2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos1
LEMESOS PILOT PROJECT
Maria Isaia, Water Board Lemesos
m.isaia@wbl.com.cy
2nd AQUAKNIGHT Conference
"Water Loss Management in the Mediterranean
Countries:
the AQUAKNIGHT Project Results“
21 May 2014, Aqaba, Jordan
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos2
Contents of the Presentation
• Introduction about the Lemesos Water Board
• Introduction about the Lemesos Pilot Area
• Pilot Activities to date (up to May 2014)
• Pilot activities planned for the next 6 months
(June 2014 - December 2014)
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos3
Water Board of Lemesos
Water Board of Lemesos
 Established in 1951
 Semi-government, non-profit organization
 Supply of potable water only
 Number of employees : 100
 Area served : 100 km2
 Population Served : 170.000
 Annual water supply : 16 million m3
 Number of consumers : 100.000
 Length of pipe network : 1.000 km
 Annual turnover : € 20 million
 30 Reservoirs, 65.500 m3 storage capacity
 Elevations from 0 to 430 m
 10 Pressure Zones
 83 DMAs
 Average daily water supply 43.800 m3
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos4
Water Board of Lemesos
Water Supply System
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos5
Water Board of Lemesos
Water Supply Network
• 30 Reservoirs
• 65.500 m3 storage
• Elevations from 0 to 430 m
• 10 Pressure Zones
• 83 DMAs
• 1.000 Km pipe network
• Average daily water supply 43.800 m3
DMA Design Key Considerations
DMA categories
Small : <1.000 properties
Medium : 1.000 – 3.000 properties
Large : 3.000 – 5.000 properties
Factors considered in DMA design
 Minimum variation in ground level
 Single entry point into the DMA
 Well defined DMA boundaries
 Area meters correctly sized and located
 Apply pressure management
 Continuous monitoring
Water Board of Lemesos
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos6
DMA 921 is divided into 3 smaller DMAs
• DMA 324
• DMA 327
• DMA 328
The division of DMA 921 was planned
in order to improve the operation and
control of the water supply network,
to reduce the pressure and
subsequently leakage.
DMA921 DMA324 DMA327 DMA328
Min Elevation 68m 76m 82m 72m
Max Elevation 116m 105m 110m 110m
PRV No Yes No Yes
Min Pressure 16m 20m 22m 22m
Max Pressure 64m 45m 50m 38m
DMA327 will be further divided
Lemesos Pilot Project
Introduction to Lemesos Pilot DMA
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos7
INLET CHAMBER
Flow meter, pressure regulation, Telemetry
Average Pressure
High Pressure
Low PressureSub-District
Lemesos Pilot Project
Introduction to Lemesos Pilot DMA
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos8
Pilot Area Sub-District
No. of inlets 1 1
No. of Closed boundary valves 6 1
No. of flow monitors installed 1 1
Network length and prevalent material
7,8 Km
Asbestos Cement (AC)
1,15 Km
Asbestos Cement (AC)
No. of connections/Km 37 31,3
No. of meters 361 78
Estimated population 718 155
Private tanks (yes/no) Yes Yes
Minimum and maximum elevation (m) 76 - 105 72 - 84
Average pressure (m) 32 30
Lemesos Pilot Project
Introduction to Lemesos Pilot DMA
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos9
Task / Activities 2012 2013 2014
Task 2: Pilot Projects 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Activity 2.1
Acquisition of equipment
Activity 2.2
Active Leakage Control
Activity 2.3
Calculation of NRW
components
Activity 2.4
Evaluation of Real Losses
Activity 2.5
Evaluation of Apparent
Losses
Lemesos Pilot Project
Pilot Project Activities up to May 2014
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos10
Equipment and supplies Total Cost Date of receipt
TBox RTU complete with panel box and photovoltaic module € 2.407 September 2012
100 Customer meters (DN15, Q3=2.5 R=315 Volumetric) € 2.515 15/03/2013
Automatic meter reading (100 MIU modules, Hand Held Computer and Software) € 5.667 15/03/2013
Pressure meters (upstream and downstream of the DMA PRV) € 394 August 2012
GSM Data loggers with integral pressure transducer € 4.054 June 2012
Unmeasured Flow Reducers (UFR) € 2.859 28/03/2013
Master Meters (DN100 for the Pilot DMA and DN50 For the Sub-District) € 1.602 July 2012
Pressure Reducing Valves (PRVs) DN100 for Pilot DMA and DN50 for Sub-District € 1.685 August 2012
Subtotal Equipment and supplies € 21.183
Infrastructure Total Cost Date of execution
Leak detection € 5.000
Finished by the end of
October 2013
Civil works for meters and tanks testing € 5.000
Finished by the end of
October 2013
Civil works for valves installation and district set up € 5.000
Finished by the end of
December 2012
Leak repairs in the district € 5.000
Finished by the end of
October 2013
Subtotal Infrastructure € 20.000
Lemesos Pilot Project
2.1 Procurements
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos11
Lemesos Pilot Project
2.2 Active Leakage Control
Equipment Installation and District setup
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos12
Lemesos Pilot Project
2.2 Active Leakage Control
Zero Pressure Test
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos13
Lemesos Pilot Project
2.2 Active Leakage Control
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos14
Lemesos Pilot Project
2.2 Active Leakage Control
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos15
Lemesos Pilot Project
2.2 Active Leakage Control
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos16
Lemesos Pilot Project
2.2 Active Leakage Control
Actual
MNF
Metered
Properties
Residential
properties
Commercial
properties
Exceptional
Commercial Use
Residential
Night Use
Commercial
Night Use
Background
Losses
Target Night
Flow
Actual Total
Losses
Locatable
Losses
m3
/h No. % No. No. m3
/h m3
/h m3
/h m3
/h m3
/h m3
/h m3
/h
1,44 361 90 325 36 0,50 0,32 0,57 0,45 1,34 0,55 0,10
DMA324 Minimum Night Flow analysis
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos17
Lemesos Pilot Project
2.2 Active Leakage Control
Pilot DMA Pressure monitoring (Hi, Mid and Lo)
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos18
Lemesos Pilot Project
2.3 Water Loss Calculation
1 1,1 1.1.1 1.1.1.1 A.
Distribution Authorised Billed Revenue Water
Input Consumption Authorised 17.671
Volume Consumption 1.1.1.2 17.671
17.671 63,61%
0
17.671 1.1.2 1.1.2.1 B.
Unbilled Authorised Non- Revenue
Consumption 0
1.1.2.2
0
0
1,2 1.2.1 1.2.1.1
27.782 Water Apparent Losses
Losses 88
972 1.2.1.2 10.111
3,50% 36,39%
884
10.111 1.2.2 1.2.2.1
Real Losses
8.517
1.2.2.2
9.139
32,90% 0
1.2.2.3
622
Simplified Water Balance using the IWA methodology (all figures in m3)
Unbilled Metered Consumption
Unbilled Un-metered Consumption
Unauthorised Consumption
Customer Metering Inaccuracies
Period: 2/1/2013 to 2/5/2013 (120 days)
Billed Metered Consumption
Billed Un-metered Consumption
Leakage on Transmission and/or Distribution Mains
Leakage and Overflows at Utility’s Storage Tanks
Leakage on Service Connections
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos19
Lemesos Pilot Project
2.3 Water Loss Calculation
1 1,1 1.1.1 1.1.1.1 A.
Distribution Authorised Billed Revenue Water
Input Consumption Authorised 42.638
Volume Consumption 1.1.1.2 42.638
42.638 85,76%
0
42.638 1.1.2 1.1.2.1 B.
Unbilled Authorised Non- Revenue
Consumption 0
1.1.2.2
0
0
1,2 1.2.1 1.2.1.1
49.717 Water Apparent Losses
Losses 213
2.345 1.2.1.2 7.079
4,72% 14,24%
2.132
7.079 1.2.2 1.2.2.1
Real Losses
4.112
1.2.2.2
4.734
9,52% 0
1.2.2.3
622
Simplified Water Balance using the IWA methodology (all figures in m3)
Period: 2/5/2013 to 2/1/2014 (245 days)
Billed Metered Consumption
Billed Un-metered Consumption
Unbilled Metered Consumption
Unbilled Un-metered Consumption
Unauthorised Consumption
Customer Metering Inaccuracies
Leakage on Transmission and/or Distribution Mains
Leakage and Overflows at Utility’s Storage Tanks
Leakage on Service Connections
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos20
2.4
Leak detection
noise loggers and correlator
YES October 2013
2.4
Leak repairs under continuous flow
monitoring
YES October 2013
2.4 Quantify water recovered YES October 2013
Lemesos Pilot Project
2.4 Evaluation of Real Losses
Logging a large consumer (private hospital)
to determine the effect on MNF
Noise logger deployment Noise logger patrolling
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos21
DMA 324
Deployment Patrol Correllation
08/10/2013 09/10/2013
Permalog No. Location Leak / No Leak Level Spread
2090742 SV Ελλης Λαμπέττη 14 N 11 14
2090743 FH Ελλης Λαμπέττη N 8 28
2090744 SV Τζένης Καρέζη N 9 13
2090747 FH Εκτωρος 10 N 6 27
2090751 FH Αγ. Μάρωνος Θεωγνισος N 8 10
2090752 FH Σκάρλατη L 26 5
2090757 FH Ελλης Λαμπέτη N 11 17
2090759 SV Ελλης Λαμπέτη Crossing N 8 6
2090774 SV Τζένης Καρέζη
2090776 FH Εκτωρος N 8 12
2090783 FH Γιώργου Ζαμπέττα N 3 8
2090787 FH Σκαρλατη 23 N 15 7
2090789 SV Αιμίλιου Φράγκου N 13 7
2090795 SV Βασίλη Τσιτσάνη & Σκαρλάτη N 18 6
2090799 SV Απ. Καλδάρα L 31 3
2090801 SV Αιμ. Φράγκου N 16 5
2090802 SV Σκαρλάτη 3 N 16 4
2090803 FH Μαρίας Ρούσου & Ημαθίας N 8 5
2090804 SV Απ. Καλδάρα N 15 10
2090807 SV Σκαρλάτη & Ελλης Λαμπέτη L 40 10
2090809 SV Σκαρλάτη & Αγ. Μάρωνος N 4 12
2090815 SV Τζενης Καρέζη N 3 6
2090816 SV Ελλής Λαμπέτη & Σουμπερτ L 23 6
2090820 SV Σκαρλάτη 23 N 11 9
2090827 FH Απ. Καλδάρα Φροντιστήριο L 35 3 Leaking FH
2090829 FH Ημαθίας N 3 4
2090831 SV Έλλης Λαμπέτη (τέρμα) N 9 4
Lemesos Pilot Project
2.4 Evaluation of Real Losses
Leak Noise Logger Deployment and patrolling at DMA324
95 Leak Noise Loggers Deployed 12 Loggers detected noise 2 Leaks detected 48 m3
/day recovered
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos22
Lemesos Pilot Project
2.4 Evaluation of Real Losses
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos23
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
Utility Water Board of Lemesos
Zone DMA 324
Name Solomos Charalambous start end Duration
Date start end 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 [tot. weeks]
ACTIVITY 2.5.
TEST 1
UFR Test to quantify enhancement in water metering (coordinated by
IREN)
To be implemented in all pilots 1 19
19
Step 1.1 Consumer Audit 1 4 4
Step 1.2 Sub-district Master Meter installation 5 5 1
Step 1.3 Field test exercise (4 months duration) 5 5 1
Stage 1.3.1 Readings of the existing consumer meters and the Sub-district master
meter 6 7
2
UFR Installation upstream (or downstream) and adiacent the old
revenue water meter 8 9
2
Stage 1.3.2 Readings of the existing consumer meters + UFR and the Sub-district
master meter 10 11
2
Old revenue water meters replacement with AMR 12 13 2
Send 20 selected old meters + 5 new meters to UNIPA laboratory 14 15 2
Stage 1.3.3 Readings of the AMR consumer meters + UFR and the Sub-district
master meter 14 15
2
UFR unit removal 16 17 2
Stage 1.3.4 Readings of the new AMR consumer meters and the Sub-district master
meter 18 19 2
TEST 2
The assessment of the impact of private storage tanks on water
metering (coordinated by UNIPA)
To be implemented only in the pilots of AW and WBL 12 24
13
TEST 3
The determination of customer demand patterns and legitimate night
use by customers (coordinated by Signal Generix, with support of
UNIPA and IREN)
To be implemented in AWCO, Sonede and IREN 16 24
9
Step 3.1
Installation of Data Loggers on 1-5 consumers based on the
description of Test3 16 17
2
Step 3.2 UFR unit removed as in 1.3.3 16 17
Step 3.3 Water consumption recording with a time resolution of 1 minute
(without UFR) 18 19 2
Step 3.4 Send Results to SG for a preliminary analysis and assesment of the
quality of the measurements 20 21 2
Step 3.5 Installation of Data Loggers on other 1-5 consumers based on
directions of SG after the analysis of the first measurements 22 22 1
Step 3.6 Water consumption recordings on the new consumers with a time
resolution of 1 minute (without UFR) 23 24 2
November
Not applicable due to the complexity of the internal plamping sytem of the houses
December
Preparatory
phase,
Acquisition etc.
GANTT TESTS 2.5 activities in 2013
The Worksheet is protected without a password, so that you can insert actual data of implementation in your pilot
This worksheet was completed by
January February March April May June July July August September October
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos24
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
Test
Period
SubDMA
Master
meter
Sum of
consumer
meters
Difference
From To days m3
m3
m3
% m3
/day m3
/meter/day
Old water meters without UFR 11/03/2013 04/04/2013 24 690 664 26 3,77% 1,08 0,014
Old water meters with UFR 22/04/2013 08/05/2013 16 467 453 14 3,00% 0,88 0,011
New water meters with UFR 11/06/2013 25/06/2013 14 466 466 0 0,00% 0,00 0,000
New water meters without UFR 01/07/2013 15/07/2013 14 436 412 24 5,50% 1,71 0,022
Activity 2.5 Test 1 - Results
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos25
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
Activity 2.5 Test 1 - Installation of UFRs
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos26
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
The house plumping system in Cyprus provides ‘municipal’ water supply in the garden, the
kitchen and the cold water storage tank. Also the cold water storage tank provides water
supply to the house and the solar water heater.
Due to the above complexity and the need of at least 5 data loggers per consumer, the test
could not be performed.
‘Municipal’ water supply to kitchen
cold water supply to house
‘Municipal’
water supply
to the garden
Water meter
Storage tank (cold water)
Storage tank (hot water)
Solar thermal collectors
hot water supply to house
House plumping schematic
Test 2 - Assessment of the impact of private storage tanks on water metering
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos27
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
Activity 2.5 Test 3 - Customer meter logging
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos28
Lemesos Pilot Project
Activity 2.5: Evaluation of Commercial Losses
Logging of consumer meter with 1 minute logging rate
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos29
Lemesos Pilot Project
Planned Activities for the next 6 months
The Minimum Night Flow (MNF) is currently very low. Leakage in the DMA is at a very low level and
is considered uneconomic to search for more leaks. The DMA Minimum Night Flow (MNF) is
continuously monitored and if increased, then Activity 2.4 will be applied again.
Task 2: Pilot Project 2014
Activities / Task 1 2 3 4 5 6 7 8 9 10 11 12
Activity 2.3 Recalculation of NRW components
Activity 2.4
Evaluation of
Real Losses
Noise Loggers
Correlators
Leak Repairs
Quantify water recovered
(July 2014 to December 2014)
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos30
Water Demand Management activities
 Division of the network into DMAs
 Pressure Management
 Pipeline and Asset Management (Selection, Installation and Maintenance
with high quality materials and procedures)
 Knowledge of the network (Correct maps, continuous monitoring of flow
and pressure with Telemetry or other logging equipment)
 Speed and Quality of Repairs
 Active Leakage Control
The application of the IWA Water Loss Task Force approach on Efficient Water
Demand Management has a positive effect on leakage reduction
Lemesos Pilot Project
Conclusions
2nd AQUAKNIGHT Conference,
21 May 2014, Aqaba, Jordan
Water Board Lemesos31
Maria Isaia
m.isaia@wbl.com.cy
THANK YOU
Lemesos Pilot Project

Contenu connexe

Tendances

Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslamGreg Gearheart
 
Illuminating Insights Into Well and Reservoir Optimisation Using Fibre-optic...
Illuminating Insights Into Well and Reservoir Optimisation Using  Fibre-optic...Illuminating Insights Into Well and Reservoir Optimisation Using  Fibre-optic...
Illuminating Insights Into Well and Reservoir Optimisation Using Fibre-optic...Society of Petroleum Engineers
 
SBIR Information Session, May 2017 - Gully Monitoring SBIR
SBIR Information Session, May 2017 - Gully Monitoring SBIR SBIR Information Session, May 2017 - Gully Monitoring SBIR
SBIR Information Session, May 2017 - Gully Monitoring SBIR Smart Dublin
 
Up on the Rooftop: Updating HVAC Rooftop UnitPerformance
Up on the Rooftop: Updating HVAC Rooftop UnitPerformanceUp on the Rooftop: Updating HVAC Rooftop UnitPerformance
Up on the Rooftop: Updating HVAC Rooftop UnitPerformanceE Source Companies, LLC
 
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...Deltares
 
Xylem WasteWater instrumentation presentation (291015)
Xylem WasteWater instrumentation presentation (291015)Xylem WasteWater instrumentation presentation (291015)
Xylem WasteWater instrumentation presentation (291015)Oliver Puckering
 
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_Naimish Raval
 
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2AMETEK STC
 
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-1510 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-15indiawrm
 
Automated Water Management and Distribution System using DTMF
Automated Water Management and Distribution System using DTMFAutomated Water Management and Distribution System using DTMF
Automated Water Management and Distribution System using DTMFijtsrd
 
Pentair - Coastal Capability
Pentair - Coastal CapabilityPentair - Coastal Capability
Pentair - Coastal CapabilityChris Goding
 
Accessing Your Lake Water Supply During Drought Conditions
Accessing Your Lake Water Supply During Drought ConditionsAccessing Your Lake Water Supply During Drought Conditions
Accessing Your Lake Water Supply During Drought ConditionsThe Texas Network, LLC
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 indiawrm
 

Tendances (14)

Ca industrial storm water program brainslam
Ca industrial storm water program brainslamCa industrial storm water program brainslam
Ca industrial storm water program brainslam
 
Illuminating Insights Into Well and Reservoir Optimisation Using Fibre-optic...
Illuminating Insights Into Well and Reservoir Optimisation Using  Fibre-optic...Illuminating Insights Into Well and Reservoir Optimisation Using  Fibre-optic...
Illuminating Insights Into Well and Reservoir Optimisation Using Fibre-optic...
 
SBIR Information Session, May 2017 - Gully Monitoring SBIR
SBIR Information Session, May 2017 - Gully Monitoring SBIR SBIR Information Session, May 2017 - Gully Monitoring SBIR
SBIR Information Session, May 2017 - Gully Monitoring SBIR
 
Up on the Rooftop: Updating HVAC Rooftop UnitPerformance
Up on the Rooftop: Updating HVAC Rooftop UnitPerformanceUp on the Rooftop: Updating HVAC Rooftop UnitPerformance
Up on the Rooftop: Updating HVAC Rooftop UnitPerformance
 
Adcp procurement note
Adcp procurement noteAdcp procurement note
Adcp procurement note
 
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...
DSD-INT 2018 A Methodology Study for Model Build and Calibration of 2D Hydrod...
 
Xylem WasteWater instrumentation presentation (291015)
Xylem WasteWater instrumentation presentation (291015)Xylem WasteWater instrumentation presentation (291015)
Xylem WasteWater instrumentation presentation (291015)
 
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
 
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2
Brochure Measurement Solutions for the Water and Wastewater Industries Ver#2
 
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-1510 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
 
Automated Water Management and Distribution System using DTMF
Automated Water Management and Distribution System using DTMFAutomated Water Management and Distribution System using DTMF
Automated Water Management and Distribution System using DTMF
 
Pentair - Coastal Capability
Pentair - Coastal CapabilityPentair - Coastal Capability
Pentair - Coastal Capability
 
Accessing Your Lake Water Supply During Drought Conditions
Accessing Your Lake Water Supply During Drought ConditionsAccessing Your Lake Water Supply During Drought Conditions
Accessing Your Lake Water Supply During Drought Conditions
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
 

Similaire à 3.4. wbl maria isaia - lemesos pilot

2.1. sgi alessandro bettin - focus on technical activities
2.1. sgi   alessandro bettin - focus on technical activities2.1. sgi   alessandro bettin - focus on technical activities
2.1. sgi alessandro bettin - focus on technical activitiesmalshafey
 
3.3. sonede mondher benaich - tunis pilot
3.3. sonede   mondher benaich - tunis pilot3.3. sonede   mondher benaich - tunis pilot
3.3. sonede mondher benaich - tunis pilotmalshafey
 
3.5. iren nicola bazzurro - genova pilot
3.5. iren   nicola bazzurro - genova pilot3.5. iren   nicola bazzurro - genova pilot
3.5. iren nicola bazzurro - genova pilotmalshafey
 
4.2. sgi alessandro bettin - palm and autoleak recent experiences from adva...
4.2. sgi   alessandro bettin - palm and autoleak recent experiences from adva...4.2. sgi   alessandro bettin - palm and autoleak recent experiences from adva...
4.2. sgi alessandro bettin - palm and autoleak recent experiences from adva...malshafey
 
Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...EIP Water
 
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water Supply
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water SupplyNon Revenue Water Reduction- A Tool for Achiving 24x7 Water Supply
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water SupplyIOSR Journals
 
3.2. awco roshdy bekir - alexandria pilot
3.2. awco   roshdy bekir - alexandria pilot3.2. awco   roshdy bekir - alexandria pilot
3.2. awco roshdy bekir - alexandria pilotmalshafey
 
Endress+Hauser : Overview & Innovation in W&WWTP Instrumentation
Endress+Hauser : Overview & Innovation in W&WWTP InstrumentationEndress+Hauser : Overview & Innovation in W&WWTP Instrumentation
Endress+Hauser : Overview & Innovation in W&WWTP Instrumentationyann lafforgue
 
CFD Analysis of faucet aerator
CFD Analysis of faucet aeratorCFD Analysis of faucet aerator
CFD Analysis of faucet aeratorMalik Abdul Wahab
 
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...Deltares
 
Smart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSmart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSai Bhaskar Reddy Nakka
 
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORWATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORdeepa bhatia
 
Mod subaqueous flowtite
Mod subaqueous flowtiteMod subaqueous flowtite
Mod subaqueous flowtitelcs13262
 
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...Blue Planet Symposium
 
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014Sentinel-3 Future Products Overview - EUMETCast User Forum 2014
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014EUMETSAT
 
Assessing_the_effectiveness_of_WSUD_in_SEQ
Assessing_the_effectiveness_of_WSUD_in_SEQAssessing_the_effectiveness_of_WSUD_in_SEQ
Assessing_the_effectiveness_of_WSUD_in_SEQNathaniel Parker
 
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITY
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITYTHE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITY
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITYiQHub
 
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...IRJET Journal
 
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBON
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBONDESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBON
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBONIRJET Journal
 

Similaire à 3.4. wbl maria isaia - lemesos pilot (20)

2.1. sgi alessandro bettin - focus on technical activities
2.1. sgi   alessandro bettin - focus on technical activities2.1. sgi   alessandro bettin - focus on technical activities
2.1. sgi alessandro bettin - focus on technical activities
 
3.3. sonede mondher benaich - tunis pilot
3.3. sonede   mondher benaich - tunis pilot3.3. sonede   mondher benaich - tunis pilot
3.3. sonede mondher benaich - tunis pilot
 
3.5. iren nicola bazzurro - genova pilot
3.5. iren   nicola bazzurro - genova pilot3.5. iren   nicola bazzurro - genova pilot
3.5. iren nicola bazzurro - genova pilot
 
4.2. sgi alessandro bettin - palm and autoleak recent experiences from adva...
4.2. sgi   alessandro bettin - palm and autoleak recent experiences from adva...4.2. sgi   alessandro bettin - palm and autoleak recent experiences from adva...
4.2. sgi alessandro bettin - palm and autoleak recent experiences from adva...
 
Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...
 
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water Supply
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water SupplyNon Revenue Water Reduction- A Tool for Achiving 24x7 Water Supply
Non Revenue Water Reduction- A Tool for Achiving 24x7 Water Supply
 
3.2. awco roshdy bekir - alexandria pilot
3.2. awco   roshdy bekir - alexandria pilot3.2. awco   roshdy bekir - alexandria pilot
3.2. awco roshdy bekir - alexandria pilot
 
Endress+Hauser : Overview & Innovation in W&WWTP Instrumentation
Endress+Hauser : Overview & Innovation in W&WWTP InstrumentationEndress+Hauser : Overview & Innovation in W&WWTP Instrumentation
Endress+Hauser : Overview & Innovation in W&WWTP Instrumentation
 
CFD Analysis of faucet aerator
CFD Analysis of faucet aeratorCFD Analysis of faucet aerator
CFD Analysis of faucet aerator
 
Sensors for Agriculture & Water
Sensors for Agriculture & WaterSensors for Agriculture & Water
Sensors for Agriculture & Water
 
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
DSD-INT 2015 - Assessment using delft3 d of the impact of canal del dique - j...
 
Smart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSmart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdapt
 
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORWATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
 
Mod subaqueous flowtite
Mod subaqueous flowtiteMod subaqueous flowtite
Mod subaqueous flowtite
 
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...
C3.02: EMSA’s Integrated Maritime Services: improving operational maritime aw...
 
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014Sentinel-3 Future Products Overview - EUMETCast User Forum 2014
Sentinel-3 Future Products Overview - EUMETCast User Forum 2014
 
Assessing_the_effectiveness_of_WSUD_in_SEQ
Assessing_the_effectiveness_of_WSUD_in_SEQAssessing_the_effectiveness_of_WSUD_in_SEQ
Assessing_the_effectiveness_of_WSUD_in_SEQ
 
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITY
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITYTHE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITY
THE ART OF REDUCING LEAKAGE – BLENDING SMART ANALYTICS WITH SIMPLICITY
 
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
Sediment Assessment of UJJANI Reservoir in Maharashtra by using Remote Sensin...
 
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBON
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBONDESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBON
DESALINATION OF SEAWATER USING WATER HYACINTH ACTIVATED CARBON
 

Dernier

Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 

Dernier (20)

Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Green Banking
Green Banking Green Banking
Green Banking
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 

3.4. wbl maria isaia - lemesos pilot

  • 1. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos1 LEMESOS PILOT PROJECT Maria Isaia, Water Board Lemesos m.isaia@wbl.com.cy 2nd AQUAKNIGHT Conference "Water Loss Management in the Mediterranean Countries: the AQUAKNIGHT Project Results“ 21 May 2014, Aqaba, Jordan
  • 2. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos2 Contents of the Presentation • Introduction about the Lemesos Water Board • Introduction about the Lemesos Pilot Area • Pilot Activities to date (up to May 2014) • Pilot activities planned for the next 6 months (June 2014 - December 2014)
  • 3. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos3 Water Board of Lemesos Water Board of Lemesos  Established in 1951  Semi-government, non-profit organization  Supply of potable water only  Number of employees : 100  Area served : 100 km2  Population Served : 170.000  Annual water supply : 16 million m3  Number of consumers : 100.000  Length of pipe network : 1.000 km  Annual turnover : € 20 million  30 Reservoirs, 65.500 m3 storage capacity  Elevations from 0 to 430 m  10 Pressure Zones  83 DMAs  Average daily water supply 43.800 m3
  • 4. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos4 Water Board of Lemesos Water Supply System
  • 5. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos5 Water Board of Lemesos Water Supply Network • 30 Reservoirs • 65.500 m3 storage • Elevations from 0 to 430 m • 10 Pressure Zones • 83 DMAs • 1.000 Km pipe network • Average daily water supply 43.800 m3 DMA Design Key Considerations DMA categories Small : <1.000 properties Medium : 1.000 – 3.000 properties Large : 3.000 – 5.000 properties Factors considered in DMA design  Minimum variation in ground level  Single entry point into the DMA  Well defined DMA boundaries  Area meters correctly sized and located  Apply pressure management  Continuous monitoring Water Board of Lemesos
  • 6. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos6 DMA 921 is divided into 3 smaller DMAs • DMA 324 • DMA 327 • DMA 328 The division of DMA 921 was planned in order to improve the operation and control of the water supply network, to reduce the pressure and subsequently leakage. DMA921 DMA324 DMA327 DMA328 Min Elevation 68m 76m 82m 72m Max Elevation 116m 105m 110m 110m PRV No Yes No Yes Min Pressure 16m 20m 22m 22m Max Pressure 64m 45m 50m 38m DMA327 will be further divided Lemesos Pilot Project Introduction to Lemesos Pilot DMA
  • 7. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos7 INLET CHAMBER Flow meter, pressure regulation, Telemetry Average Pressure High Pressure Low PressureSub-District Lemesos Pilot Project Introduction to Lemesos Pilot DMA
  • 8. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos8 Pilot Area Sub-District No. of inlets 1 1 No. of Closed boundary valves 6 1 No. of flow monitors installed 1 1 Network length and prevalent material 7,8 Km Asbestos Cement (AC) 1,15 Km Asbestos Cement (AC) No. of connections/Km 37 31,3 No. of meters 361 78 Estimated population 718 155 Private tanks (yes/no) Yes Yes Minimum and maximum elevation (m) 76 - 105 72 - 84 Average pressure (m) 32 30 Lemesos Pilot Project Introduction to Lemesos Pilot DMA
  • 9. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos9 Task / Activities 2012 2013 2014 Task 2: Pilot Projects 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 Activity 2.1 Acquisition of equipment Activity 2.2 Active Leakage Control Activity 2.3 Calculation of NRW components Activity 2.4 Evaluation of Real Losses Activity 2.5 Evaluation of Apparent Losses Lemesos Pilot Project Pilot Project Activities up to May 2014
  • 10. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos10 Equipment and supplies Total Cost Date of receipt TBox RTU complete with panel box and photovoltaic module € 2.407 September 2012 100 Customer meters (DN15, Q3=2.5 R=315 Volumetric) € 2.515 15/03/2013 Automatic meter reading (100 MIU modules, Hand Held Computer and Software) € 5.667 15/03/2013 Pressure meters (upstream and downstream of the DMA PRV) € 394 August 2012 GSM Data loggers with integral pressure transducer € 4.054 June 2012 Unmeasured Flow Reducers (UFR) € 2.859 28/03/2013 Master Meters (DN100 for the Pilot DMA and DN50 For the Sub-District) € 1.602 July 2012 Pressure Reducing Valves (PRVs) DN100 for Pilot DMA and DN50 for Sub-District € 1.685 August 2012 Subtotal Equipment and supplies € 21.183 Infrastructure Total Cost Date of execution Leak detection € 5.000 Finished by the end of October 2013 Civil works for meters and tanks testing € 5.000 Finished by the end of October 2013 Civil works for valves installation and district set up € 5.000 Finished by the end of December 2012 Leak repairs in the district € 5.000 Finished by the end of October 2013 Subtotal Infrastructure € 20.000 Lemesos Pilot Project 2.1 Procurements
  • 11. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos11 Lemesos Pilot Project 2.2 Active Leakage Control Equipment Installation and District setup
  • 12. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos12 Lemesos Pilot Project 2.2 Active Leakage Control Zero Pressure Test
  • 13. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos13 Lemesos Pilot Project 2.2 Active Leakage Control
  • 14. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos14 Lemesos Pilot Project 2.2 Active Leakage Control
  • 15. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos15 Lemesos Pilot Project 2.2 Active Leakage Control
  • 16. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos16 Lemesos Pilot Project 2.2 Active Leakage Control Actual MNF Metered Properties Residential properties Commercial properties Exceptional Commercial Use Residential Night Use Commercial Night Use Background Losses Target Night Flow Actual Total Losses Locatable Losses m3 /h No. % No. No. m3 /h m3 /h m3 /h m3 /h m3 /h m3 /h m3 /h 1,44 361 90 325 36 0,50 0,32 0,57 0,45 1,34 0,55 0,10 DMA324 Minimum Night Flow analysis
  • 17. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos17 Lemesos Pilot Project 2.2 Active Leakage Control Pilot DMA Pressure monitoring (Hi, Mid and Lo)
  • 18. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos18 Lemesos Pilot Project 2.3 Water Loss Calculation 1 1,1 1.1.1 1.1.1.1 A. Distribution Authorised Billed Revenue Water Input Consumption Authorised 17.671 Volume Consumption 1.1.1.2 17.671 17.671 63,61% 0 17.671 1.1.2 1.1.2.1 B. Unbilled Authorised Non- Revenue Consumption 0 1.1.2.2 0 0 1,2 1.2.1 1.2.1.1 27.782 Water Apparent Losses Losses 88 972 1.2.1.2 10.111 3,50% 36,39% 884 10.111 1.2.2 1.2.2.1 Real Losses 8.517 1.2.2.2 9.139 32,90% 0 1.2.2.3 622 Simplified Water Balance using the IWA methodology (all figures in m3) Unbilled Metered Consumption Unbilled Un-metered Consumption Unauthorised Consumption Customer Metering Inaccuracies Period: 2/1/2013 to 2/5/2013 (120 days) Billed Metered Consumption Billed Un-metered Consumption Leakage on Transmission and/or Distribution Mains Leakage and Overflows at Utility’s Storage Tanks Leakage on Service Connections
  • 19. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos19 Lemesos Pilot Project 2.3 Water Loss Calculation 1 1,1 1.1.1 1.1.1.1 A. Distribution Authorised Billed Revenue Water Input Consumption Authorised 42.638 Volume Consumption 1.1.1.2 42.638 42.638 85,76% 0 42.638 1.1.2 1.1.2.1 B. Unbilled Authorised Non- Revenue Consumption 0 1.1.2.2 0 0 1,2 1.2.1 1.2.1.1 49.717 Water Apparent Losses Losses 213 2.345 1.2.1.2 7.079 4,72% 14,24% 2.132 7.079 1.2.2 1.2.2.1 Real Losses 4.112 1.2.2.2 4.734 9,52% 0 1.2.2.3 622 Simplified Water Balance using the IWA methodology (all figures in m3) Period: 2/5/2013 to 2/1/2014 (245 days) Billed Metered Consumption Billed Un-metered Consumption Unbilled Metered Consumption Unbilled Un-metered Consumption Unauthorised Consumption Customer Metering Inaccuracies Leakage on Transmission and/or Distribution Mains Leakage and Overflows at Utility’s Storage Tanks Leakage on Service Connections
  • 20. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos20 2.4 Leak detection noise loggers and correlator YES October 2013 2.4 Leak repairs under continuous flow monitoring YES October 2013 2.4 Quantify water recovered YES October 2013 Lemesos Pilot Project 2.4 Evaluation of Real Losses Logging a large consumer (private hospital) to determine the effect on MNF Noise logger deployment Noise logger patrolling
  • 21. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos21 DMA 324 Deployment Patrol Correllation 08/10/2013 09/10/2013 Permalog No. Location Leak / No Leak Level Spread 2090742 SV Ελλης Λαμπέττη 14 N 11 14 2090743 FH Ελλης Λαμπέττη N 8 28 2090744 SV Τζένης Καρέζη N 9 13 2090747 FH Εκτωρος 10 N 6 27 2090751 FH Αγ. Μάρωνος Θεωγνισος N 8 10 2090752 FH Σκάρλατη L 26 5 2090757 FH Ελλης Λαμπέτη N 11 17 2090759 SV Ελλης Λαμπέτη Crossing N 8 6 2090774 SV Τζένης Καρέζη 2090776 FH Εκτωρος N 8 12 2090783 FH Γιώργου Ζαμπέττα N 3 8 2090787 FH Σκαρλατη 23 N 15 7 2090789 SV Αιμίλιου Φράγκου N 13 7 2090795 SV Βασίλη Τσιτσάνη & Σκαρλάτη N 18 6 2090799 SV Απ. Καλδάρα L 31 3 2090801 SV Αιμ. Φράγκου N 16 5 2090802 SV Σκαρλάτη 3 N 16 4 2090803 FH Μαρίας Ρούσου & Ημαθίας N 8 5 2090804 SV Απ. Καλδάρα N 15 10 2090807 SV Σκαρλάτη & Ελλης Λαμπέτη L 40 10 2090809 SV Σκαρλάτη & Αγ. Μάρωνος N 4 12 2090815 SV Τζενης Καρέζη N 3 6 2090816 SV Ελλής Λαμπέτη & Σουμπερτ L 23 6 2090820 SV Σκαρλάτη 23 N 11 9 2090827 FH Απ. Καλδάρα Φροντιστήριο L 35 3 Leaking FH 2090829 FH Ημαθίας N 3 4 2090831 SV Έλλης Λαμπέτη (τέρμα) N 9 4 Lemesos Pilot Project 2.4 Evaluation of Real Losses Leak Noise Logger Deployment and patrolling at DMA324 95 Leak Noise Loggers Deployed 12 Loggers detected noise 2 Leaks detected 48 m3 /day recovered
  • 22. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos22 Lemesos Pilot Project 2.4 Evaluation of Real Losses
  • 23. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos23 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses Utility Water Board of Lemesos Zone DMA 324 Name Solomos Charalambous start end Duration Date start end 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 [tot. weeks] ACTIVITY 2.5. TEST 1 UFR Test to quantify enhancement in water metering (coordinated by IREN) To be implemented in all pilots 1 19 19 Step 1.1 Consumer Audit 1 4 4 Step 1.2 Sub-district Master Meter installation 5 5 1 Step 1.3 Field test exercise (4 months duration) 5 5 1 Stage 1.3.1 Readings of the existing consumer meters and the Sub-district master meter 6 7 2 UFR Installation upstream (or downstream) and adiacent the old revenue water meter 8 9 2 Stage 1.3.2 Readings of the existing consumer meters + UFR and the Sub-district master meter 10 11 2 Old revenue water meters replacement with AMR 12 13 2 Send 20 selected old meters + 5 new meters to UNIPA laboratory 14 15 2 Stage 1.3.3 Readings of the AMR consumer meters + UFR and the Sub-district master meter 14 15 2 UFR unit removal 16 17 2 Stage 1.3.4 Readings of the new AMR consumer meters and the Sub-district master meter 18 19 2 TEST 2 The assessment of the impact of private storage tanks on water metering (coordinated by UNIPA) To be implemented only in the pilots of AW and WBL 12 24 13 TEST 3 The determination of customer demand patterns and legitimate night use by customers (coordinated by Signal Generix, with support of UNIPA and IREN) To be implemented in AWCO, Sonede and IREN 16 24 9 Step 3.1 Installation of Data Loggers on 1-5 consumers based on the description of Test3 16 17 2 Step 3.2 UFR unit removed as in 1.3.3 16 17 Step 3.3 Water consumption recording with a time resolution of 1 minute (without UFR) 18 19 2 Step 3.4 Send Results to SG for a preliminary analysis and assesment of the quality of the measurements 20 21 2 Step 3.5 Installation of Data Loggers on other 1-5 consumers based on directions of SG after the analysis of the first measurements 22 22 1 Step 3.6 Water consumption recordings on the new consumers with a time resolution of 1 minute (without UFR) 23 24 2 November Not applicable due to the complexity of the internal plamping sytem of the houses December Preparatory phase, Acquisition etc. GANTT TESTS 2.5 activities in 2013 The Worksheet is protected without a password, so that you can insert actual data of implementation in your pilot This worksheet was completed by January February March April May June July July August September October
  • 24. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos24 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses Test Period SubDMA Master meter Sum of consumer meters Difference From To days m3 m3 m3 % m3 /day m3 /meter/day Old water meters without UFR 11/03/2013 04/04/2013 24 690 664 26 3,77% 1,08 0,014 Old water meters with UFR 22/04/2013 08/05/2013 16 467 453 14 3,00% 0,88 0,011 New water meters with UFR 11/06/2013 25/06/2013 14 466 466 0 0,00% 0,00 0,000 New water meters without UFR 01/07/2013 15/07/2013 14 436 412 24 5,50% 1,71 0,022 Activity 2.5 Test 1 - Results
  • 25. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos25 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses Activity 2.5 Test 1 - Installation of UFRs
  • 26. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos26 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses The house plumping system in Cyprus provides ‘municipal’ water supply in the garden, the kitchen and the cold water storage tank. Also the cold water storage tank provides water supply to the house and the solar water heater. Due to the above complexity and the need of at least 5 data loggers per consumer, the test could not be performed. ‘Municipal’ water supply to kitchen cold water supply to house ‘Municipal’ water supply to the garden Water meter Storage tank (cold water) Storage tank (hot water) Solar thermal collectors hot water supply to house House plumping schematic Test 2 - Assessment of the impact of private storage tanks on water metering
  • 27. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos27 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses Activity 2.5 Test 3 - Customer meter logging
  • 28. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos28 Lemesos Pilot Project Activity 2.5: Evaluation of Commercial Losses Logging of consumer meter with 1 minute logging rate
  • 29. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos29 Lemesos Pilot Project Planned Activities for the next 6 months The Minimum Night Flow (MNF) is currently very low. Leakage in the DMA is at a very low level and is considered uneconomic to search for more leaks. The DMA Minimum Night Flow (MNF) is continuously monitored and if increased, then Activity 2.4 will be applied again. Task 2: Pilot Project 2014 Activities / Task 1 2 3 4 5 6 7 8 9 10 11 12 Activity 2.3 Recalculation of NRW components Activity 2.4 Evaluation of Real Losses Noise Loggers Correlators Leak Repairs Quantify water recovered (July 2014 to December 2014)
  • 30. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos30 Water Demand Management activities  Division of the network into DMAs  Pressure Management  Pipeline and Asset Management (Selection, Installation and Maintenance with high quality materials and procedures)  Knowledge of the network (Correct maps, continuous monitoring of flow and pressure with Telemetry or other logging equipment)  Speed and Quality of Repairs  Active Leakage Control The application of the IWA Water Loss Task Force approach on Efficient Water Demand Management has a positive effect on leakage reduction Lemesos Pilot Project Conclusions
  • 31. 2nd AQUAKNIGHT Conference, 21 May 2014, Aqaba, Jordan Water Board Lemesos31 Maria Isaia m.isaia@wbl.com.cy THANK YOU Lemesos Pilot Project