GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX
DATE: 15/01/15
ISSUED: PAULA F.
1- QW-200.2: WPQR. GENERAL FOR ALL PROCESS (TEXT FROM ASME SECTION IX):
Each organization shall be required to prepare a procedure qualification record which is defined
as follows:
(a) Procedure Qualification Record (PQR). The PQR is a record of variables recorded during the
welding of the test coupons. It also contains the test results of the tested specimens. Recorded
variables normally fall within a small range of the actual variables that will be used in production
welding.
(b) Contents of the PQR. The completed PQR shall document all essential and, when required,
supplementary essential variables of QW-250 through QW‐280 for each welding process used during
the welding of the test coupon. Nonessential or other variables used during the welding of the test
coupon may be recorded at the organization's option. All variables, if recorded, shall be the actual
variables (including ranges) used during the welding of the test coupon. If variables are not monitored
during welding, they shall not be recorded. It is not intended that the full range or the extreme of a
given range of variables to be used in production be used during qualification unless required due to a
specific essential or, when required, supplementary essential variable.
The PQR shall be certified accurate by the organization. The organization may not subcontract the
certification function. This certification is intended to be the organization's verification that the
information in the PQR is a true record of the variables that were used during the welding of the test
coupon and that the resulting tensile, bend, or macro (as required) test results are in compliance with
Section IX.
(c) Changes to the PQR. Changes to the PQR are not permitted except as described below. Editorial
corrections or addenda to the PQR are permitted. An example of an editorial correction is an incorrect
P‐Number, F‐Number, or A‐Number that was assigned to a particular base metal or filler metal. An
example of an addendum would be a change resulting from a Code change. For example, Section IX
may assign a new F‐Number to a filler metal or adopt a new filler metal under an established F‐
Number. This may permit, depending on the particular construction Code requirements, an
organization to use other filler metals that fall within that particular F‐Number where, prior to the Code
revision, the organization was limited to the particular electrode classification that was used during
qualification.
Additional information can be incorporated into a PQR at a later date provided the information is
substantiated as having been part of the original qualification condition by lab record or similar data.
All changes to a PQR require recertification (including date) by the organization.
(d) Format o f t h e PQR. Form QW-483 (see Nonmandatory Appendix B) has been provided as a
guide for the PQR. The information required to be in the PQR may be in any format to fit the needs of
each organization, as long as every essential and, when required, supplementary essential variable,
required by QW-250 through QW‐280, is included. Also the type of tests, number of tests, and test
results shall be listed in the PQR.Form QW-483 does not easily lend itself to cover combinations of
welding processes or more than oneF‐Number filler metal in one test coupon. Additional sketches or
information may be attached or referenced to record the required variables.
(e) Availability of the PQR. PQRs used to support WPSs shall be available, upon request, for review
by the Authorized Inspector (AI). The PQR need not be available to the welder or welding operator.
(f) Multiple WPSs with One PQR/Multiple PQRs with One WPS. Several WPSs may be prepared
from the data on a single PQR (e.g., a 1G plate PQR may support WPSs for the F, V, H, and O
positions on plate or pipe within all other essential variables). A single WPS may cover several sets of
essential variable ranges as long as a supporting PQR exists for each essential and, when required,
supplementary essential variable [e.g., a single WPS may cover a thickness range from 1/16 in. (1.5
mm) through 11/4 in. (32 mm) if PQRs exist for both the 1/16 in. (1.5 mm) through 3/16 in. (5 mm) and
3/16 in. (5 mm) through 11/4 in. (32 mm) thickness ranges].
GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX
DATE: 15/01/15
ISSUED: PAULA F.
GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX
DATE: 15/01/15
ISSUED: PAULA F.
NOTE:
THIS FORMAT DOES NOT CONTAIN ALL VARIABLES FOR ALL PROCESS, SEE THE SPECIFIED
VARIABLES FOR EACH PROCESS (See below for EBW).
THE SUPPLEMENTARY ESSENTIAL VARIABLES ARE MANDATORY WHEN THE IMPACT
REQUIREMENTS ARE SPECIFIED.
GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX
DATE: 15/01/15
ISSUED: PAULA F.
2- QW-215 WPQR. SPECIFIED FOR ELECTRON BEAM WELDING:
o The WPS qualification test coupon (PQR) shall be prepared with the joint geometry
duplicating that to be used in production. If the production weld is to include a lap‐over
(completing the weld by rewelding over the starting area of the weld, as for a girth weld), such
lap‐over shall be included in the WPS qualification test coupon.
o The completed PQR (FORM QW-483) shall document all ESSENTIAL variables as specified
in Table QW-260:
GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX
DATE: 15/01/15
ISSUED: PAULA F.
o The mechanical testing requirements of QW-451 shall apply. (See below).

Contenu connexe

Tendances

Tendances (19)

Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Asme section ix new
Asme section ix newAsme section ix new
Asme section ix new
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
wps qualification metho
wps qualification methowps qualification metho
wps qualification metho
 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 
Welding 4
Welding  4Welding  4
Welding 4
 
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IXA QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
A QA/QC ENGINEER MUST KNOW THESE TABLE IN ASME SEC IX
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
What is wps important tips regarding to wps
What is wps important tips regarding to wpsWhat is wps important tips regarding to wps
What is wps important tips regarding to wps
 
Welder qualification
Welder qualificationWelder qualification
Welder qualification
 
Asme sec ix
Asme sec ixAsme sec ix
Asme sec ix
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
Pqr asme ix completed
Pqr asme ix  completed Pqr asme ix  completed
Pqr asme ix completed
 
wps_variable
wps_variablewps_variable
wps_variable
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
Welding
WeldingWelding
Welding
 

Similaire à Guide to prepare_the_wpqr_-_asme_code

ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 
ASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxMuhammad Shabbir
 
ASTM A105 material standard
ASTM A105 material standard ASTM A105 material standard
ASTM A105 material standard wang yilia
 
137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cagesUlhas kamat
 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTAbrahamAby3
 
Welding Procces
Welding ProccesWelding Procces
Welding ProccesAlen Pepa
 
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesThorne & Derrick International
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptmohammed194284
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_addmozsubasi
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_addmozsubasi
 
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdf
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdfSTAUFF-Catalogue-3-STAUFF-Flanges-English.pdf
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdfAhmedSalem460811
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-studyhomeworkping4
 

Similaire à Guide to prepare_the_wpqr_-_asme_code (20)

asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
Intro
IntroIntro
Intro
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
What is new with ASME BPVC Section IX - 2017
What is new with ASME BPVC Section IX - 2017What is new with ASME BPVC Section IX - 2017
What is new with ASME BPVC Section IX - 2017
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt
 
Svr part 4_e
Svr part 4_eSvr part 4_e
Svr part 4_e
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 
ASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxASME Section IX Presentation.pptx
ASME Section IX Presentation.pptx
 
ASTM A105 material standard
ASTM A105 material standard ASTM A105 material standard
ASTM A105 material standard
 
137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages
 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPT
 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
 
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
 
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdf
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdfSTAUFF-Catalogue-3-STAUFF-Flanges-English.pdf
STAUFF-Catalogue-3-STAUFF-Flanges-English.pdf
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 

Dernier

Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoAbhimanyu Sangale
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...jiyav969
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdfKamal Acharya
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoninghotman30312
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdfKamal Acharya
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsKineticEngineeringCo
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesRashidFaridChishti
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
How to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdfHow to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdftawat puangthong
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdfKamal Acharya
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...Roi Lipman
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Prakhyath Rai
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.MdManikurRahman
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfmahaffeycheryld
 

Dernier (20)

Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of Arduino
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
How to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdfHow to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
 

Guide to prepare_the_wpqr_-_asme_code

  • 1. GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX DATE: 15/01/15 ISSUED: PAULA F. 1- QW-200.2: WPQR. GENERAL FOR ALL PROCESS (TEXT FROM ASME SECTION IX): Each organization shall be required to prepare a procedure qualification record which is defined as follows: (a) Procedure Qualification Record (PQR). The PQR is a record of variables recorded during the welding of the test coupons. It also contains the test results of the tested specimens. Recorded variables normally fall within a small range of the actual variables that will be used in production welding. (b) Contents of the PQR. The completed PQR shall document all essential and, when required, supplementary essential variables of QW-250 through QW‐280 for each welding process used during the welding of the test coupon. Nonessential or other variables used during the welding of the test coupon may be recorded at the organization's option. All variables, if recorded, shall be the actual variables (including ranges) used during the welding of the test coupon. If variables are not monitored during welding, they shall not be recorded. It is not intended that the full range or the extreme of a given range of variables to be used in production be used during qualification unless required due to a specific essential or, when required, supplementary essential variable. The PQR shall be certified accurate by the organization. The organization may not subcontract the certification function. This certification is intended to be the organization's verification that the information in the PQR is a true record of the variables that were used during the welding of the test coupon and that the resulting tensile, bend, or macro (as required) test results are in compliance with Section IX. (c) Changes to the PQR. Changes to the PQR are not permitted except as described below. Editorial corrections or addenda to the PQR are permitted. An example of an editorial correction is an incorrect P‐Number, F‐Number, or A‐Number that was assigned to a particular base metal or filler metal. An example of an addendum would be a change resulting from a Code change. For example, Section IX may assign a new F‐Number to a filler metal or adopt a new filler metal under an established F‐ Number. This may permit, depending on the particular construction Code requirements, an organization to use other filler metals that fall within that particular F‐Number where, prior to the Code revision, the organization was limited to the particular electrode classification that was used during qualification. Additional information can be incorporated into a PQR at a later date provided the information is substantiated as having been part of the original qualification condition by lab record or similar data. All changes to a PQR require recertification (including date) by the organization. (d) Format o f t h e PQR. Form QW-483 (see Nonmandatory Appendix B) has been provided as a guide for the PQR. The information required to be in the PQR may be in any format to fit the needs of each organization, as long as every essential and, when required, supplementary essential variable, required by QW-250 through QW‐280, is included. Also the type of tests, number of tests, and test results shall be listed in the PQR.Form QW-483 does not easily lend itself to cover combinations of welding processes or more than oneF‐Number filler metal in one test coupon. Additional sketches or information may be attached or referenced to record the required variables. (e) Availability of the PQR. PQRs used to support WPSs shall be available, upon request, for review by the Authorized Inspector (AI). The PQR need not be available to the welder or welding operator. (f) Multiple WPSs with One PQR/Multiple PQRs with One WPS. Several WPSs may be prepared from the data on a single PQR (e.g., a 1G plate PQR may support WPSs for the F, V, H, and O positions on plate or pipe within all other essential variables). A single WPS may cover several sets of essential variable ranges as long as a supporting PQR exists for each essential and, when required, supplementary essential variable [e.g., a single WPS may cover a thickness range from 1/16 in. (1.5 mm) through 11/4 in. (32 mm) if PQRs exist for both the 1/16 in. (1.5 mm) through 3/16 in. (5 mm) and 3/16 in. (5 mm) through 11/4 in. (32 mm) thickness ranges].
  • 2. GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX DATE: 15/01/15 ISSUED: PAULA F.
  • 3. GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX DATE: 15/01/15 ISSUED: PAULA F. NOTE: THIS FORMAT DOES NOT CONTAIN ALL VARIABLES FOR ALL PROCESS, SEE THE SPECIFIED VARIABLES FOR EACH PROCESS (See below for EBW). THE SUPPLEMENTARY ESSENTIAL VARIABLES ARE MANDATORY WHEN THE IMPACT REQUIREMENTS ARE SPECIFIED.
  • 4. GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX DATE: 15/01/15 ISSUED: PAULA F. 2- QW-215 WPQR. SPECIFIED FOR ELECTRON BEAM WELDING: o The WPS qualification test coupon (PQR) shall be prepared with the joint geometry duplicating that to be used in production. If the production weld is to include a lap‐over (completing the weld by rewelding over the starting area of the weld, as for a girth weld), such lap‐over shall be included in the WPS qualification test coupon. o The completed PQR (FORM QW-483) shall document all ESSENTIAL variables as specified in Table QW-260:
  • 5. GUIDE TO PREPARE WPQR ACCORDING TO ASME SECTION IX DATE: 15/01/15 ISSUED: PAULA F. o The mechanical testing requirements of QW-451 shall apply. (See below).