SlideShare une entreprise Scribd logo
1  sur  35
© CAMCO 1998
GAS LIFT VALVE MECHANICS
© CAMCO 1998
3 basic types of gas lift valve, each available in 1” & 1-1/2” sizes:
Dummy valves Orifice valves Unloading valves
• Square edgedSquare edged
• Venturi (nova)Venturi (nova)
• Injection pressure (casing)Injection pressure (casing)
operated valvesoperated valves
• production pressure (fluid)production pressure (fluid)
operated valvesoperated valves
• Throttling/proportionalThrottling/proportional
response valvesresponse valves
GAS LIFT VALVE MECHANICS
© CAMCO 1998
UNLOADING VALVES
© CAMCO 1998
Pressure Regulator
Diaphragm/
Atmospheric Bellows
Spring
Stem
Stem Tip
Port
Downstream
Upstream
Spring Operated Gas Lift Valve
Upstream/
Casing
Downstream/Tubing
© CAMCO 1998
VALVE OPENING & CLOSING PRESSURES
UN BALANCED VALVEUN BALANCED VALVE
F = P X AF = P X A
Pc
1
PdPd
PtPt
WHEN THE VALVE IS CLOSEDWHEN THE VALVE IS CLOSED
TO OPEN IT…..TO OPEN IT…..
Pd x Ab=Pd x Ab= Pc
1
(Ab - Ap) + Pt Ap
PdPd
Pc
2
WHEN THE VALVE IS OPENWHEN THE VALVE IS OPEN
TO CLOSE IT…..TO CLOSE IT…..
Pd =Pd = Pc
2
(Ab)
© CAMCO 1998
CLOSING FORCE (IPO VALVE) Fc = PbAb
OPENING FORCES (IPO VALVE) Fo1 = Pc (Ab- Ap)
Fo2 = Pt Ap
TOTAL OPENING FORCE Fo = Pc (Ab - Ap) + Pt Ap
JUST BEFORE THE VALVE OPENS THE FORCES ARE EQUAL
Pc (Ab - Ap) + Pt Ap = Pb Ab
Pb - Pt (Ap/Ab)
SOLVING FOR Pc Pc = --------------------------
1 - (Ap/Ab)
WHERE: Pb = Pressure in bellows
Pt = Tubing pressure
Pc = Casing pressure
Ab = Area of bellows
Ap = Area of port
VALVE OPENING & CLOSING PRESSURES
© CAMCO 1998
VALVE OPENING & CLOSING PRESSURES
Pb - Pt (Ap/Ab)
Pc = ----------------------
1 - (Ap/Ab)
Where R = Ratio Ap/Ab
Pb - Pt (R)
Pc = ----------------------
1 - R
Pb = Pc (1 - R) + Pt (R)
© CAMCO 1998
INJECTION GAS
PRODUCED FLUID
0
2000
6000
8000
10000
12000
14000
4000
1000 2000
DEPTHFTTVD
TUBING PRESSURE
CASING PRESSURE
1500500 2500
DRAWDOWN
3000 3500
FBHP SIBHP
© CAMCO 1998
GAS LIFT VALVES CLOSE IN SEQUENCE
0
2000
6000
8000
10000
12000
14000
4000
1000 2000
DEPTHFTTVD
TUBING PRESSURE
CASING PRESSURE
1500500 2500
DRAWDOWN
3000 3500
FBHP SIBHP
© CAMCO 1998
INJECTION GAS
PRODUCED FLUID
CASING P.CASING P.
TO OPENTO OPEN
CASING PCASING P
TO CLOSETO CLOSE
AT SURFACEAT SURFACE
VALVE # 1VALVE # 1
VALVE # 2VALVE # 2
VALVE # 3VALVE # 3
DOME P.DOME P.
1200 PSI1200 PSI
1260 PSI1260 PSI
1300 PSI1300 PSI
NOTE : ALL VALVES 3/16” R-20NOTE : ALL VALVES 3/16” R-20
R = 0.038 1-R = 0.962R = 0.038 1-R = 0.962
Pd = Pc (1-R) + Pt (R)Pd = Pc (1-R) + Pt (R)
TUBING P.TUBING P.
@ DEPTH@ DEPTH
890 PSI890 PSI
740 PSI740 PSI
560 PSI560 PSI
? PSI? PSI
? PSI? PSI
? PSI? PSI
1340 PSI1340 PSI ? PSI? PSI
© CAMCO 1998
Pt
Pc
Pb
Dome
Bellows
Square Edged
Seat
Check Valve
Chevron
Packing
Stack
Nitrogen Charged Bellows Type
Injection Pressure (Casing) Operated Gas Lift Valve
Chevron
Packing
Stack
Stem Tip (Ball)
Pt
Pc
Pb
Dome
Bellows
Check Valve
Chevron
Packing
Stack
Nitrogen Charged Bellows Type
Production Pressure (Fluid) Operated Gas Lift Valve
Chevron
Packing
Stack
Stem Tip (Ball)
Square Edged
Seat
© CAMCO 1998
Pt
Pc
PbDome
Bellows
Tapered
T.C. Seat
Check Valve
Chevron
Packing
Stack
Nitrogen Charged Bellows Type
Proportional Response Gas Lift Valve
Chevron
Packing
Stack
Spring
Large T.C. Ball
Pt
Pc
Atmospheric
Bellows
Square Edged
Seat
Check Valve
Chevron
Packing
Stack
Spring Operated
Injection Pressure (Casing) Operated Gas Lift Valve
Chevron
Packing
Stack
Stem Tip (Ball)
Spring
Adjustment
Nut & Lock Nuts
© CAMCO 1998
© CAMCO 1998
© CAMCO 1998
GAS LIFT VALVE FEATURES
• Bellows protection
• Max dome charge
• Check valve
• Stem travel
• Metallurgy
• Elastomers
• Max fluid rate
© CAMCO 1998
UNLOADING GAS LIFT VALVE
• Normally required during unloading phase
only
• Open only when annulus and tubing
pressures are high enough to overcome
valve set pressure
• Valve closes after transfer to next station
• May be spring or nitrogen charged
© CAMCO 1998
ORIFICE VALVES
THERE ARE 2 TYPES OF ORIFICE VALVE:
• SQUARED EDGED ORIFICE
• VENTURI (NOVA)
• Valve designed for accurate gas passage
prediction.
• One-way check valve for tubing integrity.
© CAMCO 1998
NOVA VALVENOVA VALVE
© CAMCO 1998
OPERATING GAS LIFT VALVE
• Typically an ‘orifice’ type Gas lift valve
• always open - allows gas across Passage whenever
correct differential exists
• Gas injection controlled by size and differential
across replaceable choke
• Back-check prevents reverse flow of well fluids from
the production conduit
© CAMCO 1998
GAS LIFT MANDRELS, LATCHES &
KICKOVER TOOLS
© CAMCO 1998
GAS LIFT MANDRELS
SIDE POCKET
MANDRELS
CONVENTIONAL
MANDREL
© CAMCO 1998
5 1/2” MMRG-4, 1 1/2” POCKET
ROUND MANDREL DESIGN
ENGINEERING DATA
CAMCO
©CAMCO 1996
PART NUMBER 05712-000-00001
SIZE 5 1/2”
MAX O.D. 7.982”
MIN I.D. 4.756”
DRIFT I.D. 4.653”
THREAD 17 LB/FT MANN BDS B x P
TEST PRESSURE INTERNAL 7740 PSI
TEST PRESSURE EXTERNAL 6280 PSI
LATCH TYPE RK, RK-1, RKP, RK-SP
KICKOVER TOOL OM-1, OM-1M, OM-1S
RUNNING TOOL RK-1 15079
PULLING TOOL 1 5/8” JDS 15155
MATERIAL 410 S.S., 13 CR 22 HRC MAX
TENSILE STRENGTH (EOEC) 490,000 LBS
Orienting
Sleeve
Tool
Discriminator
‘G’ Latch
Lug
Polished
Seal Bore
© CAMCO 1998
© CAMCO 1998
© CAMCO 1998
© CAMCO 1998
© CAMCO 1998
RK / BK LATCH
THERE ARE OTHER
LATCHES
• 1-1/2” RK
• 1-1/2” RA
• 1-1/2” RM
• T2 LATCHES
• 1” BK
© CAMCO 1998
KICKOVER TOOL
THE KICKOVER TOOL IS RUN ON WIRELINE AND USED TO PULL AND SET
GAS LIFT VALVES. THE ABILITY TO WIRELINE CHANGE-OUT GAS LIFT
VALVES GIVES GREAT FLEXIBILITY IN THE GAS LIFT DESIGN
© CAMCO 1998
INJECTION GAS
PRODUCED FLUID
PRESSURE (PSI)
DEPTH(FTTVD)
1000
2000
3000
4000
5000
6000
7000
0
1000 20000
OPERATING GAS LIFT VALVE
CASING PRESSURE WHEN
WELL IS BEING GAS LIFTED
FBHP
SIBHP
FLOWINGTUBINGPRESSUREGRADIENT
CONSTANT FLOW GAS LIFT WELL
DAY 2
“LET’S DO GAS LIFT DESIGN”
• Recap
• Finish off outstanding work
• Gas Lift Well Kick-off
• Gas laws applied to gas lift design
• Gas Passage
• Flowing gradient exercises
• Gas lift design methods
• Gas lift design - examples
•Mandrel spacing
•Gas requirements
•Port size selection
•Pressure valve calculations
© CAMCO 1998
INJECTION GAS
PRODUCED FLUID
PRESSURE (PSI)
DEPTH(FTTVD)
1000
2000
3000
4000
5000
6000
7000
0
1000 20000
OPERATING GAS LIFT VALVE
CASING PRESSURE WHEN
WELL IS BEING GAS LIFTED
FBHP
SIBHP
FLOWINGTUBINGPRESSUREGRADIENT
CONSTANT FLOW GAS LIFT WELL
RECAP - DAY 1
“ARM OURSELVES WITH THE KNOWLEDGE TO DO GAS LIFT DESIGN”
• Course introduction
• Introduction to artificial lift
• Types of gas lift
• Applications of continuous flow gas lift
• Advantages & disadvantages of gas lift
• Basic introduction to gas lift principles
• Continuous flow unloading sequence
• Inflow and outflow performance
• Gas lift valve mechanics
• Gas lift mandrels, latches, kickover tools
• Unloading sequence - computer model
© CAMCO 1998
© CAMCO 1998
© CAMCO 1998
GAS LIFT VALVE CHANGEOUTS!
• Methodical
• Equalise pressure
• Valve catcher
• Latches
• Running / pulling tools
• Pressure tests
• Experience
• Risk
© CAMCO 1998
EQUIPMENT SUMMARY
• Side pocket mandrels
• IPO unloading valves
• Fluid pressure operated valves
• Proportional response valves
• Orifice valves
• Shear open valves
• Latch system
• Dump kill valves
• Circulating valves
• Pilot valves
• Check systems
• Waterflood regulators
• Chemical injection systems
• Time cycle controllers
© CAMCO 1998
SURFACE ACTUATED/CONTROLLED
GAS LIFT VALVE
• Hydraulic controlled valve
• Electric controlled valve

Contenu connexe

Tendances

Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
mmody4
 

Tendances (20)

Production optimization using gas lift technique
Production optimization using gas lift techniqueProduction optimization using gas lift technique
Production optimization using gas lift technique
 
Gas lift design
Gas lift designGas lift design
Gas lift design
 
110011972 cementacion-forzada-teoria-y-calculos
110011972 cementacion-forzada-teoria-y-calculos110011972 cementacion-forzada-teoria-y-calculos
110011972 cementacion-forzada-teoria-y-calculos
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
Estranguladores o chokes de flujo
Estranguladores o chokes de flujoEstranguladores o chokes de flujo
Estranguladores o chokes de flujo
 
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...
 
Drilling problems and optimization
Drilling problems and optimizationDrilling problems and optimization
Drilling problems and optimization
 
Cementation
CementationCementation
Cementation
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
 
Tubing string
Tubing stringTubing string
Tubing string
 
Presion de fractura
Presion de fracturaPresion de fractura
Presion de fractura
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Produccion 1(clase 3)
Produccion 1(clase 3)Produccion 1(clase 3)
Produccion 1(clase 3)
 

En vedette

Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
1053 tubing%20 performance1
1053 tubing%20 performance11053 tubing%20 performance1
1053 tubing%20 performance1
Dani Garnida
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
Akhilesh Maurya
 
CBM Reservoir Simulation
CBM Reservoir SimulationCBM Reservoir Simulation
CBM Reservoir Simulation
Jameel Akbar
 
Digital oil fields completion course work
Digital oil fields completion course workDigital oil fields completion course work
Digital oil fields completion course work
Flavio Fonte, PMP, ITIL
 
Gas lift optimization
Gas lift optimizationGas lift optimization
Gas lift optimization
raciel_32
 
Sattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-newSattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-new
Sattakun Khongsong
 

En vedette (20)

Artificial lift method
Artificial lift methodArtificial lift method
Artificial lift method
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
Packers & bridge plugs
 
Production optimization
Production optimizationProduction optimization
Production optimization
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Packers
PackersPackers
Packers
 
1053 tubing%20 performance1
1053 tubing%20 performance11053 tubing%20 performance1
1053 tubing%20 performance1
 
Presentacion gas lift
Presentacion gas liftPresentacion gas lift
Presentacion gas lift
 
Nodal analysis
Nodal analysisNodal analysis
Nodal analysis
 
Well stimulation - petroleum engineering
Well stimulation - petroleum engineeringWell stimulation - petroleum engineering
Well stimulation - petroleum engineering
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
 
Spe Final
Spe FinalSpe Final
Spe Final
 
CBM Reservoir Simulation
CBM Reservoir SimulationCBM Reservoir Simulation
CBM Reservoir Simulation
 
Eclipse reservoir simulation project presentation slides team ucsi
Eclipse reservoir simulation project presentation slides   team ucsiEclipse reservoir simulation project presentation slides   team ucsi
Eclipse reservoir simulation project presentation slides team ucsi
 
Oil & Gas Fields Get Smart
Oil & Gas Fields Get SmartOil & Gas Fields Get Smart
Oil & Gas Fields Get Smart
 
Digital oil fields completion course work
Digital oil fields completion course workDigital oil fields completion course work
Digital oil fields completion course work
 
Gas lift optimization
Gas lift optimizationGas lift optimization
Gas lift optimization
 
Sattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-newSattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-new
 
3 nodal analysis
3 nodal analysis3 nodal analysis
3 nodal analysis
 

Similaire à 04 gas lift_equipment

Hmt Oil Water Separator Presentation
Hmt Oil Water Separator PresentationHmt Oil Water Separator Presentation
Hmt Oil Water Separator Presentation
Rob Leary
 
2 cylinderservicemanual
2 cylinderservicemanual2 cylinderservicemanual
2 cylinderservicemanual
sacooling
 

Similaire à 04 gas lift_equipment (20)

Bk 1 camco
Bk 1 camcoBk 1 camco
Bk 1 camco
 
Hmt Oil Water Separator Presentation
Hmt Oil Water Separator PresentationHmt Oil Water Separator Presentation
Hmt Oil Water Separator Presentation
 
Catalogo bomba de vacio.pdf
Catalogo bomba de vacio.pdfCatalogo bomba de vacio.pdf
Catalogo bomba de vacio.pdf
 
Emission Control.pdf
Emission Control.pdfEmission Control.pdf
Emission Control.pdf
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
 
Piston pumps
Piston pumpsPiston pumps
Piston pumps
 
Cashco Products Presentation
Cashco Products PresentationCashco Products Presentation
Cashco Products Presentation
 
Prvs 2. asme section i fired vessel rev4
Prvs   2. asme section i fired vessel rev4Prvs   2. asme section i fired vessel rev4
Prvs 2. asme section i fired vessel rev4
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
 
2 cylinderservicemanual
2 cylinderservicemanual2 cylinderservicemanual
2 cylinderservicemanual
 
Barry Cutting - Booster fans Angus Place Colliery
Barry Cutting  - Booster fans Angus Place CollieryBarry Cutting  - Booster fans Angus Place Colliery
Barry Cutting - Booster fans Angus Place Colliery
 
Hvac pumps 120 series pumps
Hvac pumps 120 series pumpsHvac pumps 120 series pumps
Hvac pumps 120 series pumps
 
Catálogo Williams _ X series
Catálogo Williams _ X series Catálogo Williams _ X series
Catálogo Williams _ X series
 
Catálogo Williams _ Wilroy
Catálogo Williams _ Wilroy Catálogo Williams _ Wilroy
Catálogo Williams _ Wilroy
 
Continental Industrie
Continental IndustrieContinental Industrie
Continental Industrie
 
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemBoiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Top quality stop valve maniks
Top quality stop valve maniksTop quality stop valve maniks
Top quality stop valve maniks
 
Rmt Vm Presentation
Rmt Vm PresentationRmt Vm Presentation
Rmt Vm Presentation
 

Dernier

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Dernier (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

04 gas lift_equipment

  • 1. © CAMCO 1998 GAS LIFT VALVE MECHANICS
  • 2. © CAMCO 1998 3 basic types of gas lift valve, each available in 1” & 1-1/2” sizes: Dummy valves Orifice valves Unloading valves • Square edgedSquare edged • Venturi (nova)Venturi (nova) • Injection pressure (casing)Injection pressure (casing) operated valvesoperated valves • production pressure (fluid)production pressure (fluid) operated valvesoperated valves • Throttling/proportionalThrottling/proportional response valvesresponse valves GAS LIFT VALVE MECHANICS
  • 4. © CAMCO 1998 Pressure Regulator Diaphragm/ Atmospheric Bellows Spring Stem Stem Tip Port Downstream Upstream Spring Operated Gas Lift Valve Upstream/ Casing Downstream/Tubing
  • 5. © CAMCO 1998 VALVE OPENING & CLOSING PRESSURES UN BALANCED VALVEUN BALANCED VALVE F = P X AF = P X A Pc 1 PdPd PtPt WHEN THE VALVE IS CLOSEDWHEN THE VALVE IS CLOSED TO OPEN IT…..TO OPEN IT….. Pd x Ab=Pd x Ab= Pc 1 (Ab - Ap) + Pt Ap PdPd Pc 2 WHEN THE VALVE IS OPENWHEN THE VALVE IS OPEN TO CLOSE IT…..TO CLOSE IT….. Pd =Pd = Pc 2 (Ab)
  • 6. © CAMCO 1998 CLOSING FORCE (IPO VALVE) Fc = PbAb OPENING FORCES (IPO VALVE) Fo1 = Pc (Ab- Ap) Fo2 = Pt Ap TOTAL OPENING FORCE Fo = Pc (Ab - Ap) + Pt Ap JUST BEFORE THE VALVE OPENS THE FORCES ARE EQUAL Pc (Ab - Ap) + Pt Ap = Pb Ab Pb - Pt (Ap/Ab) SOLVING FOR Pc Pc = -------------------------- 1 - (Ap/Ab) WHERE: Pb = Pressure in bellows Pt = Tubing pressure Pc = Casing pressure Ab = Area of bellows Ap = Area of port VALVE OPENING & CLOSING PRESSURES
  • 7. © CAMCO 1998 VALVE OPENING & CLOSING PRESSURES Pb - Pt (Ap/Ab) Pc = ---------------------- 1 - (Ap/Ab) Where R = Ratio Ap/Ab Pb - Pt (R) Pc = ---------------------- 1 - R Pb = Pc (1 - R) + Pt (R)
  • 8. © CAMCO 1998 INJECTION GAS PRODUCED FLUID 0 2000 6000 8000 10000 12000 14000 4000 1000 2000 DEPTHFTTVD TUBING PRESSURE CASING PRESSURE 1500500 2500 DRAWDOWN 3000 3500 FBHP SIBHP
  • 9. © CAMCO 1998 GAS LIFT VALVES CLOSE IN SEQUENCE 0 2000 6000 8000 10000 12000 14000 4000 1000 2000 DEPTHFTTVD TUBING PRESSURE CASING PRESSURE 1500500 2500 DRAWDOWN 3000 3500 FBHP SIBHP
  • 10. © CAMCO 1998 INJECTION GAS PRODUCED FLUID CASING P.CASING P. TO OPENTO OPEN CASING PCASING P TO CLOSETO CLOSE AT SURFACEAT SURFACE VALVE # 1VALVE # 1 VALVE # 2VALVE # 2 VALVE # 3VALVE # 3 DOME P.DOME P. 1200 PSI1200 PSI 1260 PSI1260 PSI 1300 PSI1300 PSI NOTE : ALL VALVES 3/16” R-20NOTE : ALL VALVES 3/16” R-20 R = 0.038 1-R = 0.962R = 0.038 1-R = 0.962 Pd = Pc (1-R) + Pt (R)Pd = Pc (1-R) + Pt (R) TUBING P.TUBING P. @ DEPTH@ DEPTH 890 PSI890 PSI 740 PSI740 PSI 560 PSI560 PSI ? PSI? PSI ? PSI? PSI ? PSI? PSI 1340 PSI1340 PSI ? PSI? PSI
  • 11. © CAMCO 1998 Pt Pc Pb Dome Bellows Square Edged Seat Check Valve Chevron Packing Stack Nitrogen Charged Bellows Type Injection Pressure (Casing) Operated Gas Lift Valve Chevron Packing Stack Stem Tip (Ball) Pt Pc Pb Dome Bellows Check Valve Chevron Packing Stack Nitrogen Charged Bellows Type Production Pressure (Fluid) Operated Gas Lift Valve Chevron Packing Stack Stem Tip (Ball) Square Edged Seat
  • 12. © CAMCO 1998 Pt Pc PbDome Bellows Tapered T.C. Seat Check Valve Chevron Packing Stack Nitrogen Charged Bellows Type Proportional Response Gas Lift Valve Chevron Packing Stack Spring Large T.C. Ball Pt Pc Atmospheric Bellows Square Edged Seat Check Valve Chevron Packing Stack Spring Operated Injection Pressure (Casing) Operated Gas Lift Valve Chevron Packing Stack Stem Tip (Ball) Spring Adjustment Nut & Lock Nuts
  • 15. © CAMCO 1998 GAS LIFT VALVE FEATURES • Bellows protection • Max dome charge • Check valve • Stem travel • Metallurgy • Elastomers • Max fluid rate
  • 16. © CAMCO 1998 UNLOADING GAS LIFT VALVE • Normally required during unloading phase only • Open only when annulus and tubing pressures are high enough to overcome valve set pressure • Valve closes after transfer to next station • May be spring or nitrogen charged
  • 17. © CAMCO 1998 ORIFICE VALVES THERE ARE 2 TYPES OF ORIFICE VALVE: • SQUARED EDGED ORIFICE • VENTURI (NOVA) • Valve designed for accurate gas passage prediction. • One-way check valve for tubing integrity.
  • 18. © CAMCO 1998 NOVA VALVENOVA VALVE
  • 19. © CAMCO 1998 OPERATING GAS LIFT VALVE • Typically an ‘orifice’ type Gas lift valve • always open - allows gas across Passage whenever correct differential exists • Gas injection controlled by size and differential across replaceable choke • Back-check prevents reverse flow of well fluids from the production conduit
  • 20. © CAMCO 1998 GAS LIFT MANDRELS, LATCHES & KICKOVER TOOLS
  • 21. © CAMCO 1998 GAS LIFT MANDRELS SIDE POCKET MANDRELS CONVENTIONAL MANDREL
  • 22. © CAMCO 1998 5 1/2” MMRG-4, 1 1/2” POCKET ROUND MANDREL DESIGN ENGINEERING DATA CAMCO ©CAMCO 1996 PART NUMBER 05712-000-00001 SIZE 5 1/2” MAX O.D. 7.982” MIN I.D. 4.756” DRIFT I.D. 4.653” THREAD 17 LB/FT MANN BDS B x P TEST PRESSURE INTERNAL 7740 PSI TEST PRESSURE EXTERNAL 6280 PSI LATCH TYPE RK, RK-1, RKP, RK-SP KICKOVER TOOL OM-1, OM-1M, OM-1S RUNNING TOOL RK-1 15079 PULLING TOOL 1 5/8” JDS 15155 MATERIAL 410 S.S., 13 CR 22 HRC MAX TENSILE STRENGTH (EOEC) 490,000 LBS Orienting Sleeve Tool Discriminator ‘G’ Latch Lug Polished Seal Bore
  • 27. © CAMCO 1998 RK / BK LATCH THERE ARE OTHER LATCHES • 1-1/2” RK • 1-1/2” RA • 1-1/2” RM • T2 LATCHES • 1” BK
  • 28. © CAMCO 1998 KICKOVER TOOL THE KICKOVER TOOL IS RUN ON WIRELINE AND USED TO PULL AND SET GAS LIFT VALVES. THE ABILITY TO WIRELINE CHANGE-OUT GAS LIFT VALVES GIVES GREAT FLEXIBILITY IN THE GAS LIFT DESIGN
  • 29. © CAMCO 1998 INJECTION GAS PRODUCED FLUID PRESSURE (PSI) DEPTH(FTTVD) 1000 2000 3000 4000 5000 6000 7000 0 1000 20000 OPERATING GAS LIFT VALVE CASING PRESSURE WHEN WELL IS BEING GAS LIFTED FBHP SIBHP FLOWINGTUBINGPRESSUREGRADIENT CONSTANT FLOW GAS LIFT WELL DAY 2 “LET’S DO GAS LIFT DESIGN” • Recap • Finish off outstanding work • Gas Lift Well Kick-off • Gas laws applied to gas lift design • Gas Passage • Flowing gradient exercises • Gas lift design methods • Gas lift design - examples •Mandrel spacing •Gas requirements •Port size selection •Pressure valve calculations
  • 30. © CAMCO 1998 INJECTION GAS PRODUCED FLUID PRESSURE (PSI) DEPTH(FTTVD) 1000 2000 3000 4000 5000 6000 7000 0 1000 20000 OPERATING GAS LIFT VALVE CASING PRESSURE WHEN WELL IS BEING GAS LIFTED FBHP SIBHP FLOWINGTUBINGPRESSUREGRADIENT CONSTANT FLOW GAS LIFT WELL RECAP - DAY 1 “ARM OURSELVES WITH THE KNOWLEDGE TO DO GAS LIFT DESIGN” • Course introduction • Introduction to artificial lift • Types of gas lift • Applications of continuous flow gas lift • Advantages & disadvantages of gas lift • Basic introduction to gas lift principles • Continuous flow unloading sequence • Inflow and outflow performance • Gas lift valve mechanics • Gas lift mandrels, latches, kickover tools • Unloading sequence - computer model
  • 33. © CAMCO 1998 GAS LIFT VALVE CHANGEOUTS! • Methodical • Equalise pressure • Valve catcher • Latches • Running / pulling tools • Pressure tests • Experience • Risk
  • 34. © CAMCO 1998 EQUIPMENT SUMMARY • Side pocket mandrels • IPO unloading valves • Fluid pressure operated valves • Proportional response valves • Orifice valves • Shear open valves • Latch system • Dump kill valves • Circulating valves • Pilot valves • Check systems • Waterflood regulators • Chemical injection systems • Time cycle controllers
  • 35. © CAMCO 1998 SURFACE ACTUATED/CONTROLLED GAS LIFT VALVE • Hydraulic controlled valve • Electric controlled valve

Notes de l'éditeur

  1. UNLOADING VALVES - DESIGNED TO CLOSED. PRESSURE REGULATORS - DIFFERENT CLOSING MECHANISMS *WHY SPRING? WHY NITROGEN)
  2. BASICALLY A PRESSURE REGULATOR OR PRV -SET TO RELIEVE PRESSURE FROM THE CASING.
  3. NOTE ; ‘UNBALANCED’ OPENING FORCE IN TERMS OF THE CASING PRESSURE IS DIFFERENT THAN THE CLOSING PRESSURE IN TERMS OF THE CASING PRESSURE. THE FORCES REMAIN CONSTANT BUT THE AFFECTED AREAS ON WHICH THE CASING ORESSURE ACTS CHANGES
  4. MANDRELS ONLY WELDED ITEM IN THE COMPLETION MANDREL - HOLDS THE TOOL IN THIS CASE THE VALVE CONVENTIAONL V’S WIRELINE RETRIEVABLE
  5. ELABORATE ON WELDING , FORGING & MACHINING SECTIONS DISCUSS THE DIFFERENT METALLURGIES AND DIFFICULTIES WITH WELDING & TREATING ESPECICALLY INCONEL.
  6. KICKOVER TOOLS - SHOW THE KICKOVER MODEL
  7. FIRST DAY WE WILL HAVE CONCENTRATED ON FLUID MECHANICS & ONLY BRIEFLY ON EQUIPMENT. DAY 2 = APPLYING FLUID PRINCIPLES TO A GAS LIFT DESGIN (SPM SPACING & VALVE CALCS) THIS FIRST DESIGN CAN BE DONE COLLECTIVELY (PREFERRED) OR INDIVIDUALLY EQUIPMENT : SPMS - CUT-AWAYS LATCHES - LATCH PROFILES RUNNING PULLING TOOLS - MENTION DIFFERENCES EXAMPLES OF FLUID DAMAGE
  8. INSTRUCTORS - RB ATTENDEES / BACKGROUNDS CONTENTS & AIMS OF COURSE (PUT ONTO FLIP PAPER FINISH FRIDAY LUNCH TIME
  9. TAKE 25 MINS - AJ 20 MINS - 45 OVERALL