Answer To The Soft Economy -
      Project Phasing & Raising
  Sustainability Standards For Mega
            Developments

Infrastructure Summit MEA, 2009
 Loay Ghazaleh – Burooj Properties
                                      1
The MEA Region Amidst The Financial Crises




                                         2
Still, Large Infrastructure Investments




                                          3
MEA Market Now!;
•   Stock market slow recovery
•   Oil prices picking up
•   The process of capital erosion / asset value shrinkage nearly bottomed
•   The period of price stagnation and foreclosure appears to be softened
•   Continued expenditures for public improvements
•   Mortgage defaults, delinquencies re-structuring in place
•   The volume of building is stimulated by real market rather than by credit
•   The banks selectively real estate & infrastructure projects
•   land boom back to basics, new buildings / speculation no longer the driver
•   Service competition - increase in service charges coupled with improvement
•   Project downsizing still taking place; Project phasing is becoming the norm

•Buy with the approach of a ‘home owner’ ALWAYS measure total return
Use the yard stick of existing and projected rental yields
NEVER speculate unless you can hold the property for the investment
REIT exposure adds liquidity at the cost of transparency
Off plan exists in your imagination .

     The belief in “ the risk less asset class” has been terminated.
              There is no risk free investing in this world.
                                                                              4
Market Forecast!
•   Capitalism has a long history of boom and bust, greed and fear, hyper
    growth and crashes. we have to continue to learn by every crisis

•   The economic recovery that may start in 2010 will remain shallow as long
    as the consumer in the Emerging Markets is not able to supersede the US
    consumer as the driving force of the world economy.

•   Governments tries to combat the systematic liquidity and solvency crisis
    with unlimited liquidity, cuts back interest rates, and recapitalizes balance
    sheets to the point of nationalization.

•   In the short time ahead, the financial crisis will have a deflationary effect
    that will make the pressure of inflation fade away. In the long term, the
    outlook concerning inflation is troubled by re-regulation and expansion of
    liquidity, especially since the government can easily recover from debts with
    the help of higher inflation rates.

•   From a long and medium perspective risks are predominant, but very
    negative scenarios have been priced in. It should take some time until
    insecurity and mere “muddling through “ will be over.
                                                                                    5
Property Development Model - Where Are We!




                                        6
Attempt 1 – Is Financing The Solution?




                                         7
Project Long term Financing
Project cash flows must be sufficient to service (interest and principal)
All risks to lenders must be eliminated
•   Construction ,Market ,Consumption ,Operating ,Inflation & Credit risk
•   Other risks as applicable –Refinancing, Interest rate, Exchange rate
Advantages
•   Enables high debt to equity ratio , Releases equity for other projects &
    reduces equity
•   Enables equity risk sharing in projects
•   Funds (usually prohibited from giving guarantees) can invest into SPV
•   Avoids refinancing risk
Disadvantages
•   More restrictions in use of funds
•   Restrictive covenants (debt service cover ratios etc)
•   More complex documentation (risk mitigation)
•   Less flexible administration (most changes require lenders' consent)

                                                                               8
Structuring Project Finance




                              9
Attempt 2A – Phasing Solution
The problem most
developments are
designed for continuous

•   Shorter overall construction time, cheaper & more convenient.
•   Predictable cash flow in expenditure, financing & revenues.
•   Credibility w/ Lending Entities , Clients, Suppliers , Consultants
•   Increased Investors trust / interest - well defined business plan
•   Pressure on Government for roads & utilities time delivery
•   Optimizing marketing budget, better project positioning
•   Increasing pre-sale due to clarity, increase mortgage interest
•   Cheaper & easier 5 years construction & 15 years rent roll financing
•   Lesser collateral needed as it will be Business Plan Based.
•   Building resilient image for the Developer.

                                                                    10
Attempt 2B – Phasing Solution

The problem most
master plans can not
be phased efficiently

Infrastructure Systems prohibitively inefficient or Impossible! OR
Infrastructure Systems Silo Situation ;
•   Little to no communication or coordination between systems
•   Result-Multiple interfaces, vendors and service providers
•   Uncoordinated system behavior
•   System incompatibilities
•   Operational inefficiencies
•   System duplication
•   Limited energy savings

Extreme geometric layouts could lead to monotony & Infrastructure problems
                                                                       11
Attempt 3 – Project Down Sizing Scenario

Earlier committed & pipeline Partners may not be interested
Financing difficult as Project concept/ success at question
Components scaled down may not be profitable on stand alone basis.
More financing required due to min pre-sale , mortgage issues
More equity injection required as lending ratio decreased
Increased cost of borrowing ( small project), reduction effect on IRR
Established operators may not be interested with such a scale
The mix use / highest & best use may not be in place
The Developer may be concerned about his market image, land banking!

  Expanding partners to Contractors w/ cash / in kind & work done
  payments OR Expanding equity partners to include direct beneficiaries
  like Operators ; have not been employed successfully in the UAE
                                                                        12
Reality Kicks In – Likely Developers Action Plan
    Developers , after some give & take, can be expected to acknowledge
    swiftly the impact of the soft economy & mix use / market shift to review
    the project, its components & investment strategy as follows;

•    Coordinate with authorities and move on with high level of Infrastructures,
     renegotiate cost share & time delivery.
•    Reevaluate Project risks , mix use, feasibility & Master Plan layout for friendly
     phasing & construction. Tailor mix to market.
•    Efficiently manage the Cash-in into the company, secure equity partners,
     financing. Manage the cash-out by efficiently planning the components that
     yields money first.
•    Improve traffic / parking / access situation & all public facilities.
•    Enhance and value engineer all Consultants designs & coordination systems
•    Introduce sustainability / Green concepts in the project, premium!
•    limit cost variances & contractor performance.
•    Improves system operation and reliability ,standardization across multiple
     facilities. Introduce DC & renewable energy. maximizes energy efficiency
                                                                                     13
Step 1A – Re-Liaise W/ Authorities
The cost of the infrastructure projects varies with respect to :
•   The size of the land , location
•   The roads & utilities requirement as per the land use
•   Various authorities’ requirement for regional development
Prepare an optimized process with authority's agreement to ensure
•   Efficient governance,
•   Effective communication,
•   Implantation of monitoring programs
Benefits from proper coordination and liaising with the local authorities :
•   Creating realistic construction program that meets stakeholders interests.
•   Proper cost estimate for project constructions
•   Allows the Project teams to assess and evaluate the project feasibility
•   Allow the authorities to properly and timely plan of the main networks.
•   Allow the authorities to build data base of all projects for planning & budgeting

                                                                                 14
Step 1B – Develop Cost Share W/ Authorities
    Identifying a cost share strategy and developing a cost share
    and cost recovery mechanism between various authorities and
    entities is at the core of infrastructure planning

•   Roads & Transport Authority – usually fund 100% based on approved TIS within the
    structural plan. Collector roads, service corridors within are by the Developer.
•   Municipalities – usually refuse to share in construction costs despite they stand to benefit
    from the networks & structures.
•   Electrical and Water Department - Usually fund the infrastructure / SS construction @ 20
    % cost share of the network to Developer and SS share is contributed based on demand
    (cost sharing) , cabling & any other costs for SS are charged as connection charges
•   Etisalat - All network costs are paid for by Etisalat. Etisalat usually provides / free issue
    material and supervision, civil works to be carried out by the Infrastructure Contractor.
•   Others Include - Civil aviation , Irrigation Department , Navigation , Water Ways,
    Environmental
•   District Cooling - funded by Developer / Investor. The additional services required to run
    the DC system (power, sewerage & water) are included in the cost sharing of the external
    main utilities.
                                                                                                15
Sharjah Marina – Better Drop Off Revision




                                            16
Sharjah Marina – Water Canal Across Design




                                         17
Sharjah Marina – Expanded Mall Design




                                        18
Sharjah Marina – Pre Market Downturn Design




                                          19
Sharjah Marina – Pre Market Downturn Design




                                         20
Step 2B – Consider Functional Guidelines
•   Start right, engage all principle disciplines
•   Grouping of structures: Towards Sea
•   Improve accessibility/safety by proper junction spacing
•   Create both -Public & Private Beaches
•   Create Buffer Zone Promenade/ Cornish Pedestrian Walkway
•   Achieve a Win-Win situation between Public and Private Demands
•   Avoid intensive high development on waterfront (massive)
•   Avoid blocked Views, locate low rise development on water front
•   Allow for road reserve & parking
•   Allow for recreational activity for public
•   Landscape green buffer, large taller trees to frame up the view
•   Provide shaded walkways , colonnades utilizing breezes and hear protection.

                                                                                  21
Sharjah Marina – Post Market Downturn Design 1




                                          22
Sharjah Marina – Post Market Downturn Design 1




                                           23
Sharjah Marina – Post Market Downturn Design 2




                                          24
Sharjah Marina – Post Market Downturn Design 2




                                          25
Beach Front Massing Guideline




                                26
Recommended Buffer Areas




                           27
Step 3 – Incorporate Sustainability




• Sustainability is a Progressive Process and a more holistic approach to
   ensure conservation and protection by seeking solutions thru seamless
   Integration of Activities that minimizes material & energy resource use
   and consumption, whilst maximizing the well-being of occupants,
   contributing positively to society and recognizes, protects and enhances
   the ecology, through re-thinking standards and effective management.
                                                                       28
What is Sustainability
•   Sustainability is as much about energy and resources as it is about the end-
    users and being good stewards of the environment, thus making the
    development more economically successful.
•   Minimal consumption of non-renewable natural resources: energy resources, land,
    water and other materials
•   Minimal wastage during construction and usage:
•   Elimination of unnecessary components or extend product life
•   Maximum indoor environment quality, including air quality, thermal regime,
    illumination, acoustics/noise and visual aspects
•   Sustainable FM Culture
•   The goal is to integrate sustainability into day-to-day FM practices.
•   FM role is to turn a cost into a benefits & then into an asset.
•   FM should look upward and ask Sr. Mangers what they want from their building?
•   FM has to use all his power of persuasion in some cases.
•   FM has to know how to push the subject just enough for a change to become an
    accepted norm. It is a long term measure.



                                                                                      29
Why Sustainability

• Delivering developments in accordance with
  Government Policy in the UAE
• Sustainability goes to the heart of ‘bank-ability’
• Attracting international finance and Development
  Finance Institutions
• Attracting high end residential tenants with sustainable
  practices
• Attracting commercial lease tenants, Business anchors
  with sustainable supply chain Policies
• Potential for enhanced equity returns - Branding,
  marketing, promotion
• Exploitation of opportunities under Clean Development
                                                             30
Sustainability – Hard Facts
In the United States alone, buildings account for:
•   -72% of electricity consumption,
•   -39% of energy use,
•   -47% of all carbon dioxide (CO2) emissions,
•   -40% of raw materials use,
•   -33% of landfill waste
•   -30% of waste output (136 million tons annually), and
•   -14% of water consumption
•   Buildings are responsible for 48% of all annual greenhouse gas emissions in the US.
•   Energy Consumption - (Tons -Oil Equivalent Per Capita)
•   UAE (Average) 10.5
•   Canada 8.3
•   USA (Average) 7.7
•   USA (non-urban) 8.9
•   USA (Manhattan) 3.0
•   U.K.6.2
•   Abu Dhabi - 4,700 residents / m2, 6.8 oil tons/capita
•   Central London 4,760 residents / m2, 3.8 oil tons/capita
•   new York City - 9,880 residents / m2, 3.0 oil tons/capita

                                                                                          31
Sustainability – Tips!
An efficient building is
-One with electrical energy consumption of less than 100 KWhe/m2/yr
-One with connected electrical load lower than 150 W/m2




                                                                      32
Sustainable communities:
more than a collection of green buildings

  •   Designed for our unique climate by building healthy communities
  •   Facilities management practices –e.g.. cleaning, monitoring , life cycle
      assessment while using certified materials and eco-products.
  •   Less power consuming equipment , onsite power generation
  •   Integrate renewable energy
  •   Safe and livable places , a living breathing ecosystem
  •   Minimized ecological impact ,work with the region’s important living systems
  •   Eco-efficient utilities & infrastructure - energy & water savings , recycle
      water ,Water Treatment
  •   Diverse and inclusive neighborhoods with mixed facilities
  •   Integration effect on local economy, population and market ,leverage
      feedback to continually
  •   Self-sustaining economies with acceptable payback periods
  •   Effective governance .Tenants , field and office staff sustainable behavior
  •   Ease of adaptability to future legislative changes – e.g. Dubai law requiring
      on-site generation of 2.5% power from renewable sources
  •   Target setting for continuous improvement
                                                                                 33
Conclusion, Major Lessons Learned
1 Continuous Construction & Geometric Layouts - Phasing Not Planned?

2 Weak Feasibility Studies - Downsizing / Construction Slowdown Later!

3 Riding The Speculative Boom - Market Demand , Financing Shock!

4 Short / Delayed Gov. Utility Capacities - Cost Sharing Solutions!

5 Gov. Regulations - Developers As Zoning / Marine Authorities!

6 Project Re-Planning, Re- Structuring & Financing - Entanglement!

7 GFA Maximization , High Density - Urban Plan. Best Practices Sacrificed

8 Fast Marine / Coastal Reclamation – Improvise methodology & regulation!

9 Marine Habitat & Environmental Impacts - Ad hoc situation!

10 Late Sustainability - Inefficiencies , Socio Economic Environ. Imbalances
                                                                           34
Loay Ghazaleh – Sharjah Marina

L.Ghazaleh@Burooj.ae ; loay.ghz@gmail.com

Contenu connexe

Tendances

DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015
Liliana Judge
 
A new approach to infrastructure financing in Colombia
A new approach to  infrastructure financing in ColombiaA new approach to  infrastructure financing in Colombia
A new approach to infrastructure financing in Colombia
pc1619
 
Dc summit presentation 170209
Dc summit presentation 170209Dc summit presentation 170209
Dc summit presentation 170209
OliviaModisakeng
 
De-risk, c’est de rigueur - Case Study: BCE
De-risk, c’est de rigueur - Case Study: BCEDe-risk, c’est de rigueur - Case Study: BCE
De-risk, c’est de rigueur - Case Study: BCE
Ron Cheshire
 

Tendances (20)

DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015
 
Solar Project Finance: Turning Sunlight Into Green
Solar Project Finance: Turning Sunlight Into Green Solar Project Finance: Turning Sunlight Into Green
Solar Project Finance: Turning Sunlight Into Green
 
Financial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure ProjectFinancial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure Project
 
Mobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS InfrastructureMobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS Infrastructure
 
Mba1034 cg law ethics week 6 sri esg 2013
Mba1034 cg law ethics week 6 sri esg 2013Mba1034 cg law ethics week 6 sri esg 2013
Mba1034 cg law ethics week 6 sri esg 2013
 
PPP Workshop
PPP WorkshopPPP Workshop
PPP Workshop
 
Stress Testing and the Impact that Over-Reliance on VaR as a risk metric in t...
Stress Testing and the Impact that Over-Reliance on VaR as a risk metric in t...Stress Testing and the Impact that Over-Reliance on VaR as a risk metric in t...
Stress Testing and the Impact that Over-Reliance on VaR as a risk metric in t...
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP models
 
Procurement types
Procurement typesProcurement types
Procurement types
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
 
Current Expected Credit Loss Model Presentation
Current Expected Credit Loss Model PresentationCurrent Expected Credit Loss Model Presentation
Current Expected Credit Loss Model Presentation
 
Models for energy efficiency project financing
Models for energy efficiency project financingModels for energy efficiency project financing
Models for energy efficiency project financing
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...
 
Hinkel Chapter 09
Hinkel Chapter 09Hinkel Chapter 09
Hinkel Chapter 09
 
Infrastructure Finance – Building for Growth - Funding of Infrastructure Proj...
Infrastructure Finance – Building for Growth - Funding of Infrastructure Proj...Infrastructure Finance – Building for Growth - Funding of Infrastructure Proj...
Infrastructure Finance – Building for Growth - Funding of Infrastructure Proj...
 
Benefits of Joining ICGFM
Benefits of Joining ICGFMBenefits of Joining ICGFM
Benefits of Joining ICGFM
 
A new approach to infrastructure financing in Colombia
A new approach to  infrastructure financing in ColombiaA new approach to  infrastructure financing in Colombia
A new approach to infrastructure financing in Colombia
 
Dc summit presentation 170209
Dc summit presentation 170209Dc summit presentation 170209
Dc summit presentation 170209
 
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar GSocial Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
 
De-risk, c’est de rigueur - Case Study: BCE
De-risk, c’est de rigueur - Case Study: BCEDe-risk, c’est de rigueur - Case Study: BCE
De-risk, c’est de rigueur - Case Study: BCE
 

Similaire à Answer to Soft Economy – Mega Developments Phasing & Sustainability Issues - Infrastructure Summit MEA, 2009

World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
Robert Jutson
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluation
VAIBHAV SINHA
 
On-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar ImplementationOn-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar Implementation
Frederick Heinle
 
Green Bank Products - Residential Solar
Green Bank Products - Residential SolarGreen Bank Products - Residential Solar
Green Bank Products - Residential Solar
CGC CGC
 
Financing Large Projects 13 - Sum Up.pptx
Financing Large Projects 13 - Sum Up.pptxFinancing Large Projects 13 - Sum Up.pptx
Financing Large Projects 13 - Sum Up.pptx
TanyaGupta696023
 

Similaire à Answer to Soft Economy – Mega Developments Phasing & Sustainability Issues - Infrastructure Summit MEA, 2009 (20)

C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie baker
 
Add on Project.pptx
Add on Project.pptxAdd on Project.pptx
Add on Project.pptx
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
 
The World Bank's framework for assessing PIM systems - Anand Rajaram, World B...
The World Bank's framework for assessing PIM systems - Anand Rajaram, World B...The World Bank's framework for assessing PIM systems - Anand Rajaram, World B...
The World Bank's framework for assessing PIM systems - Anand Rajaram, World B...
 
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority toolsUC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
Financial and technical assistance of a project
Financial and technical assistance of a projectFinancial and technical assistance of a project
Financial and technical assistance of a project
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluation
 
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
 
Contracting Best Practices - MESC 2014
Contracting Best Practices - MESC 2014Contracting Best Practices - MESC 2014
Contracting Best Practices - MESC 2014
 
Let there be Light... in Nigeria using PPPs
Let there be Light... in Nigeria using PPPsLet there be Light... in Nigeria using PPPs
Let there be Light... in Nigeria using PPPs
 
Project finance
Project financeProject finance
Project finance
 
On-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar ImplementationOn-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar Implementation
 
Green Bank Products - Residential Solar
Green Bank Products - Residential SolarGreen Bank Products - Residential Solar
Green Bank Products - Residential Solar
 
Green Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential SolarGreen Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential Solar
 
Project_finance_introduction.ppt
Project_finance_introduction.pptProject_finance_introduction.ppt
Project_finance_introduction.ppt
 
Project_finance_introduction.ppt
Project_finance_introduction.pptProject_finance_introduction.ppt
Project_finance_introduction.ppt
 
Self Redevelopment of Housing Society
Self Redevelopment of Housing SocietySelf Redevelopment of Housing Society
Self Redevelopment of Housing Society
 
Real Estate Finance - Francois Viruly.pdf
Real Estate Finance - Francois Viruly.pdfReal Estate Finance - Francois Viruly.pdf
Real Estate Finance - Francois Viruly.pdf
 
Financing Large Projects 13 - Sum Up.pptx
Financing Large Projects 13 - Sum Up.pptxFinancing Large Projects 13 - Sum Up.pptx
Financing Large Projects 13 - Sum Up.pptx
 

Plus de Loay Ghazaleh MBA, BSc Civil Eng.

Plus de Loay Ghazaleh MBA, BSc Civil Eng. (20)

Dubai sep. 2019 smart cities financing - loay ghazaleh
Dubai sep. 2019   smart cities financing - loay ghazalehDubai sep. 2019   smart cities financing - loay ghazaleh
Dubai sep. 2019 smart cities financing - loay ghazaleh
 
PPP in Modal Transport
PPP in Modal TransportPPP in Modal Transport
PPP in Modal Transport
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Privatization and Concessions (PPP) In Airports
Privatization and Concessions (PPP) In AirportsPrivatization and Concessions (PPP) In Airports
Privatization and Concessions (PPP) In Airports
 
Successfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsSuccessfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway Projects
 
ITS in Bahrain
ITS in BahrainITS in Bahrain
ITS in Bahrain
 
Exploring Renewable Energy Technologies in MENA Region
Exploring Renewable Energy Technologies in MENA RegionExploring Renewable Energy Technologies in MENA Region
Exploring Renewable Energy Technologies in MENA Region
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 
Developing Facilities Management in a Rapidly Changing Business Environment
Developing Facilities Management in a Rapidly Changing Business EnvironmentDeveloping Facilities Management in a Rapidly Changing Business Environment
Developing Facilities Management in a Rapidly Changing Business Environment
 
The Future of Passenger Railways
The Future of Passenger RailwaysThe Future of Passenger Railways
The Future of Passenger Railways
 
Energy From Waste Options
Energy From Waste OptionsEnergy From Waste Options
Energy From Waste Options
 
Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes
 
Evolving ITS Solutions
Evolving ITS SolutionsEvolving ITS Solutions
Evolving ITS Solutions
 
Loay Ghazaleh Profile and Projects Portfolio - March 2018
Loay Ghazaleh Profile and Projects Portfolio - March 2018Loay Ghazaleh Profile and Projects Portfolio - March 2018
Loay Ghazaleh Profile and Projects Portfolio - March 2018
 
Monitoring and Control Technologies to Assess Climate Change and Rising Sea L...
Monitoring and Control Technologies to Assess Climate Change and Rising Sea L...Monitoring and Control Technologies to Assess Climate Change and Rising Sea L...
Monitoring and Control Technologies to Assess Climate Change and Rising Sea L...
 
Smart High Performanc Facades
Smart High Performanc FacadesSmart High Performanc Facades
Smart High Performanc Facades
 
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP ContractsFIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
 

Answer to Soft Economy – Mega Developments Phasing & Sustainability Issues - Infrastructure Summit MEA, 2009

  • 1. Answer To The Soft Economy - Project Phasing & Raising Sustainability Standards For Mega Developments Infrastructure Summit MEA, 2009 Loay Ghazaleh – Burooj Properties 1
  • 2. The MEA Region Amidst The Financial Crises 2
  • 4. MEA Market Now!; • Stock market slow recovery • Oil prices picking up • The process of capital erosion / asset value shrinkage nearly bottomed • The period of price stagnation and foreclosure appears to be softened • Continued expenditures for public improvements • Mortgage defaults, delinquencies re-structuring in place • The volume of building is stimulated by real market rather than by credit • The banks selectively real estate & infrastructure projects • land boom back to basics, new buildings / speculation no longer the driver • Service competition - increase in service charges coupled with improvement • Project downsizing still taking place; Project phasing is becoming the norm •Buy with the approach of a ‘home owner’ ALWAYS measure total return Use the yard stick of existing and projected rental yields NEVER speculate unless you can hold the property for the investment REIT exposure adds liquidity at the cost of transparency Off plan exists in your imagination . The belief in “ the risk less asset class” has been terminated. There is no risk free investing in this world. 4
  • 5. Market Forecast! • Capitalism has a long history of boom and bust, greed and fear, hyper growth and crashes. we have to continue to learn by every crisis • The economic recovery that may start in 2010 will remain shallow as long as the consumer in the Emerging Markets is not able to supersede the US consumer as the driving force of the world economy. • Governments tries to combat the systematic liquidity and solvency crisis with unlimited liquidity, cuts back interest rates, and recapitalizes balance sheets to the point of nationalization. • In the short time ahead, the financial crisis will have a deflationary effect that will make the pressure of inflation fade away. In the long term, the outlook concerning inflation is troubled by re-regulation and expansion of liquidity, especially since the government can easily recover from debts with the help of higher inflation rates. • From a long and medium perspective risks are predominant, but very negative scenarios have been priced in. It should take some time until insecurity and mere “muddling through “ will be over. 5
  • 6. Property Development Model - Where Are We! 6
  • 7. Attempt 1 – Is Financing The Solution? 7
  • 8. Project Long term Financing Project cash flows must be sufficient to service (interest and principal) All risks to lenders must be eliminated • Construction ,Market ,Consumption ,Operating ,Inflation & Credit risk • Other risks as applicable –Refinancing, Interest rate, Exchange rate Advantages • Enables high debt to equity ratio , Releases equity for other projects & reduces equity • Enables equity risk sharing in projects • Funds (usually prohibited from giving guarantees) can invest into SPV • Avoids refinancing risk Disadvantages • More restrictions in use of funds • Restrictive covenants (debt service cover ratios etc) • More complex documentation (risk mitigation) • Less flexible administration (most changes require lenders' consent) 8
  • 10. Attempt 2A – Phasing Solution The problem most developments are designed for continuous • Shorter overall construction time, cheaper & more convenient. • Predictable cash flow in expenditure, financing & revenues. • Credibility w/ Lending Entities , Clients, Suppliers , Consultants • Increased Investors trust / interest - well defined business plan • Pressure on Government for roads & utilities time delivery • Optimizing marketing budget, better project positioning • Increasing pre-sale due to clarity, increase mortgage interest • Cheaper & easier 5 years construction & 15 years rent roll financing • Lesser collateral needed as it will be Business Plan Based. • Building resilient image for the Developer. 10
  • 11. Attempt 2B – Phasing Solution The problem most master plans can not be phased efficiently Infrastructure Systems prohibitively inefficient or Impossible! OR Infrastructure Systems Silo Situation ; • Little to no communication or coordination between systems • Result-Multiple interfaces, vendors and service providers • Uncoordinated system behavior • System incompatibilities • Operational inefficiencies • System duplication • Limited energy savings Extreme geometric layouts could lead to monotony & Infrastructure problems 11
  • 12. Attempt 3 – Project Down Sizing Scenario Earlier committed & pipeline Partners may not be interested Financing difficult as Project concept/ success at question Components scaled down may not be profitable on stand alone basis. More financing required due to min pre-sale , mortgage issues More equity injection required as lending ratio decreased Increased cost of borrowing ( small project), reduction effect on IRR Established operators may not be interested with such a scale The mix use / highest & best use may not be in place The Developer may be concerned about his market image, land banking! Expanding partners to Contractors w/ cash / in kind & work done payments OR Expanding equity partners to include direct beneficiaries like Operators ; have not been employed successfully in the UAE 12
  • 13. Reality Kicks In – Likely Developers Action Plan Developers , after some give & take, can be expected to acknowledge swiftly the impact of the soft economy & mix use / market shift to review the project, its components & investment strategy as follows; • Coordinate with authorities and move on with high level of Infrastructures, renegotiate cost share & time delivery. • Reevaluate Project risks , mix use, feasibility & Master Plan layout for friendly phasing & construction. Tailor mix to market. • Efficiently manage the Cash-in into the company, secure equity partners, financing. Manage the cash-out by efficiently planning the components that yields money first. • Improve traffic / parking / access situation & all public facilities. • Enhance and value engineer all Consultants designs & coordination systems • Introduce sustainability / Green concepts in the project, premium! • limit cost variances & contractor performance. • Improves system operation and reliability ,standardization across multiple facilities. Introduce DC & renewable energy. maximizes energy efficiency 13
  • 14. Step 1A – Re-Liaise W/ Authorities The cost of the infrastructure projects varies with respect to : • The size of the land , location • The roads & utilities requirement as per the land use • Various authorities’ requirement for regional development Prepare an optimized process with authority's agreement to ensure • Efficient governance, • Effective communication, • Implantation of monitoring programs Benefits from proper coordination and liaising with the local authorities : • Creating realistic construction program that meets stakeholders interests. • Proper cost estimate for project constructions • Allows the Project teams to assess and evaluate the project feasibility • Allow the authorities to properly and timely plan of the main networks. • Allow the authorities to build data base of all projects for planning & budgeting 14
  • 15. Step 1B – Develop Cost Share W/ Authorities Identifying a cost share strategy and developing a cost share and cost recovery mechanism between various authorities and entities is at the core of infrastructure planning • Roads & Transport Authority – usually fund 100% based on approved TIS within the structural plan. Collector roads, service corridors within are by the Developer. • Municipalities – usually refuse to share in construction costs despite they stand to benefit from the networks & structures. • Electrical and Water Department - Usually fund the infrastructure / SS construction @ 20 % cost share of the network to Developer and SS share is contributed based on demand (cost sharing) , cabling & any other costs for SS are charged as connection charges • Etisalat - All network costs are paid for by Etisalat. Etisalat usually provides / free issue material and supervision, civil works to be carried out by the Infrastructure Contractor. • Others Include - Civil aviation , Irrigation Department , Navigation , Water Ways, Environmental • District Cooling - funded by Developer / Investor. The additional services required to run the DC system (power, sewerage & water) are included in the cost sharing of the external main utilities. 15
  • 16. Sharjah Marina – Better Drop Off Revision 16
  • 17. Sharjah Marina – Water Canal Across Design 17
  • 18. Sharjah Marina – Expanded Mall Design 18
  • 19. Sharjah Marina – Pre Market Downturn Design 19
  • 20. Sharjah Marina – Pre Market Downturn Design 20
  • 21. Step 2B – Consider Functional Guidelines • Start right, engage all principle disciplines • Grouping of structures: Towards Sea • Improve accessibility/safety by proper junction spacing • Create both -Public & Private Beaches • Create Buffer Zone Promenade/ Cornish Pedestrian Walkway • Achieve a Win-Win situation between Public and Private Demands • Avoid intensive high development on waterfront (massive) • Avoid blocked Views, locate low rise development on water front • Allow for road reserve & parking • Allow for recreational activity for public • Landscape green buffer, large taller trees to frame up the view • Provide shaded walkways , colonnades utilizing breezes and hear protection. 21
  • 22. Sharjah Marina – Post Market Downturn Design 1 22
  • 23. Sharjah Marina – Post Market Downturn Design 1 23
  • 24. Sharjah Marina – Post Market Downturn Design 2 24
  • 25. Sharjah Marina – Post Market Downturn Design 2 25
  • 26. Beach Front Massing Guideline 26
  • 28. Step 3 – Incorporate Sustainability • Sustainability is a Progressive Process and a more holistic approach to ensure conservation and protection by seeking solutions thru seamless Integration of Activities that minimizes material & energy resource use and consumption, whilst maximizing the well-being of occupants, contributing positively to society and recognizes, protects and enhances the ecology, through re-thinking standards and effective management. 28
  • 29. What is Sustainability • Sustainability is as much about energy and resources as it is about the end- users and being good stewards of the environment, thus making the development more economically successful. • Minimal consumption of non-renewable natural resources: energy resources, land, water and other materials • Minimal wastage during construction and usage: • Elimination of unnecessary components or extend product life • Maximum indoor environment quality, including air quality, thermal regime, illumination, acoustics/noise and visual aspects • Sustainable FM Culture • The goal is to integrate sustainability into day-to-day FM practices. • FM role is to turn a cost into a benefits & then into an asset. • FM should look upward and ask Sr. Mangers what they want from their building? • FM has to use all his power of persuasion in some cases. • FM has to know how to push the subject just enough for a change to become an accepted norm. It is a long term measure. 29
  • 30. Why Sustainability • Delivering developments in accordance with Government Policy in the UAE • Sustainability goes to the heart of ‘bank-ability’ • Attracting international finance and Development Finance Institutions • Attracting high end residential tenants with sustainable practices • Attracting commercial lease tenants, Business anchors with sustainable supply chain Policies • Potential for enhanced equity returns - Branding, marketing, promotion • Exploitation of opportunities under Clean Development 30
  • 31. Sustainability – Hard Facts In the United States alone, buildings account for: • -72% of electricity consumption, • -39% of energy use, • -47% of all carbon dioxide (CO2) emissions, • -40% of raw materials use, • -33% of landfill waste • -30% of waste output (136 million tons annually), and • -14% of water consumption • Buildings are responsible for 48% of all annual greenhouse gas emissions in the US. • Energy Consumption - (Tons -Oil Equivalent Per Capita) • UAE (Average) 10.5 • Canada 8.3 • USA (Average) 7.7 • USA (non-urban) 8.9 • USA (Manhattan) 3.0 • U.K.6.2 • Abu Dhabi - 4,700 residents / m2, 6.8 oil tons/capita • Central London 4,760 residents / m2, 3.8 oil tons/capita • new York City - 9,880 residents / m2, 3.0 oil tons/capita 31
  • 32. Sustainability – Tips! An efficient building is -One with electrical energy consumption of less than 100 KWhe/m2/yr -One with connected electrical load lower than 150 W/m2 32
  • 33. Sustainable communities: more than a collection of green buildings • Designed for our unique climate by building healthy communities • Facilities management practices –e.g.. cleaning, monitoring , life cycle assessment while using certified materials and eco-products. • Less power consuming equipment , onsite power generation • Integrate renewable energy • Safe and livable places , a living breathing ecosystem • Minimized ecological impact ,work with the region’s important living systems • Eco-efficient utilities & infrastructure - energy & water savings , recycle water ,Water Treatment • Diverse and inclusive neighborhoods with mixed facilities • Integration effect on local economy, population and market ,leverage feedback to continually • Self-sustaining economies with acceptable payback periods • Effective governance .Tenants , field and office staff sustainable behavior • Ease of adaptability to future legislative changes – e.g. Dubai law requiring on-site generation of 2.5% power from renewable sources • Target setting for continuous improvement 33
  • 34. Conclusion, Major Lessons Learned 1 Continuous Construction & Geometric Layouts - Phasing Not Planned? 2 Weak Feasibility Studies - Downsizing / Construction Slowdown Later! 3 Riding The Speculative Boom - Market Demand , Financing Shock! 4 Short / Delayed Gov. Utility Capacities - Cost Sharing Solutions! 5 Gov. Regulations - Developers As Zoning / Marine Authorities! 6 Project Re-Planning, Re- Structuring & Financing - Entanglement! 7 GFA Maximization , High Density - Urban Plan. Best Practices Sacrificed 8 Fast Marine / Coastal Reclamation – Improvise methodology & regulation! 9 Marine Habitat & Environmental Impacts - Ad hoc situation! 10 Late Sustainability - Inefficiencies , Socio Economic Environ. Imbalances 34
  • 35. Loay Ghazaleh – Sharjah Marina L.Ghazaleh@Burooj.ae ; loay.ghz@gmail.com