1. Aim
The aim of the project was to demonstrate the ROWITEC/TIF fluidized bed technology for
Refuse Derived Fuel (RDF) incineration. The objective of the project was to recover the
energy content of RDF generated by the recycling plant of the city of Madrid. The overall
plant consists of MSW reception , separation and recycling, aerobic composting of the
organic fraction and incineration of the RDF produced by the recycling plant.




           Photo 1: Aerial view of the plant in the final stages of construction

2. Introduction
The integrated MSW plant is located at Valdemingomez at the outskirts of Madrid and has a
daily capacity of 1,200 t/day. The Commission’s support concerned only the incinerator plant
and especially the innovative fluidized bed furnace. The ROWITEC/TIF technology has
several advantages in comparison to traditional grate incinerators, the most important of
which are:
    1. Design simplicity and smaller required surface area,
    2. Good availability for burning heterogeneous and high calorific value waste,
    3. Good thermal efficiency,
    4. Good environmental performance by partial neutralisation of the acid flue gases
        within the oven by the addition of limestone or dolomite, and dry and clean slag,
    5. Lower operating and maintenance costs.

The plant meets all European environmental legislation limits. Overall the integrated plant
treats 1,200 t/d, from which about 60 t/d are recyclable components, 640 t/d are sent to the
composting plant and about 500 t/d to the incineration plant. Only 20% of the original MSW
is landfilled for final disposal.
3. Technical Description
Recycling, Classification and Composting Plant
The MSW is brought by the collecting trucks which unload in the storage area with a two-day
capacity. The waste is then fed by means of a crane to 4 independent lines of 25 ton/hour
each, where the waste is mechanically treated. This includes the tearing of the plastic bags,
classification on sizes and automatic and manual separation of various components which are
recycled (ferrous and non-ferrous metals, plastics, paper, board, & glass) the organic fraction
which is send for composting, as well as the refuse derived fuels which are sent to the storage
area of the incinerator plant.




                      Photo 2: View of the aerobic composting plant

The organic fraction is sent to the composting plant (see yellow conveyor in top right-hand
side of photo 1 and top left-hand side of photo 2) where it undergoes aerobic fermentation
during 8 to10 weeks. The compost, is then purified by separation of inert elements which are
sent to the landfill site. The remaining compost is clean and of good quality and is marketed
in the agriculture sector. The treatment capacity is 650 tons per 6,5 h or 435,000 tons/year.

Incineration Plant
The ROWITEC/TIF fluidized bed technology can incinerate the RDF as supplied by the
recycling plant without any further pre-treatment. The process consists of a feeding hopper,
fluidized bed oven with combustion chamber, steam-boiler, gas cleaning system, exhaust
fans, chimney, and the turbo-generator as well as several auxiliary systems such as steam-
boiler water treatment, compressed-air, control and instrumentation, etc.

The incinerator consists of three identical lines in parallel (see photo 1 where the three lines
are clearly shown) each of which has a nominal capacity of 220 tons/day (or 9.2 t/h), for RDF
of 14.65 +/- 20% MJ/kg energy content. The plant has an availability of 310 days/year
resulting in an annual capacity of 205,000 tons. The RDF is fed from the top of the furnace
and the material is partially dry by the time it reaches the incinerator. The fluidized bed
operates at 950 °C and the residence time of the flue gases is about 4 seconds, ensuring
therefore the 2 seconds at 850 °C established by the European Standards. The process
flowsheet per line is given in figure 1
Figure 1: Process flowsheet for each incinerator line

The non-combustible materials are removed via discharge ducts at the bottom of the fluidized
bed and are cooled indirectly by water. Therefore, the inert components are extracted in a cold
and perfectly clean condition, as if treated by sand blasting.

Lime is added in the furnace for the removal of chlorine and sulphur compounds, thus
minimising the degree of neutralisation needed. Downstream the boiler, the flue gases are
cleaned further by a powerful cleaning process comprising hydrated lime spay scrubbing for
final elimination of any remaining chlorine and sulphur compounds and big particulates. The
flue gases are then fed to a heat resistant fine-mesh fabric filter where the remaining fine dust
is removed before being emitted to the atmosphere.

4. Performance of the plant
The recycling plant was commissioned on February 1993 and was taken in commercial
operation on June 1993. The incineration plant was commissioned on November 1996, and
was taken into commercial operation on June 1997 when all official permits for the operation
of the plant were obtained.

Table 1 gives the Steam and power data while Table 2 gives the atmospheric emissions of the
plant during the demonstration period:

                                Table 1: Steam and power data
                            Component                 Data
                     Total steam production            123 tons/h
                     Steam Temperature                     425 °C
                     Steam Pressure                       47 bar a
                     Electricity generation               29 MW
                     Electricity export                   23 MW
                     Availability                        86% min

From these two tables it can be concluded that the plant meets all its original objectives and
aims. Furthermore, this integrated technology, and especially the fluidized bed furnace, has
been demonstrated for the first time in Europe with RDF produced from the MSW of a
Mediterranean city.
Table 2: Emissions from the RDF incinerator

                    Component                  Emission              Legal Limit
                                               (mg/Nm3)               (mg/Nm3)
                 Total Particulates                 5                    30
                        HCl                        23                    50
                        CO                          9                   100
                        HF                       <0.02                    2
                        SO2                      3.88                   300
                       COT                        2.01                   20
                  Pb+Cr+Cu+Mn                     0.02                    5
                      Ni+As                       0.01                    1
                      Cd+Hg                     <0.002                   0.2



5. Economic Performance
The investment for the integrated plant was 16,400 million pesetas from which 3,500 MPts
were spent for the recycling plant and 12,900 for the incineration plant. The principal sources
of income for the integrated plant of Tirmadrid are the fees received from the Madrid’s City
Hall for each ton of treated MSW and the sale of electricity generated by the incineration
plant.

The fees received by the City Hall is coupled to the consumer index price and was 4,318
Pts/ton in 1997. This corresponds to an annual income of about 1,890 million Pts. The price
for the electricity is fixed by the Ministry of Industry and Energy which in 1997 was 9.45
Pts/kWh corresponding to an annual income of 1,635 million Pts. Finally by the sale of the
various products from the recycling plant (compost, metals, glass etc.) about 120 million Pts
are obtained.

The annual operational and maintenance costs of the integrated plant are 2,100 million Pts.
However, if the incineration part of the integrated plant will be considered separately (ie. the
THERMIE supported part), the simple payback time for the project is about 7 years.

6. Project Identifiers
  Project :   BM/196/91-SP
  Owner :     TIRMADRID S.A.
              Canada Real de Merinas s/n
              Valdemingomez Vallecas
              28051 Madrid
              Spain
              Tel : +34-1-3324131
              Fax: +34-1-3322780
  Contractor: TIRMADRID, S.A.
  Technology: DRAGADOS Y CONSTRUCCIONES, S.A.,
              INTECSA-UHDE INDUSTRIAL S.A.,
              ABFALL-BESEITIGUNGS-TECHNOLOGIE GmbH.
  Total Cost: 83,594,976 ECU
  EC Support: 1,502,355 ECU

Contenu connexe

Tendances

Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineriescanaleenergia
 
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015Andrey G. Morozov
 
Thyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressureThyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressureSteve Wittrig
 
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielThermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielEBAconference
 
F E R T I L I Z E R I N D U S T R Y L E C T U R E 1
F E R T I L I Z E R  I N D U S T R Y  L E C T U R E 1F E R T I L I Z E R  I N D U S T R Y  L E C T U R E 1
F E R T I L I Z E R I N D U S T R Y L E C T U R E 1Rishi Yadav
 
Topsoe large scale_methanol_prod_paper
Topsoe large scale_methanol_prod_paperTopsoe large scale_methanol_prod_paper
Topsoe large scale_methanol_prod_paperabodin
 
Developments in Ammonia Production Technology
Developments in Ammonia Production TechnologyDevelopments in Ammonia Production Technology
Developments in Ammonia Production TechnologyJahanzeb Khan
 
Economics of ammonia production from offgases
Economics of ammonia production from offgasesEconomics of ammonia production from offgases
Economics of ammonia production from offgasesVK Arora
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engineeisenmannusa
 
Nu energy - cokemaking technology for current challenges
Nu energy - cokemaking technology for current challengesNu energy - cokemaking technology for current challenges
Nu energy - cokemaking technology for current challengesJorge Madias
 
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...Steve Wittrig
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Nofiar Rachman
 
Walter emrich (auth.) handbook of charcoal making the traditional and indust...
Walter emrich (auth.) handbook of charcoal making  the traditional and indust...Walter emrich (auth.) handbook of charcoal making  the traditional and indust...
Walter emrich (auth.) handbook of charcoal making the traditional and indust...Lee Toulouse
 

Tendances (20)

Uhde ammonia
Uhde ammoniaUhde ammonia
Uhde ammonia
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineries
 
Coal Water Slurry
Coal Water SlurryCoal Water Slurry
Coal Water Slurry
 
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015
Presentation for Russian-Korean Sci-Tech Forum, Seoul, 2015
 
Thyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressureThyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressure
 
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielThermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
 
F E R T I L I Z E R I N D U S T R Y L E C T U R E 1
F E R T I L I Z E R  I N D U S T R Y  L E C T U R E 1F E R T I L I Z E R  I N D U S T R Y  L E C T U R E 1
F E R T I L I Z E R I N D U S T R Y L E C T U R E 1
 
Topsoe large scale_methanol_prod_paper
Topsoe large scale_methanol_prod_paperTopsoe large scale_methanol_prod_paper
Topsoe large scale_methanol_prod_paper
 
Methanol oc
Methanol ocMethanol oc
Methanol oc
 
Urea plant NFL Intern report
Urea plant NFL Intern reportUrea plant NFL Intern report
Urea plant NFL Intern report
 
Developments in Ammonia Production Technology
Developments in Ammonia Production TechnologyDevelopments in Ammonia Production Technology
Developments in Ammonia Production Technology
 
Economics of ammonia production from offgases
Economics of ammonia production from offgasesEconomics of ammonia production from offgases
Economics of ammonia production from offgases
 
narendra VT SIT
narendra VT SITnarendra VT SIT
narendra VT SIT
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engine
 
Nu energy - cokemaking technology for current challenges
Nu energy - cokemaking technology for current challengesNu energy - cokemaking technology for current challenges
Nu energy - cokemaking technology for current challenges
 
Kbr[1] report
Kbr[1] reportKbr[1] report
Kbr[1] report
 
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...
Air liquide lurgi 2016 overview of coal heavy oil ch4 to syngas h2 ammonia me...
 
Carbonisation of coal
Carbonisation of coalCarbonisation of coal
Carbonisation of coal
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0
 
Walter emrich (auth.) handbook of charcoal making the traditional and indust...
Walter emrich (auth.) handbook of charcoal making  the traditional and indust...Walter emrich (auth.) handbook of charcoal making  the traditional and indust...
Walter emrich (auth.) handbook of charcoal making the traditional and indust...
 

Similaire à Integrated Plant for Municipal Solid Waste Incineration in Madrid

2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINALSandra Broekema
 
Hydrogen Production steam reforming
Hydrogen Production steam reformingHydrogen Production steam reforming
Hydrogen Production steam reformingTanay_Bobde
 
AMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfAMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfPremBaboo4
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balancePrem Baboo
 
Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...IRJET Journal
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal TechnologiesArnab Mitra
 
integrated green Technologies for MSW
integrated green Technologies for MSWintegrated green Technologies for MSW
integrated green Technologies for MSWMamdouh Abdel-Sabour
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...Global CCS Institute
 
01 fuel and industrial gases
01 fuel and industrial gases01 fuel and industrial gases
01 fuel and industrial gasesNaveen Choudhary
 
case study on dance food processing industry(process integration)
case study on dance food processing industry(process integration)case study on dance food processing industry(process integration)
case study on dance food processing industry(process integration)Vikram Kataria
 
Generation of electricity from coal parul
Generation of electricity from coal  parulGeneration of electricity from coal  parul
Generation of electricity from coal parulSwapnil Sharma
 
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationCCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationGlobal CCS Institute
 
Tp Case Study L
Tp Case Study LTp Case Study L
Tp Case Study LFNian
 
Ce 105 12 air pollution - numerical problems
Ce 105 12 air pollution - numerical problems Ce 105 12 air pollution - numerical problems
Ce 105 12 air pollution - numerical problems Gaurav Pahuja
 

Similaire à Integrated Plant for Municipal Solid Waste Incineration in Madrid (20)

2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL
 
Hydrogen Production steam reforming
Hydrogen Production steam reformingHydrogen Production steam reforming
Hydrogen Production steam reforming
 
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
 
AMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfAMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdf
 
F O S S I L F U E L S
F O S S I L  F U E L SF O S S I L  F U E L S
F O S S I L F U E L S
 
Fossil fuels
Fossil fuelsFossil fuels
Fossil fuels
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balance
 
Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal Technologies
 
GLOBAL CEMENT ARTICLE
GLOBAL CEMENT ARTICLEGLOBAL CEMENT ARTICLE
GLOBAL CEMENT ARTICLE
 
integrated green Technologies for MSW
integrated green Technologies for MSWintegrated green Technologies for MSW
integrated green Technologies for MSW
 
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
 
01 fuel and industrial gases
01 fuel and industrial gases01 fuel and industrial gases
01 fuel and industrial gases
 
case study on dance food processing industry(process integration)
case study on dance food processing industry(process integration)case study on dance food processing industry(process integration)
case study on dance food processing industry(process integration)
 
Generation of electricity from coal parul
Generation of electricity from coal  parulGeneration of electricity from coal  parul
Generation of electricity from coal parul
 
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationCCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
 
Tp Case Study L
Tp Case Study LTp Case Study L
Tp Case Study L
 
Ce 105 12 air pollution - numerical problems
Ce 105 12 air pollution - numerical problems Ce 105 12 air pollution - numerical problems
Ce 105 12 air pollution - numerical problems
 
linkedin
linkedinlinkedin
linkedin
 

Dernier

Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Dernier (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

Integrated Plant for Municipal Solid Waste Incineration in Madrid

  • 1. Integrated Plant for the Municipal Solid Waste of Madrid 1. Aim The aim of the project was to demonstrate the ROWITEC/TIF fluidized bed technology for Refuse Derived Fuel (RDF) incineration. The objective of the project was to recover the energy content of RDF generated by the recycling plant of the city of Madrid. The overall plant consists of MSW reception , separation and recycling, aerobic composting of the organic fraction and incineration of the RDF produced by the recycling plant. Photo 1: Aerial view of the plant in the final stages of construction 2. Introduction The integrated MSW plant is located at Valdemingomez at the outskirts of Madrid and has a daily capacity of 1,200 t/day. The Commission’s support concerned only the incinerator plant and especially the innovative fluidized bed furnace. The ROWITEC/TIF technology has several advantages in comparison to traditional grate incinerators, the most important of which are: 1. Design simplicity and smaller required surface area, 2. Good availability for burning heterogeneous and high calorific value waste, 3. Good thermal efficiency, 4. Good environmental performance by partial neutralisation of the acid flue gases within the oven by the addition of limestone or dolomite, and dry and clean slag, 5. Lower operating and maintenance costs. The plant meets all European environmental legislation limits. Overall the integrated plant treats 1,200 t/d, from which about 60 t/d are recyclable components, 640 t/d are sent to the composting plant and about 500 t/d to the incineration plant. Only 20% of the original MSW is landfilled for final disposal.
  • 2. 3. Technical Description Recycling, Classification and Composting Plant The MSW is brought by the collecting trucks which unload in the storage area with a two-day capacity. The waste is then fed by means of a crane to 4 independent lines of 25 ton/hour each, where the waste is mechanically treated. This includes the tearing of the plastic bags, classification on sizes and automatic and manual separation of various components which are recycled (ferrous and non-ferrous metals, plastics, paper, board, & glass) the organic fraction which is send for composting, as well as the refuse derived fuels which are sent to the storage area of the incinerator plant. Photo 2: View of the aerobic composting plant The organic fraction is sent to the composting plant (see yellow conveyor in top right-hand side of photo 1 and top left-hand side of photo 2) where it undergoes aerobic fermentation during 8 to10 weeks. The compost, is then purified by separation of inert elements which are sent to the landfill site. The remaining compost is clean and of good quality and is marketed in the agriculture sector. The treatment capacity is 650 tons per 6,5 h or 435,000 tons/year. Incineration Plant The ROWITEC/TIF fluidized bed technology can incinerate the RDF as supplied by the recycling plant without any further pre-treatment. The process consists of a feeding hopper, fluidized bed oven with combustion chamber, steam-boiler, gas cleaning system, exhaust fans, chimney, and the turbo-generator as well as several auxiliary systems such as steam- boiler water treatment, compressed-air, control and instrumentation, etc. The incinerator consists of three identical lines in parallel (see photo 1 where the three lines are clearly shown) each of which has a nominal capacity of 220 tons/day (or 9.2 t/h), for RDF of 14.65 +/- 20% MJ/kg energy content. The plant has an availability of 310 days/year resulting in an annual capacity of 205,000 tons. The RDF is fed from the top of the furnace and the material is partially dry by the time it reaches the incinerator. The fluidized bed operates at 950 °C and the residence time of the flue gases is about 4 seconds, ensuring therefore the 2 seconds at 850 °C established by the European Standards. The process flowsheet per line is given in figure 1
  • 3. Figure 1: Process flowsheet for each incinerator line The non-combustible materials are removed via discharge ducts at the bottom of the fluidized bed and are cooled indirectly by water. Therefore, the inert components are extracted in a cold and perfectly clean condition, as if treated by sand blasting. Lime is added in the furnace for the removal of chlorine and sulphur compounds, thus minimising the degree of neutralisation needed. Downstream the boiler, the flue gases are cleaned further by a powerful cleaning process comprising hydrated lime spay scrubbing for final elimination of any remaining chlorine and sulphur compounds and big particulates. The flue gases are then fed to a heat resistant fine-mesh fabric filter where the remaining fine dust is removed before being emitted to the atmosphere. 4. Performance of the plant The recycling plant was commissioned on February 1993 and was taken in commercial operation on June 1993. The incineration plant was commissioned on November 1996, and was taken into commercial operation on June 1997 when all official permits for the operation of the plant were obtained. Table 1 gives the Steam and power data while Table 2 gives the atmospheric emissions of the plant during the demonstration period: Table 1: Steam and power data Component Data Total steam production 123 tons/h Steam Temperature 425 °C Steam Pressure 47 bar a Electricity generation 29 MW Electricity export 23 MW Availability 86% min From these two tables it can be concluded that the plant meets all its original objectives and aims. Furthermore, this integrated technology, and especially the fluidized bed furnace, has been demonstrated for the first time in Europe with RDF produced from the MSW of a Mediterranean city.
  • 4. Table 2: Emissions from the RDF incinerator Component Emission Legal Limit (mg/Nm3) (mg/Nm3) Total Particulates 5 30 HCl 23 50 CO 9 100 HF <0.02 2 SO2 3.88 300 COT 2.01 20 Pb+Cr+Cu+Mn 0.02 5 Ni+As 0.01 1 Cd+Hg <0.002 0.2 5. Economic Performance The investment for the integrated plant was 16,400 million pesetas from which 3,500 MPts were spent for the recycling plant and 12,900 for the incineration plant. The principal sources of income for the integrated plant of Tirmadrid are the fees received from the Madrid’s City Hall for each ton of treated MSW and the sale of electricity generated by the incineration plant. The fees received by the City Hall is coupled to the consumer index price and was 4,318 Pts/ton in 1997. This corresponds to an annual income of about 1,890 million Pts. The price for the electricity is fixed by the Ministry of Industry and Energy which in 1997 was 9.45 Pts/kWh corresponding to an annual income of 1,635 million Pts. Finally by the sale of the various products from the recycling plant (compost, metals, glass etc.) about 120 million Pts are obtained. The annual operational and maintenance costs of the integrated plant are 2,100 million Pts. However, if the incineration part of the integrated plant will be considered separately (ie. the THERMIE supported part), the simple payback time for the project is about 7 years. 6. Project Identifiers Project : BM/196/91-SP Owner : TIRMADRID S.A. Canada Real de Merinas s/n Valdemingomez Vallecas 28051 Madrid Spain Tel : +34-1-3324131 Fax: +34-1-3322780 Contractor: TIRMADRID, S.A. Technology: DRAGADOS Y CONSTRUCCIONES, S.A., INTECSA-UHDE INDUSTRIAL S.A., ABFALL-BESEITIGUNGS-TECHNOLOGIE GmbH. Total Cost: 83,594,976 ECU EC Support: 1,502,355 ECU