16. Large restructure housing area in Rotterdam south until 2030 Pre-war housing area post-war housing area Urban renewal area Necessity of spatial restructuring to achieve the goal of greenhouse gas (GHG) reduction. The priority switches to the urban renewal master plan
17.
18.
19.
20. Systematic for refurbishment Source: Dr. Georg Wagener-Lohse, CEBra - Centre for Energy Technology Brandenburg, Cottbus - feasible in cost and time — old housing refurbishment Schemes of development II -- old housing renovation Boiler, Tube insulation Ceiling insulation Thermostatic valves Insulation of one wall Insulation of all walls I A I B I C Standard full energetic refurbishment Standard full refurbishment * estimated effect on consumption in kWh/m² Saving* time ? >20y ? >10y 45% 5-10y 30% 5y
21. Schemes of development II -- old housing renovation Good market value and add-values are possible Learn from precedent Falmouth, UK, 2003 30% energy saving 5.5 yr pay-back Berlin, Ger, 2007 50% energy saving 7 yr pay-back Veenendaal, NL, 2002 28% energy saving 7 yr pay-back
22.
23. Tip A subsidy scheme for existing housing: - solar water heaters, - heat pumps - solar panels - Properly adopting low or zero carbon energy technology
34. Comparable new housing for lot A A Density after completion: 6546 DW.m2/ha = 50 DW/ha (count by 130 ㎡ /DW) (9419) (73) Housing standard: Zero CO 2 emission BedZED current condition Design task- lot A & B housing stock
35. Comparable housing restructure case for lot B B Density after completion: 9351 DW.m2/ha = 71 DW/ha (count by 130 ㎡ /DW) Housing standard: energy saving: 62 % Poptahof current condition Motivation and goal ︱ Problem definiion ︱ Site analysis ︱ Strategy ︱ Urban renewal master plan Design task- lot A & B housing stock
36. A B Housing lot A & B design proposal Design task- lot A & B housing stock 2-3 4 2-3 3 3 3 2-3
38. Comparable housing restructure case for lot C C Density after completion: 8881 DW.m2/ha = 68 DW/ha (count by 130 ㎡ /DW) Housing standard: energy saving: 45 % Hoogvliet current condition Design task- lot C housing stock
39. C Housing lot C design proposal 4 3-4 2-3 4 4 4 3 4 3 2-3 Design task- lot C housing stock