SlideShare une entreprise Scribd logo
1  sur  4
Michael E Burns
6 Yucca Flats Rd
Tijeras, NM 87059
Tel: 505-281-3016
Cell: 505-280-0090
bulletproofmike@hotmail.com
EDUCATION_________________________________________________________________________
_
TexasA&M University College Station, TexasUSA (1989)
BS in Mechanical Engineering, GPA: 3.2 1989
US NAVY Great Lakes, Ill USA
Cert in Mine Man A School SC., GPA: Top 10%
1990 – 1994 E-4
Elevetron Costa Rica San Jose, Costa Rica Costa Rica 2005
Certificate in PLC 500
Basic information and programming on ladder logic.
Allen Bradley Woodlands, TX
RS Logics5000 L7 PLC
Autodesk AUTOCAD 2013 and 2014
Solid works
Leadership in Energy & Environmental Design
PDM VAULT
Microvelum
WORK EXPERIENCE
____________________________________________________________________________
Intrepid Offshore Construction - Houston, Tx.
Senior Engineer. 05/01/2013 - Present
Consulting for British Petroleum on the Thunderhorse Chain Jack Project.
Created plansfor new mono rail system and rigging for both on and off shore well sites.
Rebuilt mud pumps, shakers, top drive units.
Installed hydraulic pipe handling systems.
Designed and constructed Surf Laddersfor Exxon Mobile service vessels(moon pool).
Acquired materialsfrom around the world for drilling operationson land and offshore.
Candidate acquired electronic toolsand computerized surface systems at the well site to perform
open hole, borehole seismic, and cased-hole logging to record and analyze subsurface formations
in oil and gaswells.
Candidate isfamiliar with Baker Hughesdirectional drilling and Fracturing equipment.
Candidate also performed perforating servicesto facilitate the flow of oil and gasfrom the well.
We completed thisfor Halliburton and BP. Created new concept for cassion drain
system. Provided rigging layout and detailed drawingsfor BP. Project was accepted and will
launch in June.
METOX- Houston TX.
Project Manager 2/2013 - Present
Superconductor Industry (Coated Conductors) WAKE SHIELD PROGRAM (NASA)
Metal Oxide Technologies
Plan, execute, and finalize projectswithin triple constraintsof delivering on time, within budget
and scope objectives, including acquiring resourcesand coordinating effortsof team membersin
order to deliver projectsaccording to plan. Identify, effectively communicate, and resolve project
issues and risks. Develop risk mitigation plans. Effectively communicate project statusto project
stakeholders. Coach, mentor, and motivate team members, influencing them to take positive
action and accountability for assigned work. Direct project portfoliosranging from $10M to $20M.
Scope of responsibilitiesincludesimplementing requirementsfor future expansion and product
development.
•Ability to change Vacuum Pumpsto accommodate new reactors.
•Upgrade YBCO with new Pyrometer and thermocouples.
•Design Space framesfor new reactors and ProcessControl Equipment.
•Providing strategic direction during the implementation stages.
•Monitoring staff & team performance.
•Participate in new product development and provide support for the manufacturing of new parts
•Strong attention to detail and focus on task completion.
•Manage technical process, thermal calculationsand resolve technical issues.
•Ability to gain resultsthrough others.
•Demonstrated ability to work with and support cross-functional project teams.
Del Packaging CypressTx.
Field Service Engineer 10/2012 – 02/2013
I washired to troubleshoot problemsand erect packaging equipment. I wasrelocated here from
Albuquerque and laid off 3 monthslater. I managed a small engineering team and wasin charge of
capital projects.
•Repaired Air Conveyorsand made head to tail transfer to eliminate downtime.
•Demonstrated outstanding leadership and superb project management skills.
•Troubleshoot high speed packaging equipment.
•Evaluate problem areasand eliminate downtime.
•Candidate hasthe ability to mainstream manufacturing linesthrough Repeatability and
Reproducibility disciplines. GR&R. Meaning we will make the same product again and even better.
•Full management of capital projects from conception to completion
•Trouble shoot electrical issueswith equipment and make improvementswith engineering team.
Vitality Works, Albuquerque, NM
Senior Process/ FacilitiesEngineer - 04/2009 – 08/2012
•Handson Senior Process/ FacilitiesEngineer in a CFM ContinuousFlow Manufacturing for
a Nutraceutical company in Albuquerque, NM. Hired to champion and be EXPERT go to person for
applying Lean Manufacturing, problem solving & troubleshooting day to day equipment issues,
Process Improvement (CPK) operator training and project management.
•Made improvementsto rotating equipment through AutoCAD increasing mixing time.
•Designed and Constructed new liquid totesto accommodate 500 gallon kettles.
•Made CAD Drawingsto make proprietary changesfor automated equipment to run more efficient.
•Candidate maintained Bio Laz real time monitoring System for faster batch release.
•Replaced with new ISO Air and Handilaz Mini counter in areaswhere needed. (37 units)
•Made improvementsfor staffing by organizing works areasto create a better flow.
•Participate in new product development and provide support for the manufacturing of new parts.
•Designed and constructed collection bin for bad capsules
•Improving production by using Lean Manufacturing (TaktTime) principlesfor change over’s,
staging and reduced time by 33%. Help eliminate mistakes(Poka Yoke).
•Discrete Manufacturing Practicesand (MUDA) time is lost. Queue-time, Product lossetc.
•Receive Six Sigma Green Belt Certified through ASQ &championed processapplication.
•Able to identify possible failuresand defectsthat will affect the customer. (FMEA)
•Implemented Expert level skill in areasthat wasleading problem for equipment downtime such
as PNP Robots, small pneumatic solenoids, conveyor, transferring systems, motors, speed
control, pulleysand gear boxes.
•Champion the introduction of new proceduresand documentation and operator training.
•Ability to calibrate manufacturing linesto improve (TaktTime) Cycle Time and improve product
quality.
•Repaired Rotating Equipment repair. CNC Mills, Tumblersand Sifters, driersand metal detection
systems.
•Known for superior skillsfor mentoring, training and develop teammatesfor career progression,
learning & safe work environments.
•Introduced a preventive maintenance & machinery compatibility study / tracking processleading
to 36% uptime improvementsin some area.
•Facilitated conferenceswith employersto discuss purpose, scope, and results of audit findings
and activities.
ByB Automation and Controls, Alajuela Costa Rica
Owner Operator
08/2003 - 04/2009 – Sold business and wasrecruited by Vitality.
•ByB Automation wasmy company in Costa Rica. I would travel to customersand troubleshoot
their industrial equipment (unseen) or consult them on waysto reduce waist and improve
packaging quality (CFM).
•Some examplesof servicesprovided at EXPERT level: The ability to troubleshoot and repair or
replace all componentson industrial equipment.
•Repaired Twin Screw Extrusion MachinesEXTRUTECH, Kingdom Machines(Bagging Machines).
•Fuji C.P. 643 Chip Shooter Servo Replacements
•Panasonic VFD Panaterm Software Issue.
•Universal Chip Shooter bad bearing and thermocouple it wasvery old and needed a new rotary
head. (did not do job)
•Evaluated a filament winding machine from Russia LIST 400 traversing problems.
•Replacement of Hydraulic Controlson Off-Shore Equipment to decrease down time and increase
up time and it made the work area safer.
•Made machinery improvementsand re-engineered proprietary partsusing Auto Cad 2012.
•Coach the new team of techniciansin identifying malfunctionsand correcting them.
•Study the blueprintsand schematicsto analyze the appropriate method of installation, repairing
and servicing.
Black Water Security, Moyock, NC & Afghanistan
Lead Engineer – 02/2002 - 06/2003 – Left to move to Costa Rica
•Black water Security isa private agency that providesHigh and Low profile security to foreign
diplomatsin Iraq and Afghanistan.
•Vehicle crew chief for Black water Security. I maintained all equipment and scheduled and
documented all repairs to Black water vehicles.
•Installed FLIR systemsfor night OP’s.
•Responsible for the management of 3 men and 97 million dollarsof equipment. Ranging from
APC Grizzly to LAV’S.
•Upgraded all glassto Micarta (shot blocker) and used Armor-Flate for door panelsto add ballistic
integrity.
Courtesy Corp, Buffalo Grove, Ill (Pharmaceutical)
Senior Lead Plant Engineer - 07/1993 - 10/2002 – Left due to sell off merger.
•Handpicked aspreferred project manager for multimillion-dollar pharmaceutical research
projects, selection negotiated by study delivery managers, with contract award contingent upon
project manager assignment.
•Directsthe thermoplastic, thermoset extrusion and molding manufacturing group in production
and development. Isresponsible for overall operationsfor the facility by performing the following
duties. Providesinput and ideason new productsto be developed and new technologiesto
improve existing thermoset and thermoplastic extrusion and molding.
•Full management responsibility for the 54 employeesof the Class100,000 clean room injection
molding facility.
•Moved Machinesto accommodate new equipment. Installed Environmental Monitoring
Equipment in new clean room.
•Updated system for micro contamination monitoring.
•Planned, staffed, budgeted and managed productions, testing, pull through and execution
planning, quality assurance material/production control, manufacturing engineering, plant
engineering.
•Effectively trained 8 techniciansto troubleshoot by precisely monitoring molding process, thus
maintaining consistent part quality.
•Earned recognition for correcting designsof moldsthat historically produced defective parts,
improving quality and eliminating defects(Toshiba, Battenfeld, Vandorn and Cincinnati Machine).
•Trimmed cycle time of injection-molded partsand achieved annual cost reduction of $2 million.
•Oversaw training and instruction of staff and evaluate performance.
•Constantly made improvementsto increase production.
•Alwaysenforced safety and protocolsand advocated safe working environment.
•Fixed issueswith inventory and material handlerskeeping a consistent flow.
•Schedule all Pm'son equipment to make sure all wasup to date with excellent GMP practices.
•Communicate with a five departmentsand help eliminate any current or future problems.
Professional SkillsSummary
Plant Management, Project Development and Management skills, Geometric Dimensioning and
Tolerances(TexasA&M), Excellent organizational skills, Excellent Leadership, Safety and Analytical
skills, Fast Problem Solving Skills, Root Cause Analysis, Line Improvements, Visual Control
(optimization)Mechanical Theory, Six Sigma Lean Techniquesand 5S, Scope of work isprecise and to
detail, Staging Improvement's, Electrical Theory, Mechanical Design, Rotating Equipment Repairand
troubleshooting, Hydraulic Theory, Hydraulic Troubleshooting, Decision Making, Instrumentation and
Controls, Plant Operations, Project Management, HazardousMaterial Handling, Electronics, Process
Control, PLC Programming and attention to detail.

Contenu connexe

Tendances

William Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing EngineerShameer KC
 
updated resume NEW
updated resume NEWupdated resume NEW
updated resume NEWdiehardjam
 
Karel Mudde - Resume1
Karel Mudde - Resume1Karel Mudde - Resume1
Karel Mudde - Resume1Mudde Karel
 
Mo'men Yousef - Process Engineer
Mo'men Yousef - Process EngineerMo'men Yousef - Process Engineer
Mo'men Yousef - Process EngineerMo'men Yousef
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie Manalo
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis LeyvaFlores
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2PhilSuter
 
Curriculum Vitae 2016_updated
Curriculum Vitae 2016_updatedCurriculum Vitae 2016_updated
Curriculum Vitae 2016_updatedBernard Campecino
 
Anant shah asc-2017
Anant shah  asc-2017Anant shah  asc-2017
Anant shah asc-2017Anant Shah
 
Royster Menezes-Mechanical Engineer
Royster Menezes-Mechanical EngineerRoyster Menezes-Mechanical Engineer
Royster Menezes-Mechanical EngineerRoyster Menezes
 

Tendances (20)

JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
William Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process Engineer
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing Engineer
 
updated resume NEW
updated resume NEWupdated resume NEW
updated resume NEW
 
Karel Mudde - Resume1
Karel Mudde - Resume1Karel Mudde - Resume1
Karel Mudde - Resume1
 
Resume JD
Resume JDResume JD
Resume JD
 
resume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shineresume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shine
 
Mo'men Yousef - Process Engineer
Mo'men Yousef - Process EngineerMo'men Yousef - Process Engineer
Mo'men Yousef - Process Engineer
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CV
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores Plastics
 
Design for reliability
Design for reliabilityDesign for reliability
Design for reliability
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
 
Curriculum Vitae 2016_updated
Curriculum Vitae 2016_updatedCurriculum Vitae 2016_updated
Curriculum Vitae 2016_updated
 
Anant shah asc-2017
Anant shah  asc-2017Anant shah  asc-2017
Anant shah asc-2017
 
Daniel Velazquez G
Daniel Velazquez GDaniel Velazquez G
Daniel Velazquez G
 
W White Resume
W White ResumeW White Resume
W White Resume
 
Royster Menezes-Mechanical Engineer
Royster Menezes-Mechanical EngineerRoyster Menezes-Mechanical Engineer
Royster Menezes-Mechanical Engineer
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
MY CV
MY CVMY CV
MY CV
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 

Similaire à Michael E Burns Resume

Similaire à Michael E Burns Resume (20)

Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
dapski042116
dapski042116dapski042116
dapski042116
 
resume_Beatriz_Barba
resume_Beatriz_Barbaresume_Beatriz_Barba
resume_Beatriz_Barba
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
Summary Luis Barba
Summary Luis BarbaSummary Luis Barba
Summary Luis Barba
 
Resume GRV
Resume GRVResume GRV
Resume GRV
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Resume 3-17-16
Resume 3-17-16Resume 3-17-16
Resume 3-17-16
 
RESUME NO Healthcare 06 01 15
RESUME   NO Healthcare  06 01 15RESUME   NO Healthcare  06 01 15
RESUME NO Healthcare 06 01 15
 
Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 

Michael E Burns Resume

  • 1. Michael E Burns 6 Yucca Flats Rd Tijeras, NM 87059 Tel: 505-281-3016 Cell: 505-280-0090 bulletproofmike@hotmail.com EDUCATION_________________________________________________________________________ _ TexasA&M University College Station, TexasUSA (1989) BS in Mechanical Engineering, GPA: 3.2 1989 US NAVY Great Lakes, Ill USA Cert in Mine Man A School SC., GPA: Top 10% 1990 – 1994 E-4 Elevetron Costa Rica San Jose, Costa Rica Costa Rica 2005 Certificate in PLC 500 Basic information and programming on ladder logic. Allen Bradley Woodlands, TX RS Logics5000 L7 PLC Autodesk AUTOCAD 2013 and 2014 Solid works Leadership in Energy & Environmental Design PDM VAULT Microvelum WORK EXPERIENCE ____________________________________________________________________________ Intrepid Offshore Construction - Houston, Tx. Senior Engineer. 05/01/2013 - Present Consulting for British Petroleum on the Thunderhorse Chain Jack Project. Created plansfor new mono rail system and rigging for both on and off shore well sites. Rebuilt mud pumps, shakers, top drive units. Installed hydraulic pipe handling systems. Designed and constructed Surf Laddersfor Exxon Mobile service vessels(moon pool). Acquired materialsfrom around the world for drilling operationson land and offshore. Candidate acquired electronic toolsand computerized surface systems at the well site to perform open hole, borehole seismic, and cased-hole logging to record and analyze subsurface formations in oil and gaswells. Candidate isfamiliar with Baker Hughesdirectional drilling and Fracturing equipment. Candidate also performed perforating servicesto facilitate the flow of oil and gasfrom the well. We completed thisfor Halliburton and BP. Created new concept for cassion drain system. Provided rigging layout and detailed drawingsfor BP. Project was accepted and will launch in June. METOX- Houston TX. Project Manager 2/2013 - Present Superconductor Industry (Coated Conductors) WAKE SHIELD PROGRAM (NASA) Metal Oxide Technologies Plan, execute, and finalize projectswithin triple constraintsof delivering on time, within budget and scope objectives, including acquiring resourcesand coordinating effortsof team membersin order to deliver projectsaccording to plan. Identify, effectively communicate, and resolve project issues and risks. Develop risk mitigation plans. Effectively communicate project statusto project stakeholders. Coach, mentor, and motivate team members, influencing them to take positive action and accountability for assigned work. Direct project portfoliosranging from $10M to $20M. Scope of responsibilitiesincludesimplementing requirementsfor future expansion and product development.
  • 2. •Ability to change Vacuum Pumpsto accommodate new reactors. •Upgrade YBCO with new Pyrometer and thermocouples. •Design Space framesfor new reactors and ProcessControl Equipment. •Providing strategic direction during the implementation stages. •Monitoring staff & team performance. •Participate in new product development and provide support for the manufacturing of new parts •Strong attention to detail and focus on task completion. •Manage technical process, thermal calculationsand resolve technical issues. •Ability to gain resultsthrough others. •Demonstrated ability to work with and support cross-functional project teams. Del Packaging CypressTx. Field Service Engineer 10/2012 – 02/2013 I washired to troubleshoot problemsand erect packaging equipment. I wasrelocated here from Albuquerque and laid off 3 monthslater. I managed a small engineering team and wasin charge of capital projects. •Repaired Air Conveyorsand made head to tail transfer to eliminate downtime. •Demonstrated outstanding leadership and superb project management skills. •Troubleshoot high speed packaging equipment. •Evaluate problem areasand eliminate downtime. •Candidate hasthe ability to mainstream manufacturing linesthrough Repeatability and Reproducibility disciplines. GR&R. Meaning we will make the same product again and even better. •Full management of capital projects from conception to completion •Trouble shoot electrical issueswith equipment and make improvementswith engineering team. Vitality Works, Albuquerque, NM Senior Process/ FacilitiesEngineer - 04/2009 – 08/2012 •Handson Senior Process/ FacilitiesEngineer in a CFM ContinuousFlow Manufacturing for a Nutraceutical company in Albuquerque, NM. Hired to champion and be EXPERT go to person for applying Lean Manufacturing, problem solving & troubleshooting day to day equipment issues, Process Improvement (CPK) operator training and project management. •Made improvementsto rotating equipment through AutoCAD increasing mixing time. •Designed and Constructed new liquid totesto accommodate 500 gallon kettles. •Made CAD Drawingsto make proprietary changesfor automated equipment to run more efficient. •Candidate maintained Bio Laz real time monitoring System for faster batch release. •Replaced with new ISO Air and Handilaz Mini counter in areaswhere needed. (37 units) •Made improvementsfor staffing by organizing works areasto create a better flow. •Participate in new product development and provide support for the manufacturing of new parts. •Designed and constructed collection bin for bad capsules •Improving production by using Lean Manufacturing (TaktTime) principlesfor change over’s, staging and reduced time by 33%. Help eliminate mistakes(Poka Yoke). •Discrete Manufacturing Practicesand (MUDA) time is lost. Queue-time, Product lossetc. •Receive Six Sigma Green Belt Certified through ASQ &championed processapplication. •Able to identify possible failuresand defectsthat will affect the customer. (FMEA) •Implemented Expert level skill in areasthat wasleading problem for equipment downtime such as PNP Robots, small pneumatic solenoids, conveyor, transferring systems, motors, speed control, pulleysand gear boxes. •Champion the introduction of new proceduresand documentation and operator training. •Ability to calibrate manufacturing linesto improve (TaktTime) Cycle Time and improve product quality. •Repaired Rotating Equipment repair. CNC Mills, Tumblersand Sifters, driersand metal detection systems. •Known for superior skillsfor mentoring, training and develop teammatesfor career progression, learning & safe work environments. •Introduced a preventive maintenance & machinery compatibility study / tracking processleading to 36% uptime improvementsin some area. •Facilitated conferenceswith employersto discuss purpose, scope, and results of audit findings and activities.
  • 3. ByB Automation and Controls, Alajuela Costa Rica Owner Operator 08/2003 - 04/2009 – Sold business and wasrecruited by Vitality. •ByB Automation wasmy company in Costa Rica. I would travel to customersand troubleshoot their industrial equipment (unseen) or consult them on waysto reduce waist and improve packaging quality (CFM). •Some examplesof servicesprovided at EXPERT level: The ability to troubleshoot and repair or replace all componentson industrial equipment. •Repaired Twin Screw Extrusion MachinesEXTRUTECH, Kingdom Machines(Bagging Machines). •Fuji C.P. 643 Chip Shooter Servo Replacements •Panasonic VFD Panaterm Software Issue. •Universal Chip Shooter bad bearing and thermocouple it wasvery old and needed a new rotary head. (did not do job) •Evaluated a filament winding machine from Russia LIST 400 traversing problems. •Replacement of Hydraulic Controlson Off-Shore Equipment to decrease down time and increase up time and it made the work area safer. •Made machinery improvementsand re-engineered proprietary partsusing Auto Cad 2012. •Coach the new team of techniciansin identifying malfunctionsand correcting them. •Study the blueprintsand schematicsto analyze the appropriate method of installation, repairing and servicing. Black Water Security, Moyock, NC & Afghanistan Lead Engineer – 02/2002 - 06/2003 – Left to move to Costa Rica •Black water Security isa private agency that providesHigh and Low profile security to foreign diplomatsin Iraq and Afghanistan. •Vehicle crew chief for Black water Security. I maintained all equipment and scheduled and documented all repairs to Black water vehicles. •Installed FLIR systemsfor night OP’s. •Responsible for the management of 3 men and 97 million dollarsof equipment. Ranging from APC Grizzly to LAV’S. •Upgraded all glassto Micarta (shot blocker) and used Armor-Flate for door panelsto add ballistic integrity. Courtesy Corp, Buffalo Grove, Ill (Pharmaceutical) Senior Lead Plant Engineer - 07/1993 - 10/2002 – Left due to sell off merger. •Handpicked aspreferred project manager for multimillion-dollar pharmaceutical research projects, selection negotiated by study delivery managers, with contract award contingent upon project manager assignment. •Directsthe thermoplastic, thermoset extrusion and molding manufacturing group in production and development. Isresponsible for overall operationsfor the facility by performing the following duties. Providesinput and ideason new productsto be developed and new technologiesto improve existing thermoset and thermoplastic extrusion and molding. •Full management responsibility for the 54 employeesof the Class100,000 clean room injection molding facility. •Moved Machinesto accommodate new equipment. Installed Environmental Monitoring Equipment in new clean room. •Updated system for micro contamination monitoring. •Planned, staffed, budgeted and managed productions, testing, pull through and execution planning, quality assurance material/production control, manufacturing engineering, plant engineering. •Effectively trained 8 techniciansto troubleshoot by precisely monitoring molding process, thus maintaining consistent part quality. •Earned recognition for correcting designsof moldsthat historically produced defective parts, improving quality and eliminating defects(Toshiba, Battenfeld, Vandorn and Cincinnati Machine). •Trimmed cycle time of injection-molded partsand achieved annual cost reduction of $2 million. •Oversaw training and instruction of staff and evaluate performance. •Constantly made improvementsto increase production. •Alwaysenforced safety and protocolsand advocated safe working environment. •Fixed issueswith inventory and material handlerskeeping a consistent flow.
  • 4. •Schedule all Pm'son equipment to make sure all wasup to date with excellent GMP practices. •Communicate with a five departmentsand help eliminate any current or future problems. Professional SkillsSummary Plant Management, Project Development and Management skills, Geometric Dimensioning and Tolerances(TexasA&M), Excellent organizational skills, Excellent Leadership, Safety and Analytical skills, Fast Problem Solving Skills, Root Cause Analysis, Line Improvements, Visual Control (optimization)Mechanical Theory, Six Sigma Lean Techniquesand 5S, Scope of work isprecise and to detail, Staging Improvement's, Electrical Theory, Mechanical Design, Rotating Equipment Repairand troubleshooting, Hydraulic Theory, Hydraulic Troubleshooting, Decision Making, Instrumentation and Controls, Plant Operations, Project Management, HazardousMaterial Handling, Electronics, Process Control, PLC Programming and attention to detail.