Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
CAI MEP INTERNATIONAL CONTAINER TERMINAL 
METHOD STATEMENT FOR 
PAINTING WORK – EXTERIOR AND INTERIOR 
EMULSION PAINT 
Page 1
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
CONTENT 
1. Purpose Page 3 
2. Scope of Work Page 3 
3. Reference Technical Specification Page 3 
4. Shop Drawing Page 4 
5. Work Procedure Page 4 
6. Quality Control Page 7 
7. Safety Control Page 7 
Page 2 
Appendix 1-2
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
1. PURPOSE 
The Purpose of this Method Statement is to describe the process of painting works for exterior 
and interior emulsion paint in compliance with all the required specifications, standards, and 
proper construction procedures for the building finishing works of the project. 
2. SCOPE OF WORK 
The scope of work for the construction of the items are as follows : 
 Supply, rub down and apply emulsion paint for plastered surface (Exterior) 
 Supply, rub down and apply emulsion paint for plastered surface (Interior) 
3. REFERENCE TECHNICAL SPECIFICATION 
 Refer to Division 08: Painting of Part 4A – Volume 2 of Technical Specification 
4. SHOP DRAWING 
Shop drawings shall be submitted to the Engineer by separated document for review and 
approval before carrying out the works. 
Page 3 
5. WORK PROCEDURE 
5.1. General Flow Chart 
Fail 
Surface preparation 
Applying Skimcoat 
Dry Surface 
Confirm Surface 
Surface Sanding 
Apply Sealer 
Thickness Checking 
Finishing Coat (Layer 1) 
Final Coat (Layer 2) 
Thickness Inspection 
Finish
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Page 4 
5.2 Detail Procedure 
 Surface preparation 
Cement mortar surfaces to be painted shall be dry and prepared by removing dust, dirt, 
grease, oil, efflorescence and any other substance 
For imperfect surfaces with cavities, tiny holes, can use Matex Putty for making smooth 
surfaces 
 Applying Skimcoat 
Use Skimcoat for mastic 
Mix 1 bag of skimcoat with 16 liters of water 
Use mixing machine of appropriate machine to mix in 3 minutes to get a unified admixture 
Wait for 10 minutes, stir again by mixing machine then apply mastic within 2 hours 
Apply first layer on prepared surfaces to 0.8 – 1mm wet layer thickness ( 0.5 - 0.6mm thick 
after dried) 
Wait till dry within 16 hours at 300C or when mastic layer is firmed then apply second layer 
with method same as previous one. 
 Dry surface 
Minimum drying time : 16 hours at 250C 
 Confirm Surface 
Use appropriate device for checking to make sure dried surface meet the required thickness 
is not greater than 1mm 
Surface must be dry and firm 
 Surface Grinding 
Use sandpaper to grind coated surface to make a smooth and fine surface 
 Apply Sealer 
Dilute sealer with 5% of water if necessary. 
Stir up within 3 minutes 
Apply sealer paint on grinding surface by paint roller to get 100±3 microns wet face 
thickness (dry face thickness approx. 35±3 microns) 
Wait 2 hour at 300C before applying finishing coat. 
 Thickness checking 
Use Elcometer device to check, ensure the required dry face thickness (35±3 microns) to 
prevent foreign object and increase bond between painting layers 
 Finishing Coat – Layer 1
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Dilute finishing paint with 5% of water if necessary and stir up in 3 minutes 
Apply finishing paint on to sealer painted surface to get wet face thickness 97±3 microns 
(dry face thickness approx. 35±3 microns) 
Wait 2 hour at 300C before applying final coat – layer 2. 
Page 5 
 Final Coat – Layer 2 
Apply finishing paint on to finishing coat painted surface to get wet face thickness 97±3 
microns (dry face thickness approx. 35±3 microns) 
 Thickness Inspection 
Painted surface must be dry, clean, firm, smooth and uniform in color. 
Total dry face thickness must be at least 70±3 micron. 
 Finish 
All painting layer testing can be applied after 7 days at 300C 
6. QUALITY CONTROL 
6.1. Inspection and Testing Plan 
Before start Painting, Inspection and Testing Plan shall be established to keep proper quality 
of the works in accordance with specification and standard. ITP shall be submitted to the 
Engineer for approval. 
6.2. Delivery Inspection 
After deliver the materials to the site, delivery inspection shall be conducted with witnessed by 
the Engineer. Frequency of delivery inspection shall be indicated in the ITP. 
6.3. Thickness measurement : 
Thickness of painted layer can be check be Elcometer device. 
7. SAFETY CONTROL 
7.1. Fundamental Policy 
“Safety is the First Priority" 
7.2. Key Activities 
 Implementation of Safety & Health Education 
 Prevention of Human Error and Machinery Accidents 
7.3. Development and implementation of Activity 
 Implementation of Safety & Health Education 
 Pick up hazardous factors of each work activity and always reflect them at the safety 
meetings.
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
7.4. Point out them every day at the meetings in order to let individual worker to renovate his safety 
consciousness 
 Prevention of Human Error and Machinery Accidents 
 Be consistent with inspection at beginning of works, regular maintenance of working 
platform, machinery tools designation of working area. 
Page 6 
7.5. Others 
 Safety signboards and barricades shall be installed around working area if necessary. 
Security guard should observe all passengers around the site. 
 MSDS must be prepared before carry out painting work.
Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE 
Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 
Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 
Appendix – 1 
Inspection and Testing Plan 
Page 7

Contenu connexe

Tendances

Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion jointakash yadav
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & windowMinh Bui Si
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02Minh Bui Si
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavationAl-Amin Ahmed Nabin
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and faAl-Amin Ahmed Nabin
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concreteMinh Bui Si
 
Erection method statement
Erection method statementErection method statement
Erection method statementkanalbiru
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairingBharatha Rathnayke
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Method of Statement - Painting works
Method of Statement - Painting worksMethod of Statement - Painting works
Method of Statement - Painting worksMohd Nizam Mohd Zan
 

Tendances (20)

Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & window
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavation
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Car park bq
Car park bqCar park bq
Car park bq
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
Jenis kontraktor
Jenis kontraktorJenis kontraktor
Jenis kontraktor
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Method stm lean concrete
Method stm lean concreteMethod stm lean concrete
Method stm lean concrete
 
Erection method statement
Erection method statementErection method statement
Erection method statement
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Weekly excavation checklist
Weekly excavation checklistWeekly excavation checklist
Weekly excavation checklist
 
Method statement
Method statementMethod statement
Method statement
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
Construction process
Construction processConstruction process
Construction process
 
Method of Statement - Painting works
Method of Statement - Painting worksMethod of Statement - Painting works
Method of Statement - Painting works
 

Similaire à Method painting works emulsion paint

Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SiteAlok Mishra
 
Comparative Design of Column for Different Strengthening Techniques (CFRP)
Comparative Design of Column for Different Strengthening Techniques (CFRP)Comparative Design of Column for Different Strengthening Techniques (CFRP)
Comparative Design of Column for Different Strengthening Techniques (CFRP)IRJET Journal
 
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET Journal
 
IRJET- Systematic Prevention and Repair of Potholes in Flexible Pavement
IRJET- Systematic Prevention and Repair of Potholes in Flexible PavementIRJET- Systematic Prevention and Repair of Potholes in Flexible Pavement
IRJET- Systematic Prevention and Repair of Potholes in Flexible PavementIRJET Journal
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Design of automatic wall plastering machine
Design of automatic wall plastering machineDesign of automatic wall plastering machine
Design of automatic wall plastering machineLaukik Raut
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Iqbal Mohammad
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...Moaz Emad gaber
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampIRJET Journal
 
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMAR
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMARINDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMAR
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMARIndiaMART InterMESH Limited
 
Description of paint system.
Description of paint system.Description of paint system.
Description of paint system.Kish Shan Subedi
 
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...IRJET Journal
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building MeasurementSultan M Muzahir
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design ReportZakaria Yahya
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLMd. sirajul Haque Sajib
 
Project profile on gent's shirts (1)abcd
Project profile on gent's shirts (1)abcdProject profile on gent's shirts (1)abcd
Project profile on gent's shirts (1)abcdMaulik Gohil
 
experimental analysis of concrete using fibre.pdf
experimental analysis of concrete using fibre.pdfexperimental analysis of concrete using fibre.pdf
experimental analysis of concrete using fibre.pdfSantoshSantu34
 

Similaire à Method painting works emulsion paint (20)

ioc_2
ioc_2ioc_2
ioc_2
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
 
Comparative Design of Column for Different Strengthening Techniques (CFRP)
Comparative Design of Column for Different Strengthening Techniques (CFRP)Comparative Design of Column for Different Strengthening Techniques (CFRP)
Comparative Design of Column for Different Strengthening Techniques (CFRP)
 
Dry Mix Mortar
Dry Mix MortarDry Mix Mortar
Dry Mix Mortar
 
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET-  	  Controlling the Formation of Rust in the Rocker Panel using Cavity...
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...
 
IRJET- Systematic Prevention and Repair of Potholes in Flexible Pavement
IRJET- Systematic Prevention and Repair of Potholes in Flexible PavementIRJET- Systematic Prevention and Repair of Potholes in Flexible Pavement
IRJET- Systematic Prevention and Repair of Potholes in Flexible Pavement
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Design of automatic wall plastering machine
Design of automatic wall plastering machineDesign of automatic wall plastering machine
Design of automatic wall plastering machine
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle Clamp
 
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMAR
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMARINDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMAR
INDUSTRIAL PAINTING & FABRICATION SERVICES By M/s. JAYANT KUMAR
 
Description of paint system.
Description of paint system.Description of paint system.
Description of paint system.
 
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...
IRJET- Cost Effective Manufacturing and Optimization of the Formula Student N...
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building Measurement
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design Report
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCL
 
Project profile on gent's shirts (1)abcd
Project profile on gent's shirts (1)abcdProject profile on gent's shirts (1)abcd
Project profile on gent's shirts (1)abcd
 
experimental analysis of concrete using fibre.pdf
experimental analysis of concrete using fibre.pdfexperimental analysis of concrete using fibre.pdf
experimental analysis of concrete using fibre.pdf
 
Painting system
Painting systemPainting system
Painting system
 

Method painting works emulsion paint

  • 1. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal CAI MEP INTERNATIONAL CONTAINER TERMINAL METHOD STATEMENT FOR PAINTING WORK – EXTERIOR AND INTERIOR EMULSION PAINT Page 1
  • 2. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal CONTENT 1. Purpose Page 3 2. Scope of Work Page 3 3. Reference Technical Specification Page 3 4. Shop Drawing Page 4 5. Work Procedure Page 4 6. Quality Control Page 7 7. Safety Control Page 7 Page 2 Appendix 1-2
  • 3. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 1. PURPOSE The Purpose of this Method Statement is to describe the process of painting works for exterior and interior emulsion paint in compliance with all the required specifications, standards, and proper construction procedures for the building finishing works of the project. 2. SCOPE OF WORK The scope of work for the construction of the items are as follows :  Supply, rub down and apply emulsion paint for plastered surface (Exterior)  Supply, rub down and apply emulsion paint for plastered surface (Interior) 3. REFERENCE TECHNICAL SPECIFICATION  Refer to Division 08: Painting of Part 4A – Volume 2 of Technical Specification 4. SHOP DRAWING Shop drawings shall be submitted to the Engineer by separated document for review and approval before carrying out the works. Page 3 5. WORK PROCEDURE 5.1. General Flow Chart Fail Surface preparation Applying Skimcoat Dry Surface Confirm Surface Surface Sanding Apply Sealer Thickness Checking Finishing Coat (Layer 1) Final Coat (Layer 2) Thickness Inspection Finish
  • 4. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Page 4 5.2 Detail Procedure  Surface preparation Cement mortar surfaces to be painted shall be dry and prepared by removing dust, dirt, grease, oil, efflorescence and any other substance For imperfect surfaces with cavities, tiny holes, can use Matex Putty for making smooth surfaces  Applying Skimcoat Use Skimcoat for mastic Mix 1 bag of skimcoat with 16 liters of water Use mixing machine of appropriate machine to mix in 3 minutes to get a unified admixture Wait for 10 minutes, stir again by mixing machine then apply mastic within 2 hours Apply first layer on prepared surfaces to 0.8 – 1mm wet layer thickness ( 0.5 - 0.6mm thick after dried) Wait till dry within 16 hours at 300C or when mastic layer is firmed then apply second layer with method same as previous one.  Dry surface Minimum drying time : 16 hours at 250C  Confirm Surface Use appropriate device for checking to make sure dried surface meet the required thickness is not greater than 1mm Surface must be dry and firm  Surface Grinding Use sandpaper to grind coated surface to make a smooth and fine surface  Apply Sealer Dilute sealer with 5% of water if necessary. Stir up within 3 minutes Apply sealer paint on grinding surface by paint roller to get 100±3 microns wet face thickness (dry face thickness approx. 35±3 microns) Wait 2 hour at 300C before applying finishing coat.  Thickness checking Use Elcometer device to check, ensure the required dry face thickness (35±3 microns) to prevent foreign object and increase bond between painting layers  Finishing Coat – Layer 1
  • 5. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Dilute finishing paint with 5% of water if necessary and stir up in 3 minutes Apply finishing paint on to sealer painted surface to get wet face thickness 97±3 microns (dry face thickness approx. 35±3 microns) Wait 2 hour at 300C before applying final coat – layer 2. Page 5  Final Coat – Layer 2 Apply finishing paint on to finishing coat painted surface to get wet face thickness 97±3 microns (dry face thickness approx. 35±3 microns)  Thickness Inspection Painted surface must be dry, clean, firm, smooth and uniform in color. Total dry face thickness must be at least 70±3 micron.  Finish All painting layer testing can be applied after 7 days at 300C 6. QUALITY CONTROL 6.1. Inspection and Testing Plan Before start Painting, Inspection and Testing Plan shall be established to keep proper quality of the works in accordance with specification and standard. ITP shall be submitted to the Engineer for approval. 6.2. Delivery Inspection After deliver the materials to the site, delivery inspection shall be conducted with witnessed by the Engineer. Frequency of delivery inspection shall be indicated in the ITP. 6.3. Thickness measurement : Thickness of painted layer can be check be Elcometer device. 7. SAFETY CONTROL 7.1. Fundamental Policy “Safety is the First Priority" 7.2. Key Activities  Implementation of Safety & Health Education  Prevention of Human Error and Machinery Accidents 7.3. Development and implementation of Activity  Implementation of Safety & Health Education  Pick up hazardous factors of each work activity and always reflect them at the safety meetings.
  • 6. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal 7.4. Point out them every day at the meetings in order to let individual worker to renovate his safety consciousness  Prevention of Human Error and Machinery Accidents  Be consistent with inspection at beginning of works, regular maintenance of working platform, machinery tools designation of working area. Page 6 7.5. Others  Safety signboards and barricades shall be installed around working area if necessary. Security guard should observe all passengers around the site.  MSDS must be prepared before carry out painting work.
  • 7. Doc. Title Method Statement of Painting Work TOA-TOYO JOINT VENTURE Doc. No CM – MS – BW - 023 Rev. No. 0 Date May, 2012 Construction of Port Facilities and Buildings for Cai Mep International Container Terminal Appendix – 1 Inspection and Testing Plan Page 7