... 25

                      Two Sample t-test ....................................................................................................................................... 25

                      P-Value ........................................................................................................................................................ 26

                      Discrete Data ............................................................................................................................................... 26

                      Exponential Distribution ............................................................................................................................. 26

                             Probability density function ................................................................................................................ 26

                      Hypothesis Testing ...................................................................................................................................... 28

                         Null Hypothesis ....................................................................................................................................... 29

                         Alternative Hypothesis ............................................................................................................................ 29

                         Simple Hypothesis ................................................................................................................................... 29

                         Composite Hypothesis ............................................................................................................................ 30
Acknowledgments............................................................................................................................ 1


High Level Maturity
                  Table of Content .............................................................................................................................. 1
                  Abstract ............................................................................................................................................ 1


  Appraisal Team      1.1.
                      1.2.
                                 Purpose ............................................................................................................................ 2
                                 Objectives......................................................................................................................... 2
                      1.3.       CMMI Terminology .......................................................................................................... 2
     Member           1.4.       Industry Terminology ....................................................................................................... 2
                      1.5.       Terms and definitions ...................................................................................................... 2

    References        1.6.       Process Performance Models References in the CMMI Suite ......................................... 2
                      1.7.       Process Performance Models relationships with Measurements in the CMMI Suite ..... 2
                      1.8.       Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2
                      1.1        high level listen for in process performance models ....................................................... 4
                         1.1.1           Overview .................................................................................................................. 4
                         1.1.2           In Small Setting Organizations ................................................................................. 4
                         1.1.3           In Agile like development and teams ....................................................................... 4
                         1.1.4           In different type Organizations ................................................................................ 4
                         1.1.5           At Level 2 & 3 Organizations .................................................................................... 4
                         1.1.6           At Level 4 & 5 Organizations .................................................................................... 4
                      1.2        Business Objectives; quantitative objectives, Needs and Between ................................ 4
                         1.2.1           Business Objectives .................................................................................................. 4
                         1.2.2           Quantitative objectives ............................................................................................ 4
                      1.3        Analyzing the organization lifecycle and process ............................................................ 4
                         1.3.1           Key players in the process ........................................................................................ 4
                         1.3.2           Key users of performance models ........................................................................... 4
                         1.3.3           Key elements (building blocks) of the process......................................................... 4
                         1.3.4           Domain Specific Perspective .................................................................................... 4
                         1.3.5           Process perspective.................................................................................................. 4
                         1.3.6           Organizational Role Perspective .............................................................................. 4
                      3.1        Project Management Process Areas ................................................................................ 5
                  3.1.1       Project Planning (PP)                 5
PROCESS PERFORMANCE MODELS ........................................................................................................... 1

          APPLICATION AND APPROPRIATE USAGE (METHODOLOGY) .................................................................... 1


PPM-BOK      ACKNOWLEDGMENTS ....................................................................................................................................... 1
             TABLE OF CONTENT .......................................................................................................................................... 1
             ABSTRACT ...................................................................................................................................................... 6

          INTRODUCTION ........................................................................................................................................ 7

                 1.1.        Purpose ...................................................................................................................................... 7
                 1.2.        Objectives .................................................................................................................................. 7
                 1.3.        CMMI Terminology .................................................................................................................... 7
                 1.4.        Industry Terminology ................................................................................................................. 7
                 1.5.        Process Performance Models References in the CMMI Suite .................................................... 7
                 1.6.        Process Performance Models relationships with Measurements in the CMMI Suite ................ 7
                 1.7.        Relationships from PSP and TSP to support CMMI Measurements and high maturity ............. 7

          INTRODUCTION TO PROCESS PERFORMANCE MODELS ............................................................................ 8

                 1.1         Why to Measure the process performance ............................................................................... 8
                 1.2         What is all about? ..................................................................................................................... 8
                 1.3         Benefits from using process performance models ..................................................................... 9
                     1.3.1    Overview .............................................................................................................................................. 9
                     1.3.2    Application in Small Setting Organizations ........................................................................................... 9
                     1.3.3    Application in Agile like development and teams ................................................................................ 9
                     1.3.4    Application in different type Organizations ......................................................................................... 9
                        1.3.4.1     Software ..................................................................................................................................... 9
                        1.3.4.2     System ........................................................................................................................................ 9
                        1.3.4.3     Services ....................................................................................................................................... 9
                        1.3.4.4     Acquisition .................................................................................................................................. 9
                        1.3.4.5     Maintenance ............................................................................................................................... 9
                        1.3.4.6     Support ....................................................................................................................................... 9
                     1.3.5    Application and support low maturity organization ............................................................................. 9
                     1.3.6    At Level 2 & 3 Organizations ................................................................................................................ 9
                     1.3.7    At Level 4 & 5 Organizations ................................................................................................................ 9
                 1.4         The Measurements and Analysis Team ................................................................................... 10
                     1.4.1    As Organizational Level Functional Team ........................................................................................... 10
                        1.4.1.1     Position in the Organizational Structure ................................................................................... 10
                        1.4.1.2     Team Suggested Structure ........................................................................................................ 10
                        1.4.1.3     Team Roles, Responsibilities and authority .............................................................................. 10
                           1.4.1.3.1 Roles ..................................................................................................................................... 10
                           1.4.1.3.2 Responsibilities ..................................................................................................................... 10
                           1.4.1.3.3 Authority .............................................................................................................................. 10
                        1.4.1.4     Principles of Professional Conduct............................................................................................ 10
                        1.4.1.5     Basic Activities .......................................................................................................................... 10
                        1.4.1.6     Additional Activities .................................................................................................................. 10
                        1.4.1.7     Knowledge and Skills ................................................................................................................ 10
                        1.4.1.8     Personal Development Path ..................................................................................................... 10
                     1.4.2    As Group of Individuals ...................................................................................................................... 11
                        1.4.2.1     Position in the Business Organization Structure ....................................................................... 11
                        1.4.2.2     Position in the Quality Organization Structure ......................................................................... 11
Acknowledgments............................................................................................................................ 1
                      Table of Content .............................................................................................................................. 1
                      Abstract ............................................................................................................................................ 1
                         1.1.        Purpose ............................................................................................................................ 2
                         1.2.        Objectives......................................................................................................................... 2
                         1.3.        CMMI Terminology .......................................................................................................... 2
                         1.4.        Industry Terminology ....................................................................................................... 2
                         1.5.        Terms and definitions ...................................................................................................... 2
                         1.6.        Process Performance Models References in the CMMI Suite ......................................... 2
                         1.7.        Process Performance Models relationships with Measurements in the CMMI Suite ..... 2


High Level Maturity      1.8.
                         1.1
                                     Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2
                                     High level SCAMPI scripts for process performance models ........................................... 4
                             1.1.1           Overview .................................................................................................................. 4

  Lead Appraisal             1.1.2
                             1.1.3
                                             In Small Setting Organizations ................................................................................. 4
                                             In Agile like development and teams ....................................................................... 4

     Guideline               1.1.4
                             1.1.5
                                             In different type Organizations ................................................................................ 4
                                             At Level 2 & 3 Organizations .................................................................................... 4
                             1.1.6           At Level 4 & 5 Organizations .................................................................................... 4
                         1.2         SCAMPI scripts for Business Objectives; quantitative objectives, Needs and Between .. 4
                             1.2.1           Business Objectives .................................................................................................. 4
                             1.2.2           Quantitative objectives ............................................................................................ 4
                         1.3         SCAMPI scripts for analyzing the organization lifecycle and process .............................. 4
                             1.3.1           Key players in the process ........................................................................................ 4
                             1.3.2           Key users of performance models ........................................................................... 4
                             1.3.3           Key elements (building blocks) of the process......................................................... 4
                             1.3.4           Domain Specific Perspective .................................................................................... 4
                             1.3.5           Process perspective.................................................................................................. 4
                             1.3.6           Organizational Role Perspective .............................................................................. 4
                         3.1         Project Management Process Areas ................................................................................ 6
                      3.1.1       Project Planning (PP)                 6
Results and Benefits
Methodology conclusions.
• Model formulation is complex, but evaluation is straightforward.
• Standard tools, easy to integrate on domain cases.
• Method is better at capturing SMEs insights and project dynamics.
• Opportunity to further include additional domains


SME related conclusions (preliminary).
• Small units have better acceptance for audits
• Engineering related organizations have a good case for higher maturity levels
• Critical dependency on allowed investment horizon.
• Appraisal costs impacts on overall investment not dominant.
• Benefits for organizations operating at volatile (uncertain) segments.
Conclusions and Recommendations

• Method can be implemented in order to develop a decision
  support system in the management of new product
  development domain
• This model addresses various aspects of new product
  development over multiple stages, and easily can be
  adjusted to other domains
• The model can deal with quantitative and qualitative input
  and missing data
• Method can be implemented to address our managerial
  problems and to support our managers with strong ‘gate
  keepers’
• The implementation of a graphical user interface hiding the
  complexities of the method and model is significant
Future Plans
• Continue refinement of model.
   • Parameter ranges.
   • Roadmap involving multiple SCAMPI activities.
   • Complete Validation and Verification.
• Integrate work and receive feed from other
  initiatives.
• Continue sharing with other domains
Discussion Points
• Performance data
• Cost of poor planning
• Quantifying the operational impact
• Effecting and effected stakeholders
  mapping
• Quantifying the impact of support planning
  on the development teams
• Appling this model on other domains
Questions ?
Contact
      Kobi Vider
   K.V.P Consulting
Kobi.Vider@hotmail.com
   KobiVP@aol.com
 Phone: +972522946676

Contenu connexe

Tendances

Stl litigation support services..shivraj patil
Stl   litigation support services..shivraj patilStl   litigation support services..shivraj patil
Stl litigation support services..shivraj patilsraaj
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfInSync2011
 
Gtl Rim Capability Final V1 1
Gtl Rim Capability Final V1 1Gtl Rim Capability Final V1 1
Gtl Rim Capability Final V1 1sonnysonare
 
OpenErp for carpet industry
OpenErp for carpet industryOpenErp for carpet industry
OpenErp for carpet industryGaurav Kumar
 
Executive Presentation Homine
Executive Presentation HomineExecutive Presentation Homine
Executive Presentation HomineHomine Consulting
 
11.00 hr Tempelman
11.00 hr Tempelman11.00 hr Tempelman
11.00 hr TempelmanThemadagen
 
Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Franck Paduch
 
Open Air Corporate Overview
Open Air Corporate OverviewOpen Air Corporate Overview
Open Air Corporate OverviewMartin Powell
 
Gael Aviation Presentation
Gael Aviation PresentationGael Aviation Presentation
Gael Aviation Presentationeuanb
 
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...eyefortransport
 

Tendances (12)

Stl litigation support services..shivraj patil
Stl   litigation support services..shivraj patilStl   litigation support services..shivraj patil
Stl litigation support services..shivraj patil
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
 
Itil
ItilItil
Itil
 
Gtl Rim Capability Final V1 1
Gtl Rim Capability Final V1 1Gtl Rim Capability Final V1 1
Gtl Rim Capability Final V1 1
 
OpenErp for carpet industry
OpenErp for carpet industryOpenErp for carpet industry
OpenErp for carpet industry
 
Executive Presentation Homine
Executive Presentation HomineExecutive Presentation Homine
Executive Presentation Homine
 
Toc and kanban in embedded domain
Toc and kanban in embedded domainToc and kanban in embedded domain
Toc and kanban in embedded domain
 
11.00 hr Tempelman
11.00 hr Tempelman11.00 hr Tempelman
11.00 hr Tempelman
 
Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)
 
Open Air Corporate Overview
Open Air Corporate OverviewOpen Air Corporate Overview
Open Air Corporate Overview
 
Gael Aviation Presentation
Gael Aviation PresentationGael Aviation Presentation
Gael Aviation Presentation
 
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
 

En vedette

Everybody can use english 20100414
Everybody can use english 20100414Everybody can use english 20100414
Everybody can use english 20100414hquser
 
Cyberbullying w fakebook
Cyberbullying w fakebookCyberbullying w fakebook
Cyberbullying w fakebookmclardy
 
DINSON_INDUSTRIES_PROFILE_Brief EN_2014
DINSON_INDUSTRIES_PROFILE_Brief EN_2014DINSON_INDUSTRIES_PROFILE_Brief EN_2014
DINSON_INDUSTRIES_PROFILE_Brief EN_2014Kevin KONG
 
part24 中日战争,1937-1945 b
part24 中日战争,1937-1945 bpart24 中日战争,1937-1945 b
part24 中日战争,1937-1945 bcandidate
 
Posterior Lumbar Interbody Fusion (PLIF)
Posterior Lumbar Interbody Fusion (PLIF)Posterior Lumbar Interbody Fusion (PLIF)
Posterior Lumbar Interbody Fusion (PLIF)bsni
 
Grammar book
Grammar bookGrammar book
Grammar booksc79420
 
Terrible Issue Faching By Children Home And Abroad
Terrible Issue Faching By Children Home And AbroadTerrible Issue Faching By Children Home And Abroad
Terrible Issue Faching By Children Home And AbroadØ.f. Âbù Ràîhäñ
 
Java web and application development services
Java web and application development servicesJava web and application development services
Java web and application development servicesNexSoftsys
 
A permanência na educação superior revista anpae
A permanência na educação superior   revista anpae A permanência na educação superior   revista anpae
A permanência na educação superior revista anpae Felipe Vieira Gimenez
 
HAOTECH SOLAR APPLICATION
HAOTECH SOLAR APPLICATIONHAOTECH SOLAR APPLICATION
HAOTECH SOLAR APPLICATIONElmer Wong
 
Spolupráce ppp
Spolupráce pppSpolupráce ppp
Spolupráce pppjanarem
 
Draw wire sensor - Pdw 2000 p
Draw wire sensor - Pdw 2000 pDraw wire sensor - Pdw 2000 p
Draw wire sensor - Pdw 2000 pRajendra Singh
 

En vedette (20)

Everybody can use english 20100414
Everybody can use english 20100414Everybody can use english 20100414
Everybody can use english 20100414
 
12345qq
12345qq12345qq
12345qq
 
Rqa14 secondary
Rqa14 secondaryRqa14 secondary
Rqa14 secondary
 
Cyberbullying w fakebook
Cyberbullying w fakebookCyberbullying w fakebook
Cyberbullying w fakebook
 
Action profiles in sap
Action profiles in sapAction profiles in sap
Action profiles in sap
 
DINSON_INDUSTRIES_PROFILE_Brief EN_2014
DINSON_INDUSTRIES_PROFILE_Brief EN_2014DINSON_INDUSTRIES_PROFILE_Brief EN_2014
DINSON_INDUSTRIES_PROFILE_Brief EN_2014
 
part24 中日战争,1937-1945 b
part24 中日战争,1937-1945 bpart24 中日战争,1937-1945 b
part24 中日战争,1937-1945 b
 
Sa Sw of Co 8
Sa Sw of Co 8 Sa Sw of Co 8
Sa Sw of Co 8
 
Posterior Lumbar Interbody Fusion (PLIF)
Posterior Lumbar Interbody Fusion (PLIF)Posterior Lumbar Interbody Fusion (PLIF)
Posterior Lumbar Interbody Fusion (PLIF)
 
Grammar book
Grammar bookGrammar book
Grammar book
 
Terrible Issue Faching By Children Home And Abroad
Terrible Issue Faching By Children Home And AbroadTerrible Issue Faching By Children Home And Abroad
Terrible Issue Faching By Children Home And Abroad
 
Fghfdgh
FghfdghFghfdgh
Fghfdgh
 
Two types of private lessons
Two types of private lessonsTwo types of private lessons
Two types of private lessons
 
2modul 2tema
2modul 2tema2modul 2tema
2modul 2tema
 
Java web and application development services
Java web and application development servicesJava web and application development services
Java web and application development services
 
A permanência na educação superior revista anpae
A permanência na educação superior   revista anpae A permanência na educação superior   revista anpae
A permanência na educação superior revista anpae
 
Osi district 19
Osi district 19Osi district 19
Osi district 19
 
HAOTECH SOLAR APPLICATION
HAOTECH SOLAR APPLICATIONHAOTECH SOLAR APPLICATION
HAOTECH SOLAR APPLICATION
 
Spolupráce ppp
Spolupráce pppSpolupráce ppp
Spolupráce ppp
 
Draw wire sensor - Pdw 2000 p
Draw wire sensor - Pdw 2000 pDraw wire sensor - Pdw 2000 p
Draw wire sensor - Pdw 2000 p
 

Similaire à Assuring assessments leaders team member’s quality and qualification

ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsRich Laguna
 
Cmmi constellations.pptx
Cmmi constellations.pptxCmmi constellations.pptx
Cmmi constellations.pptxAndré Heijstek
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013Sammy Saba
 
Vaibhav Misra Telecom Wireless Operations Management Consulting Presentation
Vaibhav Misra Telecom Wireless Operations Management Consulting PresentationVaibhav Misra Telecom Wireless Operations Management Consulting Presentation
Vaibhav Misra Telecom Wireless Operations Management Consulting PresentationVaibhav Misra
 
ITIL involvement in itil processes
ITIL involvement in itil processesITIL involvement in itil processes
ITIL involvement in itil processesbrunodeepak
 
Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Kaushik S. Gandhi
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
PPM STUDIO for CMMI
PPM STUDIO for CMMIPPM STUDIO for CMMI
PPM STUDIO for CMMIPPM Studio
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXBAmor Group
 
IAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
Siom Corporate Presentation 2011
Siom Corporate Presentation 2011 Siom Corporate Presentation 2011
Siom Corporate Presentation 2011 Rahul Chaudhary
 

Similaire à Assuring assessments leaders team member’s quality and qualification (20)

Bsm master
Bsm   masterBsm   master
Bsm master
 
ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt Reviews
 
Cmmi constellations.pptx
Cmmi constellations.pptxCmmi constellations.pptx
Cmmi constellations.pptx
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
 
Process improvement buzz word decoder by @ecgstudio
Process improvement buzz word decoder by @ecgstudioProcess improvement buzz word decoder by @ecgstudio
Process improvement buzz word decoder by @ecgstudio
 
Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]
 
Vaibhav Misra Telecom Wireless Operations Management Consulting Presentation
Vaibhav Misra Telecom Wireless Operations Management Consulting PresentationVaibhav Misra Telecom Wireless Operations Management Consulting Presentation
Vaibhav Misra Telecom Wireless Operations Management Consulting Presentation
 
ITIL involvement in itil processes
ITIL involvement in itil processesITIL involvement in itil processes
ITIL involvement in itil processes
 
TTM extended managed services framework - High Level Overview
TTM extended managed services framework - High Level OverviewTTM extended managed services framework - High Level Overview
TTM extended managed services framework - High Level Overview
 
Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
PPM STUDIO for CMMI
PPM STUDIO for CMMIPPM STUDIO for CMMI
PPM STUDIO for CMMI
 
Presentation
PresentationPresentation
Presentation
 
Enabling the next generation airport at DXB
Enabling the next generation airport at DXBEnabling the next generation airport at DXB
Enabling the next generation airport at DXB
 
Apagen company profile
Apagen company profileApagen company profile
Apagen company profile
 
IAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions Corporate Presentation
IAPsolutions Corporate Presentation
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
Operations Careers
Operations CareersOperations Careers
Operations Careers
 
Siom Corporate Presentation 2011
Siom Corporate Presentation 2011 Siom Corporate Presentation 2011
Siom Corporate Presentation 2011
 

Plus de Kobi Vider

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagramKobi Vider
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceKobi Vider
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guideKobi Vider
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolKobi Vider
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processesKobi Vider
 
Customer value management
Customer value managementCustomer value management
Customer value managementKobi Vider
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product qualityKobi Vider
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmiKobi Vider
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian networkKobi Vider
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcKobi Vider
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfdKobi Vider
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people Kobi Vider
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carKobi Vider
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kitKobi Vider
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk managementKobi Vider
 
Configuration management
Configuration managementConfiguration management
Configuration managementKobi Vider
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total costKobi Vider
 
Cmmi and quality practices to support military operational readiness
Cmmi and quality practices to support military operational readinessCmmi and quality practices to support military operational readiness
Cmmi and quality practices to support military operational readinessKobi Vider
 

Plus de Kobi Vider (20)

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagram
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importance
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guide
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing tool
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processes
 
Customer value management
Customer value managementCustomer value management
Customer value management
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product quality
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmi
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian network
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svc
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfd
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, car
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kit
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk management
 
Configuration management
Configuration managementConfiguration management
Configuration management
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
 
Cmmi and quality practices to support military operational readiness
Cmmi and quality practices to support military operational readinessCmmi and quality practices to support military operational readiness
Cmmi and quality practices to support military operational readiness
 

Assuring assessments leaders team member’s quality and qualification

  • 1. Assuring Our Assessments, Leaders and Team Member’s Quality and Qualification Process and Quality Kobi Vider K.V.P Consulting Kobi.vider@hotmail.com kobivp@aol.com +972522946676
  • 2. Agenda and Topics • Opening • The Internal and External Assessors Community • The Challenge Statement • The ‘Project’ Goals / Success Factors • Tool DEMO And Short Walkthrough • Results and Benefits • Conclusions and Recommendations • Future Plans • Discussion Points
  • 3. Opening • As for today most of major industries mainly defense and aerospace, as well as armed forces • Which runs and mange large and complex programs • Need to comply with more than just one quality standards in many disciplines (e.g. HW, optics, software) • They use large groups of internal and external assessors that perform implementation checks, progress checks, readiness reviews and formal appraisals. • These communities are typically composed from groups of very experienced and professional individuals • These individuals have the best knowledge in their professional domain but not necessarily on how to conduct an efficient and effective appraisal which provide meaningful results.
  • 4. The Internal and External Assessors Community • ~450 auditors (internal military staff and externals reserves) • ~80 externals (contractors, that perform audits for and on the XYZ ORG) • Few tens that are the contractors internal audits and assessments teams (quality wise) • ~200 quality engineers (full time) • ~150 quality practitioners / trustees (part time) • ~X00 project / program and acquisitions officers
  • 5. The Challenge Statement • The combination of the effort and expected resources increase the risks on qualification of auditors, domain knowledge, and calibration of results and findings effectiveness. • When I have initial try to map the risks and challenges, I have discovered that the main ones are:
  • 6. The Challenge Statement • Large diversity in tailoring the methods for ‘of the same’ appraisal (such as scope, coverage, rating understanding) • Inconsistency in ratings • Inconsistency of interpretations • Reports calibration for the same unit / group and on organizational level is very difficult if not impassible • Performing quality assurance of the performed process is very challenging
  • 7. The ‘Project’ Goals / Success Factors • Role based profile and criteria • Role development path • Calibration mechanism and criteria • Evaluation mechanism and criteria • Leveling the different quality engineers and ‘auditors’ in the XYZ ORG by specific performances and graduations
  • 8. The ‘Project’ Goals / Success Factors • Flowing specific trainings (on different levels) as personal development and qualification criteria • Listing specific performances as indicators for leveling justifications • Structuring the different audits and reporting guidelines in a single mandatory to follow (based on MDD and SLA-BOK) process, to increase calibration and quality of professional conduct and results (for process and meaningfully improvements)
  • 10.
  • 11.
  • 12. ISO 9000:2008 Correlation Snapshot 20 are covered Management Responsibility Measurement Analysis & Improvement Product Realization Resource Management Quality Management System REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 13. PMBOK Correlation Snapshot 15 PAs are covered Integration Procurement Risk Communications Human Resource Scope Time Cost Quality REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 14. ITIL – CMMI Correlation Snapshot Service Delivery Financial Management for IT Services Capacity Management IT Service Continuity Management Availability Management Service Level Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 15. ITIL – CMMI Correlation Snapshot Service Support The Service Desk Incident Management Problem Management Configuration Management Change Management Release Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 16. ISO 20000 – CMMI Correlation Snapshot Control processes Planning and Resolution processes Release process implementing service management new or changed services Service delivery process Requirements for a management system Relationship processes REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. Supporting Tools for High Maturity
  • 23. High Level Maturity Appraisal Team Member References
  • 24. Statistical Methods High Level Maturity Chi-Square ..................................................................................................................................................... 4 Chi-Square Test for Goodness of Fit ......................................................................................................... 4 Appraisal Team Chi-Square Test for Independence ........................................................................................................... 5 Assumptions and Accuracy of the Chi-Square Test .................................................................................. 7 Member Common Cause of Variation ......................................................................................................................... 8 Continuous Probability Distribution ........................................................................................................... 11 References Control Chart ............................................................................................................................................... 14 Control Charts for Variables .................................................................................................................... 15 Design of Experiments (DOE) ...................................................................................................................... 19 Description .............................................................................................................................................. 19 When to Use DOE.................................................................................................................................... 19 DOE Procedure ........................................................................................................................................ 20 Discrete Probability Distributions ............................................................................................................... 22 One-sided Test ............................................................................................................................................ 22 Example ................................................................................................................................................... 23 Example ................................................................................................................................................... 24 One Sample t-test ....................................................................................................................................... 25 Two Sample t-test ....................................................................................................................................... 25 P-Value ........................................................................................................................................................ 26 Discrete Data ............................................................................................................................................... 26 Exponential Distribution ............................................................................................................................. 26 Probability density function ................................................................................................................ 26 Hypothesis Testing ...................................................................................................................................... 28 Null Hypothesis ....................................................................................................................................... 29 Alternative Hypothesis ............................................................................................................................ 29 Simple Hypothesis ................................................................................................................................... 29 Composite Hypothesis ............................................................................................................................ 30
  • 25. Acknowledgments............................................................................................................................ 1 High Level Maturity Table of Content .............................................................................................................................. 1 Abstract ............................................................................................................................................ 1 Appraisal Team 1.1. 1.2. Purpose ............................................................................................................................ 2 Objectives......................................................................................................................... 2 1.3. CMMI Terminology .......................................................................................................... 2 Member 1.4. Industry Terminology ....................................................................................................... 2 1.5. Terms and definitions ...................................................................................................... 2 References 1.6. Process Performance Models References in the CMMI Suite ......................................... 2 1.7. Process Performance Models relationships with Measurements in the CMMI Suite ..... 2 1.8. Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2 1.1 high level listen for in process performance models ....................................................... 4 1.1.1 Overview .................................................................................................................. 4 1.1.2 In Small Setting Organizations ................................................................................. 4 1.1.3 In Agile like development and teams ....................................................................... 4 1.1.4 In different type Organizations ................................................................................ 4 1.1.5 At Level 2 & 3 Organizations .................................................................................... 4 1.1.6 At Level 4 & 5 Organizations .................................................................................... 4 1.2 Business Objectives; quantitative objectives, Needs and Between ................................ 4 1.2.1 Business Objectives .................................................................................................. 4 1.2.2 Quantitative objectives ............................................................................................ 4 1.3 Analyzing the organization lifecycle and process ............................................................ 4 1.3.1 Key players in the process ........................................................................................ 4 1.3.2 Key users of performance models ........................................................................... 4 1.3.3 Key elements (building blocks) of the process......................................................... 4 1.3.4 Domain Specific Perspective .................................................................................... 4 1.3.5 Process perspective.................................................................................................. 4 1.3.6 Organizational Role Perspective .............................................................................. 4 3.1 Project Management Process Areas ................................................................................ 5 3.1.1 Project Planning (PP) 5
  • 26. PROCESS PERFORMANCE MODELS ........................................................................................................... 1 APPLICATION AND APPROPRIATE USAGE (METHODOLOGY) .................................................................... 1 PPM-BOK ACKNOWLEDGMENTS ....................................................................................................................................... 1 TABLE OF CONTENT .......................................................................................................................................... 1 ABSTRACT ...................................................................................................................................................... 6 INTRODUCTION ........................................................................................................................................ 7 1.1. Purpose ...................................................................................................................................... 7 1.2. Objectives .................................................................................................................................. 7 1.3. CMMI Terminology .................................................................................................................... 7 1.4. Industry Terminology ................................................................................................................. 7 1.5. Process Performance Models References in the CMMI Suite .................................................... 7 1.6. Process Performance Models relationships with Measurements in the CMMI Suite ................ 7 1.7. Relationships from PSP and TSP to support CMMI Measurements and high maturity ............. 7 INTRODUCTION TO PROCESS PERFORMANCE MODELS ............................................................................ 8 1.1 Why to Measure the process performance ............................................................................... 8 1.2 What is all about? ..................................................................................................................... 8 1.3 Benefits from using process performance models ..................................................................... 9 1.3.1 Overview .............................................................................................................................................. 9 1.3.2 Application in Small Setting Organizations ........................................................................................... 9 1.3.3 Application in Agile like development and teams ................................................................................ 9 1.3.4 Application in different type Organizations ......................................................................................... 9 1.3.4.1 Software ..................................................................................................................................... 9 1.3.4.2 System ........................................................................................................................................ 9 1.3.4.3 Services ....................................................................................................................................... 9 1.3.4.4 Acquisition .................................................................................................................................. 9 1.3.4.5 Maintenance ............................................................................................................................... 9 1.3.4.6 Support ....................................................................................................................................... 9 1.3.5 Application and support low maturity organization ............................................................................. 9 1.3.6 At Level 2 & 3 Organizations ................................................................................................................ 9 1.3.7 At Level 4 & 5 Organizations ................................................................................................................ 9 1.4 The Measurements and Analysis Team ................................................................................... 10 1.4.1 As Organizational Level Functional Team ........................................................................................... 10 1.4.1.1 Position in the Organizational Structure ................................................................................... 10 1.4.1.2 Team Suggested Structure ........................................................................................................ 10 1.4.1.3 Team Roles, Responsibilities and authority .............................................................................. 10 1.4.1.3.1 Roles ..................................................................................................................................... 10 1.4.1.3.2 Responsibilities ..................................................................................................................... 10 1.4.1.3.3 Authority .............................................................................................................................. 10 1.4.1.4 Principles of Professional Conduct............................................................................................ 10 1.4.1.5 Basic Activities .......................................................................................................................... 10 1.4.1.6 Additional Activities .................................................................................................................. 10 1.4.1.7 Knowledge and Skills ................................................................................................................ 10 1.4.1.8 Personal Development Path ..................................................................................................... 10 1.4.2 As Group of Individuals ...................................................................................................................... 11 1.4.2.1 Position in the Business Organization Structure ....................................................................... 11 1.4.2.2 Position in the Quality Organization Structure ......................................................................... 11
  • 27. Acknowledgments............................................................................................................................ 1 Table of Content .............................................................................................................................. 1 Abstract ............................................................................................................................................ 1 1.1. Purpose ............................................................................................................................ 2 1.2. Objectives......................................................................................................................... 2 1.3. CMMI Terminology .......................................................................................................... 2 1.4. Industry Terminology ....................................................................................................... 2 1.5. Terms and definitions ...................................................................................................... 2 1.6. Process Performance Models References in the CMMI Suite ......................................... 2 1.7. Process Performance Models relationships with Measurements in the CMMI Suite ..... 2 High Level Maturity 1.8. 1.1 Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2 High level SCAMPI scripts for process performance models ........................................... 4 1.1.1 Overview .................................................................................................................. 4 Lead Appraisal 1.1.2 1.1.3 In Small Setting Organizations ................................................................................. 4 In Agile like development and teams ....................................................................... 4 Guideline 1.1.4 1.1.5 In different type Organizations ................................................................................ 4 At Level 2 & 3 Organizations .................................................................................... 4 1.1.6 At Level 4 & 5 Organizations .................................................................................... 4 1.2 SCAMPI scripts for Business Objectives; quantitative objectives, Needs and Between .. 4 1.2.1 Business Objectives .................................................................................................. 4 1.2.2 Quantitative objectives ............................................................................................ 4 1.3 SCAMPI scripts for analyzing the organization lifecycle and process .............................. 4 1.3.1 Key players in the process ........................................................................................ 4 1.3.2 Key users of performance models ........................................................................... 4 1.3.3 Key elements (building blocks) of the process......................................................... 4 1.3.4 Domain Specific Perspective .................................................................................... 4 1.3.5 Process perspective.................................................................................................. 4 1.3.6 Organizational Role Perspective .............................................................................. 4 3.1 Project Management Process Areas ................................................................................ 6 3.1.1 Project Planning (PP) 6
  • 28. Results and Benefits Methodology conclusions. • Model formulation is complex, but evaluation is straightforward. • Standard tools, easy to integrate on domain cases. • Method is better at capturing SMEs insights and project dynamics. • Opportunity to further include additional domains SME related conclusions (preliminary). • Small units have better acceptance for audits • Engineering related organizations have a good case for higher maturity levels • Critical dependency on allowed investment horizon. • Appraisal costs impacts on overall investment not dominant. • Benefits for organizations operating at volatile (uncertain) segments.
  • 29. Conclusions and Recommendations • Method can be implemented in order to develop a decision support system in the management of new product development domain • This model addresses various aspects of new product development over multiple stages, and easily can be adjusted to other domains • The model can deal with quantitative and qualitative input and missing data • Method can be implemented to address our managerial problems and to support our managers with strong ‘gate keepers’ • The implementation of a graphical user interface hiding the complexities of the method and model is significant
  • 30. Future Plans • Continue refinement of model. • Parameter ranges. • Roadmap involving multiple SCAMPI activities. • Complete Validation and Verification. • Integrate work and receive feed from other initiatives. • Continue sharing with other domains
  • 31. Discussion Points • Performance data • Cost of poor planning • Quantifying the operational impact • Effecting and effected stakeholders mapping • Quantifying the impact of support planning on the development teams • Appling this model on other domains
  • 33. Contact Kobi Vider K.V.P Consulting Kobi.Vider@hotmail.com KobiVP@aol.com Phone: +972522946676