SlideShare une entreprise Scribd logo
1  sur  18
_____________ D-studio@_ 100831 slide1
4D Virtual Builder
‘Enabling the decision makers with
an visual overview of all steps
the project requires’
Frank Konings, Kliaplan Malysia
‘Effectively plan projects and demonstrate
this to our clients’
Kyp Kyprianou, Bam UK
_____________ D-studio@_ 100831 slide2
 Mechelen-Belgium / Schiedam-Holland
 Software – Services - Consultancy
 Project Data Integration-Centralization
 4D-5D-xD models
 4D solutions since 1999 - CAD expertise since 1984
 Markets:
 AEC (Architectural, Engineering and Construction)
 GIS (Geographical Information System)
 BIM (Building Information Modeling)
 PIM (Product Information Management)
 Main product line: 4D/xD Virtual Builder
 Full project data integration
 No data duplication
 Automated Project workbooks
 Project information sharing on everyones level
 Clients: BAM, PRC/ARCADIS, Eurostation (Station Brugges and Ghent), ERA
Contour, Amsterdam City (IBA), Erasmus and Viecuri hospital, University of
Leuven-Sydney-Liege, Deutsche Bank, Rabobank, Utrecht City (POS),...
The Dimension Studio
_____________ D-studio@_ 100831 slide3
+4D = CAD 2D/3D + Planning
Dynamic link between 2D/3D Objecten (AutoCAD, DesignCad, Sketchup, Microstation)
and Planning
xD = 4D + Attributes
Dynamic link between 2D/3D Objecten, Planning and other project data
(Costs, Functions, Parking spaces, ...)
4D Virtual Builder
_____________ D-studio@_ 100831 slide4
xD Virtual Builder Solution
_____________ D-studio@_ 100831 slide5
Advantages:
 Enhanced Communication:
Understandable communication on planning (internal and external);
 Analyzing:
Visualization of the planning leading to more accurate planning;
 Monitoring:
Close follow up on delays and resource problems;
 Sharing:
All members involved have the same view on the project;
 Reducing Costs:
Less time loss.
‘Effectively plan projects and demonstrate
this to our clients’
Kyp Kyprianou, Bam UK
Advantages
_____________ D-studio@_ 100831 slide6
Strong points:
 Learning Curve:
After basic training, easy and fast usable in every project;
 Direct Linking:
No import or duplication of data. All information remains in the native software;
 Centralized database:
All members involved can access the projects if necessary;
 Customizable:
Software architecture (Framework) ensures easy integration of data from other applications;
 User-friendly:
Several modules depending on the end-user wishes and use (Full-Pro-Lite);
 Flexibility:
Flexible and fast support;
 Automation:
Quickly generate new workbooks (tender document) based on updated information.
 Link with Google Sketchup:
2D/3D modelling made easy
Strong points
_____________ D-studio@_ 100831 slide7
Fields of Application:
 Construction
 Infrastructure
 Move management
 GIS
 Space Management
 ...
Fields of Application
_____________ D-studio@_ 100831 slide8
xD Applications
mgt SIGmgt INFRAmgt ESPACE
mgt CONSTRUCTIONmgt INFRAmgt DEMENAGEMENT
_____________ D-studio@_ 100831 slide9
xD Virtual Builder for Sketchup modules
xD Virtual BuilderxD Virtual Builder
LightLight
xD Virtual BuilderxD Virtual Builder
ProfessionalProfessional
xD Virtual BuilderxD Virtual Builder
UltimateUltimate
xD Virtual BuilderxD Virtual Builder
FullFull
Easy to use and fastEasy to use and fast
No direct link toNo direct link to
databasedatabase
Limited level of detailLimited level of detail
Instant 4D modelInstant 4D model
TimemgtTimemgt
Early project phasesEarly project phases
Easy to use, fastEasy to use, fast
Import/ExportImport/Export
planningdataplanningdata
Limited level of detailLimited level of detail
Instant 4D modelInstant 4D model
TimemgtTimemgt
Costmgt: optionCostmgt: option
Early project phasesEarly project phases
Easy to use, fast,Easy to use, fast,
directdirect
Synchronization withSynchronization with
planning dataplanning data
Unlimited level ofUnlimited level of
detaildetail
4D/xD model4D/xD model
TimemgtTimemgt
Costmgt: in progressCostmgt: in progress
All phasesAll phases
Full solutionFull solution
Direct andDirect and
continuouscontinuous
synchronization withsynchronization with
planningplanning
Unlimited level ofUnlimited level of
detaildetail
Complex 4D/xDComplex 4D/xD
model for all queriesmodel for all queries
TimemgtTimemgt
CostmgtCostmgt
Comparisons, ...Comparisons, ...
All phasesAll phases
_____________ D-studio@_ 100831 slide10
Demo
 Linking objects from Google SketchUp to Asta Powerproject;
 Navigating through time;
 Modify the schedule and reload;
 Showing a Powerpoint slideshow from a model.
Future development – see further
 Progress visualisation;
 Project Dashboard;
 xD-Ultimate with Excel real-time data server.
xD Virtual Builder for Sketchup modules
_____________ D-studio@_ 100831 slide11
xD Dashboard
_____________ D-studio@_ 100831 slide12
VU Amsterdam– september 09
_____________ D-studio@_ 100831 slide13
DELFT OSB – 2009/2010
_____________ D-studio@_ 100831 slide14
COA studies – september 09
_____________ D-studio@_ 100831 slide15
Oosterheem
_____________ D-studio@_ 100831 slide16
VIECURI movement
_____________ D-studio@_ 100831 slide17
Rabo Bank - Utrecht – 2006 – actual state
_____________ D-studio@_ 100831 slide22
… Thank You for your Attention

Contenu connexe

Tendances (6)

Wayne_Atkinson_Resume_1May16
Wayne_Atkinson_Resume_1May16Wayne_Atkinson_Resume_1May16
Wayne_Atkinson_Resume_1May16
 
Building business applications with DMN and BPMN
Building business applications with DMN and BPMNBuilding business applications with DMN and BPMN
Building business applications with DMN and BPMN
 
MicroStation Product Datasheet
MicroStation Product DatasheetMicroStation Product Datasheet
MicroStation Product Datasheet
 
GIS and CAD Integration: The Bentley Perspective
GIS and CAD Integration: The Bentley PerspectiveGIS and CAD Integration: The Bentley Perspective
GIS and CAD Integration: The Bentley Perspective
 
Cadison project-navigator
Cadison project-navigatorCadison project-navigator
Cadison project-navigator
 
Asta Powerproject: Business Case
Asta Powerproject: Business CaseAsta Powerproject: Business Case
Asta Powerproject: Business Case
 

Similaire à D-studio 4D visualisation for Google SketchUp

Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
CADISON
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10
CADISON
 

Similaire à D-studio 4D visualisation for Google SketchUp (20)

Improve Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationImprove Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data Integration
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
 
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptx
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptxIndonesia Truck Entry Project Proposal (1) [Autosaved].pptx
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptx
 
Bkl_12_9_T_0515
Bkl_12_9_T_0515Bkl_12_9_T_0515
Bkl_12_9_T_0515
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
IBM Think Milano
IBM Think MilanoIBM Think Milano
IBM Think Milano
 
Virtual Property vs. Digital Twin
Virtual Property vs. Digital TwinVirtual Property vs. Digital Twin
Virtual Property vs. Digital Twin
 
Capella Days 2021 | An example of model-centric engineering environment with ...
Capella Days 2021 | An example of model-centric engineering environment with ...Capella Days 2021 | An example of model-centric engineering environment with ...
Capella Days 2021 | An example of model-centric engineering environment with ...
 
Manjunath_Jadhav
Manjunath_JadhavManjunath_Jadhav
Manjunath_Jadhav
 
Meetup 21/9/2017 - Image Recogonition: onmisbaar voor een slimme stad?
Meetup 21/9/2017 - Image Recogonition: onmisbaar voor een slimme stad?Meetup 21/9/2017 - Image Recogonition: onmisbaar voor een slimme stad?
Meetup 21/9/2017 - Image Recogonition: onmisbaar voor een slimme stad?
 
Islam Salah Elshenawy Elshenawy - Software Testing Lead Specialist
Islam Salah Elshenawy Elshenawy - Software Testing Lead SpecialistIslam Salah Elshenawy Elshenawy - Software Testing Lead Specialist
Islam Salah Elshenawy Elshenawy - Software Testing Lead Specialist
 
VCS.REDDY_PLM
VCS.REDDY_PLMVCS.REDDY_PLM
VCS.REDDY_PLM
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Software team linkedin
Software team linkedinSoftware team linkedin
Software team linkedin
 

Dernier

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Dernier (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

D-studio 4D visualisation for Google SketchUp

  • 1. _____________ D-studio@_ 100831 slide1 4D Virtual Builder ‘Enabling the decision makers with an visual overview of all steps the project requires’ Frank Konings, Kliaplan Malysia ‘Effectively plan projects and demonstrate this to our clients’ Kyp Kyprianou, Bam UK
  • 2. _____________ D-studio@_ 100831 slide2  Mechelen-Belgium / Schiedam-Holland  Software – Services - Consultancy  Project Data Integration-Centralization  4D-5D-xD models  4D solutions since 1999 - CAD expertise since 1984  Markets:  AEC (Architectural, Engineering and Construction)  GIS (Geographical Information System)  BIM (Building Information Modeling)  PIM (Product Information Management)  Main product line: 4D/xD Virtual Builder  Full project data integration  No data duplication  Automated Project workbooks  Project information sharing on everyones level  Clients: BAM, PRC/ARCADIS, Eurostation (Station Brugges and Ghent), ERA Contour, Amsterdam City (IBA), Erasmus and Viecuri hospital, University of Leuven-Sydney-Liege, Deutsche Bank, Rabobank, Utrecht City (POS),... The Dimension Studio
  • 3. _____________ D-studio@_ 100831 slide3 +4D = CAD 2D/3D + Planning Dynamic link between 2D/3D Objecten (AutoCAD, DesignCad, Sketchup, Microstation) and Planning xD = 4D + Attributes Dynamic link between 2D/3D Objecten, Planning and other project data (Costs, Functions, Parking spaces, ...) 4D Virtual Builder
  • 4. _____________ D-studio@_ 100831 slide4 xD Virtual Builder Solution
  • 5. _____________ D-studio@_ 100831 slide5 Advantages:  Enhanced Communication: Understandable communication on planning (internal and external);  Analyzing: Visualization of the planning leading to more accurate planning;  Monitoring: Close follow up on delays and resource problems;  Sharing: All members involved have the same view on the project;  Reducing Costs: Less time loss. ‘Effectively plan projects and demonstrate this to our clients’ Kyp Kyprianou, Bam UK Advantages
  • 6. _____________ D-studio@_ 100831 slide6 Strong points:  Learning Curve: After basic training, easy and fast usable in every project;  Direct Linking: No import or duplication of data. All information remains in the native software;  Centralized database: All members involved can access the projects if necessary;  Customizable: Software architecture (Framework) ensures easy integration of data from other applications;  User-friendly: Several modules depending on the end-user wishes and use (Full-Pro-Lite);  Flexibility: Flexible and fast support;  Automation: Quickly generate new workbooks (tender document) based on updated information.  Link with Google Sketchup: 2D/3D modelling made easy Strong points
  • 7. _____________ D-studio@_ 100831 slide7 Fields of Application:  Construction  Infrastructure  Move management  GIS  Space Management  ... Fields of Application
  • 8. _____________ D-studio@_ 100831 slide8 xD Applications mgt SIGmgt INFRAmgt ESPACE mgt CONSTRUCTIONmgt INFRAmgt DEMENAGEMENT
  • 9. _____________ D-studio@_ 100831 slide9 xD Virtual Builder for Sketchup modules xD Virtual BuilderxD Virtual Builder LightLight xD Virtual BuilderxD Virtual Builder ProfessionalProfessional xD Virtual BuilderxD Virtual Builder UltimateUltimate xD Virtual BuilderxD Virtual Builder FullFull Easy to use and fastEasy to use and fast No direct link toNo direct link to databasedatabase Limited level of detailLimited level of detail Instant 4D modelInstant 4D model TimemgtTimemgt Early project phasesEarly project phases Easy to use, fastEasy to use, fast Import/ExportImport/Export planningdataplanningdata Limited level of detailLimited level of detail Instant 4D modelInstant 4D model TimemgtTimemgt Costmgt: optionCostmgt: option Early project phasesEarly project phases Easy to use, fast,Easy to use, fast, directdirect Synchronization withSynchronization with planning dataplanning data Unlimited level ofUnlimited level of detaildetail 4D/xD model4D/xD model TimemgtTimemgt Costmgt: in progressCostmgt: in progress All phasesAll phases Full solutionFull solution Direct andDirect and continuouscontinuous synchronization withsynchronization with planningplanning Unlimited level ofUnlimited level of detaildetail Complex 4D/xDComplex 4D/xD model for all queriesmodel for all queries TimemgtTimemgt CostmgtCostmgt Comparisons, ...Comparisons, ... All phasesAll phases
  • 10. _____________ D-studio@_ 100831 slide10 Demo  Linking objects from Google SketchUp to Asta Powerproject;  Navigating through time;  Modify the schedule and reload;  Showing a Powerpoint slideshow from a model. Future development – see further  Progress visualisation;  Project Dashboard;  xD-Ultimate with Excel real-time data server. xD Virtual Builder for Sketchup modules
  • 11. _____________ D-studio@_ 100831 slide11 xD Dashboard
  • 12. _____________ D-studio@_ 100831 slide12 VU Amsterdam– september 09
  • 13. _____________ D-studio@_ 100831 slide13 DELFT OSB – 2009/2010
  • 14. _____________ D-studio@_ 100831 slide14 COA studies – september 09
  • 15. _____________ D-studio@_ 100831 slide15 Oosterheem
  • 16. _____________ D-studio@_ 100831 slide16 VIECURI movement
  • 17. _____________ D-studio@_ 100831 slide17 Rabo Bank - Utrecht – 2006 – actual state
  • 18. _____________ D-studio@_ 100831 slide22 … Thank You for your Attention

Notes de l'éditeur

  1. Elevator Pitch on Dstudio and the 4D Virtual Builder
  2. Enkel het principe en de volledigheid van de oplossing aangeven. Snel overspingen … voor geïnteresseerden achteraf.
  3. Highlight the strongpoints vs other software like Navisworks and Synchro
  4. Enkel het principe en de volledigheid van de oplossing aangeven. Snel overspingen … voor geïnteresseerden achteraf.