PRESENTATION 
ON 
BEAM , SLAB , COLUMN
Presented By : Group-05 Year : 2nd, Sem : 2nd 
Name of the Group Members : 
 MOHAMMED NASIL AFTAD – 12-01-03-141 
 MD. MOHIBUL HASAN – 12-01-03-112 
 SAFFAT RABBY MUNAYEM – 12-01-03-106 
 MD. MUSABBIR AHMED – 12-01-03-156 
 MD. MYNUL KARIM – 12-01-03-126 
 MAKSUDUR RAHMAN – 12-01-03-146 
 BISWAJITH DEB RAHUL – 12-01-03-120 
 SHARMIN SIDDIKA – 12-01-03-131 
 AFSANA KHAN – 12-01-03-151 
 S.M. TOWFIQ ISLAM – 11-02-03-047
 Column is a vertical 
structural member 
 It transmits the 
load from 
ceiling/roof slab 
and beam, 
including its self-weight 
to the 
foundation.
Long 
Column/ 
Slender 
Short 
Column 
Intermediate 
Column
Horizontal 
member of a 
structure 
Carries 
transverse loads
SIMPLY SUPPORTED 
BEAM 
OVERHANGING BEAM CANTILEVER BEAM 
FIXED BEAM PROPPED 
CONTINUOUS 
BEAM
 It is a flat 
horizontal 
surface 
 It is supported by 
beam and 
column 
 It transfers load 
to the beam
GRANAIT 
MARBEL 
CONCRETE 
•*ONE WAY * TWO WAY * FLAT * BEAM 
*RIBBED 
WOODEN
SLAB 
BEAM 
COLUMN
 1. U.D.C. CONSTRUCTION 
TEJGAON INDUSTRIAL AREA, DHAKA 
 2. RANGS BABYLONIA 
TEJGAON INDUSTRIAL AREA, DHAKA 
 3. RESIDENTIAL AREA 
BASUNDHARA RESIDENTIAL AREA , DHAKA
Sand 
Cement 
Reinforcement
Vibrator 
Cutter 
Mixing Machine
 A rectangular 
column must 
have at least 4 
reinforcements 
at 4 corners
Circular column 
should have 
minimum 6 
reinforcements 
Reinforcement 
should be min 1% 
and max 8%
 It is done when 
length of 
reinforcement bar 
is small but we 
need longer 
reinforcement 
 Provided in mid 
span 
 Tied with hooks
 Columns have closed 
lateral ties spaced 
approximately 
uniformly across the 
column 
 Resist shear force 
and bursting out 
effect 
 10mm Ø, 12mm Ø 
bars are used
Normal 
spacing = S 
in mid span 
Spacing 
near support 
joint = S/2
Used to 
resist 
expansion 
The hooks 
shall be bent 
to 135º
Must be leak 
proof, smooth 
inside and 
properly aligned 
Should be 
maintained 1.5 
in clear cover
 Concrete is 
casted in two lifts 
 It should not be 
casted from more 
than 5 feet high 
to avoid concrete 
segregation
 Compaction is done by 
vibrator 
 Construction joints are 
provided for better 
bonding between new 
and old concrete 
 Formwork is removed 
after 3 days
Provides water 
for hydration 
reaction 
 Increases the 
strength up to 
2.5 times 
Done for 21 days 
Gunny bags are 
used for curing
STEEL FORMWORK WOODEN FORMWORK
A min. of 0.2% bar 
is to be provided 
for the 
compression in 
order to take care 
of the deflection 
 Extra tops are used 
in the support 
joints
Used to resist 
shear and 
diagonal tension 
stresses in a 
beam 
Shall be minimum 
size of 8mm ∅ in 
case of lateral 
load resistance
Alternate hook is 
provided 
The hooks shall 
be bent to 135º 
Stirrup 
distribution is 
dense near 
support
Casting and 
Curing are done 
simultaneously 
for beam and 
slab. 
Casting of lower 
part is done 
earlier
Side of 
formwork is 
removed after 
3 days 
Bottom part is 
removed after 
21-28 days
Steel Formwork Wooden Formwork
PROPS 
BRACING
Slab 
reinforcement 
includes straight 
bar , cranked bar 
Extra tops near 
the supports
Mainly 1.5 " 
clear cover is 
maintained 
CC blocks are 
used
 Compaction is 
done with Patta
 Curing : It is done 
for 21 days 
 Removal of 
Formwork: After 
21 days formwork 
is removed
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & Column

Contenu connexe

Tendances (20)

Shear wall
Shear wallShear wall
Shear wall
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
 
Roof truss
Roof trussRoof truss
Roof truss
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Concrete
ConcreteConcrete
Concrete
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Framed structures
Framed structures Framed structures
Framed structures
 
footing
footingfooting
footing
 
Limit state method
Limit state methodLimit state method
Limit state method
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Reinforced cement concrete
Reinforced cement concreteReinforced cement concrete
Reinforced cement concrete
 
Slabs -Design steps
Slabs -Design steps Slabs -Design steps
Slabs -Design steps
 
Beams
Beams Beams
Beams
 
SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM
 

En vedette

Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1Irfan Malik
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointShoaib Wani
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceDr. H.M.A. Mahzuz
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6firdaus Muhammad Adnan
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab designIvan Ferrer
 
Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient MethodYousuf Bin Aziz
 
Columns lecture#4
Columns lecture#4Columns lecture#4
Columns lecture#4Irfan Malik
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Lamdade Akhil
 
Seismic behavior of beam column Joint
Seismic behavior of beam column JointSeismic behavior of beam column Joint
Seismic behavior of beam column JointPavan Kumar N
 
Engineering formula sheet
Engineering formula sheetEngineering formula sheet
Engineering formula sheetsankalptiwari
 

En vedette (15)

Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column Joint
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importance
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab design
 
Placing column layout
Placing  column layoutPlacing  column layout
Placing column layout
 
Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient Method
 
Columns lecture#4
Columns lecture#4Columns lecture#4
Columns lecture#4
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
 
Seismic behavior of beam column Joint
Seismic behavior of beam column JointSeismic behavior of beam column Joint
Seismic behavior of beam column Joint
 
Beam design
Beam designBeam design
Beam design
 
Engineering formula sheet
Engineering formula sheetEngineering formula sheet
Engineering formula sheet
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 

Similaire à Presentation on Slab, Beam & Column

Beam slab column
Beam slab columnBeam slab column
Beam slab columnraj khanna
 
Unit 1 lesson 01 (introduction to reinforced concrete design)
Unit 1   lesson 01 (introduction to reinforced concrete design)Unit 1   lesson 01 (introduction to reinforced concrete design)
Unit 1 lesson 01 (introduction to reinforced concrete design)LumagbasProduction
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types17CE67
 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2SHARIQUE AHMAD
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1Carlson Ko
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop reportAmelisa Collins
 
Ms frame and truss ppt
Ms frame and truss pptMs frame and truss ppt
Ms frame and truss pptNikita Chawla
 
CTP.ppt
CTP.pptCTP.ppt
CTP.pptarun t
 

Similaire à Presentation on Slab, Beam & Column (20)

Presentation on beam, slab, column
Presentation on beam, slab, columnPresentation on beam, slab, column
Presentation on beam, slab, column
 
Beam slab column
Beam slab columnBeam slab column
Beam slab column
 
Unit 1 lesson 01 (introduction to reinforced concrete design)
Unit 1   lesson 01 (introduction to reinforced concrete design)Unit 1   lesson 01 (introduction to reinforced concrete design)
Unit 1 lesson 01 (introduction to reinforced concrete design)
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Pitch roof
Pitch roofPitch roof
Pitch roof
 
#011 TIMBER.pptx
#011 TIMBER.pptx#011 TIMBER.pptx
#011 TIMBER.pptx
 
bridge Bearings.ppt
bridge Bearings.pptbridge Bearings.ppt
bridge Bearings.ppt
 
Bearings
BearingsBearings
Bearings
 
Ms frame and truss ppt
Ms frame and truss pptMs frame and truss ppt
Ms frame and truss ppt
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
ROOF TRUSS.pptx
ROOF TRUSS.pptxROOF TRUSS.pptx
ROOF TRUSS.pptx
 
FOLDED PLATES TYPES
FOLDED PLATES TYPES FOLDED PLATES TYPES
FOLDED PLATES TYPES
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
CTP.ppt
CTP.pptCTP.ppt
CTP.ppt
 

Dernier

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Presentation on Slab, Beam & Column

  • 1. PRESENTATION ON BEAM , SLAB , COLUMN
  • 2.
  • 3. Presented By : Group-05 Year : 2nd, Sem : 2nd Name of the Group Members :  MOHAMMED NASIL AFTAD – 12-01-03-141  MD. MOHIBUL HASAN – 12-01-03-112  SAFFAT RABBY MUNAYEM – 12-01-03-106  MD. MUSABBIR AHMED – 12-01-03-156  MD. MYNUL KARIM – 12-01-03-126  MAKSUDUR RAHMAN – 12-01-03-146  BISWAJITH DEB RAHUL – 12-01-03-120  SHARMIN SIDDIKA – 12-01-03-131  AFSANA KHAN – 12-01-03-151  S.M. TOWFIQ ISLAM – 11-02-03-047
  • 4.
  • 5.  Column is a vertical structural member  It transmits the load from ceiling/roof slab and beam, including its self-weight to the foundation.
  • 6. Long Column/ Slender Short Column Intermediate Column
  • 7. Horizontal member of a structure Carries transverse loads
  • 8. SIMPLY SUPPORTED BEAM OVERHANGING BEAM CANTILEVER BEAM FIXED BEAM PROPPED CONTINUOUS BEAM
  • 9.  It is a flat horizontal surface  It is supported by beam and column  It transfers load to the beam
  • 10. GRANAIT MARBEL CONCRETE •*ONE WAY * TWO WAY * FLAT * BEAM *RIBBED WOODEN
  • 12.  1. U.D.C. CONSTRUCTION TEJGAON INDUSTRIAL AREA, DHAKA  2. RANGS BABYLONIA TEJGAON INDUSTRIAL AREA, DHAKA  3. RESIDENTIAL AREA BASUNDHARA RESIDENTIAL AREA , DHAKA
  • 15.
  • 16.  A rectangular column must have at least 4 reinforcements at 4 corners
  • 17. Circular column should have minimum 6 reinforcements Reinforcement should be min 1% and max 8%
  • 18.  It is done when length of reinforcement bar is small but we need longer reinforcement  Provided in mid span  Tied with hooks
  • 19.  Columns have closed lateral ties spaced approximately uniformly across the column  Resist shear force and bursting out effect  10mm Ø, 12mm Ø bars are used
  • 20. Normal spacing = S in mid span Spacing near support joint = S/2
  • 21. Used to resist expansion The hooks shall be bent to 135º
  • 22. Must be leak proof, smooth inside and properly aligned Should be maintained 1.5 in clear cover
  • 23.  Concrete is casted in two lifts  It should not be casted from more than 5 feet high to avoid concrete segregation
  • 24.  Compaction is done by vibrator  Construction joints are provided for better bonding between new and old concrete  Formwork is removed after 3 days
  • 25. Provides water for hydration reaction  Increases the strength up to 2.5 times Done for 21 days Gunny bags are used for curing
  • 26.
  • 28. A min. of 0.2% bar is to be provided for the compression in order to take care of the deflection  Extra tops are used in the support joints
  • 29. Used to resist shear and diagonal tension stresses in a beam Shall be minimum size of 8mm ∅ in case of lateral load resistance
  • 30. Alternate hook is provided The hooks shall be bent to 135º Stirrup distribution is dense near support
  • 31. Casting and Curing are done simultaneously for beam and slab. Casting of lower part is done earlier
  • 32. Side of formwork is removed after 3 days Bottom part is removed after 21-28 days
  • 33.
  • 36. Slab reinforcement includes straight bar , cranked bar Extra tops near the supports
  • 37. Mainly 1.5 " clear cover is maintained CC blocks are used
  • 38.  Compaction is done with Patta
  • 39.  Curing : It is done for 21 days  Removal of Formwork: After 21 days formwork is removed