SlideShare une entreprise Scribd logo
1  sur  11
SAP ASAP 8 Roadmap for
Implementation Projects
   An Overview by Manoj Dhir.
The 6 Phase Life cycle
A snapshot
Phase 1: Project Preparation
During this phase the team goes through initial planning and
preparation for SAP project, including:

Defining project goals and objectives.
Clarifying the scope of implementation.
Defining project schedule, budget plan, and implementation
sequence.
Establishing the project organization and relevant
committees, and assigning resources.
Phase 2: Business Blueprint
The purpose of this phase is to achieve a common
  understanding of how the company intends to run SAP to
  support its business. In addition, the original project goals
  and objectives will be refined and the project schedule will
  be revised in this phase. The result is the Business Blueprint,
  a detailed documentation of the results gathered during
  requirements workshops.
Phase 3: Realization
The purpose of this phase is to implement all the business
  process requirements based on the Business Blueprint. The
  system configuration methodology is provided in two work
  packages: Baseline (major scope) and Final configuration
  (remaining scope). Integration testing is conducted and end-
  user document is prepared during this phase.
Phase 4: Final Preparation
The purpose of this phase is to complete the final preparation
  (including testing, end user training, system management,
  and cutover activities) to finalize your readiness to go live.
  The Final Preparation phase also serves to resolve all critical
  open issues
Phase 5: Go Live & Support
The purpose of this phase is to move from a project-
  oriented, pre-production environment to live production
  operation. The most important elements include setting up
  production support, monitoring system transactions, and
  optimizing overall system performance.
Phase 6: Operate
 Commonly called as Run SAP. The primary goal of this
 phase is to ensure the operability of the solution
Operations Maturity Assessment -The Operations Maturity
 Assessment evaluates the SAP customer's support operations
 to determine areas in need of optimization
Optimizations:
  Solution Documentation Optimization
  Solution implementation Optimization
  Template Optimization
  Test Management Optimization
  Maintenance, Upgrade and many other Optimizations
Role of a SAP Functional Consultant

 A functional consultant evaluates the demands in talking with the customer's
    representatives, transforms the essence into an abstract and algorithmic business model.
    Hence, he identifies the use cases and transforms them into logical and technical views. 
   Then the main task starts: customizing the respective business area and making sure the
    system reacts in the manner according to the constraints of the requested use case. 
   The consultant documents the settings and prepares proper guidelines that allow other
    consultants to do further changes or repairs with due efforts. 
   The consultant takes care that proper training is given to the users and that the system is
    usable, performing appropriately and the business flow is complete and correct. 
   During go live he assists the technical staff by testing the behavior of the system. 
   After go live he guarantees that the procedures remain usable and consistent in real live
    situation and proposes enhancements. 
   The main duty of a consultant is to transfer external know-how to the client. It is not
    manpower that counts but intelligence, understanding of processes, a feeling for defects
    and general a common sense.
Detailed role in End-to-End
Implementation
 1.Functional consultant is expected to generate knowledge about the current business
    process, design current business flows, study current business processes and its
    complication, in all we can say getting through with current business setup. Flow
    diagrams and DFD are prepared, most of the time in Vision format, all this forms the
    part of AS IS document.
   2. Everything configured has to be documented as per their categories in the form of
    predefined templates, these have to be then approved by the team leads or who ever the
    consultant is reporting to.
   3. Mapping and GAP analysis is done for each module, I have seen people defining
    integration after mapping, gap analysis and configuration is done, but as per my
    experience in implementation, it is a simultaneous process.
   4. Before starting configuring  future business processes in SAP, the DFD/ERD are
    prepared, this documentation is called TO BE, which can be also said as the result of
    mapping and gap analysis.
   5. Sometimes Functional consultants are also expected to prepare test scripts for testing
    the configured scenarios.
   6. End user manual and user training is also expected from Functional Consultants.
Looking for more?
Write to dhir.manoj@gmail.com for a full time of interim
 Project or Program Management using SAP ASAP 8.
I also can help you in
  Planning services to assist client program management teams in
   preparing for large engagements
  Vendor/Partner/Integrator Selection of SAP services
  Project Health Check Reviews

Contenu connexe

Tendances

eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
David Niles
 
Sap implementation by priya pangam
Sap implementation by priya pangamSap implementation by priya pangam
Sap implementation by priya pangam
amol1212
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
Hari Krishna
 

Tendances (17)

SAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.comSAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.com
 
Sap implementation
Sap implementationSap implementation
Sap implementation
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)
 
SAP ASAP 8 Methodology
SAP ASAP 8 MethodologySAP ASAP 8 Methodology
SAP ASAP 8 Methodology
 
ASAP 8.0 Methodology
ASAP 8.0 MethodologyASAP 8.0 Methodology
ASAP 8.0 Methodology
 
SAP Implementation Phase!!
SAP Implementation Phase!!SAP Implementation Phase!!
SAP Implementation Phase!!
 
Asap methodology
Asap methodologyAsap methodology
Asap methodology
 
Sap Implementation Life Cycle Complete Process
Sap Implementation Life Cycle Complete ProcessSap Implementation Life Cycle Complete Process
Sap Implementation Life Cycle Complete Process
 
Sap Implementation Presentation
Sap Implementation PresentationSap Implementation Presentation
Sap Implementation Presentation
 
Understand SAP ASAP 8.0
Understand SAP ASAP 8.0Understand SAP ASAP 8.0
Understand SAP ASAP 8.0
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
 
Sap implementation
Sap implementationSap implementation
Sap implementation
 
SAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key TaskSAP Project Management: Major Responsibilities And Key Task
SAP Project Management: Major Responsibilities And Key Task
 
Sap implementation by priya pangam
Sap implementation by priya pangamSap implementation by priya pangam
Sap implementation by priya pangam
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
 
Sabaruddin de AB_S_Six Step ERP Project Management_FINAL
Sabaruddin de AB_S_Six Step ERP Project Management_FINALSabaruddin de AB_S_Six Step ERP Project Management_FINAL
Sabaruddin de AB_S_Six Step ERP Project Management_FINAL
 
Protorative Methodology
Protorative MethodologyProtorative Methodology
Protorative Methodology
 

En vedette

Sap Overview pdf
Sap Overview pdfSap Overview pdf
Sap Overview pdf
pimporn
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAP
Gaurav Ahluwalia
 

En vedette (12)

ASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERPASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERP
 
Sap Overview pdf
Sap Overview pdfSap Overview pdf
Sap Overview pdf
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAP
 
ERP Implementation Using Agile Project Management with Scrum
ERP Implementation Using Agile Project Management with ScrumERP Implementation Using Agile Project Management with Scrum
ERP Implementation Using Agile Project Management with Scrum
 
Magic of scrum with SAP
Magic of scrum with SAPMagic of scrum with SAP
Magic of scrum with SAP
 
Agile sap high-level introduction by ensead advisory
Agile sap   high-level introduction by ensead advisoryAgile sap   high-level introduction by ensead advisory
Agile sap high-level introduction by ensead advisory
 
SAP Net Weaver Architecture,
SAP Net Weaver Architecture, SAP Net Weaver Architecture,
SAP Net Weaver Architecture,
 
Scrum in 30 seconds!
Scrum in 30 seconds!Scrum in 30 seconds!
Scrum in 30 seconds!
 
Sap architecture
Sap architectureSap architecture
Sap architecture
 
EDI
EDIEDI
EDI
 
Big data/Hadoop/HANA Basics
Big data/Hadoop/HANA BasicsBig data/Hadoop/HANA Basics
Big data/Hadoop/HANA Basics
 
RDS Supporting SAP HANA
RDS Supporting SAP HANARDS Supporting SAP HANA
RDS Supporting SAP HANA
 

Similaire à SAP ASAP 8 overview

ASAP Methodology- SAP Project management
ASAP Methodology- SAP Project managementASAP Methodology- SAP Project management
ASAP Methodology- SAP Project management
ArjunPawar29
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
Hari Krishna
 
SAP Business Transformations - Mandrekar
SAP Business Transformations - MandrekarSAP Business Transformations - Mandrekar
SAP Business Transformations - Mandrekar
Deepak Mandrekar
 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)
Flevy.com Best Practices
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
Heidi Owens
 
Koshy Cherian__SAP_FI.doc(R)
Koshy Cherian__SAP_FI.doc(R)Koshy Cherian__SAP_FI.doc(R)
Koshy Cherian__SAP_FI.doc(R)
K C
 

Similaire à SAP ASAP 8 overview (20)

SAP ASAP
SAP ASAPSAP ASAP
SAP ASAP
 
Asap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdaryAsap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdary
 
ASAP Methodology- SAP Project management
ASAP Methodology- SAP Project managementASAP Methodology- SAP Project management
ASAP Methodology- SAP Project management
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0
 
SAP Business Transformations - Mandrekar
SAP Business Transformations - MandrekarSAP Business Transformations - Mandrekar
SAP Business Transformations - Mandrekar
 
ASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdf
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company
 
6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday Deployment6 Steps to Confirm Successful Workday Deployment
6 Steps to Confirm Successful Workday Deployment
 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)
 
Process vs Project: What’s the Difference and Which is the Best?
Process vs Project: What’s the Difference and Which is the Best?Process vs Project: What’s the Difference and Which is the Best?
Process vs Project: What’s the Difference and Which is the Best?
 
Steps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalSteps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortal
 
27631401 sap-implementation
27631401 sap-implementation27631401 sap-implementation
27631401 sap-implementation
 
SAP Managed Services Best Practices and Implementation Strategies
SAP Managed Services Best Practices and Implementation StrategiesSAP Managed Services Best Practices and Implementation Strategies
SAP Managed Services Best Practices and Implementation Strategies
 
AGILE PROJECT MANAGEMENT NOTES.docx
AGILE PROJECT MANAGEMENT NOTES.docxAGILE PROJECT MANAGEMENT NOTES.docx
AGILE PROJECT MANAGEMENT NOTES.docx
 
166427325 sap-a udit-management
166427325 sap-a udit-management166427325 sap-a udit-management
166427325 sap-a udit-management
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process Management
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
Koshy Cherian__SAP_FI.doc(R)
Koshy Cherian__SAP_FI.doc(R)Koshy Cherian__SAP_FI.doc(R)
Koshy Cherian__SAP_FI.doc(R)
 

Dernier

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Dernier (20)

Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

SAP ASAP 8 overview

  • 1. SAP ASAP 8 Roadmap for Implementation Projects An Overview by Manoj Dhir.
  • 2. The 6 Phase Life cycle A snapshot
  • 3. Phase 1: Project Preparation During this phase the team goes through initial planning and preparation for SAP project, including: Defining project goals and objectives. Clarifying the scope of implementation. Defining project schedule, budget plan, and implementation sequence. Establishing the project organization and relevant committees, and assigning resources.
  • 4. Phase 2: Business Blueprint The purpose of this phase is to achieve a common understanding of how the company intends to run SAP to support its business. In addition, the original project goals and objectives will be refined and the project schedule will be revised in this phase. The result is the Business Blueprint, a detailed documentation of the results gathered during requirements workshops.
  • 5. Phase 3: Realization The purpose of this phase is to implement all the business process requirements based on the Business Blueprint. The system configuration methodology is provided in two work packages: Baseline (major scope) and Final configuration (remaining scope). Integration testing is conducted and end- user document is prepared during this phase.
  • 6. Phase 4: Final Preparation The purpose of this phase is to complete the final preparation (including testing, end user training, system management, and cutover activities) to finalize your readiness to go live. The Final Preparation phase also serves to resolve all critical open issues
  • 7. Phase 5: Go Live & Support The purpose of this phase is to move from a project- oriented, pre-production environment to live production operation. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.
  • 8. Phase 6: Operate  Commonly called as Run SAP. The primary goal of this phase is to ensure the operability of the solution Operations Maturity Assessment -The Operations Maturity Assessment evaluates the SAP customer's support operations to determine areas in need of optimization Optimizations: Solution Documentation Optimization Solution implementation Optimization Template Optimization Test Management Optimization Maintenance, Upgrade and many other Optimizations
  • 9. Role of a SAP Functional Consultant  A functional consultant evaluates the demands in talking with the customer's representatives, transforms the essence into an abstract and algorithmic business model. Hence, he identifies the use cases and transforms them into logical and technical views.   Then the main task starts: customizing the respective business area and making sure the system reacts in the manner according to the constraints of the requested use case.   The consultant documents the settings and prepares proper guidelines that allow other consultants to do further changes or repairs with due efforts.   The consultant takes care that proper training is given to the users and that the system is usable, performing appropriately and the business flow is complete and correct.   During go live he assists the technical staff by testing the behavior of the system.   After go live he guarantees that the procedures remain usable and consistent in real live situation and proposes enhancements.   The main duty of a consultant is to transfer external know-how to the client. It is not manpower that counts but intelligence, understanding of processes, a feeling for defects and general a common sense.
  • 10. Detailed role in End-to-End Implementation  1.Functional consultant is expected to generate knowledge about the current business process, design current business flows, study current business processes and its complication, in all we can say getting through with current business setup. Flow diagrams and DFD are prepared, most of the time in Vision format, all this forms the part of AS IS document.  2. Everything configured has to be documented as per their categories in the form of predefined templates, these have to be then approved by the team leads or who ever the consultant is reporting to.  3. Mapping and GAP analysis is done for each module, I have seen people defining integration after mapping, gap analysis and configuration is done, but as per my experience in implementation, it is a simultaneous process.  4. Before starting configuring  future business processes in SAP, the DFD/ERD are prepared, this documentation is called TO BE, which can be also said as the result of mapping and gap analysis.  5. Sometimes Functional consultants are also expected to prepare test scripts for testing the configured scenarios.  6. End user manual and user training is also expected from Functional Consultants.
  • 11. Looking for more? Write to dhir.manoj@gmail.com for a full time of interim Project or Program Management using SAP ASAP 8. I also can help you in Planning services to assist client program management teams in preparing for large engagements Vendor/Partner/Integrator Selection of SAP services Project Health Check Reviews