SlideShare une entreprise Scribd logo
1  sur  5
Manish Aggarwal
  DOB: 2nd April, 1977; Marital Status: Married
  Ph.+91-9347212393 (Visakhapatnam); +91-9313704441 (Delhi), +91-9555044441®
  Email: manish.erp@hotmail.com
  URL: http://in.linkedin.com/in/manishaggarwal77

PROFILE SUMMARY
   • +14 Years of IT experience with +9 years in SAP; 6 full life cycle experience in SAP R/3.
   • IT Management, planning & execution.
   • Programming on Web Technology using Java/Web Servers/Databases/Web Hosting and Oracle/D2K platform.

EDUCATION
• Advanced Post Graduate Diploma in Computer Application (APGDCA) from Maharishi Dayand University, Rohtak
   (Haryana) - 2004.
• Post Graduate Diploma in Business Administration (PGDBA) from International Management Institute, Qutab Institu-
   tional Area, New Delhi - 2001.
• B.A. (Operational Research, Economics, Computers & English) from Delhi University -1997.
• Schooling from Prabhu Dayal Public School (CBSE Board), Shalimar Bagh, New Delhi.

PROFESSIONAL TRAININGS
Course Name                 Institution                                                   Period
QMS & ISO 9001:2008         Ministry of Small & Medium Enterprises, Okhla, New Delhi      Dec. 2010
SAP DFPS 66-67              SIEMENS ATC, New Delhi (Conducted by SAP AG)                  March 2010
SUN-JAVA                    STG International, New Delhi                                  April 2001
Microsoft Certified Systems
                            STG International, New Delhi                                  Dec.99-Feb.2000
Engineer
Oracle 7.x/D2K              SQL * International, New Delhi                                July-Nov. 1997
Masters Diploma in Soft-
                            APTECH Computer Education, New Delhi                          Aug.94-Oct. 97
ware engineering

PROFESSIONAL HISTORY
        Designation                     Duration                            Organization

Team Lead – SAP QM/PM &
                               Nov. 2011 till date         IBM India Pvt. Ltd. – Noida
Validation Consultant
Lead IT Consultant - SAP       April 2011 Nov. 2011        Fujitsu Consulting India Ltd. – Noida
                                                           Siemens IT Solution & Services Pvt. Ltd. – Gur-
Consultant – SAP               Oct.2008 to April 2011
                                                           gaon
Associate Consultant – SAP     Sept.2006 to Sept. 2008     S2 InfoTech Ltd. – Gurgaon
Techno. Functional Consul-
                               Aug 2004 to Sept. 2006      Coconut Software Pvt. Ltd. - Navi Mumbai
tant – SAP
System Analyst                 Feb.98 to Aug.2004          Jindal Stainless Ltd. – Hisar (Haryana)

ROLE & RESPONSIBILITY IN VARIOUS UNDERLYING SAP PROJECTS
• Preliminary study, Pre Sales Demo, As Is & BBP Preparation, SAP Validation, Realization, Baseline Configuration,
  ABAP requirement & scope finalization, FS preparation, Unit Testing, Integration Testing, IMG Documentation, Key &
  End User Training, Master Data Preparation & Uploading, Cut Over Plan / Open Transactions, Post Go Live support.
• Integration with : Production Planning & Control, Material Management, Sales & Distribution, Plant maintenance,
  Project System, HR & payroll, Enterprise Portal, BW, Workflow management, SRM (Suppliers Relationship Manage-
  ment), Finance, Costing, Legacy System, XI/PI, DMS.
• Team Lead, Solution Architect, Consultant, IT, Audit, Project Quality Manager, Developer




Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant                                       Page 1 of 5
PROJECT/ASSIGNMENT DETAILS
          Client / Project    Project Type / Indus-
S. No.                                                   Role / Duration             Project Details
                Tile                   try
Organization : IBM India Pvt. Ltd. (Nov. 2011 till date)
                                                                             •   Team Size : 14
                                                                             •   Status : Post Go-Live Sup-
                                                                                 port
                                                                             •   Responsibility
        Eisai Pharmatech-                                                             o Team Lead - SAP
                                                       SAP Validation &
        nology & Manufac-                                                                 Validation & PM
                              Implementation / Phar-   PM Consultant
1       turing    Pvt. Ltd.                                                               Module
                              maceutical / Onsite      (Nov. 2011 till May
        at Visakhapatnam /
                                                       2012)                 •   Additional responsibility
        Hayato                                                                        o Post Go Live Sup-
                                                                                          port for QM Mod-
                                                                                          ule
                                                                                      o Critical develop-
                                                                                          ment in QM Module
Organization : Fujitsu Consulting India (April 2011 to Nov. 2011)
                                                                             •   Team Size : 10
                                                                             •   E2E Implementation
                                                                             •   Status : Realization Phase
                                                                             •   Achievement :
                                                                                     o Designed            SAP
                                                                                          PLM QM interfaces
        Al Khalij Holding –   Implementation           Team Lead – SAP                    with FLSmidth Au-
2       Gulf Cement Co. at    Project /Cement/On-      QM/PM (April 2011                  tomation      System
        Doha-Qatar            site                     to Nov. 2011)                      for Plant i.e. for ce-
                                                                                          ment and minerals
                                                                                          industries
                                                                                     o SAP QGate used
                                                                                          as a ASAP imple-
                                                                                          mentation method-
                                                                                          ology
Organization : Siemens IT Solution & Services Pvt. Ltd. (2006 till 2011)
                            Improvement Project /    Team Lead SAP
                                                                             •   Team Size : Variable
        SUBROS/Unit Lev- Electronics (Manufac-       QM Module
3                                                                            •   To map & implement “cost
        el Accounting       turer of car air condi-  (March - Apr.
                                                                                 of quality”.
                            tioner)                  2011)
4       SIEMENS / Rapid- Internal project / Ob-      SAP QM /PM Con-         •   Team Size : 14
        SAP@SIS             jective : To reduce im- sultant (Jan. –Feb.      •   Responsibility : Preparing
                            plementation cost &      2011)                       global implementation tem-
                            time                                                 plate using BC-Set
5       Pricol, Coimbatore  BBP Audit / Automo-      SAP Consultant          •   Internal audit for BBP
                            tive parts               (Jan. 2011)                 phase
6       INDIAN Army /       Project Preparation /    Team Lead SAP           •   Team Size : 20
        CICP                Defense                  QM Module (Sept.-       •   Responsibility : SAP
                                                     Dec. 2010)                  DFPS / QM module
7       SAIL- Bhilai Steel  Implementation & Sup- Team Lead SAP              •   Team Size : 40 – 80
        Plant / Utkarsh     port / Steel             QM Module (Nov.         •   Module Team Size : 02-07
                                                     2008 to Sept.           •   E2E Implementation
                                                     2010)                   •   Achievement : Design a
                                                                                 number of interfaces with
                                                                                 Oracle based legacy sys-
                                                                                 tem using SAP-XI/PI
8.      Cadbury Pakistan      Rollout / FMCG           SAP QM / PM           •   Team Size : 07
        Ltd.                                           Consultant (June      •   Offshore (Project site :
                                                       2008 to Oct. 2008)        Cadbury India Ltd.-Mum-

Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant                                         Page 2 of 5
bai)
9       House of Pearl        Post Go Live Support /    SAP QM Consul-         •   Team Size : 16
                              Garments                  tant (April 2008 to    •   Platform : SAP AFS 6.0
                                                        June 2008)             •   Achievement : Created
                                                                                   reusable implementation
                                                                                   template for garment indus-
                                                                                   try
10      Phoenix Lamps &       Implementation / Elec-    QM / PM Consul-        •   Team Size : 08
        Light / Ujala         trical                    tant, Project Quali-   •   E2E Implementation
                                                        ty Manager (May
                                                        2007 to March
                                                        2008)
11      Radico Khaithan       Upgrade from R/3 4.6      SAP QM Consul-         •   Team Size : Variable
                              to ECC 6.0 / Bever-       tant (Oct. 2007)
                              ages
12      Lumax Automotive      Implementation / Auto-    SAP QM Consul-         •   Team Size : 12
        Parts Ltd.            motive parts              tant (Oct. 2006 to     •   E2E Implementation
                                                        May 2007)
13      SUBROS                Upgrade from R/3 4.6      SAP QM Consul-         •   Team Size : Variable
                              to ECC 6.0 / Air-condi-   tant (Dec. 2006)
                              tioning
14      OSRAM Lamps &         Upgrade from R/3 4.6      SAP QM Consul-         •   Team Size : Variable
        Light                 to ECC 6.0 / Mechani-     tant (Oct. 2006)
                              cal
15      Jindal Steel & Pow-   Upgrade from R/3 4.6      SAP QM /PM Con-        •   Team Size : 07
        er Ltd.               to ECC 6.0 / Steel        sultant (Sept.
                                                        2006)
16      Nalwa Sponge Iron     Post Go Live Support /    SAP QM Consul-         •   Team Size : 11
        Ltd.                  Steel                     tant (Sept. 2006)
17      Pre Sale Assign-      Client Detail:            Solution Architect     •   Team Size : Variable
        ments                 • KSG Group, a            – SAP QM Module        •   Period : 2007 to 2010
                                  real-estate Co.
                              • Arcelor Mittal –
                                  Kazakhstan
                              • CRIS II - Center
                                  for Railway Infor-
                                  mation Systems
                              • DRDO
                              • Powergrid
                              • PRICOL, Coimbat-
                                  ore
                              • Mawna Sugars
                                  Ltd. – Gurgaon
                              • Abu Dhabi Nation-
                                  al Industrial
                                  Projects Ltd.
                              • Seamless Tube
                                  Plant, Arcelor Mit-
                                  tal, Jubail
                              • PARAS Dairy,
                                  Sahibabad, Delhi
                              • NHPC (National
                                  Hydro Power Cor-
                                  poration), Farid-
                                  abad
                              • SAIL. - Bhilai,
                                  Bokaro, Durgapur




Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant                                          Page 3 of 5
Organization : Coconut Software Pvt. Ltd. (2004-2006)
18      Sunstar Overseas    Implementation / Agri- SAP QM / PM              •   Team Size : 08
        Ltd.-Sonepat / Rev- culture                 Consultant (April       •   E2E Implementation
        olution                                     2006 to Sept.
                                                    2006)
19      Encore Group : En- Implementation / Phar- SAP QM Consul-            •   Team Size : 08
        core Natural        maceuticals & Natural   tant (Oct. 2005 to      •   E2E Implementation
        Polymers & Halcy-   Polymers                March 2006)
        on Labs, Encore
        Health Care, ZYG
        Pharma & Mumbai
        (HO) / Divya Dr-
        ishti
20      Kemwell Pvt. Ltd. – Merger / Pharmaceuti- SAP QM / PM               •   Team Size : Variable
        Bangalore           cals                    Consultant (Sept.       •   Merger of Kemwell &
                                                    2005)                       BioKem Pharmaceuticals
                                                                                having 2 different company
                                                                                code
21      Encube Ethicals       Implementation / Phar-   SAP QM Consul-       •   Team Size : 08
        Pvt. Ltd. (Mumbai)    maceuticals              tant (May 2005 to    •   Responsibility : Key/End
                                                       August. 2005)            User Training, Master Data
                                                                                Template preparation &
                                                                                Upload, Go-live prepara-
                                                                                tion, Post Go-Live Support
                                                                            •   E2E Implementation
22      Borosil       Glass   Implementation /         SAP QM Consul-       •   Team Size : 14
        Works Ltd. – Mum-     Glass                    tant (Nov. 2004 to   •   E2E Implementation
        bai & Gujarat                                  April 2005)
23      Kemwell Pvt. Ltd. –   Implementation / Phar-    SAP QM Consul-      •   Team Size : 10+
        Bangalore             maceuticals              tant (August 2004    •   E2E Implementation
                                                       to Oct. 2004)        •   Responsibility : End User
                                                                                Training, Project/Module
                                                                                documentation
Organization : Jindal Stainless Ltd. (1998-2004)
24      Jindal Stainless      SAP Implementation /     Core Team to SAP     •   Team Size : 20+
        Steel Ltd. – Hisar /  Steel                    Basis & QM mod-      •   R3 with APO Implementa-
        Project SPEED                                  ule (Dec. 2002 to        tion
                                                       May 2004)            •   Implementation partner:
                                                                                Siemens, Gurgaon
25      Jindal Steel & Pow-   SAP Implementation /     Project Coordina-    •    Implementation partner –
        er Ltd. - Raigarh     Steel                    tor                       Siemens
                                                                            •    R3 Implementation
26      Jindal Organization   Ecommerce Projects       Project C-ordina-    •   Tools Used : NT, Apache
                              • jindalsteel.com        tion & QA Testing        Server, MYSQL, ASP,
                                  (Corporate Web                                JavaScript, Flash, Photo-
                                  site)                                         shop
                              • jindalstainless.com
                                  (B2B Portal)
27      Jindal Organization   LAN / WAN imple-         System Adminis-      •   Team Size : 8+
        (Project Connect)     mentation with mailing   trator               •   Scope : NT Server / NT
                              solution                                          Workstation 4.0, Ms-Ex-
                                                                                change 5.5 : Connecting
                                                                                multiple locations using
                                                                                X.400 on V-SAT, Mail Serv-
                                                                                er (VPOP3 1.3), Proxy
                                                                                Server (Win Proxy 3.0),
                                                                                Firewall Server (Net Guard
                                                                                4.11), Fax Server (Wipro
                                                                                eFax), V-SAT Network
                                                                                (Monitoring & Controlling
Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant                                       Page 4 of 5
using Software Tools),
                                                                               RAS.
28      Jindal Organization    Fixing Y2K big across   System Adminis-     •   Team Size : 20+
        (Project Y2K)          the organization        trator              •   Changing oracle based ap-
                                                                               plication for Y2K bug.
                                                                           •   Installation Y2K patch to
                                                                               OS & servers.
29      Jindal Organization    In-house ERP Devel-     Analysis & Design   •   Team Size : 10+
        (Project Enterprise)   opment                  of Database /       •   Modules : Fixed Deposit
                                                       Forms / Reports,        System, Payroll & Employ-
                                                       Testing and Docu-       ee Information System,
                                                       mentation               Raw Material
                                                                               Procurement, Performance
                                                                               Analyzer
                                                                           •   Platform : D2K (Forms
                                                                               4.5), Oracle 7.3, NT 4.0,
                                                                               SCO UNIX 5.0.5




Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant                                   Page 5 of 5

Contenu connexe

En vedette

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 

En vedette (20)

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 

Profile Of Manish Aggarwal (Ibm Sap May 2012)

  • 1. Manish Aggarwal DOB: 2nd April, 1977; Marital Status: Married Ph.+91-9347212393 (Visakhapatnam); +91-9313704441 (Delhi), +91-9555044441® Email: manish.erp@hotmail.com URL: http://in.linkedin.com/in/manishaggarwal77 PROFILE SUMMARY • +14 Years of IT experience with +9 years in SAP; 6 full life cycle experience in SAP R/3. • IT Management, planning & execution. • Programming on Web Technology using Java/Web Servers/Databases/Web Hosting and Oracle/D2K platform. EDUCATION • Advanced Post Graduate Diploma in Computer Application (APGDCA) from Maharishi Dayand University, Rohtak (Haryana) - 2004. • Post Graduate Diploma in Business Administration (PGDBA) from International Management Institute, Qutab Institu- tional Area, New Delhi - 2001. • B.A. (Operational Research, Economics, Computers & English) from Delhi University -1997. • Schooling from Prabhu Dayal Public School (CBSE Board), Shalimar Bagh, New Delhi. PROFESSIONAL TRAININGS Course Name Institution Period QMS & ISO 9001:2008 Ministry of Small & Medium Enterprises, Okhla, New Delhi Dec. 2010 SAP DFPS 66-67 SIEMENS ATC, New Delhi (Conducted by SAP AG) March 2010 SUN-JAVA STG International, New Delhi April 2001 Microsoft Certified Systems STG International, New Delhi Dec.99-Feb.2000 Engineer Oracle 7.x/D2K SQL * International, New Delhi July-Nov. 1997 Masters Diploma in Soft- APTECH Computer Education, New Delhi Aug.94-Oct. 97 ware engineering PROFESSIONAL HISTORY Designation Duration Organization Team Lead – SAP QM/PM & Nov. 2011 till date IBM India Pvt. Ltd. – Noida Validation Consultant Lead IT Consultant - SAP April 2011 Nov. 2011 Fujitsu Consulting India Ltd. – Noida Siemens IT Solution & Services Pvt. Ltd. – Gur- Consultant – SAP Oct.2008 to April 2011 gaon Associate Consultant – SAP Sept.2006 to Sept. 2008 S2 InfoTech Ltd. – Gurgaon Techno. Functional Consul- Aug 2004 to Sept. 2006 Coconut Software Pvt. Ltd. - Navi Mumbai tant – SAP System Analyst Feb.98 to Aug.2004 Jindal Stainless Ltd. – Hisar (Haryana) ROLE & RESPONSIBILITY IN VARIOUS UNDERLYING SAP PROJECTS • Preliminary study, Pre Sales Demo, As Is & BBP Preparation, SAP Validation, Realization, Baseline Configuration, ABAP requirement & scope finalization, FS preparation, Unit Testing, Integration Testing, IMG Documentation, Key & End User Training, Master Data Preparation & Uploading, Cut Over Plan / Open Transactions, Post Go Live support. • Integration with : Production Planning & Control, Material Management, Sales & Distribution, Plant maintenance, Project System, HR & payroll, Enterprise Portal, BW, Workflow management, SRM (Suppliers Relationship Manage- ment), Finance, Costing, Legacy System, XI/PI, DMS. • Team Lead, Solution Architect, Consultant, IT, Audit, Project Quality Manager, Developer Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant Page 1 of 5
  • 2. PROJECT/ASSIGNMENT DETAILS Client / Project Project Type / Indus- S. No. Role / Duration Project Details Tile try Organization : IBM India Pvt. Ltd. (Nov. 2011 till date) • Team Size : 14 • Status : Post Go-Live Sup- port • Responsibility Eisai Pharmatech- o Team Lead - SAP SAP Validation & nology & Manufac- Validation & PM Implementation / Phar- PM Consultant 1 turing Pvt. Ltd. Module maceutical / Onsite (Nov. 2011 till May at Visakhapatnam / 2012) • Additional responsibility Hayato o Post Go Live Sup- port for QM Mod- ule o Critical develop- ment in QM Module Organization : Fujitsu Consulting India (April 2011 to Nov. 2011) • Team Size : 10 • E2E Implementation • Status : Realization Phase • Achievement : o Designed SAP PLM QM interfaces Al Khalij Holding – Implementation Team Lead – SAP with FLSmidth Au- 2 Gulf Cement Co. at Project /Cement/On- QM/PM (April 2011 tomation System Doha-Qatar site to Nov. 2011) for Plant i.e. for ce- ment and minerals industries o SAP QGate used as a ASAP imple- mentation method- ology Organization : Siemens IT Solution & Services Pvt. Ltd. (2006 till 2011) Improvement Project / Team Lead SAP • Team Size : Variable SUBROS/Unit Lev- Electronics (Manufac- QM Module 3 • To map & implement “cost el Accounting turer of car air condi- (March - Apr. of quality”. tioner) 2011) 4 SIEMENS / Rapid- Internal project / Ob- SAP QM /PM Con- • Team Size : 14 SAP@SIS jective : To reduce im- sultant (Jan. –Feb. • Responsibility : Preparing plementation cost & 2011) global implementation tem- time plate using BC-Set 5 Pricol, Coimbatore BBP Audit / Automo- SAP Consultant • Internal audit for BBP tive parts (Jan. 2011) phase 6 INDIAN Army / Project Preparation / Team Lead SAP • Team Size : 20 CICP Defense QM Module (Sept.- • Responsibility : SAP Dec. 2010) DFPS / QM module 7 SAIL- Bhilai Steel Implementation & Sup- Team Lead SAP • Team Size : 40 – 80 Plant / Utkarsh port / Steel QM Module (Nov. • Module Team Size : 02-07 2008 to Sept. • E2E Implementation 2010) • Achievement : Design a number of interfaces with Oracle based legacy sys- tem using SAP-XI/PI 8. Cadbury Pakistan Rollout / FMCG SAP QM / PM • Team Size : 07 Ltd. Consultant (June • Offshore (Project site : 2008 to Oct. 2008) Cadbury India Ltd.-Mum- Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant Page 2 of 5
  • 3. bai) 9 House of Pearl Post Go Live Support / SAP QM Consul- • Team Size : 16 Garments tant (April 2008 to • Platform : SAP AFS 6.0 June 2008) • Achievement : Created reusable implementation template for garment indus- try 10 Phoenix Lamps & Implementation / Elec- QM / PM Consul- • Team Size : 08 Light / Ujala trical tant, Project Quali- • E2E Implementation ty Manager (May 2007 to March 2008) 11 Radico Khaithan Upgrade from R/3 4.6 SAP QM Consul- • Team Size : Variable to ECC 6.0 / Bever- tant (Oct. 2007) ages 12 Lumax Automotive Implementation / Auto- SAP QM Consul- • Team Size : 12 Parts Ltd. motive parts tant (Oct. 2006 to • E2E Implementation May 2007) 13 SUBROS Upgrade from R/3 4.6 SAP QM Consul- • Team Size : Variable to ECC 6.0 / Air-condi- tant (Dec. 2006) tioning 14 OSRAM Lamps & Upgrade from R/3 4.6 SAP QM Consul- • Team Size : Variable Light to ECC 6.0 / Mechani- tant (Oct. 2006) cal 15 Jindal Steel & Pow- Upgrade from R/3 4.6 SAP QM /PM Con- • Team Size : 07 er Ltd. to ECC 6.0 / Steel sultant (Sept. 2006) 16 Nalwa Sponge Iron Post Go Live Support / SAP QM Consul- • Team Size : 11 Ltd. Steel tant (Sept. 2006) 17 Pre Sale Assign- Client Detail: Solution Architect • Team Size : Variable ments • KSG Group, a – SAP QM Module • Period : 2007 to 2010 real-estate Co. • Arcelor Mittal – Kazakhstan • CRIS II - Center for Railway Infor- mation Systems • DRDO • Powergrid • PRICOL, Coimbat- ore • Mawna Sugars Ltd. – Gurgaon • Abu Dhabi Nation- al Industrial Projects Ltd. • Seamless Tube Plant, Arcelor Mit- tal, Jubail • PARAS Dairy, Sahibabad, Delhi • NHPC (National Hydro Power Cor- poration), Farid- abad • SAIL. - Bhilai, Bokaro, Durgapur Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant Page 3 of 5
  • 4. Organization : Coconut Software Pvt. Ltd. (2004-2006) 18 Sunstar Overseas Implementation / Agri- SAP QM / PM • Team Size : 08 Ltd.-Sonepat / Rev- culture Consultant (April • E2E Implementation olution 2006 to Sept. 2006) 19 Encore Group : En- Implementation / Phar- SAP QM Consul- • Team Size : 08 core Natural maceuticals & Natural tant (Oct. 2005 to • E2E Implementation Polymers & Halcy- Polymers March 2006) on Labs, Encore Health Care, ZYG Pharma & Mumbai (HO) / Divya Dr- ishti 20 Kemwell Pvt. Ltd. – Merger / Pharmaceuti- SAP QM / PM • Team Size : Variable Bangalore cals Consultant (Sept. • Merger of Kemwell & 2005) BioKem Pharmaceuticals having 2 different company code 21 Encube Ethicals Implementation / Phar- SAP QM Consul- • Team Size : 08 Pvt. Ltd. (Mumbai) maceuticals tant (May 2005 to • Responsibility : Key/End August. 2005) User Training, Master Data Template preparation & Upload, Go-live prepara- tion, Post Go-Live Support • E2E Implementation 22 Borosil Glass Implementation / SAP QM Consul- • Team Size : 14 Works Ltd. – Mum- Glass tant (Nov. 2004 to • E2E Implementation bai & Gujarat April 2005) 23 Kemwell Pvt. Ltd. – Implementation / Phar- SAP QM Consul- • Team Size : 10+ Bangalore maceuticals tant (August 2004 • E2E Implementation to Oct. 2004) • Responsibility : End User Training, Project/Module documentation Organization : Jindal Stainless Ltd. (1998-2004) 24 Jindal Stainless SAP Implementation / Core Team to SAP • Team Size : 20+ Steel Ltd. – Hisar / Steel Basis & QM mod- • R3 with APO Implementa- Project SPEED ule (Dec. 2002 to tion May 2004) • Implementation partner: Siemens, Gurgaon 25 Jindal Steel & Pow- SAP Implementation / Project Coordina- • Implementation partner – er Ltd. - Raigarh Steel tor Siemens • R3 Implementation 26 Jindal Organization Ecommerce Projects Project C-ordina- • Tools Used : NT, Apache • jindalsteel.com tion & QA Testing Server, MYSQL, ASP, (Corporate Web JavaScript, Flash, Photo- site) shop • jindalstainless.com (B2B Portal) 27 Jindal Organization LAN / WAN imple- System Adminis- • Team Size : 8+ (Project Connect) mentation with mailing trator • Scope : NT Server / NT solution Workstation 4.0, Ms-Ex- change 5.5 : Connecting multiple locations using X.400 on V-SAT, Mail Serv- er (VPOP3 1.3), Proxy Server (Win Proxy 3.0), Firewall Server (Net Guard 4.11), Fax Server (Wipro eFax), V-SAT Network (Monitoring & Controlling Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant Page 4 of 5
  • 5. using Software Tools), RAS. 28 Jindal Organization Fixing Y2K big across System Adminis- • Team Size : 20+ (Project Y2K) the organization trator • Changing oracle based ap- plication for Y2K bug. • Installation Y2K patch to OS & servers. 29 Jindal Organization In-house ERP Devel- Analysis & Design • Team Size : 10+ (Project Enterprise) opment of Database / • Modules : Fixed Deposit Forms / Reports, System, Payroll & Employ- Testing and Docu- ee Information System, mentation Raw Material Procurement, Performance Analyzer • Platform : D2K (Forms 4.5), Oracle 7.3, NT 4.0, SCO UNIX 5.0.5 Profile Of Manish Aggarwal – SAP QM/PM & Validation Consultant Page 5 of 5