SlideShare une entreprise Scribd logo
1  sur  50
DRY & WETDRY & WET
RISERRISER
SYSTEMSSYSTEMS
Who to decide on the nos. of wet riser main/
Dry riser system to be installed ?
• Architect
Where to locate the wet/dry riser ?
• To be decided by Architect
Design Criteria
Numbers of rising mains depend on :
• Each rising main serves not more than
930m2
of floor area
• Cover a distance of 38m from a landing
valve
The riser and landing valves shall be housed
in:
• A protected area or lobby or shaft
Where to locate the breeching inlet
Design Criteria
Breeching inlet shall be less than 18m from the
fire engine hard standing
Conspicuous position and accessible to the
fireman
TYPE OF THE SYSTEMTYPE OF THE SYSTEM
LANDINGLANDING
VALVEVALVE
Dry Riser SystemDry Riser System
BREECHING INLETBREECHING INLET
AIRAIR
RELEASEDVALVERELEASEDVALVE
Requirement of dry riser installation
• For residential building height more than 45m but
less than 60m, or with basement or commercial
building
• Ø100mm dry riser main pipe is for building
height from 10m to 45m
• Ø150mm dry riser main pipe is for building
height from 45m to 60m
Requirement of dry riser installation
•2- way breeching inlet for Ø100mm
rising main
•4- way breeching inlet for Ø 150mm
rising main
Breeching Inlet
Air Release valve
Hand Wheel
Landing
Valve
Anti-Thief
Device
FSSB SUBMISSION IS NOT REQUIREDFSSB SUBMISSION IS NOT REQUIRED
LOCAL AUTHORITIES SUBMISSIONLOCAL AUTHORITIES SUBMISSION
Submission
ConventionalConventional
PUMP FEED
GRAVITY FEED
TRANSFER PUMP
WET RISER PUMPS
JOCKEY PUMP
FROM PUB SUPPLY
4 WAY BREECHING
INLET
LANDING VALVE
Old designOld design
• Non conventional - phase out
FROM PUB
SUPPLY
AIR
RELEASE
VALVE
LANDING
VALVE
DOMESTIC
FEED
Tanks
WET
RISER
PUMP
4 WAY
BREECHING
INLET WET RISER TANK
Down Comer SystemDown Comer System
DOMESTIC
21 ST
STOREY
25TH
STOREY
BREECHING
INLET
Ø100mm
GI PIPE
1ST STOREY
Between 60m to 70 m
WET RISER
Phase out for New Building (17
Sep’01)
Transfer Water Tank Design
• One rising main = 11.5 m3
(15min) @ 27 l/s
• Two rising main = 23 m3
(15min) @ 38 l/s
Roof top wet riser tank layoutRoof top wet riser tank layout
DIA 3.62
1m 1m
2m
3m length for pump set
1m
Ring
tanks
3-Rings Tank
3 nos. = 49 m3
5 nos. =75 m3
ACOUSTIC
SOUND
INSULATION
3
1
12m
7m
4-Rings Tank
2 nos. = 49 m3
3 nos. =75 m3
Wet riser tank capacity
• One rising main capacity
= 49 m3
for half hours + 1.1 m3
fire hose reel
• Two rising main capacity
=74 m3
for half hours +1.1 m3
fire hose reel
Building Above 120mBuilding Above 120m
FROM PUB
SUPPLY
1ST STOREY
Mid-Storey
Roof Storey
WET RISER
PUMP
HOSEREEL PUMPTRANSFER PUMP
Down feed
Down feed
Transfer tanks
Power required
• PUB supply
• Generator - supply to 4 blocks per generator
FSSB SUBMISSION IS REQUIREDFSSB SUBMISSION IS REQUIRED
LOCAL AUTHORITIES SUBMISSIONLOCAL AUTHORITIES SUBMISSION
Submission
50TH STOREY HEIGHT BUILDING50TH STOREY HEIGHT BUILDING
WET RISER AND HOSEREEL SERVICEWET RISER AND HOSEREEL SERVICE
DUCTDUCT
TESTING ANDTESTING AND
COMMISSIONING OF WETCOMMISSIONING OF WET
RISERRISER
WET RISER REQUIREMENTSWET RISER REQUIREMENTS
RESIDENTIAL COMMERCIAL &
ANY MIXED BUILDING
FLOW RATE 27L/S FOR FIRST 38L/S FOR THE FIRST RISING MAIN
RISING MAIN 19L/S FOR EACH ADDITIONAL
13.5L/S FOR EACH RISING MAIN
ADDITIONAL RISING MAIN MAXIMUM SUPPLY RATE OF 190L/S
MAXIMUM SUPPLY RATE
OF 135 L/S
RUNNING PRESSURE 3.5BAR TO 5.5 BAR 3.5 BAR TO 5.5 BAR
STATIC PRESSURE 8 BAR 8 BAR
PLAN VIEW FOR WET RISER ANDPLAN VIEW FOR WET RISER AND
HOSE REELHOSE REEL
Check
Valve
Gate
Valve
Drain
Cock
Check Valve
Rubber Expansion
Joint
Gate
Valve c/w
limit
switch
Pilot Valve
Motorize
Valve
Pressure
Relief
Valve
Bypass system
Flow
Meter
Motorize
Valve
Gate
Valve
Down feed
Pilot Valve
Check
Valve
Flow Switch
Down feed
Pipe
Duty Pump
Standby Pump
Fire Pump
Jockey
Pump
Level
Indicator
Landing
Valve
Strap Lock
Air
Release
valve
Drain Cock
Limit
Switch
Butterfly
valve
Check
Valve
Piping
Pressure
Switches
Pressure
Gauge
Limit Switch
Indicator Panel
Alarm
Bell
Fire
Extinguisher
Wet Riser
Control Panel

Contenu connexe

Tendances

Fire guidelines by nbc part 2
Fire guidelines by nbc part 2Fire guidelines by nbc part 2
Fire guidelines by nbc part 2R821992
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides마 이환
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf杉 江紫
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building MaterialsSorab Mishra
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)Esa Shaikh
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1R821992
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYNamrata Jindal
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional BuildingKashish Duggal
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)Mehul Hotwani
 
Basics of dry riser & wet riser
Basics of dry riser & wet riserBasics of dry riser & wet riser
Basics of dry riser & wet riserSubanMondal
 
building services in a building
building services in a buildingbuilding services in a building
building services in a buildingBarsha
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 

Tendances (20)

Dry riser system
Dry riser systemDry riser system
Dry riser system
 
Fire guidelines by nbc part 2
Fire guidelines by nbc part 2Fire guidelines by nbc part 2
Fire guidelines by nbc part 2
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)
 
Fire Fighting System
Fire Fighting SystemFire Fighting System
Fire Fighting System
 
Building Services
Building ServicesBuilding Services
Building Services
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire protection
Fire protectionFire protection
Fire protection
 
Fire fighting passive system
Fire fighting passive systemFire fighting passive system
Fire fighting passive system
 
Fire guidelines by nbc part 1
Fire guidelines by nbc part 1Fire guidelines by nbc part 1
Fire guidelines by nbc part 1
 
Norms for educational building
Norms for educational buildingNorms for educational building
Norms for educational building
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional Building
 
Fire fighting active system
Fire fighting active systemFire fighting active system
Fire fighting active system
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)
 
Basics of dry riser & wet riser
Basics of dry riser & wet riserBasics of dry riser & wet riser
Basics of dry riser & wet riser
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 

En vedette

Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inletbansalash
 
Tim edwards new ways to deliver availability to add value for consumers
Tim edwards new ways to deliver availability to add value for consumersTim edwards new ways to deliver availability to add value for consumers
Tim edwards new ways to deliver availability to add value for consumersECR Community
 
Servic es marketing project report
Servic es marketing  project report Servic es marketing  project report
Servic es marketing project report Babasab Patil
 
Deep dive into N1QL: SQL for JSON: Internals and power features.
Deep dive into N1QL: SQL for JSON: Internals and power features.Deep dive into N1QL: SQL for JSON: Internals and power features.
Deep dive into N1QL: SQL for JSON: Internals and power features.Keshav Murthy
 
FPSO: Perspectives from the equity market
FPSO: Perspectives from the equity marketFPSO: Perspectives from the equity market
FPSO: Perspectives from the equity marketFPSO Network
 
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyWellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyPulse Structural Monitoring
 
FlexIQ - Executive Summary
FlexIQ - Executive Summary FlexIQ - Executive Summary
FlexIQ - Executive Summary INTECSEA2014
 
VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...Pulse Structural Monitoring
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plantscm_teixeira
 
Gating and riser in casting
Gating  and riser in castingGating  and riser in casting
Gating and riser in castingRajesh.S Reddy
 
MCS Presentation
MCS PresentationMCS Presentation
MCS PresentationArranEwan
 

En vedette (16)

Breeching Inlet
Breeching InletBreeching Inlet
Breeching Inlet
 
El poder
El poderEl poder
El poder
 
Fuente de-poder
Fuente de-poderFuente de-poder
Fuente de-poder
 
Portfolio
PortfolioPortfolio
Portfolio
 
Tim edwards new ways to deliver availability to add value for consumers
Tim edwards new ways to deliver availability to add value for consumersTim edwards new ways to deliver availability to add value for consumers
Tim edwards new ways to deliver availability to add value for consumers
 
M.c. con c.l.
M.c. con c.l.M.c. con c.l.
M.c. con c.l.
 
Servic es marketing project report
Servic es marketing  project report Servic es marketing  project report
Servic es marketing project report
 
Deep dive into N1QL: SQL for JSON: Internals and power features.
Deep dive into N1QL: SQL for JSON: Internals and power features.Deep dive into N1QL: SQL for JSON: Internals and power features.
Deep dive into N1QL: SQL for JSON: Internals and power features.
 
FPSO: Perspectives from the equity market
FPSO: Perspectives from the equity marketFPSO: Perspectives from the equity market
FPSO: Perspectives from the equity market
 
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case StudyWellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
Wellhead Fatigue Monitoring: Real-Time Drilling Riser Monitoring ROI Case Study
 
FlexIQ - Executive Summary
FlexIQ - Executive Summary FlexIQ - Executive Summary
FlexIQ - Executive Summary
 
VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...VIV monitoring enhancing the safety of drilling operations in high current en...
VIV monitoring enhancing the safety of drilling operations in high current en...
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plants
 
Pipes in sanitation
Pipes in sanitationPipes in sanitation
Pipes in sanitation
 
Gating and riser in casting
Gating  and riser in castingGating  and riser in casting
Gating and riser in casting
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 

Similaire à Dry & Wet Riser Systems

wetriser-170324110344.pdf
wetriser-170324110344.pdfwetriser-170324110344.pdf
wetriser-170324110344.pdfaymenaudayhatim
 
ARCHITECTURE THESIS 2
ARCHITECTURE THESIS 2ARCHITECTURE THESIS 2
ARCHITECTURE THESIS 2ong93
 
Grainair Aeration Presentation
Grainair Aeration PresentationGrainair Aeration Presentation
Grainair Aeration Presentationwayne Paddison
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminarmichaeljmack
 
Titan Cement transfer
Titan Cement transferTitan Cement transfer
Titan Cement transferWilliam Doyle
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finaleTee Joanne
 
Corrosion Protection in Energy From Waste Sector
Corrosion Protection in Energy From Waste SectorCorrosion Protection in Energy From Waste Sector
Corrosion Protection in Energy From Waste SectorPatrickB9
 
casestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdfcasestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdfPradeep889886
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systemskmsu
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARPrince Pathania
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Fire legislation - architecture legislation
Fire legislation - architecture legislation Fire legislation - architecture legislation
Fire legislation - architecture legislation Ar. Prerna Chouhan
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxNehaRanade2
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSasif anwar
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfKj Aswin
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul Hadi Rahmani
 

Similaire à Dry & Wet Riser Systems (20)

wetriser-170324110344.pdf
wetriser-170324110344.pdfwetriser-170324110344.pdf
wetriser-170324110344.pdf
 
ARCHITECTURE THESIS 2
ARCHITECTURE THESIS 2ARCHITECTURE THESIS 2
ARCHITECTURE THESIS 2
 
2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
Grainair Aeration Presentation
Grainair Aeration PresentationGrainair Aeration Presentation
Grainair Aeration Presentation
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminar
 
Titan Cement transfer
Titan Cement transferTitan Cement transfer
Titan Cement transfer
 
Bs ii presentation finale
Bs ii presentation finaleBs ii presentation finale
Bs ii presentation finale
 
Corrosion Protection in Energy From Waste Sector
Corrosion Protection in Energy From Waste SectorCorrosion Protection in Energy From Waste Sector
Corrosion Protection in Energy From Waste Sector
 
casestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdfcasestudytrilium-190419191926.pdf
casestudytrilium-190419191926.pdf
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSAR
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Fire legislation - architecture legislation
Fire legislation - architecture legislation Fire legislation - architecture legislation
Fire legislation - architecture legislation
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptx
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
 
Hot Weather Ventilation
Hot Weather VentilationHot Weather Ventilation
Hot Weather Ventilation
 
FIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdfFIRE FIGHTING Syllabus for for suppresion.pdf
FIRE FIGHTING Syllabus for for suppresion.pdf
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 

Dernier

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 

Dernier (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 

Dry & Wet Riser Systems