November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   1
•  Commercializing small civilian reactor from Los Alamos
   National Laboratory
        –  Technology transfer success
        –  Exclusive license & CRADA
•  Development and design performed by Los Alamos
   National Laboratory
        –  LANL was pioneer and is a leader in nuclear power development
        –  Experience in Navy reactors, spacecraft, other small power reactors
        –  Expert in neutronics design, reactor safety, security,
           nonproliferation, economics


November 2009              Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   2
•  Capital funded through commercial launch
        –  Venture capital & strategic partnerships
•     Completing design
•     Program office established
•     Influential technical and business advisory boards
•     Pre-Application discussions continue
        –  U.S. NRC
        –  U.K. NII
•  Customer commitments for 122 units so far
        –  US$3.6 Billion

November 2009           Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   3
•  Advisors
        –  Lady Barbara Thomas Judge, UKAEA
        –  Lee Peddicord, Texas A&M
        –  Tony Rollett, Carnegie Mellon
        –  Alan Waltar, US Pacific Northwest Lab
        –  Earl Whiteman, former manager Rocky Flats
        –  Bill Anderson, former Assist Sec US Air Force
•  Partners
        –  TetraTech
        –  Chamberlain

November 2009         Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   4
Program Office Organization
                                                                                                      Establish and maintain Project O ce (for multiple customers)
                                                                                                      Project integration and oversight; project standards, document control
                                                               Capt. Mark Campagna                    Life cycle, schedule, and risk management evaluations
                                                                     COO/CNO                          Product development
                                                                                                      Design & Construction Reviews
                                                                                                      Project security requirements




                    HPM Design Authority                          Architect Engineers                                     Licensing
                         Dr. T. J. Trapp                               TetraTech                                        Hyperion Power
                   Los Alamos National Lab                           Chamberlain

                HPM Design                                  Conceptual design of systems                       Licensing lead with the U.S. NRC for DCD and U.K. NII for GDA
                Con rmatory Testing                         Final design of systems & components               Oversight of all regulatory documents and commitments
                Preliminary Accident Analysis               Design calculations                                Regulatory certi cation holder
                Preliminary Probabilistic                   Procurement speci cations
                 Risk Assessment (PRA)                      Design Certi cation preparation
                                                            Final accident & safety analysis
                                                            Final PRA
                                                            Licensing Support
                                                            Procurement
                                                            Quality Assurance
                                                            Detailed design integrator



                       Detail Designers &                                               Construction                                  Client or Utility
                        Manufacturers                                                    Company                                   Startup & Operations

                Detailed sizing calculations                                  Receive equipment                              Operating license holder
                Detailed stress analysis                                      Build plant                                    Operator training
                Detailed manufacturing drawings                               Functional systems testing                     Simulator procurement
                Materials procurement                                         Turn over to Operators                         Oversee construction
                Components manufacturing and delivery                                                                        Manage ITAAC completion
                                                                                                                             Manage startup and operation
                                                                                                                             Waste management (depending on jurisdiction)



November 2009                           Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.                                                                   5
1. Transportable                                                        2. Sealed Core – Safe and Secure

•  Unit will measure approximately 1.5 x 2.5 m                          •  Factory sealed
•  Must fit into standard transport container                           •  No in-field refueling
•  Modular design for easy and safe transport                           •  Closed fuel cycle

3. Safety                                                               4. Operational Simplicity
•  System will handle any accident through a
   combination of inherent and engineered                               •  Operation limited to reactivity adjustments to
   features                                                                maintain constant temperature output
•  Inherent negative feedback (with respect to
   temperature) keeps the reactor stable and
   operating at a constant temperature                                  6. Isolated Power Production

5. Minimal In-core Components                                           •  Electric generation components requiring
                                                                           maintenance in an accessible location
•  Operational reliability is greatly enhanced by                       •  Allows existing generation facilities to be
   the reduction of moving mechanical parts                                retrofitted

       • Each unit will generate approximately 70MWt and 25MWe – enough to
         power 20,000 average American homes.
       • Overnight costs at $2,000 - $3,000 per KW capacity
November 2009                     Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.                      6
•  Community power
•  Dedicated power
        –  hospitals, factories, foundries, government
           centers, water treatment, irrigation, universities
•     Baseload for other renewable energy
•     Mining
•     Oil production & refining
•     Military facilities
Market Goal: generate electricity for < US$0.10 per kWh anywhere in the world

November 2009            Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   7
Reactor Power                           70MW thermal
                Electrical Output                       25MW electric
                Lifetime                                5 – 15 years
                Size (meters)                           1.5w x 2.5h
                Weight (ton)                            Less than 50
                Structural Material                     Stainless Steel
                Coolant                                 PbBi
                Fuel                                    Uranium nitride in HT-9 cladding
                Enrichment (% U-235)                    <20%
                Refuel on Site                          No
                Sealed                                  Yes
                License                                 Begin March 2010, formal Fall 2010
                Passive Shutdown                        Yes
                Active Shutdown                         Yes
                Transportable                           Yes. As single unit. Sealed core with
                                                        fuel.
                Factory Fueled                          Yes
                Safety & Control Elements               Two redundant shutdown systems &
                                                        reactivity control rods.




November 2009                 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   8
Radial Reflector



Downcomer & Heat Exchanger
            (tube and shell)



                   Internal Vessel

        Intermediate Loop
              Downcomer



                   External Vessel




   November 2009                         Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   9
Reactor vessel

                                                                                       Sub-assembly (24)



                                                                                           Shutdown Control Rod

                                                                                          Operational
                                                                                           Control Rod

                                                                                           Cavity for Reserve
                                                                                            Shutdown Balls




November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.                              10
Edge Sub-Assembly
                                                             (54 Fuel Pins)




November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   11
November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   12
November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   13
November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   14
November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   15
Cavity for Reserve Shutdown
                                                                                        balls (D≈1.5 cm)



                                                                                       Cavity wall




November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.                         16
November 2009   Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   17
•  Hyperion Power has evolved the design to
        –  Ensure high level of safety and security
        –  Meet market requirements
        –  Maximize operational life
        –  Reduce regulatory risk
        –  Satisfy enormous global demand




November 2009         Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   18
•  Mark S. Campagna, PMP
        –  Mark@HyperionPowerGeneration.com
        –  Ph: +1 (505) 216-9130
•  Deborah A. Deal Blackwell, APR
        –  Deborah@HyperionPowerGeneration.com
        –  Ph: +1 (703) 722-2821




November 2009       Copyright 2009, Hyperion Power Generation, Inc. All rights reserved.   19

Contenu connexe

Tendances

All Roads Lead to SaaS
All Roads Lead to SaaSAll Roads Lead to SaaS
All Roads Lead to SaaS
Ruann Tiller
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
NASAPMC
 
Vince.bilardo
Vince.bilardoVince.bilardo
Vince.bilardo
NASAPMC
 
Mullane stanley-hamilton-wise
Mullane stanley-hamilton-wiseMullane stanley-hamilton-wise
Mullane stanley-hamilton-wise
NASAPMC
 
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
What's New in Maximo 7 Workshop   Alex Estevam Sep 2012What's New in Maximo 7 Workshop   Alex Estevam Sep 2012
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
alipaiva
 
Tdd and a new paradigm for hardware verification
Tdd and a new paradigm for hardware verificationTdd and a new paradigm for hardware verification
Tdd and a new paradigm for hardware verification
drewz lin
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
NASAPMC
 
David Anderson Kanban At Q Con
David Anderson Kanban At Q ConDavid Anderson Kanban At Q Con
David Anderson Kanban At Q Con
deimos
 
Engineered Resilient Systems, overview and status, 31 october 2011
Engineered Resilient Systems, overview and status, 31 october 2011Engineered Resilient Systems, overview and status, 31 october 2011
Engineered Resilient Systems, overview and status, 31 october 2011
RNeches
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
NASAPMC
 
Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
NASAPMC
 
Systems Navigator - Added value of simulation in the design of terminals
Systems Navigator - Added value of simulation in the design of terminalsSystems Navigator - Added value of simulation in the design of terminals
Systems Navigator - Added value of simulation in the design of terminals
jhjsmits
 

Tendances (18)

All Roads Lead to SaaS
All Roads Lead to SaaSAll Roads Lead to SaaS
All Roads Lead to SaaS
 
Ff Presdentation User Conference Mumbai Automation 2008
Ff Presdentation   User Conference Mumbai Automation 2008Ff Presdentation   User Conference Mumbai Automation 2008
Ff Presdentation User Conference Mumbai Automation 2008
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
 
Vince.bilardo
Vince.bilardoVince.bilardo
Vince.bilardo
 
Mullane stanley-hamilton-wise
Mullane stanley-hamilton-wiseMullane stanley-hamilton-wise
Mullane stanley-hamilton-wise
 
ITS-Fidel
ITS-FidelITS-Fidel
ITS-Fidel
 
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
What's New in Maximo 7 Workshop   Alex Estevam Sep 2012What's New in Maximo 7 Workshop   Alex Estevam Sep 2012
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
 
Tdd and a new paradigm for hardware verification
Tdd and a new paradigm for hardware verificationTdd and a new paradigm for hardware verification
Tdd and a new paradigm for hardware verification
 
Benetel Overview 181209
Benetel Overview 181209Benetel Overview 181209
Benetel Overview 181209
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
 
A Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the EnterpriseA Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the Enterprise
 
David Anderson Kanban At Q Con
David Anderson Kanban At Q ConDavid Anderson Kanban At Q Con
David Anderson Kanban At Q Con
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Engineered Resilient Systems, overview and status, 31 october 2011
Engineered Resilient Systems, overview and status, 31 october 2011Engineered Resilient Systems, overview and status, 31 october 2011
Engineered Resilient Systems, overview and status, 31 october 2011
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
 
Lifecycle
LifecycleLifecycle
Lifecycle
 
Systems Navigator - Added value of simulation in the design of terminals
Systems Navigator - Added value of simulation in the design of terminalsSystems Navigator - Added value of simulation in the design of terminals
Systems Navigator - Added value of simulation in the design of terminals
 

Similaire à Hyperion Power Ans 18 Nov09

Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
IBM Danmark
 
Chen.tim
Chen.timChen.tim
Chen.tim
NASAPMC
 
BQR Company Profile
BQR Company Profile BQR Company Profile
BQR Company Profile
BQR
 
Profile
ProfileProfile
Profile
nkrrao
 
G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.Defense
The G&G Mfg. Co.
 
Kevta sales autronica v1.1
Kevta sales autronica v1.1Kevta sales autronica v1.1
Kevta sales autronica v1.1
kevta
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
kingk99
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM R & D Pvt. Ltd.
 
Kneat Gx Compliance By Design
Kneat Gx   Compliance By DesignKneat Gx   Compliance By Design
Kneat Gx Compliance By Design
Micheal_OConnell
 
Kneat Gx Compliance by Design
Kneat Gx Compliance by DesignKneat Gx Compliance by Design
Kneat Gx Compliance by Design
Kneat Solutions
 
Exp eng brochure
Exp eng brochureExp eng brochure
Exp eng brochure
kkathrynlee
 

Similaire à Hyperion Power Ans 18 Nov09 (20)

AT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic DigestionAT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic Digestion
 
Shivamtech brochure
Shivamtech brochureShivamtech brochure
Shivamtech brochure
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Chen.tim
Chen.timChen.tim
Chen.tim
 
Sen severe final presentation
Sen severe final presentationSen severe final presentation
Sen severe final presentation
 
Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment Reliability roadmap using quality function deployment
Reliability roadmap using quality function deployment
 
BQR Company Profile
BQR Company Profile BQR Company Profile
BQR Company Profile
 
Profile
ProfileProfile
Profile
 
G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.Defense
 
Kevta sales autronica v1.1
Kevta sales autronica v1.1Kevta sales autronica v1.1
Kevta sales autronica v1.1
 
Quest global overview
Quest global overviewQuest global overview
Quest global overview
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
 
TAI Industrial Manufacturing
TAI Industrial ManufacturingTAI Industrial Manufacturing
TAI Industrial Manufacturing
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
 
P4Q services
P4Q servicesP4Q services
P4Q services
 
Kneat Gx Compliance By Design
Kneat Gx   Compliance By DesignKneat Gx   Compliance By Design
Kneat Gx Compliance By Design
 
Kneat Gx Compliance by Design
Kneat Gx Compliance by DesignKneat Gx Compliance by Design
Kneat Gx Compliance by Design
 
Exp eng brochure
Exp eng brochureExp eng brochure
Exp eng brochure
 
Resume scy-re-s2
Resume scy-re-s2Resume scy-re-s2
Resume scy-re-s2
 

Plus de myatom

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
myatom
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
myatom
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
myatom
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
myatom
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
myatom
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
myatom
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
myatom
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
myatom
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
myatom
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
myatom
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
myatom
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
myatom
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
myatom
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
myatom
 
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
myatom
 
Advanced Designs of VVER Reactor Plant
Advanced Designs of VVER Reactor PlantAdvanced Designs of VVER Reactor Plant
Advanced Designs of VVER Reactor Plant
myatom
 
Temelin power uprate
Temelin power uprateTemelin power uprate
Temelin power uprate
myatom
 
Banyuk vver 2010
Banyuk vver 2010Banyuk vver 2010
Banyuk vver 2010
myatom
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
myatom
 
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
myatom
 

Plus de myatom (20)

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
 
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
TVSA-T fuel assembly for “Temelin” NPP. Main results of design and safety ana...
 
Advanced Designs of VVER Reactor Plant
Advanced Designs of VVER Reactor PlantAdvanced Designs of VVER Reactor Plant
Advanced Designs of VVER Reactor Plant
 
Temelin power uprate
Temelin power uprateTemelin power uprate
Temelin power uprate
 
Banyuk vver 2010
Banyuk vver 2010Banyuk vver 2010
Banyuk vver 2010
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
 
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
 

Hyperion Power Ans 18 Nov09

  • 1. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 1
  • 2. •  Commercializing small civilian reactor from Los Alamos National Laboratory –  Technology transfer success –  Exclusive license & CRADA •  Development and design performed by Los Alamos National Laboratory –  LANL was pioneer and is a leader in nuclear power development –  Experience in Navy reactors, spacecraft, other small power reactors –  Expert in neutronics design, reactor safety, security, nonproliferation, economics November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 2
  • 3. •  Capital funded through commercial launch –  Venture capital & strategic partnerships •  Completing design •  Program office established •  Influential technical and business advisory boards •  Pre-Application discussions continue –  U.S. NRC –  U.K. NII •  Customer commitments for 122 units so far –  US$3.6 Billion November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 3
  • 4. •  Advisors –  Lady Barbara Thomas Judge, UKAEA –  Lee Peddicord, Texas A&M –  Tony Rollett, Carnegie Mellon –  Alan Waltar, US Pacific Northwest Lab –  Earl Whiteman, former manager Rocky Flats –  Bill Anderson, former Assist Sec US Air Force •  Partners –  TetraTech –  Chamberlain November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 4
  • 5. Program Office Organization Establish and maintain Project O ce (for multiple customers) Project integration and oversight; project standards, document control Capt. Mark Campagna Life cycle, schedule, and risk management evaluations COO/CNO Product development Design & Construction Reviews Project security requirements HPM Design Authority Architect Engineers Licensing Dr. T. J. Trapp TetraTech Hyperion Power Los Alamos National Lab Chamberlain HPM Design Conceptual design of systems Licensing lead with the U.S. NRC for DCD and U.K. NII for GDA Con rmatory Testing Final design of systems & components Oversight of all regulatory documents and commitments Preliminary Accident Analysis Design calculations Regulatory certi cation holder Preliminary Probabilistic Procurement speci cations Risk Assessment (PRA) Design Certi cation preparation Final accident & safety analysis Final PRA Licensing Support Procurement Quality Assurance Detailed design integrator Detail Designers & Construction Client or Utility Manufacturers Company Startup & Operations Detailed sizing calculations Receive equipment Operating license holder Detailed stress analysis Build plant Operator training Detailed manufacturing drawings Functional systems testing Simulator procurement Materials procurement Turn over to Operators Oversee construction Components manufacturing and delivery Manage ITAAC completion Manage startup and operation Waste management (depending on jurisdiction) November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 5
  • 6. 1. Transportable 2. Sealed Core – Safe and Secure •  Unit will measure approximately 1.5 x 2.5 m •  Factory sealed •  Must fit into standard transport container •  No in-field refueling •  Modular design for easy and safe transport •  Closed fuel cycle 3. Safety 4. Operational Simplicity •  System will handle any accident through a combination of inherent and engineered •  Operation limited to reactivity adjustments to features maintain constant temperature output •  Inherent negative feedback (with respect to temperature) keeps the reactor stable and operating at a constant temperature 6. Isolated Power Production 5. Minimal In-core Components •  Electric generation components requiring maintenance in an accessible location •  Operational reliability is greatly enhanced by •  Allows existing generation facilities to be the reduction of moving mechanical parts retrofitted • Each unit will generate approximately 70MWt and 25MWe – enough to power 20,000 average American homes. • Overnight costs at $2,000 - $3,000 per KW capacity November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 6
  • 7. •  Community power •  Dedicated power –  hospitals, factories, foundries, government centers, water treatment, irrigation, universities •  Baseload for other renewable energy •  Mining •  Oil production & refining •  Military facilities Market Goal: generate electricity for < US$0.10 per kWh anywhere in the world November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 7
  • 8. Reactor Power 70MW thermal Electrical Output 25MW electric Lifetime 5 – 15 years Size (meters) 1.5w x 2.5h Weight (ton) Less than 50 Structural Material Stainless Steel Coolant PbBi Fuel Uranium nitride in HT-9 cladding Enrichment (% U-235) <20% Refuel on Site No Sealed Yes License Begin March 2010, formal Fall 2010 Passive Shutdown Yes Active Shutdown Yes Transportable Yes. As single unit. Sealed core with fuel. Factory Fueled Yes Safety & Control Elements Two redundant shutdown systems & reactivity control rods. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 8
  • 9. Radial Reflector Downcomer & Heat Exchanger (tube and shell) Internal Vessel Intermediate Loop Downcomer External Vessel November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 9
  • 10. Reactor vessel Sub-assembly (24) Shutdown Control Rod Operational Control Rod Cavity for Reserve Shutdown Balls November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 10
  • 11. Edge Sub-Assembly (54 Fuel Pins) November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 11
  • 12. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 12
  • 13. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 13
  • 14. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 14
  • 15. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 15
  • 16. Cavity for Reserve Shutdown balls (D≈1.5 cm) Cavity wall November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 16
  • 17. November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 17
  • 18. •  Hyperion Power has evolved the design to –  Ensure high level of safety and security –  Meet market requirements –  Maximize operational life –  Reduce regulatory risk –  Satisfy enormous global demand November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 18
  • 19. •  Mark S. Campagna, PMP –  Mark@HyperionPowerGeneration.com –  Ph: +1 (505) 216-9130 •  Deborah A. Deal Blackwell, APR –  Deborah@HyperionPowerGeneration.com –  Ph: +1 (703) 722-2821 November 2009 Copyright 2009, Hyperion Power Generation, Inc. All rights reserved. 19