SlideShare une entreprise Scribd logo
1  sur  10
Télécharger pour lire hors ligne
Smoke Alarm Requirements for
Residential Property in Maryland
Stricter mandates regarding
smoke detectors
Effective July 1, 2013
Tim Knobloch, (240) 292-1040,
TKnobloch@mris.com
Single-Family (one to two dwelling units)
Sale Requirements as of July 1, 2013:
• Language added to the Seller disclosure form asking
sellers to indicate whether the smoke alarms are over
10 years old and whether they have sealed, tamper
resistant batteries
• This requirement applies to contracts entered into
after July 1, 2013
Single-Family (one to two dwelling units)
New Construction (including renovation) after July 1, 2013
• Number of alarms:
• 1 alarm in each sleeping room
• 1 alarm in each hallway or common area outside of the sleeping rooms
• 1 alarm in a hallway or common area on each level, including basements
but excluding unoccupied attics, garages, and crawl spaces
• If more than two alarms are required in a new residential dwelling, the
alarms shall be configured to sound simultaneously
• The alarms shall operate on alternating current (AC) with a battery
backup or approved secondary power source
• This is the same requirement as the current 2012 International Residential
Code and was already being enforced by building permit offices since
2006
Single-Family (one to two dwelling units)
Existing Properties
• For properties built before July 1, 1975
▫ Number of alarms:
 At least one alarm either battery operated or AC
 After January 1, 2018 (NEW REQUIREMENT)
 At least one alarm on each level of the home (excluding unoccupied
attics, garages)
▫ Battery alarms after 2018 must be sealed, long-life battery
smoke alarms with a silence/hush button feature
Single-Family (one to two dwelling units)
Existing Properties
• For properties built between July 1, 1975 – Jan 1, 1989
▫ Number of alarms:
 At least one AC smoke alarm installed in the sleeping area
 After January 1, 2018 (NEW REQUIREMENT)
 At least one alarm in a sleeping area and one alarm on each level
of the home.
▫ The new additional alarms may be battery-operated as long as they are
sealed, long-life battery smoke alarms with a silence/hush button
feature
▫ No alarm should be older than 10 years
Single-Family (one to two dwelling units)
Existing Properties
• For properties built between January 1, 1989 – July 1,
1990:
▫ Number of alarms:
 At least one alarm outside of each sleeping area and on each
additional story of the home, including the basement but not
unoccupied attics, garages or crawl spaces
 Alarms must be AC and interconnected to alarm
simultaneously
 After January 1, 2018 (NEW REQUIREMENT)
 No change to the number of alarms, but no alarm should be older
than 10 years
Single-Family (one to two dwelling units)
Existing Properties
• For properties built between July 1, 1990 and July 1,
2013:
▫ Same requirement as the previous slide for Jan. 1
1989 – July 1, 1990 properties except that the
alarms must be AC AND have battery back-up
▫ NOTE: some counties required more stringent
rules including alarms in each bedroom for new
construction
Single-Family (one to two dwelling units) after
July 1, 2013 (New Requirement)
• Alarms must be upgraded if:
▫ Existing alarms exceed 10 years from date of manufacture
▫ Existing alarms fail to operate or malfunction
▫ A change in tenancy occurs and the residence has not been previously equipped
with sealed, long-life battery smoke alarms with silence/hush button features
• AC alarms must be upgraded to new AC alarms
• Battery alarms must be upgraded to sealed, long-life battery smoke
alarms with silence/hush button features
• Alarms must be located on each level of the residence excluding
unoccupied attics, garages, or crawl spaces
▫ Any additional alarm required by the new law may be battery operated as long
as it is a sealed, long-life battery with silence/hush button features
Multi-Family Rentals
(more than two dwelling units)
• Alarms must be AC powered
▫ Multi-family units constructed after July 1, 1990 must be AC
powered with battery back-up
• Landlords must provide special alarms for the deaf or hard
of hearing, and may require reimbursement for those alarms
• Landlords are responsible for the installation, repair and
replacement of smoke alarms
• Tenants are responsible for testing the units and notifying
the landlord in writing of the failure or malfunction of the
unit
• No alarms should be older than 10 years unless the alarms
have been sensitivity tested and properly calibrated on an
annual basis per current fire codes
Smoke Alarm Requirements for
Residential Property in Maryland
For questions concerning property
management or leasing services,
please call or email:
Tim Knobloch, (240) 292-1040,
TKnobloch@mris.com

Contenu connexe

En vedette

Film poster
Film posterFilm poster
Film posterhivron
 
Potencial target market research
Potencial target market researchPotencial target market research
Potencial target market researchhivron
 
Research on teaser trailers
Research on teaser trailersResearch on teaser trailers
Research on teaser trailershivron
 
Storyboard[1]
Storyboard[1]Storyboard[1]
Storyboard[1]hivron
 
Windows 8 and the cloud a match made in heaven
Windows 8 and the cloud a match made in heavenWindows 8 and the cloud a match made in heaven
Windows 8 and the cloud a match made in heavenNoam Sheffer
 
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้Sununtha Putpun
 
การ เรียนรู้เพื่อพัฒนากระบวนการคิด
การ เรียนรู้เพื่อพัฒนากระบวนการคิดการ เรียนรู้เพื่อพัฒนากระบวนการคิด
การ เรียนรู้เพื่อพัฒนากระบวนการคิดSununtha Putpun
 
Integrated marketing - Using LinkedIn as your Hub for marketing
Integrated marketing - Using LinkedIn as your Hub for marketingIntegrated marketing - Using LinkedIn as your Hub for marketing
Integrated marketing - Using LinkedIn as your Hub for marketingRockville Chamber of Commerce
 
Grass roots marketing - marketing for immediate results
Grass roots marketing - marketing for immediate resultsGrass roots marketing - marketing for immediate results
Grass roots marketing - marketing for immediate resultsRockville Chamber of Commerce
 

En vedette (12)

Film poster
Film posterFilm poster
Film poster
 
Potencial target market research
Potencial target market researchPotencial target market research
Potencial target market research
 
Research on teaser trailers
Research on teaser trailersResearch on teaser trailers
Research on teaser trailers
 
Storyboard[1]
Storyboard[1]Storyboard[1]
Storyboard[1]
 
Full Paper
Full PaperFull Paper
Full Paper
 
Windows 8 and the cloud a match made in heaven
Windows 8 and the cloud a match made in heavenWindows 8 and the cloud a match made in heaven
Windows 8 and the cloud a match made in heaven
 
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้
ชุดฝึกอบรมการวัดและประเมินผลการเรียนรู้
 
การ เรียนรู้เพื่อพัฒนากระบวนการคิด
การ เรียนรู้เพื่อพัฒนากระบวนการคิดการ เรียนรู้เพื่อพัฒนากระบวนการคิด
การ เรียนรู้เพื่อพัฒนากระบวนการคิด
 
Hubungan etnik
Hubungan etnikHubungan etnik
Hubungan etnik
 
Integrated marketing - Using LinkedIn as your Hub for marketing
Integrated marketing - Using LinkedIn as your Hub for marketingIntegrated marketing - Using LinkedIn as your Hub for marketing
Integrated marketing - Using LinkedIn as your Hub for marketing
 
Terapi bermain
Terapi bermain Terapi bermain
Terapi bermain
 
Grass roots marketing - marketing for immediate results
Grass roots marketing - marketing for immediate resultsGrass roots marketing - marketing for immediate results
Grass roots marketing - marketing for immediate results
 

Plus de Rockville Chamber of Commerce (8)

Color On The Creek Time To Dance
Color On The Creek Time To DanceColor On The Creek Time To Dance
Color On The Creek Time To Dance
 
NewSchinnerer QRC_2009final
NewSchinnerer QRC_2009finalNewSchinnerer QRC_2009final
NewSchinnerer QRC_2009final
 
Consultants_Postcards2008
Consultants_Postcards2008Consultants_Postcards2008
Consultants_Postcards2008
 
Rockville chamber invite
Rockville chamber inviteRockville chamber invite
Rockville chamber invite
 
Linked in for business2
Linked in for business2Linked in for business2
Linked in for business2
 
Risk Reduction Steps for Landlords
Risk Reduction Steps for LandlordsRisk Reduction Steps for Landlords
Risk Reduction Steps for Landlords
 
Rental statistics june 2013
Rental statistics june 2013Rental statistics june 2013
Rental statistics june 2013
 
Media Overview
Media OverviewMedia Overview
Media Overview
 

Dernier

Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

Dernier (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 

Smoke alarm requirements

  • 1. Smoke Alarm Requirements for Residential Property in Maryland Stricter mandates regarding smoke detectors Effective July 1, 2013 Tim Knobloch, (240) 292-1040, TKnobloch@mris.com
  • 2. Single-Family (one to two dwelling units) Sale Requirements as of July 1, 2013: • Language added to the Seller disclosure form asking sellers to indicate whether the smoke alarms are over 10 years old and whether they have sealed, tamper resistant batteries • This requirement applies to contracts entered into after July 1, 2013
  • 3. Single-Family (one to two dwelling units) New Construction (including renovation) after July 1, 2013 • Number of alarms: • 1 alarm in each sleeping room • 1 alarm in each hallway or common area outside of the sleeping rooms • 1 alarm in a hallway or common area on each level, including basements but excluding unoccupied attics, garages, and crawl spaces • If more than two alarms are required in a new residential dwelling, the alarms shall be configured to sound simultaneously • The alarms shall operate on alternating current (AC) with a battery backup or approved secondary power source • This is the same requirement as the current 2012 International Residential Code and was already being enforced by building permit offices since 2006
  • 4. Single-Family (one to two dwelling units) Existing Properties • For properties built before July 1, 1975 ▫ Number of alarms:  At least one alarm either battery operated or AC  After January 1, 2018 (NEW REQUIREMENT)  At least one alarm on each level of the home (excluding unoccupied attics, garages) ▫ Battery alarms after 2018 must be sealed, long-life battery smoke alarms with a silence/hush button feature
  • 5. Single-Family (one to two dwelling units) Existing Properties • For properties built between July 1, 1975 – Jan 1, 1989 ▫ Number of alarms:  At least one AC smoke alarm installed in the sleeping area  After January 1, 2018 (NEW REQUIREMENT)  At least one alarm in a sleeping area and one alarm on each level of the home. ▫ The new additional alarms may be battery-operated as long as they are sealed, long-life battery smoke alarms with a silence/hush button feature ▫ No alarm should be older than 10 years
  • 6. Single-Family (one to two dwelling units) Existing Properties • For properties built between January 1, 1989 – July 1, 1990: ▫ Number of alarms:  At least one alarm outside of each sleeping area and on each additional story of the home, including the basement but not unoccupied attics, garages or crawl spaces  Alarms must be AC and interconnected to alarm simultaneously  After January 1, 2018 (NEW REQUIREMENT)  No change to the number of alarms, but no alarm should be older than 10 years
  • 7. Single-Family (one to two dwelling units) Existing Properties • For properties built between July 1, 1990 and July 1, 2013: ▫ Same requirement as the previous slide for Jan. 1 1989 – July 1, 1990 properties except that the alarms must be AC AND have battery back-up ▫ NOTE: some counties required more stringent rules including alarms in each bedroom for new construction
  • 8. Single-Family (one to two dwelling units) after July 1, 2013 (New Requirement) • Alarms must be upgraded if: ▫ Existing alarms exceed 10 years from date of manufacture ▫ Existing alarms fail to operate or malfunction ▫ A change in tenancy occurs and the residence has not been previously equipped with sealed, long-life battery smoke alarms with silence/hush button features • AC alarms must be upgraded to new AC alarms • Battery alarms must be upgraded to sealed, long-life battery smoke alarms with silence/hush button features • Alarms must be located on each level of the residence excluding unoccupied attics, garages, or crawl spaces ▫ Any additional alarm required by the new law may be battery operated as long as it is a sealed, long-life battery with silence/hush button features
  • 9. Multi-Family Rentals (more than two dwelling units) • Alarms must be AC powered ▫ Multi-family units constructed after July 1, 1990 must be AC powered with battery back-up • Landlords must provide special alarms for the deaf or hard of hearing, and may require reimbursement for those alarms • Landlords are responsible for the installation, repair and replacement of smoke alarms • Tenants are responsible for testing the units and notifying the landlord in writing of the failure or malfunction of the unit • No alarms should be older than 10 years unless the alarms have been sensitivity tested and properly calibrated on an annual basis per current fire codes
  • 10. Smoke Alarm Requirements for Residential Property in Maryland For questions concerning property management or leasing services, please call or email: Tim Knobloch, (240) 292-1040, TKnobloch@mris.com