Valuendo Aiesec Importance Of Planning (2001) Handout
•
1 j'aime
•
511 vues
Marc Vael
Suivre
Generic presentation on planning
Lire moins
Lire la suite
Business
Technologie
Signaler
Partager
Signaler
Partager
1 sur 26
Télécharger maintenant
Télécharger pour lire hors ligne
Recommandé
Lou wheatcraft
Lou wheatcraft
NASAPMC
WBS
WBS
Muneeb HaXan
Popcake Pdf Presentation
Popcake Pdf Presentation
timayoung1
Hoe lokaal kan een veiligheidsbeleid zijn?
Hoe lokaal kan een veiligheidsbeleid zijn?
TomasV
Resultados quilicura 2° etapa
Resultados quilicura 2° etapa
terapeuta.cristian
Fms pune prospectus 2011
Fms pune prospectus 2011
Firoze Khan
Cobit presentation
Cobit presentation
Fran Rodriguez
CobIT presentation
CobIT presentation
Marc Vael
Recommandé
Lou wheatcraft
Lou wheatcraft
NASAPMC
WBS
WBS
Muneeb HaXan
Popcake Pdf Presentation
Popcake Pdf Presentation
timayoung1
Hoe lokaal kan een veiligheidsbeleid zijn?
Hoe lokaal kan een veiligheidsbeleid zijn?
TomasV
Resultados quilicura 2° etapa
Resultados quilicura 2° etapa
terapeuta.cristian
Fms pune prospectus 2011
Fms pune prospectus 2011
Firoze Khan
Cobit presentation
Cobit presentation
Fran Rodriguez
CobIT presentation
CobIT presentation
Marc Vael
Value of IT Project Governance
Value of IT Project Governance
UNSW Canberra
What is Cobit
What is Cobit
Ben Kalland
EA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy In
Russ Gibfried
Emerging Demand For Business Project Audits
Emerging Demand For Business Project Audits
UNSW Canberra
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
Christine Troianello
GrEAnland
GrEAnland
John Gøtze
Getting Management Buy In Your Top 7 Actions
Getting Management Buy In Your Top 7 Actions
AndrewLi
The 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report Findings
KeyedIn Projects
¿Cómo gestionar un proyecto aspectos clave
¿Cómo gestionar un proyecto aspectos clave
ProColombia
Pojectmanagementver4
Pojectmanagementver4
sami325
Project Governance and Failure
Project Governance and Failure
Michael Krigsman
Risk Management_Consulting Industry
Risk Management_Consulting Industry
Atul Singh
5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final
phlckb
Change Management
Change Management
promoking
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile Methods
Grigori Melnik
IPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management Organization
Stefan Hagen
Alkatesting
Alkatesting
techweb08
C prime webinar-ppt-validating agile
C prime webinar-ppt-validating agile
cPrime | Project Management | Agile | Consulting | Staffing | Training
Managing project risk
Managing project risk
Michelle Hrlec
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Ed Brill
How secure are chat and webconf tools
How secure are chat and webconf tools
Marc Vael
my experience as ciso
my experience as ciso
Marc Vael
Contenu connexe
Similaire à Valuendo Aiesec Importance Of Planning (2001) Handout
Value of IT Project Governance
Value of IT Project Governance
UNSW Canberra
What is Cobit
What is Cobit
Ben Kalland
EA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy In
Russ Gibfried
Emerging Demand For Business Project Audits
Emerging Demand For Business Project Audits
UNSW Canberra
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
Christine Troianello
GrEAnland
GrEAnland
John Gøtze
Getting Management Buy In Your Top 7 Actions
Getting Management Buy In Your Top 7 Actions
AndrewLi
The 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report Findings
KeyedIn Projects
¿Cómo gestionar un proyecto aspectos clave
¿Cómo gestionar un proyecto aspectos clave
ProColombia
Pojectmanagementver4
Pojectmanagementver4
sami325
Project Governance and Failure
Project Governance and Failure
Michael Krigsman
Risk Management_Consulting Industry
Risk Management_Consulting Industry
Atul Singh
5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final
phlckb
Change Management
Change Management
promoking
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile Methods
Grigori Melnik
IPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management Organization
Stefan Hagen
Alkatesting
Alkatesting
techweb08
C prime webinar-ppt-validating agile
C prime webinar-ppt-validating agile
cPrime | Project Management | Agile | Consulting | Staffing | Training
Managing project risk
Managing project risk
Michelle Hrlec
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Ed Brill
Similaire à Valuendo Aiesec Importance Of Planning (2001) Handout
(20)
Value of IT Project Governance
Value of IT Project Governance
What is Cobit
What is Cobit
EA - Gaining And Retaining Stakeholder Buy In
EA - Gaining And Retaining Stakeholder Buy In
Emerging Demand For Business Project Audits
Emerging Demand For Business Project Audits
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
GrEAnland
GrEAnland
Getting Management Buy In Your Top 7 Actions
Getting Management Buy In Your Top 7 Actions
The 2021 PMO Outlook Report Findings
The 2021 PMO Outlook Report Findings
¿Cómo gestionar un proyecto aspectos clave
¿Cómo gestionar un proyecto aspectos clave
Pojectmanagementver4
Pojectmanagementver4
Project Governance and Failure
Project Governance and Failure
Risk Management_Consulting Industry
Risk Management_Consulting Industry
5 Ingredients Of The EVM Secret Sauce V Final
5 Ingredients Of The EVM Secret Sauce V Final
Change Management
Change Management
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile Methods
IPPM - The Integrated Process and Project Management Organization
IPPM - The Integrated Process and Project Management Organization
Alkatesting
Alkatesting
C prime webinar-ppt-validating agile
C prime webinar-ppt-validating agile
Managing project risk
Managing project risk
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Lotusphere Id601 - Understanding the marketplace advantages for IBM Lotus sol...
Plus de Marc Vael
How secure are chat and webconf tools
How secure are chat and webconf tools
Marc Vael
my experience as ciso
my experience as ciso
Marc Vael
Advantages of privacy by design in IoE
Advantages of privacy by design in IoE
Marc Vael
Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)
Marc Vael
Cybersecurity nexus vision
Cybersecurity nexus vision
Marc Vael
ISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholders
Marc Vael
Cloud security lessons learned and audit
Cloud security lessons learned and audit
Marc Vael
Value-added it auditing
Value-added it auditing
Marc Vael
ISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentation
Marc Vael
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
Marc Vael
The value of big data analytics
The value of big data analytics
Marc Vael
Social media risks and controls
Social media risks and controls
Marc Vael
The view of auditor on cybercrime
The view of auditor on cybercrime
Marc Vael
ISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentation
Marc Vael
Belgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programme
Marc Vael
ISACA Cloud Computing Risks
ISACA Cloud Computing Risks
Marc Vael
Information security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handout
Marc Vael
ISACA smart security for smart devices
ISACA smart security for smart devices
Marc Vael
Securing big data (july 2012)
Securing big data (july 2012)
Marc Vael
Valuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handout
Marc Vael
Plus de Marc Vael
(20)
How secure are chat and webconf tools
How secure are chat and webconf tools
my experience as ciso
my experience as ciso
Advantages of privacy by design in IoE
Advantages of privacy by design in IoE
Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity governance existing frameworks (nov 2015)
Cybersecurity nexus vision
Cybersecurity nexus vision
ISACA Reporting relevant IT risks to stakeholders
ISACA Reporting relevant IT risks to stakeholders
Cloud security lessons learned and audit
Cloud security lessons learned and audit
Value-added it auditing
Value-added it auditing
ISACA Internet of Things open forum presentation
ISACA Internet of Things open forum presentation
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
hoe kan u vandaag informatie veiligheid realiseren op een praktische manier?
The value of big data analytics
The value of big data analytics
Social media risks and controls
Social media risks and controls
The view of auditor on cybercrime
The view of auditor on cybercrime
ISACA Mobile Payments Forum presentation
ISACA Mobile Payments Forum presentation
Belgian Data Protection Commission's new audit programme
Belgian Data Protection Commission's new audit programme
ISACA Cloud Computing Risks
ISACA Cloud Computing Risks
Information security awareness (sept 2012) bis handout
Information security awareness (sept 2012) bis handout
ISACA smart security for smart devices
ISACA smart security for smart devices
Securing big data (july 2012)
Securing big data (july 2012)
Valuendo cyberwar and security (jan 2012) handout
Valuendo cyberwar and security (jan 2012) handout
Dernier
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
ritikaroy0888
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Dipal Arora
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Workforce Group
Progress Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
Holger Mueller
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
anilsa9823
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
IlamathiKannappan
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
Seo
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
Ravindra Nath Shukla
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
Ravindra Nath Shukla
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
tbatkhuu1
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Denis Gagné
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
Exhibitors Data
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
Roland Driesen
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
lizamodels9
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
Any kyc Account
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
Ethan lee
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
P&CO
Dernier
(20)
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Progress Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
Valuendo Aiesec Importance Of Planning (2001) Handout
1.
Importance of Planning
The importance of planning AIESEC Mr. Marc Vael Managing Director Valuendo © 2001 Valuendo. All rights reserved. 1 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 2 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 1
2.
Importance of Planning
Introduction • Marc Vael • Managing Director Valuendo (“value & do”) since July 2001 • Education – Master Applied Economics (UAntwerp) – Master Information Management (UHasselt) – Master+ Applied Economics & ICT (KUL) • Core Services – Enterprise Risk Management – IT Governance – Information Security Management – Data Privacy & Protection – Business Continuity / Disaster Recovery – Crisis Management – IT Audit & Compliance • Certifications – CISA © 2001 Valuendo. All rights reserved. 3 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? In 1999, of all projects : • 25 % SUCCEEDED : => on time, on budget, as initially specified • 35 % were CHALLENGED : => late, over budget, delivering less than specified • 40 % FAILED : => canceled at some point © 2001 Valuendo. All rights reserved. 4 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 2
3.
Importance of Planning
Planning: Why? The most elementary aspects are missing : • 85% of projects starts without an accepted view on costs and timeframe. • The exact starting date is known in < 1% of projects. • Of 15% of projects it is not clear if they are finished or not. • Scope enlargements are common in > 50% of projects. • Less than 15% of project managers have created a change-management plan to deal with scope changes. © 2001 Valuendo. All rights reserved. 5 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? Why do projects fail so often? – Poorly defined scope (incomplete requirements / specifications) – Poor organization and management – No standard vision / communication on the progress – Wrong estimations (time and budget) – Lack of proper resources – Poor quality control – “Silo vision” – Conflicts between projects – Organizational / Corporate Politics – Problems are hidden for top management (quot;shoot the messengerquot;) – Resource draining – “hardest shouting man” syndrome – Lack of proper change management standards & procedures – No study for (technical) feasibility – Usage of immature / poor (technology) infrastructure – Inadequate testing procedures/controls – Project crisis management instead of project (risk) management – No one is in charge (too many Indians and no chief?) – Everyone is in charge (too many chiefs and no Indians?) – Excessive / Unrealistic expectations – Hidden costs © 2001 Valuendo. All rights reserved. 6 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 3
4.
Importance of Planning
Planning: Words from the wise There is much to be said of failure. It is more interesting than success. Max Beerbohm © 2001 Valuendo. All rights reserved. 7 INFORMATION CLASSIFICATION = PUBLIC Planning: Why? Warning signs of a project heading for failure: – A lack of scope / change control – Real costs consistently exceeding budgeted costs – Breakdown of team communication – Team members working excessively long hours – Decreasing team co-operation and enthusiasm – Increasing number of “ad hoc crisis meetings” that are held in an attempt to regain project control – No presence of internal control & security requirements – Missing or out-of-date documentation – Resource consumption on non-issues – Little or no “end-user group” interest and involvement © 2001 Valuendo. All rights reserved. 8 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 4
5.
Importance of Planning
Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 9 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Program = may comprise multiple projects or be a recurring project with predictability, but with a new plan and unique product •Project = combination of complex, sequenced, goal-driven, interrelated tasks and unique events with a defined beginning and an end-date to be executed bounded by resources, time and budgets with many people involved and resulting in a desired end-product or service. © 2001 Valuendo. All rights reserved. 10 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 5
6.
Importance of Planning
Planning: Definition •Task (activity) = a cohesive unit of work on a project divided into “work assignments” •Work Assignment (sub-task) = individual activity required to complete a project assigned by the project manager and/or subordinates of the project manager. Subtasks are the steps needed to complete a task. These subtasks are not traced in the plan. Work Program Task Project Assignment © 2001 Valuendo. All rights reserved. 11 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Scope = the size which determines how many resources, how much time and how large the final product is. •Project Resources = time, people, money, equipment and facilities used to complete a project. •Project Sponsors = people with a personal or business interest in the desired end- results of a project (e.g. customers, managers, corporate executives, shareholders and/or representatives of governmental agencies). © 2001 Valuendo. All rights reserved. 12 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 6
7.
Importance of Planning
Planning: Definition •Project Manager = person designated as responsible for the management of all activities necessary for the delivery of the contracted deliverables to the end-customer to the customer's satisfaction and within the agreed time and budget constraints. •Deliverable (goals) = clearly defined result, good or service produced during the project or at its outcome. This may include organizational attributes, reports, plans, physical products or objects. © 2001 Valuendo. All rights reserved. 13 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Lag = amount of time after one task is started or finished before the next task can be started or finished. •Lead = amount of time that precedes the start of work on another task. •Duration = the time it takes to complete a task. In a schedule, the duration is an estimate. •Project duration = the time (usually in days) that it takes to complete the entire project, from starting the first task to finishing the last one. © 2001 Valuendo. All rights reserved. 14 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 7
8.
Importance of Planning
Planning: Definition •Float (slack) = the difference between the time available for a task and the time required to complete it. •Total float = latest finish - earliest start – duration. If the total float for a task equals zero, then that task is on the critical path. •Work Breakdown Structure (WBS) = hierarchical chart used to organize the milestones and tasks of a project clearly into related areas. This is often completed as a tree diagram or as an outline. A completed WBS can be used for budgeting, personnel selection, scheduling and network diagram purposes. © 2001 Valuendo. All rights reserved. 15 INFORMATION CLASSIFICATION = PUBLIC Planning: Definition •Milestone = summary of the completion of an important set of tasks or event •Resource loading = the time individual resources (people, vendors, etc.) have committed to a project. •Resource leveling = the process of shifting the use of resources to even out the workload of team members and equipment. This will cause changes in network diagram, budget or the timing of a project. © 2001 Valuendo. All rights reserved. 16 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 8
9.
Importance of Planning
Planning : Definition •Rush charges = when external companies are rushed. A task which normally takes 24 hours will cost more if needed in 2 hours. •Project conflict = people, priorities or problems begin to interfere with completing a project on time and within budget. •Project murder = the sudden termination of a project for reasons that range from rational to absurd. © 2001 Valuendo. All rights reserved. 17 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 18 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 9
10.
Importance of Planning
Planning: Words from the wise “Begin at the beginning” the King said, gravely, “and go until you come to the end, then stop.” Lewis Carroll, Alice’s Adventures in Wonderland (1865) © 2001 Valuendo. All rights reserved. 19 INFORMATION CLASSIFICATION = PUBLIC Planning: Critical Success Factors (CSF) 1. Provide structure 2. Identify all stakeholders 3. Understand the scope 4. Proper resources 5. Risk management 6. Progress measurement & quality control 7. Change management 8. Contingency planning 9. Communication Strategy 10. Power of re-application © 2001 Valuendo. All rights reserved. 20 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 10
11.
Importance of Planning
Planning: Words from the wise The greatest mistake an executive can make is to be afraid of making a mistake. John Capozzi, 1997 © 2001 Valuendo. All rights reserved. 21 INFORMATION CLASSIFICATION = PUBLIC CSF 1: Provide structure • What are you going to do? • Provide detailed breakdown of – the program in projects, – the project in tasks, – the task in work assignments • Provide timing • Provide cost • Provide deliverables • Provide people • Provide place => WHO / WHAT / HOW / WHEN / WHERE ? © 2001 Valuendo. All rights reserved. 22 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 11
12.
Importance of Planning
CSF 2: Identify all stakeholders Stakeholders –Who? »Steering Committee: Guarantee appropriate control over key plans »Sponsorship: Drive the plan and ensure that it has the appropriate resources (budget, technology and people) »Project Management Office: Provide assurance to management with regard to the overall plan, business and risk management process »Leadership: Guarantee that appropriate strategies are in place »Customers: Are identified and appropriately involved © 2001 Valuendo. All rights reserved. 23 INFORMATION CLASSIFICATION = PUBLIC CSF 2: Identify all stakeholders • Steering Committee Organization – Full management buy-in and commitment – Accountable sponsor with leadership • The plan is based on a sound business case in alignment with the overall business (strategy) • Adequate authority levels are in place to “enforce” the plan (approval/rejection power) based on a specific written document • Make sure that effective project management & QA office is installed and active • Direct and regular communication to all parties involved • Appropriate incentive schemes are in place © 2001 Valuendo. All rights reserved. 24 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 12
13.
Importance of Planning
Planning: Words from the wise When you don’t know where you want to go, any road will get you there. Chinese proverb. © 2001 Valuendo. All rights reserved. 25 INFORMATION CLASSIFICATION = PUBLIC CSF 3: Understand the Scope • The scope is clearly defined, properly approved and controlled – What is wanted? – What is needed? – For which business processes? • Scope is translated in – detailed estimates – a detailed inventory of assumptions • Cost / Benefit analysis • Detailed scope (in writing for each phase) –detailed & realistic approach –(tangible) deliverable definition –scope limitations (“STRICTLY EXCLUDED”) • The scope is communicated to all direct parties involved © 2001 Valuendo. All rights reserved. 26 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 13
14.
Importance of Planning
Planning: Words from the wise Give us the tools, and we will finish the job. Winston Churchill, radio broadcast 1941 © 2001 Valuendo. All rights reserved. 27 INFORMATION CLASSIFICATION = PUBLIC CSF 4: Proper Resources • Cost calculation & budget development • Staff & resource planning • Adequate financial resources • Use metrics to validate funding needs • Recognition of costs and approved funding – Arrangements for technical personnel – Arrangements for user personnel – Arrangements for supplemental personnel • Legal and contractual arrangements • Top management involvement to determine approach under strenuous conditions • Human element is vital for success • Allow margin of error (hidden buffer) © 2001 Valuendo. All rights reserved. 28 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 14
15.
Importance of Planning
CSF 4: Proper resources • The team is cohesive and well-motivated – defined roles, responsibilities and authorities – clear structure – know what the success criteria are • Key personnel (including QA) is identified and available • Active participation with key user buy-in, enthusiasm and commitment • Skills transfer (“delegation power”) and empowerment strategies are in place (including the transfer of skills from external to internal personnel and from team members to end-users) • Appropriate skills retention strategies and fall-back plans are in place (outsourcing and downsizing issues) © 2001 Valuendo. All rights reserved. 29 INFORMATION CLASSIFICATION = PUBLIC CSF 4: Proper resources • Organization –Milestone settings to identify subprojects derived from master plan – “You can’t eat an elephant” –Business application and general controls assurance: support the accreditation of new or modified systems and assure that internal controls meet the requirements –Responsibilities? »Execution and decisions »Progress monitoring and communication –Communication? »Who to consult? »Who to inform? © 2001 Valuendo. All rights reserved. 30 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 15
16.
Importance of Planning
CSF 4: Proper resources • The responsible manager has to have following interpersonal skills : –a prophet with prediction skills –a politician to sell anything needed and find compromises –a police agent to guard and enforce the rules of the game –a surgeon to detect and solve / eliminate problems –an attorney with the in-depth knowledge & negotiating skills –a psychiatrist with the people (listening) & analytical skills © 2001 Valuendo. All rights reserved. 31 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise “Now remember, the first step in avoiding a trap is knowing of its existence.” From the movie DUNE © 2001 Valuendo. All rights reserved. 32 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 16
17.
Importance of Planning
CSF 5: Risk Management • Risk identification and risk management plan • The plan is business-driven with a detailed analysis of business impacts (business benefits and costs) (including external dependencies and performance requirements) • Include study of potential exposures : – contracts and SLA’s – liability and indemnification – ownership of products/results • Comparison of similar projects is useful • The controls are focused on the provision of efficient, effective and economic follow-up. © 2001 Valuendo. All rights reserved. 33 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise The best preparation for good work tomorrow is to do good work today. Elbert Hubbard © 2001 Valuendo. All rights reserved. 34 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 17
18.
Importance of Planning
CSF 6: Progress Measurement & Quality Control • Detailed program with a functional breakdown into manageable “sub”-projects, tasks, dependencies and milestones • Detailed time frame and priority setting • Reasonable buffers in time and/or budget are always incorporated in the plan • Formal project methodology with standards and rules – Appropriate logistics and infrastructure are in place – Pilot plan with prototypes – Testing methodology and environment (intra / inter) – Documentation • Use of resources and tools © 2001 Valuendo. All rights reserved. 35 INFORMATION CLASSIFICATION = PUBLIC CSF 6: Progress Measurement & Quality Control • Estimates –Every hour of planning saves 10 hours of work –The accuracy of an estimate is increased with the power of the number of persons. –Based on : »own experience »experience of colleagues »experience of external experts / competitors »historical data »external metrics & estimate methods »planning / QA methodology Real-time, Infrequent Very Estimates Accurate © 2001 Valuendo. All rights reserved. 36 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 18
19.
Importance of Planning
CSF 6: Progress Measurement & Quality Control • QA & Change Control is integrated in master plan • Review of the plan – expectations – communication – resources – risks – documentation of key issues and decisions against QA standards and procedures • Satisfaction verification via – Survey – “Lessons learned” meeting © 2001 Valuendo. All rights reserved. 37 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise If you go into battle, it’s better to win the first time. George S. Patton, 1941 © 2001 Valuendo. All rights reserved. 38 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 19
20.
Importance of Planning
CSF 7: Change Management SCOPE CHANGE MANAGEMENT • Flexibility to rapidly and effectively respond to changes within the environment (live document) • Mechanisms in place to enable rapid and effective decision making (documentation, validation, verification and communication) TRANSITION MANAGEMENT • Business readiness is assessed as ready prior to execution • Business change-agents / project champions are identified and well-motivated © 2001 Valuendo. All rights reserved. 39 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Time waits for no one and nowhere is that more true than when managing a project. Project Manager and PM Teacher Jim MacIntyre © 2001 Valuendo. All rights reserved. 40 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 20
21.
Importance of Planning
CSF 8: Contingency plan • Formal contingency plan (“what if”-scenario’s) • Proper contingency resources (budget and people) • Alternative plans with counter-actions in case issues occur © 2001 Valuendo. All rights reserved. 41 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Graham’s Law: If they know nothing of what you are doing, they suspect you are doing nothing. Robert Graham in Understanding Project Management © 2001 Valuendo. All rights reserved. 42 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 21
22.
Importance of Planning
CSF 9: Communication Strategy • Official communication – high-level management dashboard overviews – detailed activity milestones and issue lists • Communication management & strategy – Despite phone, e-mail and documents are PHYSICAL MEETINGS still the most effective – distribution of regular concise status reports to all relevant people involved is easy in order to receive open and structured feedback – emphasis on each success and focus on benefits realized from each failure. © 2001 Valuendo. All rights reserved. 43 INFORMATION CLASSIFICATION = PUBLIC CSF 10: Power of re-application • All plans eventually lead to a deliverable, a result. • Such result can be achieved again – In other locations – On a larger scale provided following conditions are met : – Complete and detailed documentation – Track of all communications – Lessons learned • Avoiding re-inventing the wheel and dependency of specific skilled people © 2001 Valuendo. All rights reserved. 44 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 22
23.
Importance of Planning
Planning: Critical Success Factors (CSF) The 10 CSF elements lead to © 2001 Valuendo. All rights reserved. 45 INFORMATION CLASSIFICATION = PUBLIC Agenda • Introduction • Why is planning needed? • Definition • Critical Success Factors • Conclusion • Internet Sites © 2001 Valuendo. All rights reserved. 46 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 23
24.
Importance of Planning
Planning: Conclusion Team Deadlines Sched End ule Budget Quality Expectations © 2001 Valuendo. All rights reserved. 47 INFORMATION CLASSIFICATION = PUBLIC Planning: Words from the wise Those who cannot remember the past are condemned to repeat it. George Santayana, 1905 © 2001 Valuendo. All rights reserved. 48 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 24
25.
Importance of Planning
Planning: Conclusion May the Force be with you on your Planning Endeavors. © 2001 Valuendo. All rights reserved. 49 INFORMATION CLASSIFICATION = PUBLIC Planning : Internet Sites • Project Management Institute – http://www.pmi.org/ • Project Management Forum – http://www.pmforum.org/ • Project Net – http://www.projectnet.co.uk/ © 2001 Valuendo. All rights reserved. 50 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 25
26.
Importance of Planning
Planning: Words from the wise No project is too small to not be taken seriously. An Intel Project Manager © 2001 Valuendo. All rights reserved. 51 INFORMATION CLASSIFICATION = PUBLIC Contact information Mr. Marc Vael, CISA, CISM, CISSP, ITIL Managing Director Valuendo Kriebrugstraat 33 1760 Roosdaal Belgium T: +32 5 433 61 93 M: +32 473 99 30 31 M: mvael@valuendo.com mvael@ valuendo.com © 2001 Valuendo. All rights reserved. 52 INFORMATION CLASSIFICATION = PUBLIC Marc Vael AIESEC Valuendo 2001 26