Introduction to
Sewerage Network Design
Presented by Mazhar Alam
Basic Definitions
• Sewage
• Sewer
• Sewerage
Basic Definitions
Sewage
It is mainly liquid waste containing some
solids produced by humans and
industry. Foul water , waste water.
Grey water-Non faecal. From washing
Black water-Contains faecal matter. It
needs full treatment.
Basic Definitions
Sewer
An artificial conduit (or pipe) or system
of conduits used to convey sewage
from source to sewage treatment
facility.
Basic Definitions
Sewerage
The system of sewers that conveys
wastewater (sewage) to a treatment
plant or disposal point.
It includes all the chambers, manholes,
gravity mains, pumps, rising mains, air
valves, washouts etc
Design of Sewerage Network
Information Required
•Design Criteria
•Master Plan Layout Drawing
•Levels
Design of Sewerage Network
Design Criteria
It describes the parameters to be used in
design;
•Sewage generated per person
•Minimum, maximum & proportional velocity
•Minimum slopes
•Peaking factors
•Pipe diameters and material etc
•Minimum Backdrop height.
Design of Sewerage Network
Sewage generated per person
It depends on the type of occupancy or
land use details of the facility to be served.
e.g. residential, commercial, recreational.
Qasr Al Sarab sewage generated from
villas - 275 l/p/d
Hotels – 298 l/p/d
Design of Sewerage Network
Min. , Max., Proportional velocity
Min. velocity is normally 0.75m/s at full
capacity to allow for self cleaning.
Max. velocity is 2.5 to 3.0m/s.
Proportional velocity is the actual velocity
at given flow. 0.6m/s
Design of Sewerage Network
Minimum slopes
For a given diameter and roughness
minimum slope is required to achieve min.
velocity.
Dependent on the pipe diameter and
roughness e.g. for dia=200 and k=0.6 the
minimum slope is 1:240.
For lager dias the minimum slope is 1:1000
Design of Sewerage Network
Peaking Factor
Babbitt A/(P)^B ( A=0.176,B=5.096)
Abu Dhabi (18+sqrt(P))/(4+sqrt(P))
Harman 1+(14/(4+sqrt(P))
Design of Sewerage Network
Pipe dias & material
In the UAE
Minimum pipe dia is 200mm for main line
and
150mm for house connection pipe.
Material;
uPVC – for smaller dias
GRP – for larger dias
Design of Sewerage Network
Minimum backdrop height
•Avoid direct fall
•Splashing
•Erosion of benching
•Smooth transition
•Minimum value. 600mm to 700mm
Design of Sewerage Network
Master Plan Layout Drawing
•Plot – types and land use details
•Road corridor – ROW for services
•Location of STP or final disposal point
Design of Sewerage Network
Levels
•Spot Levels
•Contours
•Finished Road Levels
Design of Sewerage Network
Steps in design
• Marking the network on layout.
• Calculating the population
• Hydraulic design
• Final presentation drawings.
Design of Sewerage Network
Steps in design
Marking the network on layout.
• Gravitating the network
• House connection chambers- at each plot
• Manholes- maximum spacing
• Angle b/w incoming & outgoing sewer.
• Max. no. of connections to a manhole.
Design of Sewerage Network
Steps in design
Population calculations.
• Type of plot single storey or multi rise.
• Type of occupancy i.e. villa, hotel, office,
school, restaurant etc.
• Equivalent population.
Design of Sewerage Network
Steps in design
Hydraulic design.
• Spread sheet - Excel
• Software – WinDes, PipeMate, Sewer
CAD.
Design of Sewerage Network
Steps in design
Final presentation drawings.
To show pipe dias, invert level, cover
levels, manhole types etc.
• Manhole schedule
• Layout drawings
LINE DIAGRAM- SEWAGE NETROWK
Phase III
• Commissioned in 1993
• The Works provided an additional capacity of 25700 m3
/d
• Client : • Sharjah Municipality
Drainage Section (SMDS)
• Civil Contractor: • Six Construct
• PM /M&E RE :
• Consultant :
• M&E Contractor: • PCL
• Halcrow
• Martin Davis
• Civil RE : • Stephen Smythe
LINE DIAGRAM- SEWAGE NETROWK
3D VIEW - WINDES
3D VIEW - WINDES
MANHOLE SCHEDULE – WINDES OUTPUT
LOND SECTION - WINDES
Questions

Contenu connexe

Tendances

Building services
Building services Building services
Building services
Nur Azreen
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage Design
Jeremy Molayem
 

Tendances (10)

building services in a building
building services in a buildingbuilding services in a building
building services in a building
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Estimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemsEstimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systems
 
Building services
Building services Building services
Building services
 
vlsi Lecture05
vlsi Lecture05vlsi Lecture05
vlsi Lecture05
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage Design
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & Layout
 
Sewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsdSewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsd
 
Ld partners Design Consutants Go green
Ld partners Design Consutants Go greenLd partners Design Consutants Go green
Ld partners Design Consutants Go green
 

Similaire à Sewerage network

GISInManagementAndMaintenance
GISInManagementAndMaintenanceGISInManagementAndMaintenance
GISInManagementAndMaintenance
Zeev Somer
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
AsnelTiffa
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflows
Zeev Somer
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
Noorule Inie Osman
 

Similaire à Sewerage network (20)

Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Small bore system: Wastewater Engineering
Small bore system: Wastewater EngineeringSmall bore system: Wastewater Engineering
Small bore system: Wastewater Engineering
 
Sewer Design
Sewer Design Sewer Design
Sewer Design
 
HOUSING (SERVICES)
HOUSING (SERVICES)HOUSING (SERVICES)
HOUSING (SERVICES)
 
Supplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindoSupplier Hoist Cranes Jakarta | stahlindo
Supplier Hoist Cranes Jakarta | stahlindo
 
Hydrology and Water resources software
Hydrology and Water resources softwareHydrology and Water resources software
Hydrology and Water resources software
 
GISInManagementAndMaintenance
GISInManagementAndMaintenanceGISInManagementAndMaintenance
GISInManagementAndMaintenance
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptx
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Hydraulic modelling.pptx
Hydraulic modelling.pptxHydraulic modelling.pptx
Hydraulic modelling.pptx
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflows
 
Groundwater Control for Construction
Groundwater Control for ConstructionGroundwater Control for Construction
Groundwater Control for Construction
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain Applications
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineering
 
CONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptxCONVENTIONAL TUNNELLING.pptx
CONVENTIONAL TUNNELLING.pptx
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System,
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
 
4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx
 

Plus de AHMED NADIM JILANI

Plus de AHMED NADIM JILANI (20)

Scaffolding by vn prabhu source facebook group survey & engineering de...
Scaffolding  by  vn prabhu source facebook group survey  & engineering de...Scaffolding  by  vn prabhu source facebook group survey  & engineering de...
Scaffolding by vn prabhu source facebook group survey & engineering de...
 
Nanotechnology in civil engineering0
Nanotechnology in civil engineering0Nanotechnology in civil engineering0
Nanotechnology in civil engineering0
 
Staadpresentation1 159
Staadpresentation1 159Staadpresentation1 159
Staadpresentation1 159
 
Pres staadpro
Pres staadproPres staadpro
Pres staadpro
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day4
Ccna day4Ccna day4
Ccna day4
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna day2
Ccna day2Ccna day2
Ccna day2
 
Ccna day1
Ccna day1Ccna day1
Ccna day1
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Carbon nanotubes
Carbon nanotubesCarbon nanotubes
Carbon nanotubes
 
Nanotechnology in civil engineering
Nanotechnology in civil engineeringNanotechnology in civil engineering
Nanotechnology in civil engineering
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 

Dernier

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Sewerage network

  • 1. Introduction to Sewerage Network Design Presented by Mazhar Alam
  • 2. Basic Definitions • Sewage • Sewer • Sewerage
  • 3. Basic Definitions Sewage It is mainly liquid waste containing some solids produced by humans and industry. Foul water , waste water. Grey water-Non faecal. From washing Black water-Contains faecal matter. It needs full treatment.
  • 4. Basic Definitions Sewer An artificial conduit (or pipe) or system of conduits used to convey sewage from source to sewage treatment facility.
  • 5. Basic Definitions Sewerage The system of sewers that conveys wastewater (sewage) to a treatment plant or disposal point. It includes all the chambers, manholes, gravity mains, pumps, rising mains, air valves, washouts etc
  • 6. Design of Sewerage Network Information Required •Design Criteria •Master Plan Layout Drawing •Levels
  • 7. Design of Sewerage Network Design Criteria It describes the parameters to be used in design; •Sewage generated per person •Minimum, maximum & proportional velocity •Minimum slopes •Peaking factors •Pipe diameters and material etc •Minimum Backdrop height.
  • 8. Design of Sewerage Network Sewage generated per person It depends on the type of occupancy or land use details of the facility to be served. e.g. residential, commercial, recreational. Qasr Al Sarab sewage generated from villas - 275 l/p/d Hotels – 298 l/p/d
  • 9. Design of Sewerage Network Min. , Max., Proportional velocity Min. velocity is normally 0.75m/s at full capacity to allow for self cleaning. Max. velocity is 2.5 to 3.0m/s. Proportional velocity is the actual velocity at given flow. 0.6m/s
  • 10. Design of Sewerage Network Minimum slopes For a given diameter and roughness minimum slope is required to achieve min. velocity. Dependent on the pipe diameter and roughness e.g. for dia=200 and k=0.6 the minimum slope is 1:240. For lager dias the minimum slope is 1:1000
  • 11. Design of Sewerage Network Peaking Factor Babbitt A/(P)^B ( A=0.176,B=5.096) Abu Dhabi (18+sqrt(P))/(4+sqrt(P)) Harman 1+(14/(4+sqrt(P))
  • 12. Design of Sewerage Network Pipe dias & material In the UAE Minimum pipe dia is 200mm for main line and 150mm for house connection pipe. Material; uPVC – for smaller dias GRP – for larger dias
  • 13. Design of Sewerage Network Minimum backdrop height •Avoid direct fall •Splashing •Erosion of benching •Smooth transition •Minimum value. 600mm to 700mm
  • 14.
  • 15. Design of Sewerage Network Master Plan Layout Drawing •Plot – types and land use details •Road corridor – ROW for services •Location of STP or final disposal point
  • 16. Design of Sewerage Network Levels •Spot Levels •Contours •Finished Road Levels
  • 17. Design of Sewerage Network Steps in design • Marking the network on layout. • Calculating the population • Hydraulic design • Final presentation drawings.
  • 18. Design of Sewerage Network Steps in design Marking the network on layout. • Gravitating the network • House connection chambers- at each plot • Manholes- maximum spacing • Angle b/w incoming & outgoing sewer. • Max. no. of connections to a manhole.
  • 19. Design of Sewerage Network Steps in design Population calculations. • Type of plot single storey or multi rise. • Type of occupancy i.e. villa, hotel, office, school, restaurant etc. • Equivalent population.
  • 20. Design of Sewerage Network Steps in design Hydraulic design. • Spread sheet - Excel • Software – WinDes, PipeMate, Sewer CAD.
  • 21. Design of Sewerage Network Steps in design Final presentation drawings. To show pipe dias, invert level, cover levels, manhole types etc. • Manhole schedule • Layout drawings
  • 22.
  • 24. Phase III • Commissioned in 1993 • The Works provided an additional capacity of 25700 m3 /d • Client : • Sharjah Municipality Drainage Section (SMDS) • Civil Contractor: • Six Construct • PM /M&E RE : • Consultant : • M&E Contractor: • PCL • Halcrow • Martin Davis • Civil RE : • Stephen Smythe LINE DIAGRAM- SEWAGE NETROWK
  • 25.
  • 26. 3D VIEW - WINDES
  • 27. 3D VIEW - WINDES
  • 28. MANHOLE SCHEDULE – WINDES OUTPUT
  • 29. LOND SECTION - WINDES