Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome




                                    Luciana Pascarelli(1), Rafaela Lançone(1), Rodrigo Costa(1), Luiz
                                    Pires(1), Eduardo Macedo(2), Fabricio Mirandola(2), Fabiana
                                    Checchinato(2), Katia Canil(2)
                                    Mapping geological at-risk areas in the city of São
                                    Paulo: issues and results from the largest risk
                                    survey in Brazil
                                    (1) Consultancy Services and Technical Works Department, Sao Paulo City Hall, Rua Libero
                                    Badaro, 425, Brazil –lupsantos@prefeitura.sp.gov.br
                                    (2) Laboratory Environmental Risks, Environmental Technology Centre, Technological
                                    Research Institute, Sao Paulo, Brazil - emacedo@ipt.br




Abstract Since the 1980s the risk studies have definitely         geological process causes consequences on Humans or
been unable to follow the growth and the density of               their property.       This concept involves, besides the
favelas, and some communities have started to trigger the         physical process that causes instability (landslides,
first records of accidents in areas hitherto stable. The          exfoliations, etc), the accident attributed to it.
mapping made in 2010 is today the largest geological-risk               Although the Brazilian slopes have witnessed some
database in the country. Besides technical information,           instability phenomena, it was through the advent of soil
the survey has also shown the types of intervention to be         mechanics that Brazil has deepened its research. The
implemented according to the degree of risk and the type          improvement of these studies had a breakthrough in the
of verified occupation, - vital data to prioritizing the          1950s, when the first works appeared, and each new
public-authority actions.     Out of 1,602 favelas and            occurrence generated the study phase, aiming at
informal settlements in the city, 25 percent have                 understanding the mechanisms of such events (Guidicini
currently occupied areas with some occurrence                     and Nieble, 1976).
probability of mass-movement processes. Together, the                   In the City of São Paulo, the first reports of
assessed areas cover about 13.5 square kilometers, located        accidents resulting from landslides have had a direct
in the outskirt regions. Nowadays, about 115,000 people           relationship to the urban expansion that has been going
are living in landslide-prone areas in the capital. As a          on since the 1930s. According to Nogueira (2002), the
result the low-income intervention projects by the                urban sprawl to the city has increased from 355 square
government have been reassessed and adjusted,                     meters to 1,370 square meters in five decades. The real
prioritizing housing, social-educational infrastructure,          estate speculation has used a method of the land
and basic-sanitation actions in areas of greatest                 subdivision that has generated “urban voids”, later
susceptibility.                                                   occupied by favelas and irregular settlements.
                                                                        Especially since the 1970s, this occupation has also
Keywords mapping, susceptibility, disaster, urban area            begun in areas of major environmental fragility, such as
                                                                  slopes and stream banks. In the late 1980s, the first
Risk scenario in São Paulo City, political and social             accident on the slopes happened, and in the mid-1990’s,
framework                                                         these accidents became more frequent and less localized,
                                                                  revealing the presence of a large population in at-risk
The magnitude of the concept of geological risk is larger         occupation areas.
than the “natural risk”. Other terms such as
environmental risk and technological risk are also                Instability processes in São Paulo
interrelated, and sometimes these concepts partially
overlap.                                                          The presence of floodplain and watershed areas and
      Any research and risk assessment should consider            reservoirs has characterized the geography of the City of
which events affect the social and economic aspects of a          São Paulo.      An extensive hydrographical network
particular place and community.          The geological           composed of streams and rivers has served every area of
occurrence does not represent a risk in itself if its             the municipality, with approximately 3,200 km of
triggering event does not generate material, economic, or         watercourses.
environmental damages, or losses. Mass movement are                     Within their administrative boundaries, the
natural processes and they are part of the erosive/               municipality has schematically covered three sets of quite
depositional cycle, responsible for modelling the Earth’s         different sectors: the Sedimentary Basin of São Paulo,
surface and its landscape setting. However, the concept           from the Tertiary age; its granite-gneiss-schist edge,
of geological accident arises when the occurrence of a            broken in a system of blocks and wedges in steps by a
Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo…




reactivated the Precambrian old fault system; and the                               Sliding on Slopes
quaternary colluvial and alluvial cover.
                                                                                    It consists of gravitational mass movement (soil, rock, or
       Sand deposits, clays, and subordinate conglomerates
                                                                                    debris). The loss of stability of the slope material can
predominate in the sedimentary basin. The alluvial
                                                                                    occur through infiltration and water concentration. The
deposits have their occurrence along the floodplains of
                                                                                    increase in the weight by the flooding, the loss of internal
rivers and streams in the city, especially the plains of the
                                                                                    cohesion, and the geometry of the slope (steepness,
Tietê, Pinheiros, and Tamanduateí, though human
                                                                                    morphology, height, etc) lead to destabilization and
activity has intensely reshaped them, through channel
                                                                                    triggers the slides. In São Paulo, there is a higher
rectification, floodplain grounding, etc. These are areas
                                                                                    occurrence of induced landslides, whose outbreak is due
prone to flooding and differential settling by the presence
                                                                                    to the implementation of cuts and inadequate landfills,
of shallow groundwater.
                                                                                    concentration of storm water and served water, as well as
       In the granitic unit, the biggest instability problems
                                                                                    the removal of vegetation.
correspond to boulder rolling, especially in areas near the
                                                                                          In the City of São Paulo, the PLANAR slides are
mountains.
                                                                                    usually the most common types of sliding, common in
       The oldest rocks in the area of São Paulo are gneiss,
                                                                                    thin soils and rocks with a weakness plane, and the
mica-schist, and quartzite, covered by diverse
                                                                                    CIRCULAR slides, which occur in homogeneous thick
metasediments and basic metavolcanics. The main
                                                                                    soils and fractured rocks. They feature variable geometry
problems associated with massive land occupation of this
                                                                                    and material compound, where soil, gravel and, mostly, a
unit are landslides of altered mica schist with low degree
                                                                                    mixture of these two components represent the
of soil compaction. There are also intense erosions in
                                                                                    mobilized materials. This type of mixed material is today
heavy cuts (bare soil) and schist-phyllite dumped
                                                                                    the worst kind of soil if we think of stability, since its
landfills, exfoliation of massive quartz, and low capacity
                                                                                    porosity and permeability indexes are extremely high,
of soil support due to the presence of expanded clay.
                                                                                    compared to natural soil.
       This geologic framework has conditioned the
morphology of the region, reflecting the existence of a
                                                                                    Erosions on Stream Banks
hilly topography, with floodplains and terraces of the
Tietê and Pinheiros Rivers and tributaries, where lies its                          They correspond to the active erosion on marginal slopes
consolidated urban core, surrounded by the most salient                             of the streams/ rivers. There is often a correlation
forms of elevations, and sustained by granitic bodies                               between them and the high water and/or flood processes.
(Serra da Cantareira) and resistant metasediments.                                  The presence of landfill and pouring of water directly on
       This natural landscape, associated with illegal                              the banks have enhanced them.
human occupation, promotes the development of the
processes associated with natural disasters. Modification                           Rock-block Exfoliation and Falling
of soil characteristics happens in non-ordered areas
                                                                                    Gravity on the rock blocks causes exfoliation and falling,
where the stable areas can become highly susceptible to
                                                                                    associated with erosion and/or anthropogenic activities.
occurrences of these processes, even if that interference
                                                                                    It creates movement and subsequent break and fall along
happens to be punctual. The main events in the urban
                                                                                    the discontinuities or weakness planes.
area are mass movements (landslides/slumps), stream-
bank erosion, and sliding and falling boulders.
                                                                                    Aspects to define in at-risk areas
       The causes can be natural, enhanced by the
accumulation of rainwater, or induced by human                                      When examining an at-risk area, it is necessary to
intervention through the modification of natural                                    understand the geological processes, their occurrence
conditions of the terrain, such as cuts, landfills, and                             probability, and their potential to cause harm.
pouring and concentration of the water on the hillsides,                                  Based on technical information on a land in a given
etc. The highest number of accidents takes place during                             region, it is possible to identify the scenarios where such
the months of highest rainfall – November to March in                               events may occur. Only from information on the actual
the Southeast region.         However, the records show                             use and occupation specific to each area of the city, one
occurrences in the “dry seasons”, as the water from                                 can measure the magnitude of these events. For example,
sewage or households contributes to the processes.                                  if in a particular site, there has been some identification
       There have been increasingly common occurrences                              of a geological EVENT possibility that can generate
of destabilization in areas of uncontrolled deposits of                             “social and/or economic harm”, one can admit that this is
litter and/or debris, directly affecting nearby occupations.                        an AT-RISK AREA. Conceptually, there is only risk when
These situations can be more critical where high                                    there is some prospect of loss or damage.
permeability and porosity of this material promote rapid                                  These areas have generally corresponded to low-
saturation and, therefore, its collapse by overweight.                              income housing units (settlements) in the context of
                                                                                    Brazilian cities.
Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome




                                                                                                                          Favelas and informal
                                                                                                                          settlements (SEHAB,
                                                                                                                          2006)



   Figure 1: Records of deaths from landslide in Brazil and location of favelas in São Paulo City. Note that most events occurred in
                                       crowded areas of the metropolitan region of São Paulo

The product of two or more terms represents most of the                     Risk analysis should consider information on the
at-risk equations that different authors have proposed                geological and geomorphological and morphometric
that relate the probability of a process or phenomenon to             features of the terrain as height and steepness of the
the magnitude of the socially harmful consequences that               slopes, soil/rock composition observations, and
it may cause [1].                                                     structures that might constrain movements analyses (e.g.
                                                                      foliation, fractures, and other geological discontinuities),
    R (hazard) = P (probability) x C (consequences)                   on the possible geological processes. Besides that, it
                                                             [1]      should also consider which conditions could trigger
                                                                      them, as well as their consequences.
      The term “probability” relates to specific risk or                    Considering that our study has focused on densely
hazard that should be at least qualified for the intended             populated areas or on the occupational expansion, the
use of the equation. The probability of a landslide in a              human level interference has a large weight in the risk
given area is certainly different from the one of flooding,           qualification process. Also, one can say that changing the
for example.      Another element to consider is the                  original setting configuration could also change the
“vulnerability of a given area or community”. Similar                 dynamics of the processes that act upon it, that is,
processes of the same intensity can frequently generate               processes that might gradually have occurred over the
intense damage if the village housings are poor. On the               years would occur suddenly. People have made these
other hand, damages are barely noticeable if the affected             changes in order to build houses or to expand the
area consists of more consolidated and more resistant                 existing ones. People have made cuts or landfills without
buildings.                                                            any appropriated criteria, which may favour
      The risk equation has already included the presence             destabilization, as well as the vegetation removal, which,
of an effective management system administered by                     by exposing the soil, has favoured erosion and reduced
public officials or by the community. It shows that the               the soil capacity for absorbing water.
adoption of policies to prevent accidents, although                         Besides that, the growing of certain kinds of plant
difficult to quantify, directly and positively influences the         species can be harmful, as in the case of the “banana
policy of reducing risks.                                             trees”, which favour the water accumulation on their
                                                                      roots, increasing the terrain weight and reducing the
The importance of field work in mapping vulnerable areas              internal cohesion by soil saturation.
                                                                            Water is the main triggering agent of mass-
Through the knowledge of the areas naturally susceptible              movement The absence of a drainage system can make
to movement-process occurrences, it is possible to assess             the area susceptible to instability. In the field, one
behaviour of a certain place, from the data on geology,               should check for points of upwelling, infiltration, and
geotechnical engineering, geomorphology, and hydrology                concentration of the surface water, observing the
collected from previous studies and analyses of aerial                rainwater direction, and identifying the sewage/
photographs, low-altitude satellite images, and radar.                wastewater treatment systems from the houses.
Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo…




Table 1: Risk qualitative classification (Brasil, 2006 – simplified)                      Note that the definition of risk sectors based on
                                                                                    judgment of the professionals have been responsible for
             Low Risk                            Medium Risk                        risk mapping and for assigning to each sector a degree of
               (R1)                                 (R2)                            occurrence probability of the destabilizing process.
 Gently sloping (<17º), stable soils       There are some evidence of
    No evidence of instability.           incipient instability. There is a
                                                                                          This is a qualitative analysis recognized by the IUGS
      Less critical condition.          reduced possibility of destructive          Working Group – Committee on Risk Assessment
                                       events during episodes of heavy and          (Cruden and Fell, 1997), which allows the information
                                                prolonged rainfall.                 refinement, and specially, the ranking of the areas
             High Risk                           Very High Risk                     needing preventive or emergency management.
               (R3)                                   (R4)                                It is worth to mention that, according to Nardocci
       Inclined slopes > 30°               Low stability soils.                     (1999), even if the event-probability calculation is
    High potential for landslides    High conditions of instability
                                                                                    accurate, this is only a probability. It is not possible to
  process. Great deal of instability  (garbage, poor drainage, no
  evidence (cracks in the ground,              vegetation)                          say for sure if the event will occur, neither to define when
steps abatement). It is possible the Lot of evidences of instability.               it happens.
 occurrence of destructive events Recent records of landslides. It is the
   during episodes of heavy and          most critical condition.
        prolonged rainfall.
                                                                                    The São Paulo City’s case
                                                                                    From September 2009 to December 2010, the São Paulo
       Because most mass-movement processes occur                                   City held a survey entitled “Análise e mapeamento de
gradually and continuously, it is possible to identify                              riscos associados a escorregamentos em áreas de encostas
evidences of movement even before the event starts.                                 e a solapamentos de margens de córregos em favelas do
Some evidences are cracks and steps on ground surface                               município de São Paulo” (Analysis and mapping of risks
tilting of trees, utility poles and linear structures, and                          associated with slopes landslides and stream-bank
cracks on walls and houses that may indicate local or                               washouts in the favelas of São Paulo city), through the
regional terrain destabilization. One should evaluate                               Instituto de Pesquisas Tecnológicas do Estado de São
these signs for its scope (localized or not) and magnitude                          Paulo (Institute for Technological Research) - IPT. The
(low or high), and use them as movement speed                                       work involved the reassessment of the areas mapped in
indicators of unstable terrain. Once compiled the                                   previous years, as well as the survey of new sites of
information obtained in the field and those gathered in                             geological risk in the city. More than a geotechnical
maps, images, photographs, one can classify the areas                               survey, the mapping had its focus turned to areas where
according to Table 01.                                                              the population vulnerability was the highest one.




                                                                                                                      Border of área
                                                                                                                      Border of probability
                                                                                                                      sector
                                                                                                                VP-07-01 (R3)
                                                                                                                VP: Area code (neighborhood
                                                                                                                name)
                                                                                                                07: Area number
                                                                                                                01: Sector number
                                                                                                                R3: High risk
                                                                                                                Orthophotos 1:5000 (São Paulo)
                                                                                                                EMPLASA 2007


                                 Figure 2: Representation of sector in air photo with probability degree indication
Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome




      In these locations, any type of event, even the small
ones, could cause significant damage to the community,
given its low risk-perception and its low capacity for
rapid management within the proposed period of
implementation.
      Furthermore, the survey needed to establish
response and recovery
      Initially, more than 400 assessment areas were
assigned for assessment, which required a different plan
for the organization of work within the proposed period
of implementation. Moreover, it was necessary to lay
down guidelines that would ensure the objective
effectiveness of the work the staff should performed. In
addition to 20 technical experts responsible for
developing the work from IPT and São Paulo City Hall,
other 52 servers have actively participated in this             Figure 3 Oblique image of risk area. View of homes in specific
mapping, from the indication of the areas to the                risk sectors.
monitoring of the final field works. This is the greatest
risk mapping Brazil has done, considering the amount of         Quantified results obtained
analyzed areas and the professionals directly or indirectly     São Paulo municipality has hired the IPT to do the
involved in this activity. The work consisted of the            mapping of at risk-areas and they have identified 407
following 5 phases, implemented in groups for each              stream-bank and slope areas subject to landslide and
region of the city, that is, Northern, Southern/Western         erosion processes. Such areas comprise around 13.5
and Eastern Zones:                                              square meters representing 0.9 percent of the total
      Phase one - Appointment and selection of areas the        municipality area.
staff should evaluate, after the official consultation to            Every risk survey has the a technical-report format,
each district. There were meetings to explain about the         containing     location,   delimitation,    photographic
survey and introduce the team, as well as for the               documentation, and fieldwork technical data in digital
designation of the places to assess.                            and printed media, making available the easy access to
      Phase two – Field Screening: visits to the areas listed   needed information that will lead to planning of actions
in “Phase 1” for the GPS data and for the over flight plans.    and decision-making.
      Phase three – Flying over region for picturing
oblique image: the staff made low-altitude oblique                    (A)                                  (B)
photos to identify large-size risk signs or constraints,
primary sectoring, and housing quantification.
      Phase four –Fieldwork: based on previous data, IPT
team checked the specific characteristics of occupations,
behavior of water on the terrain, presence of movement
signs, and other information that enabled the needed
refinement for the risk sectoring.
      Phase five – Delivering Results: final report,
including the information on occurrences of destructive
processes, potential consequences on household                  Figure 4 Distribution of areas by risk degree (A) and percentage
vulnerability, area sectoring, definition of the sector risk    of houses in each one (B) in São Paulo City.
degree, recommendations of interventions to control risk,
and data insertion into geo-referenced database                       This study has included all the vulnerable areas in
integrated to the São Paulo City system (HABISP/                the city, located in the 26 administrative districts.
SEHAB).                                                         Considering the details and the obtained information,
      The team qualitatively analyzed risk estimate from        this has been the largest survey ever conducted in Brazil
field observations, by integrating the analysis parameters      on the at-risk areas. Among 407 identified areas, 179
contained in a risk-assessment form, with the support of        were located in the South, 107 in the North, 100 at East,
aerial images. In addition to that, the team set four types     and 24 in the Western region. Out of 1,179 identified at-
of occupations that indicated their consolidation level:        risk areas, 57 percent correspond to slopes and 43 percent
consolidated, partially consolidated, subdivided, and           to the occupied stream banks.
mixed areas. This information has directly affected the               The figure 4 shows the distribution number of the
risk degree, once higher consolidation levels and better        at-risk sectors (A) and the amount of housing (B)
basic infrastructure collaborate to increase the security of    estimated according to the destabilization probability
the areas.                                                      degree.
Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo…




The mapping results use                       in    the      municipality           Among the main activities in progress is the “Favela and
management risk system                                                              Watershed Upgrade Program”, which includes basic-
                                                                                    sanitation and infrastructure actions, relocation of
From 2010, the works on the at-risk areas have counted                              families to new homes, preservation of natural water
with a technological tool, enabling the integration of                              reservoirs (Guarapiranga and Billings Dams).
information from all Secretariats and other public                                        The municipality has also conducted the stream-
agencies, as well as the joint and continuous intervention                          dredging action and the implementation of a small-to-
planning, from punctual actions to the implementation                               medium-scale intervention project.
of governmental programs. Today, through the HABISP                                       They are as part of the Intervention on the at-Risk
System, all the collected mapping data are available to all                         Area Program, as well as some maintenance actions to
staff involved. This system allows identifying, for                                 prevent potential risks. The Linear Park implementation
instance, if the limits of a linear park implementation                             has restored and expanded green and permeable areas in
area are co-incident with a very high at-risk sector, or if a                       the city in areas along the rivers and streams previously
given road project requires the relocation of the                                   occupied by illegal housing. These integrated actions
community families from an at-risk area.                                            have reduced the risk in areas previously considered
      Through this resource, the São Paulo municipality’s                           critical, such as Paraisópolis and New Jaguaré Favelas.
technicians have been identifying and readjusted the                                      It is worth mentioning that, in addition to the
actions undertaken by the different departments allowing                            infrastructure and resettlement of families, an effective
a multidisciplinary approach and, consequently, more                                system of risk management needs to count on the
efficient work.                                                                     preventive, emergency, and recuperative local actions.




                                                                                                                                  AFTER




                               Figure 5: Example of a risk intervention project in a susceptible area “Favela Paraisópolis”



      For this reason, São Paulo City Hall administration                                 Nowadays, São Paulo has monitored information on
has defined and has been adopting standard proceeding                               such proceedings in real time, as well as any ongoing
for the rainy season. Actions as signaling risky areas,                             occurrence in the city. Central remains linked to the all
community orientation, hillside monitoring, and                                     districts for 24 hours a day, providing them with
evaluation and removal of material mobilized by                                     information on the level in the “big pools” of water and
landslides are some examples of specific procedures of                              traffic condition on main roads of the City, besides the
these patronization. Secretariat has also recommend                                 meteorology data that the Emergency Management
theses actions in case of floods, overflows, and tree falls,                        Center make available. Some emergency services require
which have their high incidence during the summer                                   large numbers of operations or machines. At this point,
(From October to March). It has also described each of                              in order to provide them, Central works together with
these actions in detail to ensure standardization of                                Centro de Controle de Operações Integrada – CCOI
services performed in each district, and a speedy service                           (Integrated Operations Control Center), as an integrated
at the affected areas, responding to the guidelines of                              action facilitator among the municipal secretariats and
Municipal Civil Defense Plan.                                                       other governmental spheres.
Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome




      In order to ensure the continuity of risk
management actions, São Paulo municipality held the
first Risk Area Mapping Training Course, for geologists,
engineers, architect, Civil Defense, and Fire Department
teams working in at-risk areas. This course has addressed
mapping-related themes, risk management, and technical
reports and examinations based on the municipality
condition, as well as evaluation of recovering solutions
for the area, in face of the obtained results. This 40-hour
course has involved both practice and theory.
      This program has started the mapping techniques,
gone through orientation and training the public
authorities, and reached the careful selection of at-risk
area interventions. A multidisciplinary perspective has
been showing the importance of integrated work of both
government and society in building an effective policy on
disaster reduction.

References
Brasil, Ministério das Cidades (2006). Capacitação em Mapeamento
    e Gerenciamento de Risco. Ministério das Cidades, Brasília, DF,
    Brazil.
CETAE-IPT/ATOS (2010). Análise e mapeamento de riscos associados
    a escorregamentos em áreas de encostas e a solapamentos de
    margens de córregos em favelas do município de São Paulo. São
    Paulo City Hall, São Paulo, Brazil.
Cruden D., Fell, R. (1997) Quantitative risk assessment for slopes
    and landslides. The state of the art. IUGS WORKING GROUP –
    Committee on Risk Assessment. Proceedings of the
    International Workshop on Landslide Risk Assessment.
Nardocci, A.C. (1999) Risco como instrumento de gestão ambiental.
    São Paulo, 1999, DR Thesis Departamento de Saúde Ambiental
    da Faculdade de Saúde Pública, University de São Paulo, São
    Paulo, Brazil.
Guidicini G., Nieble C.M. (1976) Estabilidade de Taludes Naturais e
    de Escavação. University of São Paulo, São Paulo, Brazil.
Nogueira F.R. (2002) Gerenciamento de Riscos Ambientais
    Associados à Escorregamento: Contribuição às Políticas
    Municipais Para Áreas de Ocupação Subnormal. DR Thesis,
    UNESP, Rio Claro, São Paulo, Brazil.
SEHAB (2008) HABISP: Information system for social housing in the
    city of São Paulo (http://www.habisp.inf.br)




                                                                                                                                     7

Contenu connexe

Tendances

Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...
Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...
Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...erosslo
 
A Rich Vein? Mining and the Pursuit of Sustainability
A Rich Vein? Mining and the Pursuit of SustainabilityA Rich Vein? Mining and the Pursuit of Sustainability
A Rich Vein? Mining and the Pursuit of SustainabilityNo to mining in Palawan
 
Schneider - Impact of Largelandslide
Schneider - Impact of LargelandslideSchneider - Impact of Largelandslide
Schneider - Impact of Largelandslideceriuniroma
 
Poster Heathland Rockdust Experiments
Poster Heathland Rockdust ExperimentsPoster Heathland Rockdust Experiments
Poster Heathland Rockdust ExperimentsHuig Bergsma
 
Engineering geology gs 119 pdf
Engineering geology gs 119 pdfEngineering geology gs 119 pdf
Engineering geology gs 119 pdfSaqib Imran
 
Status of Soil Resources in Lebanon By Roger Francis
Status of Soil Resources in Lebanon By Roger FrancisStatus of Soil Resources in Lebanon By Roger Francis
Status of Soil Resources in Lebanon By Roger FrancisFAO
 
Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Steve Williams
 
Site planning by kevin lynch
Site planning by kevin lynchSite planning by kevin lynch
Site planning by kevin lynchjoannaPG
 
Lebanon
LebanonLebanon
LebanonFAO
 
Disaster management using Remote sensing and GIS
Disaster management using Remote sensing and GISDisaster management using Remote sensing and GIS
Disaster management using Remote sensing and GISHarsh Singh
 
Wasteland assessment using remotesensing and gis
Wasteland assessment using remotesensing and gisWasteland assessment using remotesensing and gis
Wasteland assessment using remotesensing and gisaakvd
 
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN No to mining in Palawan
 
Dartford creek representation[1]
Dartford creek representation[1]Dartford creek representation[1]
Dartford creek representation[1]llica
 
Cebu Presentation: Climate Change Issues and Initiatives
Cebu Presentation: Climate Change Issues and InitiativesCebu Presentation: Climate Change Issues and Initiatives
Cebu Presentation: Climate Change Issues and Initiativesgtapang
 
Site planning kevin lynch
Site planning kevin lynchSite planning kevin lynch
Site planning kevin lynchXtian Escala
 
Wetlands: Climate adaptation, mitigation and biodiversity protection
Wetlands: Climate adaptation, mitigation and biodiversity protectionWetlands: Climate adaptation, mitigation and biodiversity protection
Wetlands: Climate adaptation, mitigation and biodiversity protectionCIFOR-ICRAF
 

Tendances (20)

Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...
Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...
Predicting longterm-dynamics-of-soil-salinity-and-sodicity-on-a-global-scale2...
 
A Rich Vein? Mining and the Pursuit of Sustainability
A Rich Vein? Mining and the Pursuit of SustainabilityA Rich Vein? Mining and the Pursuit of Sustainability
A Rich Vein? Mining and the Pursuit of Sustainability
 
Schneider - Impact of Largelandslide
Schneider - Impact of LargelandslideSchneider - Impact of Largelandslide
Schneider - Impact of Largelandslide
 
Poster Heathland Rockdust Experiments
Poster Heathland Rockdust ExperimentsPoster Heathland Rockdust Experiments
Poster Heathland Rockdust Experiments
 
Engineering geology gs 119 pdf
Engineering geology gs 119 pdfEngineering geology gs 119 pdf
Engineering geology gs 119 pdf
 
Landslide aw
Landslide aw Landslide aw
Landslide aw
 
Status of Soil Resources in Lebanon By Roger Francis
Status of Soil Resources in Lebanon By Roger FrancisStatus of Soil Resources in Lebanon By Roger Francis
Status of Soil Resources in Lebanon By Roger Francis
 
Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010
 
Site planning by kevin lynch
Site planning by kevin lynchSite planning by kevin lynch
Site planning by kevin lynch
 
Lebanon
LebanonLebanon
Lebanon
 
Southern California may be due soon -- Lessons From Past Notable Earthquakes
Southern California may be due soon -- Lessons From Past Notable Earthquakes Southern California may be due soon -- Lessons From Past Notable Earthquakes
Southern California may be due soon -- Lessons From Past Notable Earthquakes
 
Còpia de Benito_msthesis_FINAL2
Còpia de Benito_msthesis_FINAL2Còpia de Benito_msthesis_FINAL2
Còpia de Benito_msthesis_FINAL2
 
Disaster management using Remote sensing and GIS
Disaster management using Remote sensing and GISDisaster management using Remote sensing and GIS
Disaster management using Remote sensing and GIS
 
Evaluating soil erosion using gis
Evaluating soil erosion using gisEvaluating soil erosion using gis
Evaluating soil erosion using gis
 
Wasteland assessment using remotesensing and gis
Wasteland assessment using remotesensing and gisWasteland assessment using remotesensing and gis
Wasteland assessment using remotesensing and gis
 
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN
G.R. NO. 197754 FOR: SPECIAL CIVIL ACTION FOR ISSUANCE OF A WRIT OF KALIKASAN
 
Dartford creek representation[1]
Dartford creek representation[1]Dartford creek representation[1]
Dartford creek representation[1]
 
Cebu Presentation: Climate Change Issues and Initiatives
Cebu Presentation: Climate Change Issues and InitiativesCebu Presentation: Climate Change Issues and Initiatives
Cebu Presentation: Climate Change Issues and Initiatives
 
Site planning kevin lynch
Site planning kevin lynchSite planning kevin lynch
Site planning kevin lynch
 
Wetlands: Climate adaptation, mitigation and biodiversity protection
Wetlands: Climate adaptation, mitigation and biodiversity protectionWetlands: Climate adaptation, mitigation and biodiversity protection
Wetlands: Climate adaptation, mitigation and biodiversity protection
 

Similaire à Mapping geological at risk areas in são paulo

Assesment of the morphometry of gullies in kastina ala, nigeria
Assesment of the morphometry of gullies in kastina ala, nigeriaAssesment of the morphometry of gullies in kastina ala, nigeria
Assesment of the morphometry of gullies in kastina ala, nigeriaAlexander Decker
 
Disaster management landslide
Disaster management landslideDisaster management landslide
Disaster management landslidePramoda Raj
 
Identificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfIdentificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfDENNYSHAYDERDUEASTAP
 
Identificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfIdentificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfDENNYSHAYDERDUEASTAP
 
Environmental Hazards
Environmental HazardsEnvironmental Hazards
Environmental HazardsMalia Damit
 
Syllabus Breakdown
Syllabus BreakdownSyllabus Breakdown
Syllabus Breakdowntudorgeog
 
Carst de Cardona
Carst de CardonaCarst de Cardona
Carst de Cardonaguestb30f29
 
Milestone1 Section1In the May 2010years in the China Gansu Zh.docx
Milestone1 Section1In the May 2010years in the China Gansu Zh.docxMilestone1 Section1In the May 2010years in the China Gansu Zh.docx
Milestone1 Section1In the May 2010years in the China Gansu Zh.docxARIV4
 
Prioritizing Dal Watersheds
Prioritizing Dal WatershedsPrioritizing Dal Watersheds
Prioritizing Dal WatershedsShakil Romshoo
 
10 Geologic Processes and Hazards.pptx
10 Geologic Processes and Hazards.pptx10 Geologic Processes and Hazards.pptx
10 Geologic Processes and Hazards.pptxClarenceMarasiganCas
 
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...IJERA Editor
 
landslide in environmental geology
landslide  in environmental geologylandslide  in environmental geology
landslide in environmental geologyThomas Chinnappan
 
Journal Entry of volcanic eruption activity
Journal Entry of volcanic eruption activityJournal Entry of volcanic eruption activity
Journal Entry of volcanic eruption activityReyAcosta8
 
A contribution to the analysis of urban erosion (Democratic Republic of Congo)
A contribution to the analysis of urban erosion (Democratic Republic of Congo) A contribution to the analysis of urban erosion (Democratic Republic of Congo)
A contribution to the analysis of urban erosion (Democratic Republic of Congo) ExternalEvents
 
Gi4DM2010 GIS and geomatics for disaster relief
Gi4DM2010 GIS and geomatics for disaster reliefGi4DM2010 GIS and geomatics for disaster relief
Gi4DM2010 GIS and geomatics for disaster reliefMassimo Lanfranco
 

Similaire à Mapping geological at risk areas in são paulo (20)

Assesment of the morphometry of gullies in kastina ala, nigeria
Assesment of the morphometry of gullies in kastina ala, nigeriaAssesment of the morphometry of gullies in kastina ala, nigeria
Assesment of the morphometry of gullies in kastina ala, nigeria
 
Disaster management landslide
Disaster management landslideDisaster management landslide
Disaster management landslide
 
Identificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfIdentificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdf
 
Identificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdfIdentificación y Gestión de Riesgos Geologicos.pdf
Identificación y Gestión de Riesgos Geologicos.pdf
 
Environmental Hazards
Environmental HazardsEnvironmental Hazards
Environmental Hazards
 
Syllabus Breakdown
Syllabus BreakdownSyllabus Breakdown
Syllabus Breakdown
 
Geohazards gmap yes camp
Geohazards gmap yes campGeohazards gmap yes camp
Geohazards gmap yes camp
 
Technical paper on ulysses flooding
Technical paper on ulysses floodingTechnical paper on ulysses flooding
Technical paper on ulysses flooding
 
Shanmugam, 2006. the tsunamite problem
Shanmugam, 2006. the tsunamite problemShanmugam, 2006. the tsunamite problem
Shanmugam, 2006. the tsunamite problem
 
Carst de Cardona
Carst de CardonaCarst de Cardona
Carst de Cardona
 
-geomorphology.pptx
-geomorphology.pptx-geomorphology.pptx
-geomorphology.pptx
 
Milestone1 Section1In the May 2010years in the China Gansu Zh.docx
Milestone1 Section1In the May 2010years in the China Gansu Zh.docxMilestone1 Section1In the May 2010years in the China Gansu Zh.docx
Milestone1 Section1In the May 2010years in the China Gansu Zh.docx
 
Prioritizing Dal Watersheds
Prioritizing Dal WatershedsPrioritizing Dal Watersheds
Prioritizing Dal Watersheds
 
10 Geologic Processes and Hazards.pptx
10 Geologic Processes and Hazards.pptx10 Geologic Processes and Hazards.pptx
10 Geologic Processes and Hazards.pptx
 
Amato et al amq
Amato et al amqAmato et al amq
Amato et al amq
 
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...
Geomatics Based Landslide Vulnerability Zonation Mapping - Parts Of Nilgiri D...
 
landslide in environmental geology
landslide  in environmental geologylandslide  in environmental geology
landslide in environmental geology
 
Journal Entry of volcanic eruption activity
Journal Entry of volcanic eruption activityJournal Entry of volcanic eruption activity
Journal Entry of volcanic eruption activity
 
A contribution to the analysis of urban erosion (Democratic Republic of Congo)
A contribution to the analysis of urban erosion (Democratic Republic of Congo) A contribution to the analysis of urban erosion (Democratic Republic of Congo)
A contribution to the analysis of urban erosion (Democratic Republic of Congo)
 
Gi4DM2010 GIS and geomatics for disaster relief
Gi4DM2010 GIS and geomatics for disaster reliefGi4DM2010 GIS and geomatics for disaster relief
Gi4DM2010 GIS and geomatics for disaster relief
 

Mapping geological at risk areas in são paulo

  • 1. Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome Luciana Pascarelli(1), Rafaela Lançone(1), Rodrigo Costa(1), Luiz Pires(1), Eduardo Macedo(2), Fabricio Mirandola(2), Fabiana Checchinato(2), Katia Canil(2) Mapping geological at-risk areas in the city of São Paulo: issues and results from the largest risk survey in Brazil (1) Consultancy Services and Technical Works Department, Sao Paulo City Hall, Rua Libero Badaro, 425, Brazil –lupsantos@prefeitura.sp.gov.br (2) Laboratory Environmental Risks, Environmental Technology Centre, Technological Research Institute, Sao Paulo, Brazil - emacedo@ipt.br Abstract Since the 1980s the risk studies have definitely geological process causes consequences on Humans or been unable to follow the growth and the density of their property. This concept involves, besides the favelas, and some communities have started to trigger the physical process that causes instability (landslides, first records of accidents in areas hitherto stable. The exfoliations, etc), the accident attributed to it. mapping made in 2010 is today the largest geological-risk Although the Brazilian slopes have witnessed some database in the country. Besides technical information, instability phenomena, it was through the advent of soil the survey has also shown the types of intervention to be mechanics that Brazil has deepened its research. The implemented according to the degree of risk and the type improvement of these studies had a breakthrough in the of verified occupation, - vital data to prioritizing the 1950s, when the first works appeared, and each new public-authority actions. Out of 1,602 favelas and occurrence generated the study phase, aiming at informal settlements in the city, 25 percent have understanding the mechanisms of such events (Guidicini currently occupied areas with some occurrence and Nieble, 1976). probability of mass-movement processes. Together, the In the City of São Paulo, the first reports of assessed areas cover about 13.5 square kilometers, located accidents resulting from landslides have had a direct in the outskirt regions. Nowadays, about 115,000 people relationship to the urban expansion that has been going are living in landslide-prone areas in the capital. As a on since the 1930s. According to Nogueira (2002), the result the low-income intervention projects by the urban sprawl to the city has increased from 355 square government have been reassessed and adjusted, meters to 1,370 square meters in five decades. The real prioritizing housing, social-educational infrastructure, estate speculation has used a method of the land and basic-sanitation actions in areas of greatest subdivision that has generated “urban voids”, later susceptibility. occupied by favelas and irregular settlements. Especially since the 1970s, this occupation has also Keywords mapping, susceptibility, disaster, urban area begun in areas of major environmental fragility, such as slopes and stream banks. In the late 1980s, the first Risk scenario in São Paulo City, political and social accident on the slopes happened, and in the mid-1990’s, framework these accidents became more frequent and less localized, revealing the presence of a large population in at-risk The magnitude of the concept of geological risk is larger occupation areas. than the “natural risk”. Other terms such as environmental risk and technological risk are also Instability processes in São Paulo interrelated, and sometimes these concepts partially overlap. The presence of floodplain and watershed areas and Any research and risk assessment should consider reservoirs has characterized the geography of the City of which events affect the social and economic aspects of a São Paulo. An extensive hydrographical network particular place and community. The geological composed of streams and rivers has served every area of occurrence does not represent a risk in itself if its the municipality, with approximately 3,200 km of triggering event does not generate material, economic, or watercourses. environmental damages, or losses. Mass movement are Within their administrative boundaries, the natural processes and they are part of the erosive/ municipality has schematically covered three sets of quite depositional cycle, responsible for modelling the Earth’s different sectors: the Sedimentary Basin of São Paulo, surface and its landscape setting. However, the concept from the Tertiary age; its granite-gneiss-schist edge, of geological accident arises when the occurrence of a broken in a system of blocks and wedges in steps by a
  • 2. Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo… reactivated the Precambrian old fault system; and the Sliding on Slopes quaternary colluvial and alluvial cover. It consists of gravitational mass movement (soil, rock, or Sand deposits, clays, and subordinate conglomerates debris). The loss of stability of the slope material can predominate in the sedimentary basin. The alluvial occur through infiltration and water concentration. The deposits have their occurrence along the floodplains of increase in the weight by the flooding, the loss of internal rivers and streams in the city, especially the plains of the cohesion, and the geometry of the slope (steepness, Tietê, Pinheiros, and Tamanduateí, though human morphology, height, etc) lead to destabilization and activity has intensely reshaped them, through channel triggers the slides. In São Paulo, there is a higher rectification, floodplain grounding, etc. These are areas occurrence of induced landslides, whose outbreak is due prone to flooding and differential settling by the presence to the implementation of cuts and inadequate landfills, of shallow groundwater. concentration of storm water and served water, as well as In the granitic unit, the biggest instability problems the removal of vegetation. correspond to boulder rolling, especially in areas near the In the City of São Paulo, the PLANAR slides are mountains. usually the most common types of sliding, common in The oldest rocks in the area of São Paulo are gneiss, thin soils and rocks with a weakness plane, and the mica-schist, and quartzite, covered by diverse CIRCULAR slides, which occur in homogeneous thick metasediments and basic metavolcanics. The main soils and fractured rocks. They feature variable geometry problems associated with massive land occupation of this and material compound, where soil, gravel and, mostly, a unit are landslides of altered mica schist with low degree mixture of these two components represent the of soil compaction. There are also intense erosions in mobilized materials. This type of mixed material is today heavy cuts (bare soil) and schist-phyllite dumped the worst kind of soil if we think of stability, since its landfills, exfoliation of massive quartz, and low capacity porosity and permeability indexes are extremely high, of soil support due to the presence of expanded clay. compared to natural soil. This geologic framework has conditioned the morphology of the region, reflecting the existence of a Erosions on Stream Banks hilly topography, with floodplains and terraces of the Tietê and Pinheiros Rivers and tributaries, where lies its They correspond to the active erosion on marginal slopes consolidated urban core, surrounded by the most salient of the streams/ rivers. There is often a correlation forms of elevations, and sustained by granitic bodies between them and the high water and/or flood processes. (Serra da Cantareira) and resistant metasediments. The presence of landfill and pouring of water directly on This natural landscape, associated with illegal the banks have enhanced them. human occupation, promotes the development of the processes associated with natural disasters. Modification Rock-block Exfoliation and Falling of soil characteristics happens in non-ordered areas Gravity on the rock blocks causes exfoliation and falling, where the stable areas can become highly susceptible to associated with erosion and/or anthropogenic activities. occurrences of these processes, even if that interference It creates movement and subsequent break and fall along happens to be punctual. The main events in the urban the discontinuities or weakness planes. area are mass movements (landslides/slumps), stream- bank erosion, and sliding and falling boulders. Aspects to define in at-risk areas The causes can be natural, enhanced by the accumulation of rainwater, or induced by human When examining an at-risk area, it is necessary to intervention through the modification of natural understand the geological processes, their occurrence conditions of the terrain, such as cuts, landfills, and probability, and their potential to cause harm. pouring and concentration of the water on the hillsides, Based on technical information on a land in a given etc. The highest number of accidents takes place during region, it is possible to identify the scenarios where such the months of highest rainfall – November to March in events may occur. Only from information on the actual the Southeast region. However, the records show use and occupation specific to each area of the city, one occurrences in the “dry seasons”, as the water from can measure the magnitude of these events. For example, sewage or households contributes to the processes. if in a particular site, there has been some identification There have been increasingly common occurrences of a geological EVENT possibility that can generate of destabilization in areas of uncontrolled deposits of “social and/or economic harm”, one can admit that this is litter and/or debris, directly affecting nearby occupations. an AT-RISK AREA. Conceptually, there is only risk when These situations can be more critical where high there is some prospect of loss or damage. permeability and porosity of this material promote rapid These areas have generally corresponded to low- saturation and, therefore, its collapse by overweight. income housing units (settlements) in the context of Brazilian cities.
  • 3. Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome Favelas and informal settlements (SEHAB, 2006) Figure 1: Records of deaths from landslide in Brazil and location of favelas in São Paulo City. Note that most events occurred in crowded areas of the metropolitan region of São Paulo The product of two or more terms represents most of the Risk analysis should consider information on the at-risk equations that different authors have proposed geological and geomorphological and morphometric that relate the probability of a process or phenomenon to features of the terrain as height and steepness of the the magnitude of the socially harmful consequences that slopes, soil/rock composition observations, and it may cause [1]. structures that might constrain movements analyses (e.g. foliation, fractures, and other geological discontinuities), R (hazard) = P (probability) x C (consequences) on the possible geological processes. Besides that, it [1] should also consider which conditions could trigger them, as well as their consequences. The term “probability” relates to specific risk or Considering that our study has focused on densely hazard that should be at least qualified for the intended populated areas or on the occupational expansion, the use of the equation. The probability of a landslide in a human level interference has a large weight in the risk given area is certainly different from the one of flooding, qualification process. Also, one can say that changing the for example. Another element to consider is the original setting configuration could also change the “vulnerability of a given area or community”. Similar dynamics of the processes that act upon it, that is, processes of the same intensity can frequently generate processes that might gradually have occurred over the intense damage if the village housings are poor. On the years would occur suddenly. People have made these other hand, damages are barely noticeable if the affected changes in order to build houses or to expand the area consists of more consolidated and more resistant existing ones. People have made cuts or landfills without buildings. any appropriated criteria, which may favour The risk equation has already included the presence destabilization, as well as the vegetation removal, which, of an effective management system administered by by exposing the soil, has favoured erosion and reduced public officials or by the community. It shows that the the soil capacity for absorbing water. adoption of policies to prevent accidents, although Besides that, the growing of certain kinds of plant difficult to quantify, directly and positively influences the species can be harmful, as in the case of the “banana policy of reducing risks. trees”, which favour the water accumulation on their roots, increasing the terrain weight and reducing the The importance of field work in mapping vulnerable areas internal cohesion by soil saturation. Water is the main triggering agent of mass- Through the knowledge of the areas naturally susceptible movement The absence of a drainage system can make to movement-process occurrences, it is possible to assess the area susceptible to instability. In the field, one behaviour of a certain place, from the data on geology, should check for points of upwelling, infiltration, and geotechnical engineering, geomorphology, and hydrology concentration of the surface water, observing the collected from previous studies and analyses of aerial rainwater direction, and identifying the sewage/ photographs, low-altitude satellite images, and radar. wastewater treatment systems from the houses.
  • 4. Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo… Table 1: Risk qualitative classification (Brasil, 2006 – simplified) Note that the definition of risk sectors based on judgment of the professionals have been responsible for Low Risk Medium Risk risk mapping and for assigning to each sector a degree of (R1) (R2) occurrence probability of the destabilizing process. Gently sloping (<17º), stable soils There are some evidence of No evidence of instability. incipient instability. There is a This is a qualitative analysis recognized by the IUGS Less critical condition. reduced possibility of destructive Working Group – Committee on Risk Assessment events during episodes of heavy and (Cruden and Fell, 1997), which allows the information prolonged rainfall. refinement, and specially, the ranking of the areas High Risk Very High Risk needing preventive or emergency management. (R3) (R4) It is worth to mention that, according to Nardocci Inclined slopes > 30° Low stability soils. (1999), even if the event-probability calculation is High potential for landslides High conditions of instability accurate, this is only a probability. It is not possible to process. Great deal of instability (garbage, poor drainage, no evidence (cracks in the ground, vegetation) say for sure if the event will occur, neither to define when steps abatement). It is possible the Lot of evidences of instability. it happens. occurrence of destructive events Recent records of landslides. It is the during episodes of heavy and most critical condition. prolonged rainfall. The São Paulo City’s case From September 2009 to December 2010, the São Paulo Because most mass-movement processes occur City held a survey entitled “Análise e mapeamento de gradually and continuously, it is possible to identify riscos associados a escorregamentos em áreas de encostas evidences of movement even before the event starts. e a solapamentos de margens de córregos em favelas do Some evidences are cracks and steps on ground surface município de São Paulo” (Analysis and mapping of risks tilting of trees, utility poles and linear structures, and associated with slopes landslides and stream-bank cracks on walls and houses that may indicate local or washouts in the favelas of São Paulo city), through the regional terrain destabilization. One should evaluate Instituto de Pesquisas Tecnológicas do Estado de São these signs for its scope (localized or not) and magnitude Paulo (Institute for Technological Research) - IPT. The (low or high), and use them as movement speed work involved the reassessment of the areas mapped in indicators of unstable terrain. Once compiled the previous years, as well as the survey of new sites of information obtained in the field and those gathered in geological risk in the city. More than a geotechnical maps, images, photographs, one can classify the areas survey, the mapping had its focus turned to areas where according to Table 01. the population vulnerability was the highest one. Border of área Border of probability sector VP-07-01 (R3) VP: Area code (neighborhood name) 07: Area number 01: Sector number R3: High risk Orthophotos 1:5000 (São Paulo) EMPLASA 2007 Figure 2: Representation of sector in air photo with probability degree indication
  • 5. Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome In these locations, any type of event, even the small ones, could cause significant damage to the community, given its low risk-perception and its low capacity for rapid management within the proposed period of implementation. Furthermore, the survey needed to establish response and recovery Initially, more than 400 assessment areas were assigned for assessment, which required a different plan for the organization of work within the proposed period of implementation. Moreover, it was necessary to lay down guidelines that would ensure the objective effectiveness of the work the staff should performed. In addition to 20 technical experts responsible for developing the work from IPT and São Paulo City Hall, other 52 servers have actively participated in this Figure 3 Oblique image of risk area. View of homes in specific mapping, from the indication of the areas to the risk sectors. monitoring of the final field works. This is the greatest risk mapping Brazil has done, considering the amount of Quantified results obtained analyzed areas and the professionals directly or indirectly São Paulo municipality has hired the IPT to do the involved in this activity. The work consisted of the mapping of at risk-areas and they have identified 407 following 5 phases, implemented in groups for each stream-bank and slope areas subject to landslide and region of the city, that is, Northern, Southern/Western erosion processes. Such areas comprise around 13.5 and Eastern Zones: square meters representing 0.9 percent of the total Phase one - Appointment and selection of areas the municipality area. staff should evaluate, after the official consultation to Every risk survey has the a technical-report format, each district. There were meetings to explain about the containing location, delimitation, photographic survey and introduce the team, as well as for the documentation, and fieldwork technical data in digital designation of the places to assess. and printed media, making available the easy access to Phase two – Field Screening: visits to the areas listed needed information that will lead to planning of actions in “Phase 1” for the GPS data and for the over flight plans. and decision-making. Phase three – Flying over region for picturing oblique image: the staff made low-altitude oblique (A) (B) photos to identify large-size risk signs or constraints, primary sectoring, and housing quantification. Phase four –Fieldwork: based on previous data, IPT team checked the specific characteristics of occupations, behavior of water on the terrain, presence of movement signs, and other information that enabled the needed refinement for the risk sectoring. Phase five – Delivering Results: final report, including the information on occurrences of destructive processes, potential consequences on household Figure 4 Distribution of areas by risk degree (A) and percentage vulnerability, area sectoring, definition of the sector risk of houses in each one (B) in São Paulo City. degree, recommendations of interventions to control risk, and data insertion into geo-referenced database This study has included all the vulnerable areas in integrated to the São Paulo City system (HABISP/ the city, located in the 26 administrative districts. SEHAB). Considering the details and the obtained information, The team qualitatively analyzed risk estimate from this has been the largest survey ever conducted in Brazil field observations, by integrating the analysis parameters on the at-risk areas. Among 407 identified areas, 179 contained in a risk-assessment form, with the support of were located in the South, 107 in the North, 100 at East, aerial images. In addition to that, the team set four types and 24 in the Western region. Out of 1,179 identified at- of occupations that indicated their consolidation level: risk areas, 57 percent correspond to slopes and 43 percent consolidated, partially consolidated, subdivided, and to the occupied stream banks. mixed areas. This information has directly affected the The figure 4 shows the distribution number of the risk degree, once higher consolidation levels and better at-risk sectors (A) and the amount of housing (B) basic infrastructure collaborate to increase the security of estimated according to the destabilization probability the areas. degree.
  • 6. Pascarelli, L et al. – Mapping geological at-risk areas in the city of São Paulo… The mapping results use in the municipality Among the main activities in progress is the “Favela and management risk system Watershed Upgrade Program”, which includes basic- sanitation and infrastructure actions, relocation of From 2010, the works on the at-risk areas have counted families to new homes, preservation of natural water with a technological tool, enabling the integration of reservoirs (Guarapiranga and Billings Dams). information from all Secretariats and other public The municipality has also conducted the stream- agencies, as well as the joint and continuous intervention dredging action and the implementation of a small-to- planning, from punctual actions to the implementation medium-scale intervention project. of governmental programs. Today, through the HABISP They are as part of the Intervention on the at-Risk System, all the collected mapping data are available to all Area Program, as well as some maintenance actions to staff involved. This system allows identifying, for prevent potential risks. The Linear Park implementation instance, if the limits of a linear park implementation has restored and expanded green and permeable areas in area are co-incident with a very high at-risk sector, or if a the city in areas along the rivers and streams previously given road project requires the relocation of the occupied by illegal housing. These integrated actions community families from an at-risk area. have reduced the risk in areas previously considered Through this resource, the São Paulo municipality’s critical, such as Paraisópolis and New Jaguaré Favelas. technicians have been identifying and readjusted the It is worth mentioning that, in addition to the actions undertaken by the different departments allowing infrastructure and resettlement of families, an effective a multidisciplinary approach and, consequently, more system of risk management needs to count on the efficient work. preventive, emergency, and recuperative local actions. AFTER Figure 5: Example of a risk intervention project in a susceptible area “Favela Paraisópolis” For this reason, São Paulo City Hall administration Nowadays, São Paulo has monitored information on has defined and has been adopting standard proceeding such proceedings in real time, as well as any ongoing for the rainy season. Actions as signaling risky areas, occurrence in the city. Central remains linked to the all community orientation, hillside monitoring, and districts for 24 hours a day, providing them with evaluation and removal of material mobilized by information on the level in the “big pools” of water and landslides are some examples of specific procedures of traffic condition on main roads of the City, besides the these patronization. Secretariat has also recommend meteorology data that the Emergency Management theses actions in case of floods, overflows, and tree falls, Center make available. Some emergency services require which have their high incidence during the summer large numbers of operations or machines. At this point, (From October to March). It has also described each of in order to provide them, Central works together with these actions in detail to ensure standardization of Centro de Controle de Operações Integrada – CCOI services performed in each district, and a speedy service (Integrated Operations Control Center), as an integrated at the affected areas, responding to the guidelines of action facilitator among the municipal secretariats and Municipal Civil Defense Plan. other governmental spheres.
  • 7. Proceedings of the Second World Landslide Forum – 3-7 October 2011, Rome In order to ensure the continuity of risk management actions, São Paulo municipality held the first Risk Area Mapping Training Course, for geologists, engineers, architect, Civil Defense, and Fire Department teams working in at-risk areas. This course has addressed mapping-related themes, risk management, and technical reports and examinations based on the municipality condition, as well as evaluation of recovering solutions for the area, in face of the obtained results. This 40-hour course has involved both practice and theory. This program has started the mapping techniques, gone through orientation and training the public authorities, and reached the careful selection of at-risk area interventions. A multidisciplinary perspective has been showing the importance of integrated work of both government and society in building an effective policy on disaster reduction. References Brasil, Ministério das Cidades (2006). Capacitação em Mapeamento e Gerenciamento de Risco. Ministério das Cidades, Brasília, DF, Brazil. CETAE-IPT/ATOS (2010). Análise e mapeamento de riscos associados a escorregamentos em áreas de encostas e a solapamentos de margens de córregos em favelas do município de São Paulo. São Paulo City Hall, São Paulo, Brazil. Cruden D., Fell, R. (1997) Quantitative risk assessment for slopes and landslides. The state of the art. IUGS WORKING GROUP – Committee on Risk Assessment. Proceedings of the International Workshop on Landslide Risk Assessment. Nardocci, A.C. (1999) Risco como instrumento de gestão ambiental. São Paulo, 1999, DR Thesis Departamento de Saúde Ambiental da Faculdade de Saúde Pública, University de São Paulo, São Paulo, Brazil. Guidicini G., Nieble C.M. (1976) Estabilidade de Taludes Naturais e de Escavação. University of São Paulo, São Paulo, Brazil. Nogueira F.R. (2002) Gerenciamento de Riscos Ambientais Associados à Escorregamento: Contribuição às Políticas Municipais Para Áreas de Ocupação Subnormal. DR Thesis, UNESP, Rio Claro, São Paulo, Brazil. SEHAB (2008) HABISP: Information system for social housing in the city of São Paulo (http://www.habisp.inf.br) 7