Importance of Planning




                                         The importance of planning


                                                   AIESEC

                                                  Mr. Marc Vael
                                                 Managing Director
                                                    Valuendo

        © 2001 Valuendo. All rights reserved.
                                                                              1
      INFORMATION CLASSIFICATION = PUBLIC




                                                                     Agenda

       •     Introduction
       •     Why is planning needed?
       •     Definition
       •     Critical Success Factors
       •     Conclusion
       •     Internet Sites




        © 2001 Valuendo. All rights reserved.
                                                                              2
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                             AIESEC
Valuendo                                                                 2001
                                                                                  1
Importance of Planning


                                                         Introduction
        • Marc Vael
        • Managing Director Valuendo (“value & do”) since July 2001
        • Education
           – Master Applied Economics (UAntwerp)
           – Master Information Management (UHasselt)
           – Master+ Applied Economics & ICT (KUL)
        • Core Services
           – Enterprise Risk Management
           – IT Governance
           – Information Security Management
           – Data Privacy & Protection
           – Business Continuity / Disaster Recovery
           – Crisis Management
           – IT Audit & Compliance
        • Certifications
           – CISA

        © 2001 Valuendo. All rights reserved.
                                                                            3
      INFORMATION CLASSIFICATION = PUBLIC




                                                    Planning: Why?
         In 1999, of all projects :
         • 25 % SUCCEEDED :
          => on time, on budget,
               as initially specified
         • 35 % were CHALLENGED :
         => late, over budget,
               delivering less than specified
         • 40 % FAILED :
         => canceled at some point




        © 2001 Valuendo. All rights reserved.
                                                                            4
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                             AIESEC
Valuendo                                                                 2001
                                                                                2
Importance of Planning


                                                                                              Planning: Why?
        The most elementary aspects are missing :


        • 85% of projects starts without an accepted view
         on costs and timeframe.
        • The exact starting date is known in < 1% of projects.
        • Of 15% of projects it is not clear if they are finished or
         not.
        • Scope enlargements are common in > 50% of projects.
        • Less than 15% of project managers have created a
         change-management plan to deal with scope changes.




        © 2001 Valuendo. All rights reserved.
                                                                                                                            5
      INFORMATION CLASSIFICATION = PUBLIC




                                                                                               Planning: Why?
                                         Why do projects fail so often?
                                                –   Poorly defined scope (incomplete requirements / specifications)
                                                –   Poor organization and management
                                                –   No standard vision / communication on the progress
                                                –   Wrong estimations (time and budget)
                                                –   Lack of proper resources
                                                –   Poor quality control
                                                –   “Silo vision”
                                                –   Conflicts between projects
                                                –   Organizational / Corporate Politics
                                                –   Problems are hidden for top management (quot;shoot the messengerquot;)
                                                –   Resource draining – “hardest shouting man” syndrome
                                                –   Lack of proper change management standards & procedures
                                                –   No study for (technical) feasibility
                                                –   Usage of immature / poor (technology) infrastructure
                                                –   Inadequate testing procedures/controls
                                                –   Project crisis management instead of project (risk) management
                                                –   No one is in charge (too many Indians and no chief?)
                                                –   Everyone is in charge (too many chiefs and no Indians?)
                                                –   Excessive / Unrealistic expectations
                                                –   Hidden costs

        © 2001 Valuendo. All rights reserved.
                                                                                                                            6
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                                                             AIESEC
Valuendo                                                                                                                 2001
                                                                                                                                3
Importance of Planning


                                                  Planning: Words from the wise




                        There is much to be said of failure.
                        It is more interesting than success.
                                                                                           Max Beerbohm




        © 2001 Valuendo. All rights reserved.
                                                                                                          7
      INFORMATION CLASSIFICATION = PUBLIC




                                                                              Planning: Why?
                                      Warning signs of a project heading for failure:

                                          –     A lack of scope / change control
                                          –     Real costs consistently exceeding budgeted costs
                                          –     Breakdown of team communication
                                          –     Team members working excessively long hours
                                          –     Decreasing team co-operation and enthusiasm
                                          –     Increasing number of “ad hoc crisis meetings” that are
                                                held in an attempt to regain project control
                                          –     No presence of internal control & security requirements
                                          –     Missing or out-of-date documentation
                                          –     Resource consumption on non-issues
                                          –     Little or no “end-user group” interest and involvement


        © 2001 Valuendo. All rights reserved.
                                                                                                          8
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                                    AIESEC
Valuendo                                                                                        2001
                                                                                                              4
Importance of Planning


                                                              Agenda

       •     Introduction
       •     Why is planning needed?
       •     Definition
       •     Critical Success Factors
       •     Conclusion
       •     Internet Sites




        © 2001 Valuendo. All rights reserved.
                                                                        9
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Definition
        •Program =
        may comprise multiple projects or be a recurring project with
        predictability, but with a new plan and unique product


        •Project =
        combination of complex, sequenced, goal-driven, interrelated
        tasks and unique events
        with a defined beginning and an end-date
        to be executed bounded by resources, time and budgets
        with many people involved and
        resulting in a desired end-product or service.




        © 2001 Valuendo. All rights reserved.
                                                                        10
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                      AIESEC
Valuendo                                                          2001
                                                                             5
Importance of Planning


                                                               Planning: Definition
        •Task (activity) =
        a cohesive unit of work on a project divided into “work
        assignments”


        •Work Assignment (sub-task) =
        individual activity required to complete a project assigned by the
        project manager and/or subordinates of the project manager.
        Subtasks are the steps needed to complete a task. These
        subtasks are not traced in the plan.




                                                                         Work
                                           Program             Task
                                                     Project
                                                                      Assignment

        © 2001 Valuendo. All rights reserved.
                                                                                         11
      INFORMATION CLASSIFICATION = PUBLIC




                                                               Planning: Definition
        •Scope =
        the size which determines how many resources, how much time
        and how large the final product is.


        •Project Resources =
        time, people, money, equipment and facilities used to complete a
        project.


        •Project Sponsors =
        people with a personal or business interest in the desired end-
        results of a project (e.g. customers, managers, corporate
        executives, shareholders and/or representatives of governmental
        agencies).

        © 2001 Valuendo. All rights reserved.
                                                                                         12
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                          AIESEC
Valuendo                                                                              2001
                                                                                              6
Importance of Planning


                                                Planning: Definition
        •Project Manager =
        person designated as responsible for the management of all
        activities necessary for the delivery of the contracted
        deliverables to the end-customer to the customer's satisfaction
        and within the agreed time and budget constraints.


        •Deliverable (goals) =
        clearly defined result, good or service produced during the
        project or at its outcome. This may include organizational
        attributes, reports, plans, physical products or objects.




        © 2001 Valuendo. All rights reserved.
                                                                          13
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Definition
        •Lag =
        amount of time after one task is started or finished before the
        next task can be started or finished.
        •Lead =
        amount of time that precedes the start of work on another task.
        •Duration =
        the time it takes to complete a task.
        In a schedule, the duration is an estimate.
        •Project duration = the time (usually in days) that it takes to
        complete the entire project, from starting the first task to
        finishing the last one.




        © 2001 Valuendo. All rights reserved.
                                                                          14
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                         AIESEC
Valuendo                                                             2001
                                                                               7
Importance of Planning


                                                Planning: Definition
         •Float (slack) =
         the difference between the time available for a task and the
         time required to complete it.
         •Total float = latest finish - earliest start – duration.
         If the total float for a task equals zero, then that task is on
         the critical path.
         •Work Breakdown Structure (WBS) =
         hierarchical chart used to organize the milestones and tasks
         of a project clearly into related areas. This is often
         completed as a tree diagram or as an
         outline. A completed WBS can be used for budgeting,
         personnel selection, scheduling and network diagram
         purposes.


        © 2001 Valuendo. All rights reserved.
                                                                           15
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Definition
         •Milestone =
         summary of the completion of an important set of tasks or
         event
         •Resource loading =
         the time individual resources (people, vendors, etc.) have
         committed to a project.
         •Resource leveling =
         the process of shifting the use of resources to even out the
         workload of team members and equipment. This will cause
         changes in network diagram, budget or the timing of a
         project.




        © 2001 Valuendo. All rights reserved.
                                                                           16
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                           AIESEC
Valuendo                                                               2001
                                                                                8
Importance of Planning


                                                Planning : Definition
           •Rush charges =
           when external companies are rushed. A task which normally
           takes 24 hours will cost more if needed in 2 hours.


           •Project conflict =
           people, priorities or problems begin to interfere with
           completing a project on time and within budget.


           •Project murder =
           the sudden termination of a project for reasons that range from
           rational to absurd.




        © 2001 Valuendo. All rights reserved.
                                                                             17
      INFORMATION CLASSIFICATION = PUBLIC




                                                                    Agenda

       •     Introduction
       •     Why is planning needed?
       •     Definition
       •     Critical Success Factors
       •     Conclusion
       •     Internet Sites




        © 2001 Valuendo. All rights reserved.
                                                                             18
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                           AIESEC
Valuendo                                                               2001
                                                                                  9
Importance of Planning


                                                Planning: Words from the wise



           “Begin at the beginning” the King said,
           gravely, “and go until you come to the end,
           then stop.”
                                                  Lewis Carroll, Alice’s Adventures in Wonderland (1865)




        © 2001 Valuendo. All rights reserved.
                                                                                                           19
      INFORMATION CLASSIFICATION = PUBLIC




                                            Planning: Critical Success Factors
                                                                         (CSF)
         1. Provide structure
         2. Identify all stakeholders
         3. Understand the scope
         4. Proper resources
         5. Risk management
         6. Progress measurement & quality control
         7. Change management
         8. Contingency planning
         9. Communication Strategy
         10. Power of re-application

        © 2001 Valuendo. All rights reserved.
                                                                                                           20
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                                  AIESEC
Valuendo                                                                                      2001
                                                                                                                10
Importance of Planning


                                                Planning: Words from the wise



                   The greatest mistake an executive can make
                   is to be afraid of making a mistake.
                                                                    John Capozzi, 1997




        © 2001 Valuendo. All rights reserved.
                                                                                         21
      INFORMATION CLASSIFICATION = PUBLIC




                                                      CSF 1: Provide structure
         •  What are you going to do?
         •  Provide detailed breakdown of
             – the program in projects,
             – the project in tasks,
             – the task in work assignments
         • Provide timing
         • Provide cost
         • Provide deliverables
         • Provide people
         • Provide place
          => WHO / WHAT / HOW / WHEN / WHERE ?




        © 2001 Valuendo. All rights reserved.
                                                                                         22
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                AIESEC
Valuendo                                                                    2001
                                                                                              11
Importance of Planning


                                                CSF 2: Identify all stakeholders
                                                Stakeholders
                                                   –Who?
                                                    »Steering Committee:
                                                    Guarantee appropriate control over key plans
                                                    »Sponsorship:
                                                    Drive the plan and ensure that it has the
                                                    appropriate resources (budget, technology
                                                    and people)
                                                    »Project Management Office:
                                                    Provide assurance to management with
                                                    regard to the overall plan, business and risk
                                                    management process
                                                    »Leadership:
                                                    Guarantee that appropriate strategies are in
                                                    place
                                                    »Customers:
                                                    Are identified and appropriately involved
        © 2001 Valuendo. All rights reserved.
                                                                                                    23
      INFORMATION CLASSIFICATION = PUBLIC




                                                CSF 2: Identify all stakeholders
         •          Steering Committee Organization
                      – Full management buy-in and commitment
                      – Accountable sponsor with leadership
         •          The plan is based on a sound business case in alignment with
                    the overall business (strategy)
         •          Adequate authority levels are in place to “enforce” the plan
                    (approval/rejection power) based on a specific written
                    document
         •          Make sure that effective project management & QA office is
                    installed and active
         •          Direct and regular communication to all parties involved
         •          Appropriate incentive schemes are in place



        © 2001 Valuendo. All rights reserved.
                                                                                                    24
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                              AIESEC
Valuendo                                                                                  2001
                                                                                                         12
Importance of Planning


                                                Planning: Words from the wise



                 When you don’t know where you want to go,
                 any road will get you there.
                                                                     Chinese proverb.




        © 2001 Valuendo. All rights reserved.
                                                                                        25
      INFORMATION CLASSIFICATION = PUBLIC




                                                 CSF 3: Understand the Scope
         •          The scope is clearly defined, properly approved and
                    controlled
                     – What is wanted?
                     – What is needed?
                     – For which business processes?
         •          Scope is translated in
                     – detailed estimates
                     – a detailed inventory of assumptions
         •          Cost / Benefit analysis
         •          Detailed scope (in writing for each phase)
                             –detailed & realistic approach
                             –(tangible) deliverable definition
                             –scope limitations (“STRICTLY EXCLUDED”)
         •          The scope is communicated to all direct parties involved

        © 2001 Valuendo. All rights reserved.
                                                                                        26
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                               AIESEC
Valuendo                                                                   2001
                                                                                             13
Importance of Planning


                                                Planning: Words from the wise




                Give us the tools, and we will finish the job.
                                                          Winston Churchill, radio broadcast 1941




        © 2001 Valuendo. All rights reserved.
                                                                                                    27
      INFORMATION CLASSIFICATION = PUBLIC




                                                      CSF 4: Proper Resources
         •          Cost calculation & budget development
         •          Staff & resource planning
         •          Adequate financial resources
         •          Use metrics to validate funding needs
         •          Recognition of costs and approved funding
                        – Arrangements for technical personnel
                        – Arrangements for user personnel
                        – Arrangements for supplemental personnel
         •          Legal and contractual arrangements
         •          Top management involvement to determine approach
                    under strenuous conditions
         •          Human element is vital for success
         •          Allow margin of error (hidden buffer)
        © 2001 Valuendo. All rights reserved.
                                                                                                    28
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                           AIESEC
Valuendo                                                                               2001
                                                                                                         14
Importance of Planning


                                                            CSF 4: Proper resources
         •          The team is cohesive and well-motivated
                        – defined roles, responsibilities and authorities
                        – clear structure
                        – know what the success criteria are
         •          Key personnel (including QA) is identified and available
         •          Active participation with key user buy-in, enthusiasm and
                    commitment
         •          Skills transfer (“delegation power”) and empowerment
                    strategies are in place (including the transfer of skills from
                    external to internal personnel and from team members to
                    end-users)
         •          Appropriate skills retention strategies and fall-back plans
                    are in place (outsourcing and downsizing issues)
        © 2001 Valuendo. All rights reserved.
                                                                                                    29
      INFORMATION CLASSIFICATION = PUBLIC




                                                            CSF 4: Proper resources
                                                • Organization
                                                   –Milestone settings to identify subprojects
                                                   derived from master plan
                                                   – “You can’t eat an elephant”
                                                   –Business application and general controls
                                                   assurance: support the accreditation of new or
                                                   modified systems and assure that internal
                                                   controls meet the requirements
                                                   –Responsibilities?
                                                    »Execution and decisions
                                                    »Progress monitoring and communication
                                                   –Communication?
                                                    »Who to consult?
                                                    »Who to inform?
        © 2001 Valuendo. All rights reserved.
                                                                                                    30
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                              AIESEC
Valuendo                                                                                  2001
                                                                                                         15
Importance of Planning


                                                      CSF 4: Proper resources
         •          The responsible manager has to have following interpersonal
                    skills :
                     –a prophet
                     with prediction skills
                     –a politician
                     to sell anything needed and find compromises
                     –a police agent
                     to guard and enforce the rules of the game
                     –a surgeon
                     to detect and solve / eliminate problems
                     –an attorney
                     with the in-depth knowledge & negotiating skills
                     –a psychiatrist
                     with the people (listening) & analytical skills
        © 2001 Valuendo. All rights reserved.
                                                                                              31
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Words from the wise



             “Now remember, the first step in avoiding a
             trap is knowing of its existence.”
                                                                        From the movie DUNE




        © 2001 Valuendo. All rights reserved.
                                                                                              32
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                      AIESEC
Valuendo                                                                          2001
                                                                                                   16
Importance of Planning


                                                     CSF 5: Risk Management
         •          Risk identification and risk management plan
         •          The plan is business-driven with a detailed analysis of
                    business impacts (business benefits and costs)
                    (including external dependencies and performance
                    requirements)
         •          Include study of potential exposures :
                        – contracts and SLA’s
                        – liability and indemnification
                        – ownership of products/results
         •          Comparison of similar projects is useful
         •          The controls are focused on the provision of efficient,
                    effective and economic follow-up.


        © 2001 Valuendo. All rights reserved.
                                                                                        33
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Words from the wise



                         The best preparation for good work
                         tomorrow is to do good work today.
                                                                       Elbert Hubbard




        © 2001 Valuendo. All rights reserved.
                                                                                        34
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                AIESEC
Valuendo                                                                    2001
                                                                                             17
Importance of Planning

                                                CSF 6: Progress Measurement &
                                                                Quality Control
         •          Detailed program with a functional breakdown into
                    manageable “sub”-projects, tasks, dependencies and
                    milestones
         •          Detailed time frame and priority setting
         •          Reasonable buffers in time and/or budget are always
                    incorporated in the plan
         •          Formal project methodology with standards and rules
                      – Appropriate logistics and infrastructure are in place
                      – Pilot plan with prototypes
                      – Testing methodology and environment (intra / inter)
                      – Documentation
         •          Use of resources and tools



        © 2001 Valuendo. All rights reserved.
                                                                                                          35
      INFORMATION CLASSIFICATION = PUBLIC




                                                CSF 6: Progress Measurement &
                                                                Quality Control
                                                • Estimates
                                                   –Every hour of planning saves 10 hours of work
                                                   –The accuracy of an estimate is increased with the
                                                   power of the number of persons.
                                                   –Based on :
                                                    »own experience
                                                    »experience of colleagues
                                                    »experience of external experts / competitors
                                                    »historical data
                                                    »external metrics & estimate methods
                                                    »planning / QA methodology

                                                                                             Real-time,
                                       Infrequent                                              Very
                                       Estimates                                             Accurate

        © 2001 Valuendo. All rights reserved.
                                                                                                          36
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                                   AIESEC
Valuendo                                                                                       2001
                                                                                                               18
Importance of Planning

                                                CSF 6: Progress Measurement &
                                                                Quality Control
         •          QA & Change Control is integrated in master plan
         •          Review of the plan
                     – expectations
                     – communication
                     – resources
                     – risks
                     – documentation of key issues and decisions
                    against QA standards and procedures
         •          Satisfaction verification via
                     – Survey
                     – “Lessons learned” meeting




        © 2001 Valuendo. All rights reserved.
                                                                                            37
      INFORMATION CLASSIFICATION = PUBLIC




                                                 Planning: Words from the wise



                                  If you go into battle,
                                  it’s better to win the first time.
                                                                   George S. Patton, 1941




        © 2001 Valuendo. All rights reserved.
                                                                                            38
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                   AIESEC
Valuendo                                                                       2001
                                                                                                 19
Importance of Planning


                                                  CSF 7: Change Management
         SCOPE CHANGE MANAGEMENT
         • Flexibility to rapidly and effectively respond to changes
            within the environment (live document)
         • Mechanisms in place to enable rapid and effective
            decision making (documentation, validation,
            verification and communication)
         TRANSITION MANAGEMENT
         • Business readiness is assessed as ready prior to
            execution
         • Business change-agents / project champions
            are identified and well-motivated




        © 2001 Valuendo. All rights reserved.
                                                                                                     39
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Words from the wise



                         Time waits for no one and nowhere is that
                         more true than when managing a project.
                                                      Project Manager and PM Teacher Jim MacIntyre




        © 2001 Valuendo. All rights reserved.
                                                                                                     40
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                             AIESEC
Valuendo                                                                                 2001
                                                                                                          20
Importance of Planning


                                                        CSF 8: Contingency plan
         •          Formal contingency plan (“what if”-scenario’s)
         •          Proper contingency resources (budget and people)
         •          Alternative plans with counter-actions in case issues
                    occur




        © 2001 Valuendo. All rights reserved.
                                                                                                       41
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Words from the wise



                         Graham’s Law: If they know nothing of
                         what you are doing, they suspect you are
                         doing nothing.
                                                   Robert Graham in Understanding Project Management




        © 2001 Valuendo. All rights reserved.
                                                                                                       42
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                               AIESEC
Valuendo                                                                                   2001
                                                                                                            21
Importance of Planning


                                                CSF 9: Communication Strategy
         •          Official communication
                     – high-level management dashboard overviews
                     – detailed activity milestones and issue lists
         •          Communication management & strategy
                     – Despite phone, e-mail and documents are
                        PHYSICAL MEETINGS still the most effective
                     – distribution of regular concise status reports to all
                        relevant people involved is easy in order to receive
                        open and structured feedback
                     – emphasis on each success and focus on benefits
                        realized from each failure.




        © 2001 Valuendo. All rights reserved.
                                                                                  43
      INFORMATION CLASSIFICATION = PUBLIC




                                                CSF 10: Power of re-application
         •          All plans eventually lead to a deliverable, a result.
         •          Such result can be achieved again
                     – In other locations
                     – On a larger scale
                    provided following conditions are met :
                     – Complete and detailed documentation
                     – Track of all communications
                     – Lessons learned
         •          Avoiding re-inventing the wheel and
                    dependency of specific skilled people




        © 2001 Valuendo. All rights reserved.
                                                                                  44
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                   AIESEC
Valuendo                                                                       2001
                                                                                       22
Importance of Planning

                                            Planning: Critical Success Factors
                                                                         (CSF)
                                 The 10 CSF elements lead to




        © 2001 Valuendo. All rights reserved.
                                                                                 45
      INFORMATION CLASSIFICATION = PUBLIC




                                                                      Agenda

       •     Introduction
       •     Why is planning needed?
       •     Definition
       •     Critical Success Factors
       •     Conclusion
       •     Internet Sites




        © 2001 Valuendo. All rights reserved.
                                                                                 46
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                              AIESEC
Valuendo                                                                  2001
                                                                                      23
Importance of Planning


                                                            Planning: Conclusion



                                   Team




                                                    Deadlines
                                                         Sched                  End
                                                               ule
                 Budget                                                        Quality

                                                                Expectations



        © 2001 Valuendo. All rights reserved.
                                                                                                   47
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning: Words from the wise



                         Those who cannot remember the past
                         are condemned to repeat it.
                                                                          George Santayana, 1905




        © 2001 Valuendo. All rights reserved.
                                                                                                   48
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                            AIESEC
Valuendo                                                                                2001
                                                                                                        24
Importance of Planning


                                                   Planning: Conclusion


                   May the Force be
                   with you on your
                       Planning
                      Endeavors.
        © 2001 Valuendo. All rights reserved.
                                                                            49
      INFORMATION CLASSIFICATION = PUBLIC




                                                Planning : Internet Sites
         • Project Management Institute
            – http://www.pmi.org/

         • Project Management Forum
            – http://www.pmforum.org/

         • Project Net
            – http://www.projectnet.co.uk/


        © 2001 Valuendo. All rights reserved.
                                                                            50
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                         AIESEC
Valuendo                                                             2001
                                                                                 25
Importance of Planning


                                                Planning: Words from the wise



                   No project is too small
                   to not be taken seriously.
                                                                  An Intel Project Manager




        © 2001 Valuendo. All rights reserved.
                                                                                             51
      INFORMATION CLASSIFICATION = PUBLIC




                                                          Contact information

                         Mr. Marc Vael, CISA, CISM, CISSP, ITIL
                         Managing Director
                         Valuendo
                         Kriebrugstraat 33
                         1760 Roosdaal
                         Belgium
                         T: +32 5 433 61 93
                         M: +32 473 99 30 31
                         M: mvael@valuendo.com
                            mvael@ valuendo.com

        © 2001 Valuendo. All rights reserved.
                                                                                             52
      INFORMATION CLASSIFICATION = PUBLIC




Marc Vael                                                                    AIESEC
Valuendo                                                                        2001
                                                                                                  26

Contenu connexe

Similaire à Valuendo Aiesec Importance Of Planning (2001) Handout

Value of IT Project Governance
Value of IT Project GovernanceValue of IT Project Governance
Value of IT Project GovernanceUNSW Canberra
 
EA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy InEA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy InRuss Gibfried
 
Emerging Demand For Business Project Audits
Emerging Demand For Business Project AuditsEmerging Demand For Business Project Audits
Emerging Demand For Business Project AuditsUNSW Canberra
 
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Christine Troianello
 
Getting Management Buy In Your Top 7 Actions
Getting Management Buy In   Your Top 7 ActionsGetting Management Buy In   Your Top 7 Actions
Getting Management Buy In Your Top 7 ActionsAndrewLi
 
The 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report FindingsThe 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report FindingsKeyedIn Projects
 
¿Cómo gestionar un proyecto aspectos clave
¿Cómo gestionar un proyecto   aspectos clave¿Cómo gestionar un proyecto   aspectos clave
¿Cómo gestionar un proyecto aspectos claveProColombia
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4sami325
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and FailureMichael Krigsman
 
Risk Management_Consulting Industry
Risk Management_Consulting  IndustryRisk Management_Consulting  Industry
Risk Management_Consulting IndustryAtul Singh
 
5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Finalphlckb
 
Change Management
Change ManagementChange Management
Change Managementpromoking
 
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsEmpirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsGrigori Melnik
 
IPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management OrganizationIPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management OrganizationStefan Hagen
 
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...Ed Brill
 

Similaire à Valuendo Aiesec Importance Of Planning (2001) Handout (20)

Value of IT Project Governance
Value of IT Project GovernanceValue of IT Project Governance
Value of IT Project Governance
 
What is Cobit
What is CobitWhat is Cobit
What is Cobit
 
EA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy InEA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy In
 
Emerging Demand For Business Project Audits
Emerging Demand For Business Project AuditsEmerging Demand For Business Project Audits
Emerging Demand For Business Project Audits
 
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
 
GrEAnland
GrEAnlandGrEAnland
GrEAnland
 
Getting Management Buy In Your Top 7 Actions
Getting Management Buy In   Your Top 7 ActionsGetting Management Buy In   Your Top 7 Actions
Getting Management Buy In Your Top 7 Actions
 
The 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report FindingsThe 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report Findings
 
¿Cómo gestionar un proyecto aspectos clave
¿Cómo gestionar un proyecto   aspectos clave¿Cómo gestionar un proyecto   aspectos clave
¿Cómo gestionar un proyecto aspectos clave
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and Failure
 
Risk Management_Consulting Industry
Risk Management_Consulting  IndustryRisk Management_Consulting  Industry
Risk Management_Consulting Industry
 
5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final
 
Change Management
Change ManagementChange Management
Change Management
 
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsEmpirical Evidence Of Agile Methods
Empirical Evidence Of Agile Methods
 
IPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management OrganizationIPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management Organization
 
Alkatesting
AlkatestingAlkatesting
Alkatesting
 
C prime webinar-ppt-validating agile
C prime webinar-ppt-validating agileC prime webinar-ppt-validating agile
C prime webinar-ppt-validating agile
 
Managing project risk
Managing project riskManaging project risk
Managing project risk
 
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
 

Plus de Marc Vael

How secure are chat and webconf tools
How secure are chat and webconf toolsHow secure are chat and webconf tools
How secure are chat and webconf toolsMarc Vael
 
my experience as ciso
my experience as cisomy experience as ciso
my experience as cisoMarc Vael
 
Advantages of privacy by design in IoE
Advantages of privacy by design in IoEAdvantages of privacy by design in IoE
Advantages of privacy by design in IoEMarc Vael
 
Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)Marc Vael
 
Cybersecurity nexus vision
Cybersecurity nexus visionCybersecurity nexus vision
Cybersecurity nexus visionMarc Vael
 
ISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholdersISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholdersMarc Vael
 
Cloud security lessons learned and audit
Cloud security lessons learned and auditCloud security lessons learned and audit
Cloud security lessons learned and auditMarc Vael
 
Value-added it auditing
Value-added it auditingValue-added it auditing
Value-added it auditingMarc Vael
 
ISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentationISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentationMarc Vael
 
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?Marc Vael
 
The value of big data analytics
The value of big data analyticsThe value of big data analytics
The value of big data analyticsMarc Vael
 
Social media risks and controls
Social media risks and controlsSocial media risks and controls
Social media risks and controlsMarc Vael
 
The view of auditor on cybercrime
The view of auditor on cybercrimeThe view of auditor on cybercrime
The view of auditor on cybercrimeMarc Vael
 
ISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentationISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentationMarc Vael
 
Belgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programmeBelgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programmeMarc Vael
 
ISACA Cloud Computing Risks
ISACA Cloud Computing RisksISACA Cloud Computing Risks
ISACA Cloud Computing RisksMarc Vael
 
Information security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handoutInformation security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handoutMarc Vael
 
ISACA smart security for smart devices
ISACA smart security for smart devicesISACA smart security for smart devices
ISACA smart security for smart devicesMarc Vael
 
Securing big data (july 2012)
Securing big data (july 2012)Securing big data (july 2012)
Securing big data (july 2012)Marc Vael
 
Valuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handoutValuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handoutMarc Vael
 

Plus de Marc Vael (20)

How secure are chat and webconf tools
How secure are chat and webconf toolsHow secure are chat and webconf tools
How secure are chat and webconf tools
 
my experience as ciso
my experience as cisomy experience as ciso
my experience as ciso
 
Advantages of privacy by design in IoE
Advantages of privacy by design in IoEAdvantages of privacy by design in IoE
Advantages of privacy by design in IoE
 
Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)
 
Cybersecurity nexus vision
Cybersecurity nexus visionCybersecurity nexus vision
Cybersecurity nexus vision
 
ISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholdersISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholders
 
Cloud security lessons learned and audit
Cloud security lessons learned and auditCloud security lessons learned and audit
Cloud security lessons learned and audit
 
Value-added it auditing
Value-added it auditingValue-added it auditing
Value-added it auditing
 
ISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentationISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentation
 
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
 
The value of big data analytics
The value of big data analyticsThe value of big data analytics
The value of big data analytics
 
Social media risks and controls
Social media risks and controlsSocial media risks and controls
Social media risks and controls
 
The view of auditor on cybercrime
The view of auditor on cybercrimeThe view of auditor on cybercrime
The view of auditor on cybercrime
 
ISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentationISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentation
 
Belgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programmeBelgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programme
 
ISACA Cloud Computing Risks
ISACA Cloud Computing RisksISACA Cloud Computing Risks
ISACA Cloud Computing Risks
 
Information security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handoutInformation security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handout
 
ISACA smart security for smart devices
ISACA smart security for smart devicesISACA smart security for smart devices
ISACA smart security for smart devices
 
Securing big data (july 2012)
Securing big data (july 2012)Securing big data (july 2012)
Securing big data (july 2012)
 
Valuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handoutValuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handout
 

Dernier

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Dernier (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Valuendo Aiesec Importance Of Planning (2001) Handout

  • 1. Importance of Planning The importance of planning AIESEC Mr. Marc Vael Managing Director Valuendo © 2001 Valuendo. All rights reserved. 1 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 2 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 1
  • 2. Importance of Planning Introduction • Marc Vael • Managing Director Valuendo (“value & do”) since July 2001 • Education – Master Applied Economics (UAntwerp) – Master Information Management (UHasselt) – Master+ Applied Economics & ICT (KUL) • Core Services – Enterprise Risk Management – IT Governance – Information Security Management – Data Privacy & Protection – Business Continuity / Disaster Recovery – Crisis Management – IT Audit & Compliance • Certifications – CISA © 2001 Valuendo. All rights reserved. 3 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? In 1999, of all projects : • 25 % SUCCEEDED : => on time, on budget, as initially specified • 35 % were CHALLENGED : => late, over budget, delivering less than specified • 40 % FAILED : => canceled at some point © 2001 Valuendo. All rights reserved. 4 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 2
  • 3. Importance of Planning Planning: Why? The most elementary aspects are missing : • 85% of projects starts without an accepted view on costs and timeframe. • The exact starting date is known in < 1% of projects. • Of 15% of projects it is not clear if they are finished or not. • Scope enlargements are common in > 50% of projects. • Less than 15% of project managers have created a change-management plan to deal with scope changes. © 2001 Valuendo. All rights reserved. 5 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? Why do projects fail so often? – Poorly defined scope (incomplete requirements / specifications) – Poor organization and management – No standard vision / communication on the progress – Wrong estimations (time and budget) – Lack of proper resources – Poor quality control – “Silo vision” – Conflicts between projects – Organizational / Corporate Politics – Problems are hidden for top management (quot;shoot the messengerquot;) – Resource draining – “hardest shouting man” syndrome – Lack of proper change management standards & procedures – No study for (technical) feasibility – Usage of immature / poor (technology) infrastructure – Inadequate testing procedures/controls – Project crisis management instead of project (risk) management – No one is in charge (too many Indians and no chief?) – Everyone is in charge (too many chiefs and no Indians?) – Excessive / Unrealistic expectations – Hidden costs © 2001 Valuendo. All rights reserved. 6 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 3
  • 4. Importance of Planning Planning: Words from the wise There is much to be said of failure. It is more interesting than success. Max Beerbohm © 2001 Valuendo. All rights reserved. 7 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? Warning signs of a project heading for failure: – A lack of scope / change control – Real costs consistently exceeding budgeted costs – Breakdown of team communication – Team members working excessively long hours – Decreasing team co-operation and enthusiasm – Increasing number of “ad hoc crisis meetings” that are held in an attempt to regain project control – No presence of internal control & security requirements – Missing or out-of-date documentation – Resource consumption on non-issues – Little or no “end-user group” interest and involvement © 2001 Valuendo. All rights reserved. 8 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 4
  • 5. Importance of Planning Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 9 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Program = may comprise multiple projects or be a recurring project with predictability, but with a new plan and unique product •Project = combination of complex, sequenced, goal-driven, interrelated tasks and unique events with a defined beginning and an end-date to be executed bounded by resources, time and budgets with many people involved and resulting in a desired end-product or service. © 2001 Valuendo. All rights reserved. 10 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 5
  • 6. Importance of Planning Planning: Definition •Task (activity) = a cohesive unit of work on a project divided into “work assignments” •Work Assignment (sub-task) = individual activity required to complete a project assigned by the project manager and/or subordinates of the project manager. Subtasks are the steps needed to complete a task. These subtasks are not traced in the plan. Work Program Task Project Assignment © 2001 Valuendo. All rights reserved. 11 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Scope = the size which determines how many resources, how much time and how large the final product is. •Project Resources = time, people, money, equipment and facilities used to complete a project. •Project Sponsors = people with a personal or business interest in the desired end- results of a project (e.g. customers, managers, corporate executives, shareholders and/or representatives of governmental agencies). © 2001 Valuendo. All rights reserved. 12 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 6
  • 7. Importance of Planning Planning: Definition •Project Manager = person designated as responsible for the management of all activities necessary for the delivery of the contracted deliverables to the end-customer to the customer's satisfaction and within the agreed time and budget constraints. •Deliverable (goals) = clearly defined result, good or service produced during the project or at its outcome. This may include organizational attributes, reports, plans, physical products or objects. © 2001 Valuendo. All rights reserved. 13 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Lag = amount of time after one task is started or finished before the next task can be started or finished. •Lead = amount of time that precedes the start of work on another task. •Duration = the time it takes to complete a task. In a schedule, the duration is an estimate. •Project duration = the time (usually in days) that it takes to complete the entire project, from starting the first task to finishing the last one. © 2001 Valuendo. All rights reserved. 14 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 7
  • 8. Importance of Planning Planning: Definition •Float (slack) = the difference between the time available for a task and the time required to complete it. •Total float = latest finish - earliest start – duration. If the total float for a task equals zero, then that task is on the critical path. •Work Breakdown Structure (WBS) = hierarchical chart used to organize the milestones and tasks of a project clearly into related areas. This is often completed as a tree diagram or as an outline. A completed WBS can be used for budgeting, personnel selection, scheduling and network diagram purposes. © 2001 Valuendo. All rights reserved. 15 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Milestone = summary of the completion of an important set of tasks or event •Resource loading = the time individual resources (people, vendors, etc.) have committed to a project. •Resource leveling = the process of shifting the use of resources to even out the workload of team members and equipment. This will cause changes in network diagram, budget or the timing of a project. © 2001 Valuendo. All rights reserved. 16 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 8
  • 9. Importance of Planning Planning : Definition •Rush charges = when external companies are rushed. A task which normally takes 24 hours will cost more if needed in 2 hours. •Project conflict = people, priorities or problems begin to interfere with completing a project on time and within budget. •Project murder = the sudden termination of a project for reasons that range from rational to absurd. © 2001 Valuendo. All rights reserved. 17 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 18 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 9
  • 10. Importance of Planning Planning: Words from the wise “Begin at the beginning” the King said, gravely, “and go until you come to the end, then stop.” Lewis Carroll, Alice’s Adventures in Wonderland (1865) © 2001 Valuendo. All rights reserved. 19 INFORMATION CLASSIFICATION = PUBLIC Planning: Critical Success Factors (CSF) 1. Provide structure 2. Identify all stakeholders 3. Understand the scope 4. Proper resources 5. Risk management 6. Progress measurement & quality control 7. Change management 8. Contingency planning 9. Communication Strategy 10. Power of re-application © 2001 Valuendo. All rights reserved. 20 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 10
  • 11. Importance of Planning Planning: Words from the wise The greatest mistake an executive can make is to be afraid of making a mistake. John Capozzi, 1997 © 2001 Valuendo. All rights reserved. 21 INFORMATION CLASSIFICATION = PUBLIC CSF 1: Provide structure • What are you going to do? • Provide detailed breakdown of – the program in projects, – the project in tasks, – the task in work assignments • Provide timing • Provide cost • Provide deliverables • Provide people • Provide place => WHO / WHAT / HOW / WHEN / WHERE ? © 2001 Valuendo. All rights reserved. 22 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 11
  • 12. Importance of Planning CSF 2: Identify all stakeholders Stakeholders –Who? »Steering Committee: Guarantee appropriate control over key plans »Sponsorship: Drive the plan and ensure that it has the appropriate resources (budget, technology and people) »Project Management Office: Provide assurance to management with regard to the overall plan, business and risk management process »Leadership: Guarantee that appropriate strategies are in place »Customers: Are identified and appropriately involved © 2001 Valuendo. All rights reserved. 23 INFORMATION CLASSIFICATION = PUBLIC CSF 2: Identify all stakeholders • Steering Committee Organization – Full management buy-in and commitment – Accountable sponsor with leadership • The plan is based on a sound business case in alignment with the overall business (strategy) • Adequate authority levels are in place to “enforce” the plan (approval/rejection power) based on a specific written document • Make sure that effective project management & QA office is installed and active • Direct and regular communication to all parties involved • Appropriate incentive schemes are in place © 2001 Valuendo. All rights reserved. 24 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 12
  • 13. Importance of Planning Planning: Words from the wise When you don’t know where you want to go, any road will get you there. Chinese proverb. © 2001 Valuendo. All rights reserved. 25 INFORMATION CLASSIFICATION = PUBLIC CSF 3: Understand the Scope • The scope is clearly defined, properly approved and controlled – What is wanted? – What is needed? – For which business processes? • Scope is translated in – detailed estimates – a detailed inventory of assumptions • Cost / Benefit analysis • Detailed scope (in writing for each phase) –detailed & realistic approach –(tangible) deliverable definition –scope limitations (“STRICTLY EXCLUDED”) • The scope is communicated to all direct parties involved © 2001 Valuendo. All rights reserved. 26 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 13
  • 14. Importance of Planning Planning: Words from the wise Give us the tools, and we will finish the job. Winston Churchill, radio broadcast 1941 © 2001 Valuendo. All rights reserved. 27 INFORMATION CLASSIFICATION = PUBLIC CSF 4: Proper Resources • Cost calculation & budget development • Staff & resource planning • Adequate financial resources • Use metrics to validate funding needs • Recognition of costs and approved funding – Arrangements for technical personnel – Arrangements for user personnel – Arrangements for supplemental personnel • Legal and contractual arrangements • Top management involvement to determine approach under strenuous conditions • Human element is vital for success • Allow margin of error (hidden buffer) © 2001 Valuendo. All rights reserved. 28 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 14
  • 15. Importance of Planning CSF 4: Proper resources • The team is cohesive and well-motivated – defined roles, responsibilities and authorities – clear structure – know what the success criteria are • Key personnel (including QA) is identified and available • Active participation with key user buy-in, enthusiasm and commitment • Skills transfer (“delegation power”) and empowerment strategies are in place (including the transfer of skills from external to internal personnel and from team members to end-users) • Appropriate skills retention strategies and fall-back plans are in place (outsourcing and downsizing issues) © 2001 Valuendo. All rights reserved. 29 INFORMATION CLASSIFICATION = PUBLIC CSF 4: Proper resources • Organization –Milestone settings to identify subprojects derived from master plan – “You can’t eat an elephant” –Business application and general controls assurance: support the accreditation of new or modified systems and assure that internal controls meet the requirements –Responsibilities? »Execution and decisions »Progress monitoring and communication –Communication? »Who to consult? »Who to inform? © 2001 Valuendo. All rights reserved. 30 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 15
  • 16. Importance of Planning CSF 4: Proper resources • The responsible manager has to have following interpersonal skills : –a prophet with prediction skills –a politician to sell anything needed and find compromises –a police agent to guard and enforce the rules of the game –a surgeon to detect and solve / eliminate problems –an attorney with the in-depth knowledge & negotiating skills –a psychiatrist with the people (listening) & analytical skills © 2001 Valuendo. All rights reserved. 31 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise “Now remember, the first step in avoiding a trap is knowing of its existence.” From the movie DUNE © 2001 Valuendo. All rights reserved. 32 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 16
  • 17. Importance of Planning CSF 5: Risk Management • Risk identification and risk management plan • The plan is business-driven with a detailed analysis of business impacts (business benefits and costs) (including external dependencies and performance requirements) • Include study of potential exposures : – contracts and SLA’s – liability and indemnification – ownership of products/results • Comparison of similar projects is useful • The controls are focused on the provision of efficient, effective and economic follow-up. © 2001 Valuendo. All rights reserved. 33 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise The best preparation for good work tomorrow is to do good work today. Elbert Hubbard © 2001 Valuendo. All rights reserved. 34 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 17
  • 18. Importance of Planning CSF 6: Progress Measurement & Quality Control • Detailed program with a functional breakdown into manageable “sub”-projects, tasks, dependencies and milestones • Detailed time frame and priority setting • Reasonable buffers in time and/or budget are always incorporated in the plan • Formal project methodology with standards and rules – Appropriate logistics and infrastructure are in place – Pilot plan with prototypes – Testing methodology and environment (intra / inter) – Documentation • Use of resources and tools © 2001 Valuendo. All rights reserved. 35 INFORMATION CLASSIFICATION = PUBLIC CSF 6: Progress Measurement & Quality Control • Estimates –Every hour of planning saves 10 hours of work –The accuracy of an estimate is increased with the power of the number of persons. –Based on : »own experience »experience of colleagues »experience of external experts / competitors »historical data »external metrics & estimate methods »planning / QA methodology Real-time, Infrequent Very Estimates Accurate © 2001 Valuendo. All rights reserved. 36 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 18
  • 19. Importance of Planning CSF 6: Progress Measurement & Quality Control • QA & Change Control is integrated in master plan • Review of the plan – expectations – communication – resources – risks – documentation of key issues and decisions against QA standards and procedures • Satisfaction verification via – Survey – “Lessons learned” meeting © 2001 Valuendo. All rights reserved. 37 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise If you go into battle, it’s better to win the first time. George S. Patton, 1941 © 2001 Valuendo. All rights reserved. 38 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 19
  • 20. Importance of Planning CSF 7: Change Management SCOPE CHANGE MANAGEMENT • Flexibility to rapidly and effectively respond to changes within the environment (live document) • Mechanisms in place to enable rapid and effective decision making (documentation, validation, verification and communication) TRANSITION MANAGEMENT • Business readiness is assessed as ready prior to execution • Business change-agents / project champions are identified and well-motivated © 2001 Valuendo. All rights reserved. 39 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Time waits for no one and nowhere is that more true than when managing a project. Project Manager and PM Teacher Jim MacIntyre © 2001 Valuendo. All rights reserved. 40 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 20
  • 21. Importance of Planning CSF 8: Contingency plan • Formal contingency plan (“what if”-scenario’s) • Proper contingency resources (budget and people) • Alternative plans with counter-actions in case issues occur © 2001 Valuendo. All rights reserved. 41 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Graham’s Law: If they know nothing of what you are doing, they suspect you are doing nothing. Robert Graham in Understanding Project Management © 2001 Valuendo. All rights reserved. 42 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 21
  • 22. Importance of Planning CSF 9: Communication Strategy • Official communication – high-level management dashboard overviews – detailed activity milestones and issue lists • Communication management & strategy – Despite phone, e-mail and documents are PHYSICAL MEETINGS still the most effective – distribution of regular concise status reports to all relevant people involved is easy in order to receive open and structured feedback – emphasis on each success and focus on benefits realized from each failure. © 2001 Valuendo. All rights reserved. 43 INFORMATION CLASSIFICATION = PUBLIC CSF 10: Power of re-application • All plans eventually lead to a deliverable, a result. • Such result can be achieved again – In other locations – On a larger scale provided following conditions are met : – Complete and detailed documentation – Track of all communications – Lessons learned • Avoiding re-inventing the wheel and dependency of specific skilled people © 2001 Valuendo. All rights reserved. 44 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 22
  • 23. Importance of Planning Planning: Critical Success Factors (CSF) The 10 CSF elements lead to © 2001 Valuendo. All rights reserved. 45 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 46 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 23
  • 24. Importance of Planning Planning: Conclusion Team Deadlines Sched End ule Budget Quality Expectations © 2001 Valuendo. All rights reserved. 47 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Those who cannot remember the past are condemned to repeat it. George Santayana, 1905 © 2001 Valuendo. All rights reserved. 48 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 24
  • 25. Importance of Planning Planning: Conclusion May the Force be with you on your Planning Endeavors. © 2001 Valuendo. All rights reserved. 49 INFORMATION CLASSIFICATION = PUBLIC Planning : Internet Sites • Project Management Institute – http://www.pmi.org/ • Project Management Forum – http://www.pmforum.org/ • Project Net – http://www.projectnet.co.uk/ © 2001 Valuendo. All rights reserved. 50 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 25
  • 26. Importance of Planning Planning: Words from the wise No project is too small to not be taken seriously. An Intel Project Manager © 2001 Valuendo. All rights reserved. 51 INFORMATION CLASSIFICATION = PUBLIC Contact information Mr. Marc Vael, CISA, CISM, CISSP, ITIL Managing Director Valuendo Kriebrugstraat 33 1760 Roosdaal Belgium T: +32 5 433 61 93 M: +32 473 99 30 31 M: mvael@valuendo.com mvael@ valuendo.com © 2001 Valuendo. All rights reserved. 52 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 26