SlideShare une entreprise Scribd logo
1  sur  48
UNIT 1
Water demand and quantity of water
Introduction: Quantity ofWater
Why to study aboutQuantity ofWater?
 Toestimate the water demand for the community
 Todesign the water supply system with long term benefits
 Todetermine the capacity of the reservoir used in water supply system
 Tofind the suitable water resources that can meet the
demand.
Water Demand
• The rate of water required for a particular town or a city to
successfully carry out its day to day activities is known as water
demand.
• While designing the water supply scheme for a town or city, it is
necessary to determine the total quantity of water required.
• As a matter it is a first duty of an engineer to determine water
demand and then to find a probable source from where the
demand can be met.
Various Quantities need to be assessed
• Total annual volume (V) in liters or ML
• Annual average rate of draft in lit/day i.eV/365
• Annual avg. rate of draft in lit/day/person called per capita
demand
• Average rate of draft in lit/day per service i.e. (V/365) X (1/No.
of services)
• Fluctuations in flows expressed in terms of percentage ratios of
maximum or minimum yearly, monthly, daily or hourly rates to
their corresponding average values.
Factors to be known before Designing Water
Supply System
Population
PerCapita
Demand ofWater
Base and Design
period
Determining quantity of water
The quantity of water required for a city can be tackled by twofactors:
1. Rate of demand: The requirements of water for various uses are
properly analyzed and ultimately, the rate of consumption per capita
per day is calculated.
2. Population: The population to be served by the water supply scheme
is estimated and estimate of future population is worked out with help
of population forecastmethod.
1. Domestic water demand
2. Industrial water demand
3. Institution and commercial water demand
4. Demand for public uses
5. Fire demand
6. Water required to compensate losses in wastes and thefts
Types of water demands
DomesticWater Demand
Drinking Washing
Cooking
This includes the water requirement of people for drinking, cooking,
bathing, lawn sprinkling, gardening, sanitary purposes, etc.
The domestic consumption completely depends upon the economic
status of the people:
200 lit/head/day for rich living
135 lit/head/day for middle class living
•The total domestic demand is equal to 50-60% of the total water
consumption.
Use Consumption in litres per
head per day
Drinking 5
Cooking 5
Bathing 75
Washing clothes 25
Washing of utensils 15
Washing and cleaning of
houses and residences
15
Lawn watering and gardening 15
Flushing of water closets, etc. 45
TOTAL 200
Use Consumption in litres per
head per day
Drinking 5
Cooking 5
Bathing 55
Washing clothes 20
Washing of utensils 10
Washing and cleaning of houses
and residences
10
Flushing of water closets, etc. 30
TOTAL 135
Minimum Domestic water consumption for weaker sections and
LIG colonies in small Indian towns and cities
The quantity of industrial water demand will vary with the type and
number of industries.
In industrial cities the per capita water demand computed as 450
l/h/day for high scale industrial zones and as 50 l/h/day for small scale
industrial zones.
S. No. Name of industry
and product
Unit of production or
raw material used
Appropriate quantity of
water required per unit of
production or raw material
in kilo litres
1 Auto mobiles vehicle 40
2 Distillery (Alcohol) Kilo litre 122-170
3 Fertilizer Tonne 80-200
4 Leather (tanned) Tonne 40
5 Paper Tonne 200-400
6 Special quality paper Tonne 400-1000
7 Petroleum refinery Tonne 1-2
8 Steel Tonne 200-250
9 Sugar Tonne 1-2
10 Textile Tonne 80-140
The water requirements of institutions, hospitals, hotels,
restaurants, schools, offices, etc. come under this category.
The quantity will vary with the nature of the city and with the number
and type of commercial establishments.
On an average, a per capita demand of 20-50 l/h/day is usually
considered for such demand.
Indivisual water requirement
S.
No.
Type of Institution or Commercial establishment Avg demand in l/h/d
1 offices 45-90
2 Hostels 135-180
3 Restaurants 70 per seat
4 schools a) day school 45-90
b) Residential 135-225
5 Factories a) Where bath rooms are provided 45-90
b) No bath rooms provided 30-60
6 Hospitals ( Including laundry) a) beds less than 100 340 per bed
b) beds more than 100 450 per bed
7 Nurses homes & medical quarters 135-225
8 Cinema hall 15
9 Airports 70
10 Railway station 23-70
This includes the quantity
of water required for
public utility purposes,
such as
Watering of
public parks
Gardening
Washing and
sprinkling
on roads
Use in
public
fountains,
etc.
A figure of 10 l/h/day is
usually considered for this
demand.
PurposeWater
Public parks
Street washing
Sewer cleaning
Requirements
1.4 litres/m2/day
1.0-1.5 litres/m2/day
4.5 litres/head/day
The requirements of water for public utility shall be taken as…
In thickly populated and industrial areas, fires generally break out and
may lead to serious damages, if not controlled effectively.
There fore, a provision should be made in modern water supply
schemes for fighting fires.
The quantity of water for extinguishing fires, should be easily available
and kept always in storage reservoirs.
Fire demand
 Kuichling’s formula:
Q = 3182 √𝑃
where, P = Population
Q = Quantity of water demand
 Freeman’s formula:
10
Q = 1136 𝑃
+ 10
where, P = Population
Q = Quantity of water demand
National Board of Fire Under Writer’s formula
Population < 2,00,000
Q = 4637 sq.rt.(P)[1-0.01sq.rt.(p)]
Population > 2,00,000
Q = 54,600 l/min and more 9600 to
36400 l/min
Loses and wastes
• Losses due to defective pipe joints, cracked and broken
pipes, faulty valves and fittings.
• Losses due to, continuous wastage of water.
• Losses due to unauthorised and illegal connections.
• While estimating the total quantity of water of a town;
allowance of 15% of total quantity of water is made to
compensate for losses, thefts and wastage of water.
Water Consumption forVarious Purposes
Types of Normal Average %
Consumption Range
(lit/capita/da
y)
1 Domestic
Consumption 65-300 160 35
2 Industrial and
Commercial
Demand
45-450 135 30
3 Public Uses
including Fire
Demand
20-90 45 10
4 Losses and
Waste 45-150 62 25
38
Per Capita Demand ofWater
• Average quantity of water consumption or water demand for various
purposes per person per day
• Usually expressed in liters per capita per day(lpcd)
V
P ×365
• Per Capita demand in lpcd =
Where,
V= total quantity required per year in litres
P= population
 It varies from person to person, place to place and time to time
• Water demands in liters/d= Per capita demand ×Population
Break up of Per Capita Demand for an Average Indian City
USE Demand in l/h/d
Domestic use 200
Industrial use 50
Commercial use 20
Civic use or public use 10
Wastes & thefts, etc 55
Total 335 = per capita Demand (q)
Factors affecting per capita demand
1. Size of the city: Per capita demand for big cities is generally
large as compared to that for smaller towns .
2. Presence of industries & commercial activities
3. Climatic conditions
4. Habits of people and their economic status
5. Pressure in the distribution system
6. Quality of water supplied
7. Development of sewerage facility
8. System of supply
9. Cost of water
10. policy of metering & Method of charging
11. Quality of water: If water is aesthetically & medically
safe, the consumption will increase
12. Efficiency of water works administration: Leaks in
water mains and services; and unauthorized use of
water can be kept to a minimum by surveys.
13.Cost of water.
14. Policy of metering and charging method: Water tax
is charged in two different ways: on the basis of meter
reading and on the basis of certain fixed monthly rate.
FACTORE AFFECTINGTHEWATER DEMAND
Big city
• Size of the city
Small towns
Example: Delhi 244 l/c/d Vijayawada 135 l/c/d
• Climate condition
less in winter
more in summer
• Cost of water
rate demand rate demand
• Supply system
Bad Supply
• Distribution System
Good supply
demand
Pressure
high
Pressure
low
demand
demand demand
• Industry
• Quality of water
good demand demand
bad
demand demand
industry
industry
• Habit of people
EWS demand MIG demand
(Living style)
Variations in demand and its effects on design of components of
water supply scheme
• Variations in demand :
• Seasonal variation :
• Water Consumption :Winter , Summer, Rainy season
• DailyVariations
• Household & industrial activity.
• Water consumption – more holidays
• Hourly variations:
• Assessment of normal variations : to design supply pipes , service reservoirs , distributary
pipes etc..
Design Periods & Population Forecast
This quantity should be worked out with due provision for the
estimated requirements of the future .
The future period for which a provision is made in the water supply
scheme is known as the design period.
It is suggested that the construction of sewage treatment plant may
be carried out in phases with an initial design period ranging from 5
to 10 years excluding the construction period.
Design period is estimated based on the following:
•Useful life of the component, considering obsolescence, wear, tear, etc.
•Expandability aspect.
•Anticipated rate of growth of population, including industrial,
commercial developments & migration-immigration.
•Available resources.
•Performance of the system during initial period.
Population forecasting
Design of water supply and sanitation scheme is based on the projected
population ofa particular city, estimated for the design period.
Any underestimated value will make system inadequate for the purpose
intended; similarly overestimated value will make it costly.
Changes in the population of the city over the years occur, and the system
should be designed taking into account of the population at the end of the
design period.
Factors affecting changes in population are:
increase due to births
decrease due to deaths
increase/ decrease due to migration
Population forecasting Methods
1. ARITHMETICAL INCREASE METHOD
2. GEOMETRICAL INCREASE METHOD (ORGEOMETRICAL PROGRESSION
METHOD
3. INCREMENTAL INCREASE METHOD
4. GRAPHICAL METHOD
5. COMPARATIVEGRAPHICALMETHOD
6. MASTER PLAN METHOD
7. LOGISTICCURVEMETHOD
ARITHMETIC INCREASE METHOD
 This method is suitable for large and old city with considerable development.
 If it is used for small, average or comparatively new cities, it will give lower population
estimate than actual value.
 In this method the average increase in population per decade is calculated from the past
census reports.
 This increase is added to the present population to find out the population of the next
decade.Thus, it is assumed that the population is increasing at constantrate.
 Hence, dP/dt = C i.e., rate of change of population with respect to time is constant.
Therefore, Population after nth decade will be Pn= Po+ n.x
 Where, Pn is the population after ‘n’ decades and ‘P’ is present population
GEOMETRIC INCREASE METHOD
INCREMENTALINCREASE METHOD
GRAPHICAL METHOD
In this method, the populations of last few decades are correctly
plotted to a suitable scale on graph. The population curve is
smoothly extended for getting future population. This extension
should be done carefully and it requires proper experience and
judgment. The best way of applying this method is to extend the
curve by comparing with population curve of some other similar
cities having the similar growth condition.
COMPARATIVEGRAPHICAL METHOD
MASTER PLAN METHOD
• The big and metropolitan cities are generally not developed in haphazard
manner, but are planned and regulated by local bodies according to master
plan.
• The master plan is prepared for next 25 to 30 years for the city.
• According to the master plan the city is divided into various zones
such as residence, commerce and industry.
• The population densities are fixed for various zones in the master plan. From
this population density total water demand and wastewater generation for
that zone can be worked out. By this method it is very easy to access
precisely the design population.
LOGISTIC CURVE METHOD
• This method is used when the growth rate of population due to births,
deaths and migrations takes place under normal situation and it is not
subjected to any extraordinary changes like epidemic, war, earth quake or
any natural disaster, etc.,
• and the population follows the growth curve characteristics of living things
within limited space and economic opportunity.
• If the population of a city is plotted with respect to time, the curve so
obtained under normal condition looks like S-shaped curve and is known
as logistic curve.
Lec 2.pptx
Lec 2.pptx

Contenu connexe

Tendances

Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resources
Mohammed Salahat
 

Tendances (20)

02 water demand
02 water demand02 water demand
02 water demand
 
Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demand
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
Types of water demand
Types of water demandTypes of water demand
Types of water demand
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Water demand
Water demandWater demand
Water demand
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysis
 
Introduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.ShahIntroduction to water supply engg. by Prof. D S.Shah
Introduction to water supply engg. by Prof. D S.Shah
 
Unit ii introduction to water supply scheme
Unit  ii introduction to water supply schemeUnit  ii introduction to water supply scheme
Unit ii introduction to water supply scheme
 
Groundwater & pumps
Groundwater & pumpsGroundwater & pumps
Groundwater & pumps
 
Sources of water supply
Sources of water supplySources of water supply
Sources of water supply
 
Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1Water Supply and Treatment Engineering- Module 1
Water Supply and Treatment Engineering- Module 1
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2
 
Urban water supply
Urban water supply  Urban water supply
Urban water supply
 
Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resources
 
Scope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda cityScope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda city
 
water quality, water demands
water quality, water demandswater quality, water demands
water quality, water demands
 
Simulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanetSimulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanet
 

Similaire à Lec 2.pptx

Water Demand & Flow Calculations
Water Demand & Flow CalculationsWater Demand & Flow Calculations
Water Demand & Flow Calculations
Hara Bhara Pakistan
 

Similaire à Lec 2.pptx (20)

Water requirements
Water requirementsWater requirements
Water requirements
 
Water requirements
Water requirementsWater requirements
Water requirements
 
Water Requirements
Water RequirementsWater Requirements
Water Requirements
 
L1 - Introduction.ppt
L1 - Introduction.pptL1 - Introduction.ppt
L1 - Introduction.ppt
 
chapter 1 - part 1.pptx
chapter 1 - part 1.pptxchapter 1 - part 1.pptx
chapter 1 - part 1.pptx
 
Water Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptxWater Supply & Urban Drainage.pptx
Water Supply & Urban Drainage.pptx
 
Quantity of water-1.pdf
Quantity of water-1.pdfQuantity of water-1.pdf
Quantity of water-1.pdf
 
03 Water Demand
03 Water Demand03 Water Demand
03 Water Demand
 
Quantity of Water.pptx
Quantity of Water.pptxQuantity of Water.pptx
Quantity of Water.pptx
 
Water resource treatment
Water resource treatmentWater resource treatment
Water resource treatment
 
EE Module 1 (2).pptx
EE Module 1 (2).pptxEE Module 1 (2).pptx
EE Module 1 (2).pptx
 
2 domestic water requirements
2 domestic water requirements2 domestic water requirements
2 domestic water requirements
 
Chapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptxChapter 1..Water Demand (1) examples.pptx
Chapter 1..Water Demand (1) examples.pptx
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46
 
unit 1 EEppc
unit 1 EEppc unit 1 EEppc
unit 1 EEppc
 
quantity of water
quantity of waterquantity of water
quantity of water
 
Sources, intake structures and water demand in Water Supply Schemes
  Sources, intake structures and water demand in Water Supply Schemes   Sources, intake structures and water demand in Water Supply Schemes
Sources, intake structures and water demand in Water Supply Schemes
 
Che 2 quantity &amp; quality of water
Che 2 quantity &amp; quality of waterChe 2 quantity &amp; quality of water
Che 2 quantity &amp; quality of water
 
NATIONAL SERVICE SCHEME NATIONAL GREEN CORPS CLIMATE EDUCATION AND WATER CONS...
NATIONAL SERVICE SCHEME NATIONAL GREEN CORPS CLIMATE EDUCATION AND WATER CONS...NATIONAL SERVICE SCHEME NATIONAL GREEN CORPS CLIMATE EDUCATION AND WATER CONS...
NATIONAL SERVICE SCHEME NATIONAL GREEN CORPS CLIMATE EDUCATION AND WATER CONS...
 
Water Demand & Flow Calculations
Water Demand & Flow CalculationsWater Demand & Flow Calculations
Water Demand & Flow Calculations
 

Plus de mrunmayee20

Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptxLecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
mrunmayee20
 
research methodolgy CIV 381.pptx
research methodolgy CIV 381.pptxresearch methodolgy CIV 381.pptx
research methodolgy CIV 381.pptx
mrunmayee20
 
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptxLecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
mrunmayee20
 
renewable-energy-170909063718.pptx
renewable-energy-170909063718.pptxrenewable-energy-170909063718.pptx
renewable-energy-170909063718.pptx
mrunmayee20
 
Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptx
mrunmayee20
 
astronomy-advancedsurveying.pptx
astronomy-advancedsurveying.pptxastronomy-advancedsurveying.pptx
astronomy-advancedsurveying.pptx
mrunmayee20
 

Plus de mrunmayee20 (20)

Project detail.pptx
Project detail.pptxProject detail.pptx
Project detail.pptx
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
UNIT 1.pptx
UNIT 1.pptxUNIT 1.pptx
UNIT 1.pptx
 
UNIT 1 CIV 880.pptx
UNIT 1 CIV 880.pptxUNIT 1 CIV 880.pptx
UNIT 1 CIV 880.pptx
 
Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptxLecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
Lecture1-2_21636_Lecture1-2_21636_Lecture1-2_18869_GEN531 zero lecture.pptx
 
CIV880_23405.pptx
CIV880_23405.pptxCIV880_23405.pptx
CIV880_23405.pptx
 
iet-201119175041.pptx
iet-201119175041.pptxiet-201119175041.pptx
iet-201119175041.pptx
 
UNIT 4_CIV 108.pptx
UNIT 4_CIV 108.pptxUNIT 4_CIV 108.pptx
UNIT 4_CIV 108.pptx
 
research methodolgy CIV 381.pptx
research methodolgy CIV 381.pptxresearch methodolgy CIV 381.pptx
research methodolgy CIV 381.pptx
 
UNIT 4.pptx
UNIT 4.pptxUNIT 4.pptx
UNIT 4.pptx
 
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptxLecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
 
renewable-energy-170909063718.pptx
renewable-energy-170909063718.pptxrenewable-energy-170909063718.pptx
renewable-energy-170909063718.pptx
 
zero lecture.pptx
zero lecture.pptxzero lecture.pptx
zero lecture.pptx
 
Tacheometry 2.pptx
Tacheometry 2.pptxTacheometry 2.pptx
Tacheometry 2.pptx
 
photogrammetry.pptx
photogrammetry.pptxphotogrammetry.pptx
photogrammetry.pptx
 
Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptx
 
astronomy-advancedsurveying.pptx
astronomy-advancedsurveying.pptxastronomy-advancedsurveying.pptx
astronomy-advancedsurveying.pptx
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
Disinfection.pptx
Disinfection.pptxDisinfection.pptx
Disinfection.pptx
 
lec 1.pptx
lec 1.pptxlec 1.pptx
lec 1.pptx
 

Dernier

+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
Health
 
Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptx
chadhar227
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
nirzagarg
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
gajnagarg
 
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
HyderabadDolls
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 

Dernier (20)

Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
 
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
 
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptx
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
Kings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about themKings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about them
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
 
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Chandrapur [ 7014168258 ] Call Me For Genuine Model...
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
 
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 

Lec 2.pptx

  • 1. UNIT 1 Water demand and quantity of water
  • 2. Introduction: Quantity ofWater Why to study aboutQuantity ofWater?  Toestimate the water demand for the community  Todesign the water supply system with long term benefits  Todetermine the capacity of the reservoir used in water supply system  Tofind the suitable water resources that can meet the demand.
  • 3. Water Demand • The rate of water required for a particular town or a city to successfully carry out its day to day activities is known as water demand. • While designing the water supply scheme for a town or city, it is necessary to determine the total quantity of water required. • As a matter it is a first duty of an engineer to determine water demand and then to find a probable source from where the demand can be met.
  • 4. Various Quantities need to be assessed • Total annual volume (V) in liters or ML • Annual average rate of draft in lit/day i.eV/365 • Annual avg. rate of draft in lit/day/person called per capita demand • Average rate of draft in lit/day per service i.e. (V/365) X (1/No. of services) • Fluctuations in flows expressed in terms of percentage ratios of maximum or minimum yearly, monthly, daily or hourly rates to their corresponding average values.
  • 5. Factors to be known before Designing Water Supply System Population PerCapita Demand ofWater Base and Design period
  • 6. Determining quantity of water The quantity of water required for a city can be tackled by twofactors: 1. Rate of demand: The requirements of water for various uses are properly analyzed and ultimately, the rate of consumption per capita per day is calculated. 2. Population: The population to be served by the water supply scheme is estimated and estimate of future population is worked out with help of population forecastmethod.
  • 7. 1. Domestic water demand 2. Industrial water demand 3. Institution and commercial water demand 4. Demand for public uses 5. Fire demand 6. Water required to compensate losses in wastes and thefts Types of water demands
  • 9. This includes the water requirement of people for drinking, cooking, bathing, lawn sprinkling, gardening, sanitary purposes, etc. The domestic consumption completely depends upon the economic status of the people: 200 lit/head/day for rich living 135 lit/head/day for middle class living •The total domestic demand is equal to 50-60% of the total water consumption.
  • 10. Use Consumption in litres per head per day Drinking 5 Cooking 5 Bathing 75 Washing clothes 25 Washing of utensils 15 Washing and cleaning of houses and residences 15 Lawn watering and gardening 15 Flushing of water closets, etc. 45 TOTAL 200
  • 11. Use Consumption in litres per head per day Drinking 5 Cooking 5 Bathing 55 Washing clothes 20 Washing of utensils 10 Washing and cleaning of houses and residences 10 Flushing of water closets, etc. 30 TOTAL 135 Minimum Domestic water consumption for weaker sections and LIG colonies in small Indian towns and cities
  • 12. The quantity of industrial water demand will vary with the type and number of industries. In industrial cities the per capita water demand computed as 450 l/h/day for high scale industrial zones and as 50 l/h/day for small scale industrial zones.
  • 13. S. No. Name of industry and product Unit of production or raw material used Appropriate quantity of water required per unit of production or raw material in kilo litres 1 Auto mobiles vehicle 40 2 Distillery (Alcohol) Kilo litre 122-170 3 Fertilizer Tonne 80-200 4 Leather (tanned) Tonne 40 5 Paper Tonne 200-400 6 Special quality paper Tonne 400-1000 7 Petroleum refinery Tonne 1-2 8 Steel Tonne 200-250 9 Sugar Tonne 1-2 10 Textile Tonne 80-140
  • 14. The water requirements of institutions, hospitals, hotels, restaurants, schools, offices, etc. come under this category. The quantity will vary with the nature of the city and with the number and type of commercial establishments. On an average, a per capita demand of 20-50 l/h/day is usually considered for such demand.
  • 15. Indivisual water requirement S. No. Type of Institution or Commercial establishment Avg demand in l/h/d 1 offices 45-90 2 Hostels 135-180 3 Restaurants 70 per seat 4 schools a) day school 45-90 b) Residential 135-225 5 Factories a) Where bath rooms are provided 45-90 b) No bath rooms provided 30-60 6 Hospitals ( Including laundry) a) beds less than 100 340 per bed b) beds more than 100 450 per bed 7 Nurses homes & medical quarters 135-225 8 Cinema hall 15 9 Airports 70 10 Railway station 23-70
  • 16. This includes the quantity of water required for public utility purposes, such as Watering of public parks Gardening Washing and sprinkling on roads Use in public fountains, etc. A figure of 10 l/h/day is usually considered for this demand.
  • 17. PurposeWater Public parks Street washing Sewer cleaning Requirements 1.4 litres/m2/day 1.0-1.5 litres/m2/day 4.5 litres/head/day The requirements of water for public utility shall be taken as…
  • 18. In thickly populated and industrial areas, fires generally break out and may lead to serious damages, if not controlled effectively. There fore, a provision should be made in modern water supply schemes for fighting fires. The quantity of water for extinguishing fires, should be easily available and kept always in storage reservoirs. Fire demand
  • 19.  Kuichling’s formula: Q = 3182 √𝑃 where, P = Population Q = Quantity of water demand  Freeman’s formula: 10 Q = 1136 𝑃 + 10 where, P = Population Q = Quantity of water demand
  • 20. National Board of Fire Under Writer’s formula Population < 2,00,000 Q = 4637 sq.rt.(P)[1-0.01sq.rt.(p)] Population > 2,00,000 Q = 54,600 l/min and more 9600 to 36400 l/min
  • 21. Loses and wastes • Losses due to defective pipe joints, cracked and broken pipes, faulty valves and fittings. • Losses due to, continuous wastage of water. • Losses due to unauthorised and illegal connections. • While estimating the total quantity of water of a town; allowance of 15% of total quantity of water is made to compensate for losses, thefts and wastage of water.
  • 22. Water Consumption forVarious Purposes Types of Normal Average % Consumption Range (lit/capita/da y) 1 Domestic Consumption 65-300 160 35 2 Industrial and Commercial Demand 45-450 135 30 3 Public Uses including Fire Demand 20-90 45 10 4 Losses and Waste 45-150 62 25 38
  • 23. Per Capita Demand ofWater • Average quantity of water consumption or water demand for various purposes per person per day • Usually expressed in liters per capita per day(lpcd) V P ×365 • Per Capita demand in lpcd = Where, V= total quantity required per year in litres P= population  It varies from person to person, place to place and time to time • Water demands in liters/d= Per capita demand ×Population
  • 24. Break up of Per Capita Demand for an Average Indian City USE Demand in l/h/d Domestic use 200 Industrial use 50 Commercial use 20 Civic use or public use 10 Wastes & thefts, etc 55 Total 335 = per capita Demand (q)
  • 25. Factors affecting per capita demand 1. Size of the city: Per capita demand for big cities is generally large as compared to that for smaller towns . 2. Presence of industries & commercial activities 3. Climatic conditions 4. Habits of people and their economic status 5. Pressure in the distribution system 6. Quality of water supplied 7. Development of sewerage facility 8. System of supply 9. Cost of water 10. policy of metering & Method of charging
  • 26. 11. Quality of water: If water is aesthetically & medically safe, the consumption will increase 12. Efficiency of water works administration: Leaks in water mains and services; and unauthorized use of water can be kept to a minimum by surveys. 13.Cost of water. 14. Policy of metering and charging method: Water tax is charged in two different ways: on the basis of meter reading and on the basis of certain fixed monthly rate.
  • 27. FACTORE AFFECTINGTHEWATER DEMAND Big city • Size of the city Small towns Example: Delhi 244 l/c/d Vijayawada 135 l/c/d • Climate condition less in winter more in summer • Cost of water rate demand rate demand
  • 28. • Supply system Bad Supply • Distribution System Good supply demand Pressure high Pressure low demand demand demand
  • 29. • Industry • Quality of water good demand demand bad demand demand industry industry • Habit of people EWS demand MIG demand (Living style)
  • 30. Variations in demand and its effects on design of components of water supply scheme • Variations in demand : • Seasonal variation : • Water Consumption :Winter , Summer, Rainy season • DailyVariations • Household & industrial activity. • Water consumption – more holidays • Hourly variations: • Assessment of normal variations : to design supply pipes , service reservoirs , distributary pipes etc..
  • 31. Design Periods & Population Forecast This quantity should be worked out with due provision for the estimated requirements of the future . The future period for which a provision is made in the water supply scheme is known as the design period. It is suggested that the construction of sewage treatment plant may be carried out in phases with an initial design period ranging from 5 to 10 years excluding the construction period.
  • 32. Design period is estimated based on the following: •Useful life of the component, considering obsolescence, wear, tear, etc. •Expandability aspect. •Anticipated rate of growth of population, including industrial, commercial developments & migration-immigration. •Available resources. •Performance of the system during initial period.
  • 33.
  • 34. Population forecasting Design of water supply and sanitation scheme is based on the projected population ofa particular city, estimated for the design period. Any underestimated value will make system inadequate for the purpose intended; similarly overestimated value will make it costly. Changes in the population of the city over the years occur, and the system should be designed taking into account of the population at the end of the design period. Factors affecting changes in population are: increase due to births decrease due to deaths increase/ decrease due to migration
  • 35. Population forecasting Methods 1. ARITHMETICAL INCREASE METHOD 2. GEOMETRICAL INCREASE METHOD (ORGEOMETRICAL PROGRESSION METHOD 3. INCREMENTAL INCREASE METHOD 4. GRAPHICAL METHOD 5. COMPARATIVEGRAPHICALMETHOD 6. MASTER PLAN METHOD 7. LOGISTICCURVEMETHOD
  • 36. ARITHMETIC INCREASE METHOD  This method is suitable for large and old city with considerable development.  If it is used for small, average or comparatively new cities, it will give lower population estimate than actual value.  In this method the average increase in population per decade is calculated from the past census reports.  This increase is added to the present population to find out the population of the next decade.Thus, it is assumed that the population is increasing at constantrate.  Hence, dP/dt = C i.e., rate of change of population with respect to time is constant. Therefore, Population after nth decade will be Pn= Po+ n.x  Where, Pn is the population after ‘n’ decades and ‘P’ is present population
  • 37.
  • 39.
  • 41.
  • 42. GRAPHICAL METHOD In this method, the populations of last few decades are correctly plotted to a suitable scale on graph. The population curve is smoothly extended for getting future population. This extension should be done carefully and it requires proper experience and judgment. The best way of applying this method is to extend the curve by comparing with population curve of some other similar cities having the similar growth condition.
  • 44.
  • 45. MASTER PLAN METHOD • The big and metropolitan cities are generally not developed in haphazard manner, but are planned and regulated by local bodies according to master plan. • The master plan is prepared for next 25 to 30 years for the city. • According to the master plan the city is divided into various zones such as residence, commerce and industry. • The population densities are fixed for various zones in the master plan. From this population density total water demand and wastewater generation for that zone can be worked out. By this method it is very easy to access precisely the design population.
  • 46. LOGISTIC CURVE METHOD • This method is used when the growth rate of population due to births, deaths and migrations takes place under normal situation and it is not subjected to any extraordinary changes like epidemic, war, earth quake or any natural disaster, etc., • and the population follows the growth curve characteristics of living things within limited space and economic opportunity. • If the population of a city is plotted with respect to time, the curve so obtained under normal condition looks like S-shaped curve and is known as logistic curve.