Lecture # 11
Measures of profitability
1 Dr. A. Alim
MEASURES OF PROFITABILITY
• We need a systematic method for comparing
expenses and incomes at different times
• We need to compare the project profitability with a
norm or minimum acceptable performance
• Many measures are in use; we’ll look at four.
- Two include time value of money. These are
almost always used.
- Two do not include time value of money. These
are only used for initial screening, but are not
recommended for final decision making.
2
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
3
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Key Relationships
For any year:
CFBT = GI – E – P + S
= GI – E For years 1 to (n-1)
Taxable income TI = GI – E – D
Taxes = TI (te)
Net Profit after taxes = Np = TI (1-te)
CFAT = A = Np + D only for years 1 to (n-1)
4
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
5
Important reminder:
Taxable income (TI) does not include P, S, or W
…just (GI-E-D)!
MEASURES OF PROFITABILITY
1. RETURN ON ORIGINAL INVESTMENT(ROI)
• Simple calculation
• Defined as: ROI = NP, av. / F
= (average annual profit)/(fixed capital + working
capital)
• Expressed in units of %/yr
• For acceptable investment ROI >MARR >Cost of
capital
6
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
7
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Example, ROI calculation:
Interest in converting trucks fueled by Diesel to run on compressed natural gas
(CNG) has been increasing in recent years. Studies have shown that 25%
savings in fuel cost/mile are achievable.
The following information is available for a certain truck being considered for
such conversion. Calculate the expected ROI for this project:
Annual miles driven = 30,000 miles/year
Truck diesel fuel economy = 8 miles per gallon (MPG)
Cost of diesel fuel = $ 4 per gallon
Conversion hardware cost (tanks, valves, etc…) = $15,000
Solution:
Diesel fuel cost per year = [(30,000 miles/year) / (8 miles/gallon)] x (4
$/gallon) = 15,000 $/year
Annual fuel cost savings with CNG = 0.25 x 15,000 = $3750
Therefore ROI = 3750/15,000 = 25 % per year
In addition to cost savings, there are also environmental benefits.
MEASURES OF PROFITABILITY
2. PAYBACK PERIOD (PBP)
• This measure is often used as a “quick and dirty” measure of
profitability. Also called Payback Time
• Defined in units of time (months or years):
- The time for the cumulative cash flow (CFAT) from operation to
recover the fixed capital.
Usually , payback period does not consider time value of money.
However, time value of money could be considered if discounted CFAT
are used.
• The CFAT used in PBP calculation is the cash flow from operation only.
It does not include the initial investment in year 0, or the recovery of
salvage value or working capital in the last year of operation.
• Therefore, for PBP calculation we should use the equation:
CFAT = NPAT + D (and not CFAT = CFBT – taxes) .
. It is therefore recommended to use CFAT = NPAT + D for all years
from 1 to n.
8
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
PAYBACK PERIOD (PBP)
• PBP = Fixed capital / Average annual cash flow after tax
= Fixed capital / A av.
• Aav is average annual cash flow after tax for years 1 to n.
• It is recommended to use “ CFAT = NPAT + D” for all years from 1 to
n.
9
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
10
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Example: PBP*
Period Cash Flow (k$)
0 -1000
1 475
2 400
3 330
4 270
5 200
• A project with initial investment of k$ 1000
(all fixed) has the following series of CFAT.
What is the PBP of this project?
* Jelen’s cost and optimization engineering, third edition, McGraw Hill
1991. Page 104
11
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
• The average annual cash flow is:
(475 + 400 + 330 + 270 + 200) / 5 = 335
Hence: Payback Time = 1000/335  3
years
• Note:
- No time value of money
12
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
13
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
PAYBACK PERIOD (PBP)
• PBP = Fixed capital cost / Average annual cash flow after tax
• For acceptable investment PBP should be ≤ PBP ref
• PBP ref is defined as PBP when ROI = MARR
• Since fixed capital is usually 0.85 F; where F is the total capital invested:
PBP = 0.85F/A av. = 0.85F / ( Np+ D ) av.
• ROI = Np / F or NP = ROI * F
• When ROI = MARR → NP(at MARR) = MARR*F
PBP ref = 0.85F/{(MARR)*F) + (0.85F/n)} = 0.85/(MARR +(0.85/n))
this is Np this is D
Generally, if R = Fixed capital / Total capital, then:
PBP ref = R / (MARR + R /n)
14
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
Limitations of PAYBACK PERIOD method:
1) It neglects any required return, since the time value of money is
omitted.
2) It also neglects all net cash flows after the PBP, including
positive cash flows that may contribute to the return on the
investment.
15
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
3. NET PRESENT WORTH or VALUE (NPW) or (NPV)
• Explicitly considers time value of money
• Defined as present value of all after-tax cash flows
• Must be positive for acceptable investment.
• For n compounding periods in the life of the project, with
net cash flow at each period = An
• NPV is calculated at interest rate = MARR
FiANPV
N
n
n
n  

1
)1(
16
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
Period Cash Flow
(k$)
0 -1000
1 475
2 400
3 330
4 270
5 200
• Calculate the NPV for this project at 10%
Class Exercise: Net Present Value
(NPV)
17
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
• Calculate the NPV for this project at 10%
NPV = -1000 + 475/(1.1) + 400/(1.1)2 + …. =
Note - Considers time value of money explicitly
Class Exercise: Net Present Value
(NPV)
і = 0.1
n 0 1 2 3 4 5
C -1000 475 400 330 270 200
PV -1000 431.82 330.58 247.93 184.41 124.18 sum = 318.93
Alternatively, we can use Excel NPV function:
NPV = NPV(0.10,A1:A5) + A0
18
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
4. DISCOUNTED CASH FLOW RATE OF RETURN (DCFRR)
Also called, Discounted Cash Flow (DCF) or
Internal Rate of Return (IRR)
Defined as the interest rate that results in a NPV value of 0.0
DFCRR must be ≥ MARR for acceptable investment.
0)1(
1
 

FiANPV
N
n
n
n
19
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
Period Cash Flow
(k$)
0 -1000
1 475
2 400
3 330
4 270
5 200
• Calculate the DCFRR for this project
Class Exercise: Discounted cash
flow rate of return (DCFRR)
20
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
MEASURES OF PROFITABILITY
• Calculate the DCFRR for this project
NPV = -1000 + 475/(1+i) + 400/(1+i)2 + …. = 0
DCFRR = i = .2393 or 23.93% (By trial and error)
• Note - Considers time value of money explicitly
і = 0.2393
n 0 1 2 3 4 5
C -1000 475 400 330 270 200 23.93%
PV -1000 383.2809 260.4396 173.3742 114.4611 68.41444 sum = -0.02968
Alternatively we can use the Excel IRR function:
DCFRR = IRR(A0:A5)
21Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Profitability vs. Cash Flow
• Assume Companies A & B make the same product, in
same quantities and have the same gross income
(revenues) GI of $100,000 per year
• Annual expenses are $50,000/yr for both
• A produces products on a machine worth $200,000 and
has a life of 5 years
• B's machine also costs $200,000, but has a useful life
of 10 years
• MARR is 5% for both companies.
Cash flow before taxes (CFBT)
For A = $100,000 - $50,000 = $50,000/yr
For B = $100,000 - $50,000 = $50,000/yr
NO DIFFERENCE!
22
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Net Profit after Taxes (NPAT)
•Taxable Income (GI – E – D):
A = $100,000 - $50,000 - (200,000/5) = $10,000/yr
B = $100,000 - $50,000 - (200,000/10) = $30,000/yr
• Taxes @ (50%)
A = 0.50($10,000) = $5,000/yr
B = 0.50($30,000) = $15,000/yr
• NPAT
(Taxable income) - (Taxes)
A = 10,000 - 5000 = $5,000
B = 30,000 - 15,000 = $15,000
• CFAT = [CFBT - Taxes]
A = $50,000 - $5,000 = $45,000
B = $50,000 - $15,000 = $35,000
23
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Which company is better?
24
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
A B
F (total = fixed) $200,000 $200,000
MARR 5% 5%
CFAT $45,000 $35,000
NPAT $5,000 $15,000
n 5 10
D $40,000 $20,000
Profitability analysis assuming MARR = 5%
25
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
A Acceptable
?
B Acceptable
?
ROI
%
5,000/200,000
= 2.5%
NO 15,000/200,000
= 7.5%
YES
PBPref
years
1/(0.05 + 1/5)
= 4.00
1/(0.05 + 1/10)
= 6.67
PBP
years
200,000 / 45,000
= 4.44
NO 200,000 / 35,000
= 5.71
YES
NPV
$
-$5,173
EXCEL
NO $70,261
EXCEL
YES
IRR
%
4%
EXCEL
NO 12%
EXCEL
YES
26
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
n CFAT n CFAT
0 -200000 0 -200000
1 45000 1 35000
2 45000 2 35000
3 45000 3 35000
4 45000 4 35000
5 45000 5 35000
6 35000
7 35000
8 35000
9 35000
10 35000
NPV = ($5,173.55) NPV = $70,260.72
IRR = 4% IRR = 12%
Company A Company B
27
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed.
McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.
Which company is better?
• Company B is better as shown by profitability analysis
• Higher cash flow is not necessarily better. Profitability
analysis should be used to select the better alternative.
• A has “turned” more of its assets into cash, but is using its
assets less efficiently (shorter useful life!)
28
Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th
ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes,
McMaster University © 2001-2007.

Contenu connexe

Tendances (20)

Theory of costs
Theory of costsTheory of costs
Theory of costs
 
Intro to engineering economy
Intro to engineering economyIntro to engineering economy
Intro to engineering economy
 
Accelerator Theory of Investment
Accelerator Theory of InvestmentAccelerator Theory of Investment
Accelerator Theory of Investment
 
Cost analysis & Break even analysis
Cost analysis & Break even analysisCost analysis & Break even analysis
Cost analysis & Break even analysis
 
Theory of production 2
Theory of production 2Theory of production 2
Theory of production 2
 
Business cycle
Business cycleBusiness cycle
Business cycle
 
Payback period by harikrishnanan
Payback period by harikrishnananPayback period by harikrishnanan
Payback period by harikrishnanan
 
Marginal Costing
Marginal CostingMarginal Costing
Marginal Costing
 
Investment Appraisal
Investment AppraisalInvestment Appraisal
Investment Appraisal
 
Cobb Douglas Production Function
Cobb Douglas Production FunctionCobb Douglas Production Function
Cobb Douglas Production Function
 
Cost and Cost Concepts
Cost and Cost ConceptsCost and Cost Concepts
Cost and Cost Concepts
 
Measuring unemployment
Measuring unemploymentMeasuring unemployment
Measuring unemployment
 
Scope of Managerial Economics
 Scope of Managerial   Economics Scope of Managerial   Economics
Scope of Managerial Economics
 
Accounting rate of return
Accounting rate of returnAccounting rate of return
Accounting rate of return
 
national income accounting
national income accountingnational income accounting
national income accounting
 
Cost plus pricing
Cost plus pricingCost plus pricing
Cost plus pricing
 
Life cycle costing
Life cycle costingLife cycle costing
Life cycle costing
 
Introduction to Econometrics
Introduction to EconometricsIntroduction to Econometrics
Introduction to Econometrics
 
Internal rate of return
Internal rate of returnInternal rate of return
Internal rate of return
 
Chapter 1 introduction to engineering economy
Chapter 1 introduction to engineering economy Chapter 1 introduction to engineering economy
Chapter 1 introduction to engineering economy
 

En vedette

Lecture # 9 taxes and eva
Lecture # 9 taxes and evaLecture # 9 taxes and eva
Lecture # 9 taxes and evaBich Lien Pham
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation iBich Lien Pham
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of moneyBich Lien Pham
 
Lecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiLecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiBich Lien Pham
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under riskBich Lien Pham
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesBich Lien Pham
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundationBich Lien Pham
 
Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives iBich Lien Pham
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of moneyBich Lien Pham
 
Lecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsLecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsBich Lien Pham
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysisBich Lien Pham
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation iiBich Lien Pham
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflationBich Lien Pham
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation iBich Lien Pham
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesBich Lien Pham
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysisBich Lien Pham
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysisBich Lien Pham
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflationBich Lien Pham
 
Chapter 7 capital cost estimation
Chapter 7 capital cost estimationChapter 7 capital cost estimation
Chapter 7 capital cost estimationjose2424
 

En vedette (20)

Lecture # 9 taxes and eva
Lecture # 9 taxes and evaLecture # 9 taxes and eva
Lecture # 9 taxes and eva
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation i
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of money
 
Lecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiLecture # 12 measures of profitability ii
Lecture # 12 measures of profitability ii
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under risk
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest rates
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundation
 
Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives i
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of money
 
Lecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsLecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assets
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysis
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation ii
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflation
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation i
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest rates
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysis
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysis
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflation
 
Chapter 7 capital cost estimation
Chapter 7 capital cost estimationChapter 7 capital cost estimation
Chapter 7 capital cost estimation
 

Similaire à Lecture # 11 measures of profitability i

Dr P. Badari Narayana
Dr P. Badari NarayanaDr P. Badari Narayana
Dr P. Badari Narayanabadarinp
 
Project Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfProject Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfDr Mohamed Elfarran
 
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...MeleseMengistu
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdf
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdfCOMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdf
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdfMarkVincentJaysonBal1
 
Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Nour Dagher
 
Engineering Economy Chapter 3.pdf
Engineering Economy Chapter 3.pdfEngineering Economy Chapter 3.pdf
Engineering Economy Chapter 3.pdfbcimenoglu
 
Lecture _Analysis of Cost Estimation.pptx
Lecture _Analysis of Cost Estimation.pptxLecture _Analysis of Cost Estimation.pptx
Lecture _Analysis of Cost Estimation.pptxRayanAlShehri6
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential BuildingIRJET Journal
 
Be chap4 the production process and costs
Be chap4 the production process and costsBe chap4 the production process and costs
Be chap4 the production process and costsfadzliskc
 
Engineering economics Slides for Postgraduates
Engineering economics Slides for PostgraduatesEngineering economics Slides for Postgraduates
Engineering economics Slides for Postgraduatesssuser50050d1
 
Cost Indices for Industrial Application
Cost Indices for Industrial ApplicationCost Indices for Industrial Application
Cost Indices for Industrial ApplicationK. Shahzad Baig
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Giriraj Srinivasan
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...Arantico Ltd
 
Theory and estimation of cost
Theory and estimation of costTheory and estimation of cost
Theory and estimation of costAmandeep Kaur
 
Planning tool and technique \\ Principle of managment
Planning tool and technique \\ Principle of managmentPlanning tool and technique \\ Principle of managment
Planning tool and technique \\ Principle of managmentmmuhammadzulfqar5
 

Similaire à Lecture # 11 measures of profitability i (20)

Dr P. Badari Narayana
Dr P. Badari NarayanaDr P. Badari Narayana
Dr P. Badari Narayana
 
Project Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfProject Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdf
 
Capital Investment
Capital InvestmentCapital Investment
Capital Investment
 
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...
Engineering Economics for Civil Engineering-full Lecture Note, By Melese Meng...
 
Engineering Economy
Engineering EconomyEngineering Economy
Engineering Economy
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdf
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdfCOMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdf
COMPILED_LECTURE_IN_ENGINEERING_ECONOMY.pdf
 
Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4
 
Engineering Economy Chapter 3.pdf
Engineering Economy Chapter 3.pdfEngineering Economy Chapter 3.pdf
Engineering Economy Chapter 3.pdf
 
Lecture _Analysis of Cost Estimation.pptx
Lecture _Analysis of Cost Estimation.pptxLecture _Analysis of Cost Estimation.pptx
Lecture _Analysis of Cost Estimation.pptx
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential Building
 
Be chap4 the production process and costs
Be chap4 the production process and costsBe chap4 the production process and costs
Be chap4 the production process and costs
 
Engineering economics Slides for Postgraduates
Engineering economics Slides for PostgraduatesEngineering economics Slides for Postgraduates
Engineering economics Slides for Postgraduates
 
Cost Indices for Industrial Application
Cost Indices for Industrial ApplicationCost Indices for Industrial Application
Cost Indices for Industrial Application
 
Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)Peirson business finance10e_power_point_05 (2)
Peirson business finance10e_power_point_05 (2)
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
 
Theory and estimation of cost
Theory and estimation of costTheory and estimation of cost
Theory and estimation of cost
 
Robbins9 ppt09
Robbins9 ppt09Robbins9 ppt09
Robbins9 ppt09
 
Planning tool and technique \\ Principle of managment
Planning tool and technique \\ Principle of managmentPlanning tool and technique \\ Principle of managment
Planning tool and technique \\ Principle of managment
 
Earned Effort Analysis
Earned Effort AnalysisEarned Effort Analysis
Earned Effort Analysis
 

Plus de Bich Lien Pham

Lecture # 8 depreciation ii
Lecture # 8 depreciation iiLecture # 8 depreciation ii
Lecture # 8 depreciation iiBich Lien Pham
 
Lecture # 7 depreciation i
Lecture # 7 depreciation iLecture # 7 depreciation i
Lecture # 7 depreciation iBich Lien Pham
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysisBich Lien Pham
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
Chapter 14 effects of inflation
Chapter 14   effects of inflationChapter 14   effects of inflation
Chapter 14 effects of inflationBich Lien Pham
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Chapter 11 replacement & retention decisions
Chapter 11   replacement & retention decisionsChapter 11   replacement & retention decisions
Chapter 11 replacement & retention decisionsBich Lien Pham
 
Chapter 10 making choices & marr
Chapter 10   making choices & marrChapter 10   making choices & marr
Chapter 10 making choices & marrBich Lien Pham
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysisBich Lien Pham
 
Chapter 8 ror analysis for multiple alternatives
Chapter 8   ror analysis for multiple alternativesChapter 8   ror analysis for multiple alternatives
Chapter 8 ror analysis for multiple alternativesBich Lien Pham
 
Chapter 7 ror analysis for a single alternative
Chapter 7   ror analysis for a single alternativeChapter 7   ror analysis for a single alternative
Chapter 7 ror analysis for a single alternativeBich Lien Pham
 
Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysisBich Lien Pham
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factorsBich Lien Pham
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on moneyBich Lien Pham
 

Plus de Bich Lien Pham (15)

Lecture # 8 depreciation ii
Lecture # 8 depreciation iiLecture # 8 depreciation ii
Lecture # 8 depreciation ii
 
Lecture # 7 depreciation i
Lecture # 7 depreciation iLecture # 7 depreciation i
Lecture # 7 depreciation i
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysis
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
Chapter 14 effects of inflation
Chapter 14   effects of inflationChapter 14   effects of inflation
Chapter 14 effects of inflation
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Chapter 11 replacement & retention decisions
Chapter 11   replacement & retention decisionsChapter 11   replacement & retention decisions
Chapter 11 replacement & retention decisions
 
Chapter 10 making choices & marr
Chapter 10   making choices & marrChapter 10   making choices & marr
Chapter 10 making choices & marr
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysis
 
Chapter 8 ror analysis for multiple alternatives
Chapter 8   ror analysis for multiple alternativesChapter 8   ror analysis for multiple alternatives
Chapter 8 ror analysis for multiple alternatives
 
Chapter 7 ror analysis for a single alternative
Chapter 7   ror analysis for a single alternativeChapter 7   ror analysis for a single alternative
Chapter 7 ror analysis for a single alternative
 
Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysis
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factors
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on money
 

Dernier

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 

Dernier (20)

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 

Lecture # 11 measures of profitability i

  • 1. Lecture # 11 Measures of profitability 1 Dr. A. Alim
  • 2. MEASURES OF PROFITABILITY • We need a systematic method for comparing expenses and incomes at different times • We need to compare the project profitability with a norm or minimum acceptable performance • Many measures are in use; we’ll look at four. - Two include time value of money. These are almost always used. - Two do not include time value of money. These are only used for initial screening, but are not recommended for final decision making. 2 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 3. 3 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 4. Key Relationships For any year: CFBT = GI – E – P + S = GI – E For years 1 to (n-1) Taxable income TI = GI – E – D Taxes = TI (te) Net Profit after taxes = Np = TI (1-te) CFAT = A = Np + D only for years 1 to (n-1) 4 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 5. Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007. 5 Important reminder: Taxable income (TI) does not include P, S, or W …just (GI-E-D)!
  • 6. MEASURES OF PROFITABILITY 1. RETURN ON ORIGINAL INVESTMENT(ROI) • Simple calculation • Defined as: ROI = NP, av. / F = (average annual profit)/(fixed capital + working capital) • Expressed in units of %/yr • For acceptable investment ROI >MARR >Cost of capital 6 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 7. 7 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007. Example, ROI calculation: Interest in converting trucks fueled by Diesel to run on compressed natural gas (CNG) has been increasing in recent years. Studies have shown that 25% savings in fuel cost/mile are achievable. The following information is available for a certain truck being considered for such conversion. Calculate the expected ROI for this project: Annual miles driven = 30,000 miles/year Truck diesel fuel economy = 8 miles per gallon (MPG) Cost of diesel fuel = $ 4 per gallon Conversion hardware cost (tanks, valves, etc…) = $15,000 Solution: Diesel fuel cost per year = [(30,000 miles/year) / (8 miles/gallon)] x (4 $/gallon) = 15,000 $/year Annual fuel cost savings with CNG = 0.25 x 15,000 = $3750 Therefore ROI = 3750/15,000 = 25 % per year In addition to cost savings, there are also environmental benefits.
  • 8. MEASURES OF PROFITABILITY 2. PAYBACK PERIOD (PBP) • This measure is often used as a “quick and dirty” measure of profitability. Also called Payback Time • Defined in units of time (months or years): - The time for the cumulative cash flow (CFAT) from operation to recover the fixed capital. Usually , payback period does not consider time value of money. However, time value of money could be considered if discounted CFAT are used. • The CFAT used in PBP calculation is the cash flow from operation only. It does not include the initial investment in year 0, or the recovery of salvage value or working capital in the last year of operation. • Therefore, for PBP calculation we should use the equation: CFAT = NPAT + D (and not CFAT = CFBT – taxes) . . It is therefore recommended to use CFAT = NPAT + D for all years from 1 to n. 8 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 9. MEASURES OF PROFITABILITY PAYBACK PERIOD (PBP) • PBP = Fixed capital / Average annual cash flow after tax = Fixed capital / A av. • Aav is average annual cash flow after tax for years 1 to n. • It is recommended to use “ CFAT = NPAT + D” for all years from 1 to n. 9 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 10. 10 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 11. Example: PBP* Period Cash Flow (k$) 0 -1000 1 475 2 400 3 330 4 270 5 200 • A project with initial investment of k$ 1000 (all fixed) has the following series of CFAT. What is the PBP of this project? * Jelen’s cost and optimization engineering, third edition, McGraw Hill 1991. Page 104 11 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 12. • The average annual cash flow is: (475 + 400 + 330 + 270 + 200) / 5 = 335 Hence: Payback Time = 1000/335  3 years • Note: - No time value of money 12 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 13. 13 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 14. MEASURES OF PROFITABILITY PAYBACK PERIOD (PBP) • PBP = Fixed capital cost / Average annual cash flow after tax • For acceptable investment PBP should be ≤ PBP ref • PBP ref is defined as PBP when ROI = MARR • Since fixed capital is usually 0.85 F; where F is the total capital invested: PBP = 0.85F/A av. = 0.85F / ( Np+ D ) av. • ROI = Np / F or NP = ROI * F • When ROI = MARR → NP(at MARR) = MARR*F PBP ref = 0.85F/{(MARR)*F) + (0.85F/n)} = 0.85/(MARR +(0.85/n)) this is Np this is D Generally, if R = Fixed capital / Total capital, then: PBP ref = R / (MARR + R /n) 14 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 15. MEASURES OF PROFITABILITY Limitations of PAYBACK PERIOD method: 1) It neglects any required return, since the time value of money is omitted. 2) It also neglects all net cash flows after the PBP, including positive cash flows that may contribute to the return on the investment. 15 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 16. MEASURES OF PROFITABILITY 3. NET PRESENT WORTH or VALUE (NPW) or (NPV) • Explicitly considers time value of money • Defined as present value of all after-tax cash flows • Must be positive for acceptable investment. • For n compounding periods in the life of the project, with net cash flow at each period = An • NPV is calculated at interest rate = MARR FiANPV N n n n    1 )1( 16 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 17. MEASURES OF PROFITABILITY Period Cash Flow (k$) 0 -1000 1 475 2 400 3 330 4 270 5 200 • Calculate the NPV for this project at 10% Class Exercise: Net Present Value (NPV) 17 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 18. MEASURES OF PROFITABILITY • Calculate the NPV for this project at 10% NPV = -1000 + 475/(1.1) + 400/(1.1)2 + …. = Note - Considers time value of money explicitly Class Exercise: Net Present Value (NPV) і = 0.1 n 0 1 2 3 4 5 C -1000 475 400 330 270 200 PV -1000 431.82 330.58 247.93 184.41 124.18 sum = 318.93 Alternatively, we can use Excel NPV function: NPV = NPV(0.10,A1:A5) + A0 18 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 19. MEASURES OF PROFITABILITY 4. DISCOUNTED CASH FLOW RATE OF RETURN (DCFRR) Also called, Discounted Cash Flow (DCF) or Internal Rate of Return (IRR) Defined as the interest rate that results in a NPV value of 0.0 DFCRR must be ≥ MARR for acceptable investment. 0)1( 1    FiANPV N n n n 19 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 20. MEASURES OF PROFITABILITY Period Cash Flow (k$) 0 -1000 1 475 2 400 3 330 4 270 5 200 • Calculate the DCFRR for this project Class Exercise: Discounted cash flow rate of return (DCFRR) 20 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 21. MEASURES OF PROFITABILITY • Calculate the DCFRR for this project NPV = -1000 + 475/(1+i) + 400/(1+i)2 + …. = 0 DCFRR = i = .2393 or 23.93% (By trial and error) • Note - Considers time value of money explicitly і = 0.2393 n 0 1 2 3 4 5 C -1000 475 400 330 270 200 23.93% PV -1000 383.2809 260.4396 173.3742 114.4611 68.41444 sum = -0.02968 Alternatively we can use the Excel IRR function: DCFRR = IRR(A0:A5) 21Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 22. Profitability vs. Cash Flow • Assume Companies A & B make the same product, in same quantities and have the same gross income (revenues) GI of $100,000 per year • Annual expenses are $50,000/yr for both • A produces products on a machine worth $200,000 and has a life of 5 years • B's machine also costs $200,000, but has a useful life of 10 years • MARR is 5% for both companies. Cash flow before taxes (CFBT) For A = $100,000 - $50,000 = $50,000/yr For B = $100,000 - $50,000 = $50,000/yr NO DIFFERENCE! 22 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 23. Net Profit after Taxes (NPAT) •Taxable Income (GI – E – D): A = $100,000 - $50,000 - (200,000/5) = $10,000/yr B = $100,000 - $50,000 - (200,000/10) = $30,000/yr • Taxes @ (50%) A = 0.50($10,000) = $5,000/yr B = 0.50($30,000) = $15,000/yr • NPAT (Taxable income) - (Taxes) A = 10,000 - 5000 = $5,000 B = 30,000 - 15,000 = $15,000 • CFAT = [CFBT - Taxes] A = $50,000 - $5,000 = $45,000 B = $50,000 - $15,000 = $35,000 23 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 24. Which company is better? 24 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 25. A B F (total = fixed) $200,000 $200,000 MARR 5% 5% CFAT $45,000 $35,000 NPAT $5,000 $15,000 n 5 10 D $40,000 $20,000 Profitability analysis assuming MARR = 5% 25 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 26. A Acceptable ? B Acceptable ? ROI % 5,000/200,000 = 2.5% NO 15,000/200,000 = 7.5% YES PBPref years 1/(0.05 + 1/5) = 4.00 1/(0.05 + 1/10) = 6.67 PBP years 200,000 / 45,000 = 4.44 NO 200,000 / 35,000 = 5.71 YES NPV $ -$5,173 EXCEL NO $70,261 EXCEL YES IRR % 4% EXCEL NO 12% EXCEL YES 26 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 27. n CFAT n CFAT 0 -200000 0 -200000 1 45000 1 35000 2 45000 2 35000 3 45000 3 35000 4 45000 4 35000 5 45000 5 35000 6 35000 7 35000 8 35000 9 35000 10 35000 NPV = ($5,173.55) NPV = $70,260.72 IRR = 4% IRR = 12% Company A Company B 27 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.
  • 28. Which company is better? • Company B is better as shown by profitability analysis • Higher cash flow is not necessarily better. Profitability analysis should be used to select the better alternative. • A has “turned” more of its assets into cash, but is using its assets less efficiently (shorter useful life!) 28 Material used in this lecture is sourced from "Plant Design and Economics for Chem. Engineers", 5th ed. McGraw Hill, © 2003 , by Peters, et al., and also from Engineering Economics 4N04 class notes, McMaster University © 2001-2007.