CIVIL AVIATION
REQUIREMENTS FOR
CONSTRUCTION IN THE
VICINITY OF AN
AERODROME
BYE LAWS
DEFINATIONS
 AERODROME REFERENCE POINT (ARP) — This is a
designated point, which is established in the horizontal
plane.
 ELEVATION OR REDUCED LEVEL — The vertical
distance of a point or a level, on or affixed to the
surface of the earth, measured from the mean sea
level.
 TRANSITIONAL AREA — An area which is below a
specified surface sloping upwards and outwards
from the edge of the approach funnel and from a
line originating at the end of the inner edge of
each approach area, drawn parallel to the runway
centre line in the direction of landing.
 APPROACH FUNNEL
 RUNWAY STRIP
PROHIBITED AREAS
 No building or structure shall be constructed or
erected, or no tree shall be planted, on any land within
the limits of the aerodromes listed and in respect of the
aerodrome at Thiruvananthapuram.
 These requirements shall be applicable for the land
enclosed in approach funnels of the runway with a
maximum distance of 360 m measured from each
runway and along the extended centre line of the
runway.
THE REQUIREMENTS OF APPROACH
FUNNEL AND AN INSTRUMENT RUNWAY
SHALL BE AS FOLLOWS
 An instrument runway is a runway served by
visual and non-visual aid or aids providing at
least directional guidance adequate for a
straight in approach and intended for the
operation of aircraft using instrument
approach procedures.
 Approach funnel in the case of an
instrument runway means the area in the
shape of an isosceles trapezium having the -
i. longer parallel side 4800 m long (2 400 m on
either side of the extended centre line of the
runway)
ii. and smaller parallel side 300 m long (150 m on
either side of the extended centre line of the
runway)
where the smaller and longer parallel sides are placed
at a distance of 60 m and 15060 m, respectively,
from the end of the runway and at right angles to
the extended centre line.
IN THE CASE OF A NON-INSTRUMENT RUNWAY,
THE APPROACH FUNNEL MEANS THE AREA IN THE
SHAPE OF AN ISOSCELES TRAPEZIUM HAVING
 the longer parallel side 1800 m long (900 m on either side of
the extended centre line of the runway)
 and smaller parallel side 180 m long (90 m on either side of the
extended centre line of the runway),
 where the smaller and longer parallel sides are placed at a
distance of 60 m and 6540 m, respectively, from the end of
the runway
 And at right angles to the extended centre line.
 Thereafter, the trapezium is followed by a contiguous
rectangular area of that width for the remainder of the length
up to a distance of 15060 m from the end of the runway.
SPECIAL CLAUSE FOR THE AERODROME AT
THIRUVANANTHAPURAM:
 These requirements shall be applicable for the land
enclosed in approach funnels of all runways with a
maximum distance of 304.80 m, measured from each
runway
 and along extended centre line of the runway,
 and the land enclosed in a belt of 30.48 m width
outside the operational boundary of the aerodrome.
 For the purpose of this clause, the requirements of
approach funnel and operational boundary shall be as
given
APPROACH FUNNEL means the area in the shape of an isosceles
trapezium having the longer parallel side of length 4724.4 m (2
362.2 m on either side of the extended centre line of the
runway)
 and smaller parallel side of 152.4 m (76.2 m on either side of
the extended centre line of the runway)
 where the smaller and longer parallel sides are placed at a
distance of 60.9 m and 15301 m, respectively, from the end of
the runway and at right angles to the extended centre line.
OPERATIONAL BOUNDARY means an area enclosed between
parallel lines at a distance of 152.4 m on either side of the
centre line of the runways or 30.4 m from the boundary
fencing of the aerodrome, whichever is greater.
HEIGHT RESTRICTIONS
 No building or structure higher than the height specified
in tables shall be constructed or erected
 or no tree which is likely to grow or ordinarily grows
higher than the height specified in the tables shall be
planted, on any land within a radius of 20 km from ARP
of the aerodromes listed
HEIGHT RESTRICTION
WITH RESPECT TO
APPROACH FUNNELS
This shall be applicable
for the land enclosed in
the approach funnels of
all runways where
distances are measured
from each end of the
runway, along extended
centre line of the
runway.
S.N
O
AREA MAXIMUM PERMISSIBLE HEIGHT
AHOVE THE ELEVATION OF THE
NEAREST RUNWAY END
1 More than 360 m but not
exceeding 510 m
6
2 More than 510 m but not
exceeding 660 m
9
3 More than 660 m but not
exceeding 810 m
12
4 More than 810 m but not
exceeding 960 m
15
5 More than 960 m but not
exceeding 1110 m
18
6 More than 1110 m but not
exceeding 1260 m
21
7 More than 1 260 m but not
exceeding 1410 m
24
8 More than 1410 m but not
exceeding 1560 m
27
9 More than 1560 m 30
HEIGHT RESTRICTION
WITH RESPECT TO
TRANSITIONAL AREA
S.
NO.
DISTANCE FROM THE INNER BOUNDARY OF
THE TRANSITIONAL AREA SPECIFIED
MAXIMUM
PERMISSIBLE HEIGHT
ABOVE THE
ELEVATION OF THE
ARP
1 UPTO 21m 0
2 21 m TO LESS THAN 42m 3
3 42m TO LESS THAN 63m 6
4 63m TO LESS THAN 84m 9
5 84m TO LESS THAN 105m 12
6 105m TO LESS THAN 126m 15
7 126m TO LESS THAN 147m 18
8 147m TO LESS THAN 168m 21
9 168m TO LESS THAN 189m 24
10 189m TO LESS THAN 210m 27
11 ABOVE 210m 30
 Height restriction with respect to transitional area
and shall be applicable for the land enclosed in the
transitional area of all runways where distances are
measured from the associated runway strip and the
edge of the associated approach funnels, forming
the inner boundary of the transitional area and
along a line at right angles to the centre line of the
runway.
 The height restrictions are also same as above as in
case of the aerodrome at Thiruvananthapuram
within a radius of 20 km from ARP
FURTHER HEIGHT RESTRICTIONS FOR THE
AERODROME AT THIRUVANANTHAPURAM
AREA MAXIMUM PERMISSIBLE
HEIGHT
ABOVE GROUND LEVEL
The area lying between the coastline and
the Chakai canal
3
The area lying in a belt of 457.2 m width
between the Eastem Bank of the Chakai
canaL and a Line running parallel to this
canal for the entire
Length
6
A parallel belt of 762 m width running East of
area (ii) above
15.2
A parallel belt of 609.6 m width running East
of area above
24.3
Rest of the area extending up to 20 km from
ARP
30.4
WATER SUPPLY
Nature of Station Where Bathing Facilities
are Provided
litres/capita
Where Bathing Facilities
are not Provided
litres / capita
International and
domestic airports
70 40
SANITATION
Type of Airport WC for Males WC for Females Urinals for Males
Only
Domestic airports
For 200 persons 5 8 6
For 400 persons 9 15 12
For 600 persons 12 20 16
For 800 persons 16 26 20
For 1000 persons 18 29 22
International
airports
For 200 persons 6 10 8
For 600 persons 12 20 16
For 1000 persons 18 29 22
BUILDING BYE-LAWS FOR
HOSPITALS
INTRODUCTION
“Institutional Building”- Includes a building
constructed by Government, Semi- Government
Organizations or Registered Trusts and used for medical or
other treatment, …….care of persons suffering from
physical or mental illness , handicap, disease or infirmity,
care of orphans, abandoned women, children and
infants,…….., mental hospitals…………
BYE LAWS
 F.A.R - 1.5 (Rule 61- Bhumi Vikas Niyam )
 The width of the main street on which the building
abuts shall not be less than 12.0 m.
 Open spaces around the building should be at least
6m.
 Main access to the buiding atlest 5m.
LAND AREA REQUIREMENT
Sr.n
o
Land area
requirement
(min )
N.B.C
Land area
requirement
(min )
Raipur
master plan
1 . Dispensary 1500 0.08 ha-
0.12ha
2 Nursing home and
child welfare
20 -30 45000 0.2 - 0.3 ha 0.2 to 0.5 ha
3. Intermediate hospital 80 -100 1 lakh 1 ha -3 ha 1ha to 3ha
Sr.
no.
Land area
requirement
(min )
N.B.C
Land area
requirement
(min )
Raipur
master plan
4. Intermediate 200 1 lakh 3.70 ha 2.7 ha
5. General 500 2 5 lakh 6 ha 6 ha
6. Multi-specialty
hospital
200 1 lakh 9 ha 9 ha
7. Specialty
hospital
200 1 lakh 3.7 ha 3.7
PARKING
Area
One car
parking
space
75 sq.m
150 sq.m
For private sector
For government sector
More than 100 beds
10 X 3.75 sq.m
Stairways Ramps Lifts EXIT DOORS
(unit width
of 50 cm)
25 50 75 75
NO. OF OCCUPANTS THAT COULD BE SAFELY
EVACUATED OR MOVED FROM ONE NO. OF
EACH
Min. width =2m
Min. corridor
width=2.4mt
• In case of nursing homes,
hospitals etc. area
exceeding 300 sq m. at
each floor one of the exit
facility shall be a ramp of
not less than 2.4 m. in
width.
Minimum width = 2.4m
Slope :
Min. =1:8
max=1:10
WATER REQUIREMENT
340 LTR -100beds
450LT- more then 100
135 LT- others
Per head
consumptions
SANITATION REQUIREMENT
Sr.no. FITMENTS HOSPITAL WITH
IPD
HOSPITAL
WITH OPD
ADMINIS-
TRATIVE BLOCK
1. Water closet One for 8 beds One for 100
persons
One for 25
male
One for 15
females
2. Ablution taps one for each
w.c.
One for
each w.c.
One for each
w.c.
3. Wash basins 2 for 30 beds One for 100
beds
One for 25
persons
4. Cleaner’s sink One for each
ward
One on each
floor
5. Kitchen sink One for each
floor
6. Urinals - One for 50
persons
One for 20
persons
Sr.NO. FITMENTS HOSPITALS
FOR IPD
HOSPITALS
FOR OPD
ADMINIS-
TRATIVE
BLOCK
7. Baths with showers One bath for
every 8 beds
- One on
each floor
8. Bed pan washing
sinks
One for
each ward
- -
Note: one water tap is mandatory for every 50 persons .
PUBLIC AND SEMI-PUBLIC
BUILDINGS
BYE LAWS
PUBLIC BUILDINGS
 The words “public building” means
nursing home, hospitals, social, cultural
and other institutions, government and
semi-government
offices, Schools, college, university etc…
BYE LAWS
NURSING
HOME,
HOSPITALS
SOCIAL,
CULTURAL
AND OTHER
INSTITUTIONS
GOVERNMEN
T AND SEMI-
GOVERNMEN
T OFFICES
EDUCATION
AL
INSTITUTION
S
Maximum ground
coverage
25% 35% 25% 33%
Maximum floor area
ratio
100 100 125 120
Maximum height 26 m 20 m 37 m 15 m
ROAD WIDTH
The width of the main street
on which the building abuts
shall not be less than 12.0 m.
SET BACK
Main access to the building at least 5m.
SET BACK
Sl. No. Height of the Building Set back (front rear and sides in each plot)
1 10 (in meters) 5 (in meters)
2 15 5
3 18 6
4 21 7
5 24 8
6 27 9
7 30 10
8 35 11
9 40 12
10 45 13
11 50 14
12 55 and above 16
PARKING
BUILDINGS Equivalent Car Spaces (ECS)
per 100 sq m. of floor area
HOSPITALS, SOCIAL, CULTURAL AND OTHER
INSTITUTIONS, GOVERNMENT AND SEMI-
GOVERNMENT OFFICES.
0.50 - 1.50
EDUCATIONAL INSTITUTIONS 0.25 - 0.75
One car
parking space
For the provision of car parking spaces, the space standards shall
be as under:
i) For open parking 20.0 sq m. per equivalent car space.
ii) For ground floor covered parking 25.0 sq m. per equivalent car space.
iii) For basement 30.0 sq m. per equivalent car space
WATER REQUIREMENT
BUILDINGS Liters per head per day
NURSING HOME, HOSPITALS 340 (per bed)
SOCIAL, CULTURAL AND OTHER
INSTITUTIONS
15
GOVERNMENT AND SEMI-
GOVERNMENT OFFICES
45
EDUCATIONAL INSTITUTIONS 135
SANITATION REQUIREMENT
Fitments For Male Public For Female Public For Male Staff For Female Staff
Water closets 1 per 100 persons up
to 400 persons; and
for over 400 persons,
add at the rate of 1
per 250 persons or
part thereof
3 per 100 persons up
to 200 persons; and
for over 200 persons
add at the rate of 2
per 100 persons or
part thereof
1 for 1 to 15
persons
2 for 16 to 35
Persons
1 for 1 to 12
persons
2 for 13 to 25
persons
Ablution taps 1 in each water closet 1 in each water closet 1 in each water
closet
1 in each water
closet
Urinals 1 for 25 persons Nil up to 6
persons;1 for 7 to
20 persons
2 for 21 to 45
persons
Wash basins 1 for every 200
persons
1 for every 200
persons
1 for 1 to 15
persons
2 for 16 to 35
persons
1 for 1 to 12
persons
2 for 13 to 25
persons

Contenu connexe

Tendances

FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYSheraniDaniel
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital designBee Key Verma
 
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARCASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARPrince Pathania
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDYRohit Saxena
 
Standards of School
Standards of SchoolStandards of School
Standards of SchoolBilal Ansari
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Mayank Aggarwal
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture Abhijeet Roy
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsAr. Md Shahroz Alam
 
Auditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsAuditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsVartika Sharma
 
literature study on school design
 literature study on school design literature study on school design
literature study on school designAnupmaGoel
 
acoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingacoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingSaleh Ahmed
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing IndiaRohan Zagade
 

Tendances (20)

medicity - hospital thesis synopsis
medicity - hospital thesis synopsis medicity - hospital thesis synopsis
medicity - hospital thesis synopsis
 
Case study inferences
Case study inferencesCase study inferences
Case study inferences
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDY
 
Literature Study
Literature StudyLiterature Study
Literature Study
 
Parking final
Parking finalParking final
Parking final
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital design
 
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARCASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
 
Literature ; shopping mall
Literature ; shopping mallLiterature ; shopping mall
Literature ; shopping mall
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDY
 
Standards of School
Standards of SchoolStandards of School
Standards of School
 
Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)Fortis memorial research institute (Gurgaon)
Fortis memorial research institute (Gurgaon)
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For Hotels
 
Auditorium Literature Study & Design Considerations
Auditorium Literature Study & Design ConsiderationsAuditorium Literature Study & Design Considerations
Auditorium Literature Study & Design Considerations
 
literature study on school design
 literature study on school design literature study on school design
literature study on school design
 
acoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium buildingacoustic and viewing angle analysis of an auditorium building
acoustic and viewing angle analysis of an auditorium building
 
Site analysis
Site analysis Site analysis
Site analysis
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing India
 

En vedette

Aerodrome Surfaces English Russian
Aerodrome Surfaces English RussianAerodrome Surfaces English Russian
Aerodrome Surfaces English Russianherwig_callebaut
 
Nội dung m.i.s.s hanh
Nội dung m.i.s.s   hanhNội dung m.i.s.s   hanh
Nội dung m.i.s.s hanhATC
 
permissions projects
 permissions projects permissions projects
permissions projectsanshulpatel89
 
Air Traffic Controller
Air Traffic ControllerAir Traffic Controller
Air Traffic Controllerchris5755
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsLinkedIn
 
Hype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerHype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerLuminary Labs
 

En vedette (7)

Aerodrome Surfaces English Russian
Aerodrome Surfaces English RussianAerodrome Surfaces English Russian
Aerodrome Surfaces English Russian
 
A special place
A special placeA special place
A special place
 
Nội dung m.i.s.s hanh
Nội dung m.i.s.s   hanhNội dung m.i.s.s   hanh
Nội dung m.i.s.s hanh
 
permissions projects
 permissions projects permissions projects
permissions projects
 
Air Traffic Controller
Air Traffic ControllerAir Traffic Controller
Air Traffic Controller
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
 
Hype vs. Reality: The AI Explainer
Hype vs. Reality: The AI ExplainerHype vs. Reality: The AI Explainer
Hype vs. Reality: The AI Explainer
 

Similaire à CIVIL AVIATION REQUIREMENTS FOR CONSTRUCTION

electrical cable crossing.pdf
electrical cable crossing.pdfelectrical cable crossing.pdf
electrical cable crossing.pdfssuser01e374
 
Airport lighting
Airport lighting Airport lighting
Airport lighting KHOLA IQBAL
 
airportobstructions1.pptx
airportobstructions1.pptxairportobstructions1.pptx
airportobstructions1.pptxManasa472163
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructionsjagadish108
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructionssrinivas2036
 
Runway orientation
Runway orientationRunway orientation
Runway orientationjagadish108
 
Airport Design RHTA - VTU Module 5
Airport Design RHTA - VTU Module 5Airport Design RHTA - VTU Module 5
Airport Design RHTA - VTU Module 5AJEETH B
 
Airport lighting
Airport lightingAirport lighting
Airport lightingjagadish108
 
AIRPORT 06.pptx
AIRPORT 06.pptxAIRPORT 06.pptx
AIRPORT 06.pptxRishi Nath
 
airportlighting.pptx
airportlighting.pptxairportlighting.pptx
airportlighting.pptxsatish sajja
 
A320 ILS (CAT II inc.).ppt
A320 ILS (CAT II inc.).pptA320 ILS (CAT II inc.).ppt
A320 ILS (CAT II inc.).pptUditSharma76602
 
shah auditorium Case study
shah auditorium Case study  shah auditorium Case study
shah auditorium Case study sonali parashar
 
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure Thorne & Derrick UK
 

Similaire à CIVIL AVIATION REQUIREMENTS FOR CONSTRUCTION (20)

2. jar 25 distances
2. jar 25 distances2. jar 25 distances
2. jar 25 distances
 
electrical cable crossing.pdf
electrical cable crossing.pdfelectrical cable crossing.pdf
electrical cable crossing.pdf
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Airport lighting
Airport lighting Airport lighting
Airport lighting
 
1Bridges.ppt
1Bridges.ppt1Bridges.ppt
1Bridges.ppt
 
airportobstructions1.pptx
airportobstructions1.pptxairportobstructions1.pptx
airportobstructions1.pptx
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructions
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructions
 
Runways
RunwaysRunways
Runways
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
Airport Design RHTA - VTU Module 5
Airport Design RHTA - VTU Module 5Airport Design RHTA - VTU Module 5
Airport Design RHTA - VTU Module 5
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
AIRPORT 06.pptx
AIRPORT 06.pptxAIRPORT 06.pptx
AIRPORT 06.pptx
 
airportlighting.pptx
airportlighting.pptxairportlighting.pptx
airportlighting.pptx
 
runway orientation.pdf
runway orientation.pdfrunway orientation.pdf
runway orientation.pdf
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
A320 ILS (CAT II inc.).ppt
A320 ILS (CAT II inc.).pptA320 ILS (CAT II inc.).ppt
A320 ILS (CAT II inc.).ppt
 
shah auditorium Case study
shah auditorium Case study  shah auditorium Case study
shah auditorium Case study
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure
Flexim Fluxus Ultrasonic Liquid Flow Meters - Adm Series - Brochure
 

Dernier

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Dernier (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

CIVIL AVIATION REQUIREMENTS FOR CONSTRUCTION

  • 1. CIVIL AVIATION REQUIREMENTS FOR CONSTRUCTION IN THE VICINITY OF AN AERODROME BYE LAWS
  • 2. DEFINATIONS  AERODROME REFERENCE POINT (ARP) — This is a designated point, which is established in the horizontal plane.  ELEVATION OR REDUCED LEVEL — The vertical distance of a point or a level, on or affixed to the surface of the earth, measured from the mean sea level.
  • 3.  TRANSITIONAL AREA — An area which is below a specified surface sloping upwards and outwards from the edge of the approach funnel and from a line originating at the end of the inner edge of each approach area, drawn parallel to the runway centre line in the direction of landing.  APPROACH FUNNEL  RUNWAY STRIP
  • 4.
  • 5. PROHIBITED AREAS  No building or structure shall be constructed or erected, or no tree shall be planted, on any land within the limits of the aerodromes listed and in respect of the aerodrome at Thiruvananthapuram.  These requirements shall be applicable for the land enclosed in approach funnels of the runway with a maximum distance of 360 m measured from each runway and along the extended centre line of the runway.
  • 6. THE REQUIREMENTS OF APPROACH FUNNEL AND AN INSTRUMENT RUNWAY SHALL BE AS FOLLOWS  An instrument runway is a runway served by visual and non-visual aid or aids providing at least directional guidance adequate for a straight in approach and intended for the operation of aircraft using instrument approach procedures.  Approach funnel in the case of an instrument runway means the area in the shape of an isosceles trapezium having the -
  • 7. i. longer parallel side 4800 m long (2 400 m on either side of the extended centre line of the runway) ii. and smaller parallel side 300 m long (150 m on either side of the extended centre line of the runway) where the smaller and longer parallel sides are placed at a distance of 60 m and 15060 m, respectively, from the end of the runway and at right angles to the extended centre line.
  • 8. IN THE CASE OF A NON-INSTRUMENT RUNWAY, THE APPROACH FUNNEL MEANS THE AREA IN THE SHAPE OF AN ISOSCELES TRAPEZIUM HAVING  the longer parallel side 1800 m long (900 m on either side of the extended centre line of the runway)  and smaller parallel side 180 m long (90 m on either side of the extended centre line of the runway),  where the smaller and longer parallel sides are placed at a distance of 60 m and 6540 m, respectively, from the end of the runway  And at right angles to the extended centre line.  Thereafter, the trapezium is followed by a contiguous rectangular area of that width for the remainder of the length up to a distance of 15060 m from the end of the runway.
  • 9. SPECIAL CLAUSE FOR THE AERODROME AT THIRUVANANTHAPURAM:  These requirements shall be applicable for the land enclosed in approach funnels of all runways with a maximum distance of 304.80 m, measured from each runway  and along extended centre line of the runway,  and the land enclosed in a belt of 30.48 m width outside the operational boundary of the aerodrome.  For the purpose of this clause, the requirements of approach funnel and operational boundary shall be as given
  • 10. APPROACH FUNNEL means the area in the shape of an isosceles trapezium having the longer parallel side of length 4724.4 m (2 362.2 m on either side of the extended centre line of the runway)  and smaller parallel side of 152.4 m (76.2 m on either side of the extended centre line of the runway)  where the smaller and longer parallel sides are placed at a distance of 60.9 m and 15301 m, respectively, from the end of the runway and at right angles to the extended centre line. OPERATIONAL BOUNDARY means an area enclosed between parallel lines at a distance of 152.4 m on either side of the centre line of the runways or 30.4 m from the boundary fencing of the aerodrome, whichever is greater.
  • 11. HEIGHT RESTRICTIONS  No building or structure higher than the height specified in tables shall be constructed or erected  or no tree which is likely to grow or ordinarily grows higher than the height specified in the tables shall be planted, on any land within a radius of 20 km from ARP of the aerodromes listed
  • 12. HEIGHT RESTRICTION WITH RESPECT TO APPROACH FUNNELS This shall be applicable for the land enclosed in the approach funnels of all runways where distances are measured from each end of the runway, along extended centre line of the runway. S.N O AREA MAXIMUM PERMISSIBLE HEIGHT AHOVE THE ELEVATION OF THE NEAREST RUNWAY END 1 More than 360 m but not exceeding 510 m 6 2 More than 510 m but not exceeding 660 m 9 3 More than 660 m but not exceeding 810 m 12 4 More than 810 m but not exceeding 960 m 15 5 More than 960 m but not exceeding 1110 m 18 6 More than 1110 m but not exceeding 1260 m 21 7 More than 1 260 m but not exceeding 1410 m 24 8 More than 1410 m but not exceeding 1560 m 27 9 More than 1560 m 30
  • 13. HEIGHT RESTRICTION WITH RESPECT TO TRANSITIONAL AREA S. NO. DISTANCE FROM THE INNER BOUNDARY OF THE TRANSITIONAL AREA SPECIFIED MAXIMUM PERMISSIBLE HEIGHT ABOVE THE ELEVATION OF THE ARP 1 UPTO 21m 0 2 21 m TO LESS THAN 42m 3 3 42m TO LESS THAN 63m 6 4 63m TO LESS THAN 84m 9 5 84m TO LESS THAN 105m 12 6 105m TO LESS THAN 126m 15 7 126m TO LESS THAN 147m 18 8 147m TO LESS THAN 168m 21 9 168m TO LESS THAN 189m 24 10 189m TO LESS THAN 210m 27 11 ABOVE 210m 30
  • 14.  Height restriction with respect to transitional area and shall be applicable for the land enclosed in the transitional area of all runways where distances are measured from the associated runway strip and the edge of the associated approach funnels, forming the inner boundary of the transitional area and along a line at right angles to the centre line of the runway.  The height restrictions are also same as above as in case of the aerodrome at Thiruvananthapuram within a radius of 20 km from ARP
  • 15. FURTHER HEIGHT RESTRICTIONS FOR THE AERODROME AT THIRUVANANTHAPURAM AREA MAXIMUM PERMISSIBLE HEIGHT ABOVE GROUND LEVEL The area lying between the coastline and the Chakai canal 3 The area lying in a belt of 457.2 m width between the Eastem Bank of the Chakai canaL and a Line running parallel to this canal for the entire Length 6 A parallel belt of 762 m width running East of area (ii) above 15.2 A parallel belt of 609.6 m width running East of area above 24.3 Rest of the area extending up to 20 km from ARP 30.4
  • 16. WATER SUPPLY Nature of Station Where Bathing Facilities are Provided litres/capita Where Bathing Facilities are not Provided litres / capita International and domestic airports 70 40
  • 17. SANITATION Type of Airport WC for Males WC for Females Urinals for Males Only Domestic airports For 200 persons 5 8 6 For 400 persons 9 15 12 For 600 persons 12 20 16 For 800 persons 16 26 20 For 1000 persons 18 29 22 International airports For 200 persons 6 10 8 For 600 persons 12 20 16 For 1000 persons 18 29 22
  • 19. INTRODUCTION “Institutional Building”- Includes a building constructed by Government, Semi- Government Organizations or Registered Trusts and used for medical or other treatment, …….care of persons suffering from physical or mental illness , handicap, disease or infirmity, care of orphans, abandoned women, children and infants,…….., mental hospitals…………
  • 20. BYE LAWS  F.A.R - 1.5 (Rule 61- Bhumi Vikas Niyam )  The width of the main street on which the building abuts shall not be less than 12.0 m.  Open spaces around the building should be at least 6m.  Main access to the buiding atlest 5m.
  • 21. LAND AREA REQUIREMENT Sr.n o Land area requirement (min ) N.B.C Land area requirement (min ) Raipur master plan 1 . Dispensary 1500 0.08 ha- 0.12ha 2 Nursing home and child welfare 20 -30 45000 0.2 - 0.3 ha 0.2 to 0.5 ha 3. Intermediate hospital 80 -100 1 lakh 1 ha -3 ha 1ha to 3ha
  • 22. Sr. no. Land area requirement (min ) N.B.C Land area requirement (min ) Raipur master plan 4. Intermediate 200 1 lakh 3.70 ha 2.7 ha 5. General 500 2 5 lakh 6 ha 6 ha 6. Multi-specialty hospital 200 1 lakh 9 ha 9 ha 7. Specialty hospital 200 1 lakh 3.7 ha 3.7
  • 23. PARKING Area One car parking space 75 sq.m 150 sq.m For private sector For government sector More than 100 beds 10 X 3.75 sq.m
  • 24. Stairways Ramps Lifts EXIT DOORS (unit width of 50 cm) 25 50 75 75 NO. OF OCCUPANTS THAT COULD BE SAFELY EVACUATED OR MOVED FROM ONE NO. OF EACH Min. width =2m Min. corridor width=2.4mt
  • 25. • In case of nursing homes, hospitals etc. area exceeding 300 sq m. at each floor one of the exit facility shall be a ramp of not less than 2.4 m. in width. Minimum width = 2.4m Slope : Min. =1:8 max=1:10
  • 26. WATER REQUIREMENT 340 LTR -100beds 450LT- more then 100 135 LT- others Per head consumptions
  • 27. SANITATION REQUIREMENT Sr.no. FITMENTS HOSPITAL WITH IPD HOSPITAL WITH OPD ADMINIS- TRATIVE BLOCK 1. Water closet One for 8 beds One for 100 persons One for 25 male One for 15 females 2. Ablution taps one for each w.c. One for each w.c. One for each w.c. 3. Wash basins 2 for 30 beds One for 100 beds One for 25 persons 4. Cleaner’s sink One for each ward One on each floor 5. Kitchen sink One for each floor 6. Urinals - One for 50 persons One for 20 persons
  • 28. Sr.NO. FITMENTS HOSPITALS FOR IPD HOSPITALS FOR OPD ADMINIS- TRATIVE BLOCK 7. Baths with showers One bath for every 8 beds - One on each floor 8. Bed pan washing sinks One for each ward - - Note: one water tap is mandatory for every 50 persons .
  • 30. PUBLIC BUILDINGS  The words “public building” means nursing home, hospitals, social, cultural and other institutions, government and semi-government offices, Schools, college, university etc…
  • 31. BYE LAWS NURSING HOME, HOSPITALS SOCIAL, CULTURAL AND OTHER INSTITUTIONS GOVERNMEN T AND SEMI- GOVERNMEN T OFFICES EDUCATION AL INSTITUTION S Maximum ground coverage 25% 35% 25% 33% Maximum floor area ratio 100 100 125 120 Maximum height 26 m 20 m 37 m 15 m
  • 32. ROAD WIDTH The width of the main street on which the building abuts shall not be less than 12.0 m.
  • 33. SET BACK Main access to the building at least 5m.
  • 34. SET BACK Sl. No. Height of the Building Set back (front rear and sides in each plot) 1 10 (in meters) 5 (in meters) 2 15 5 3 18 6 4 21 7 5 24 8 6 27 9 7 30 10 8 35 11 9 40 12 10 45 13 11 50 14 12 55 and above 16
  • 35. PARKING BUILDINGS Equivalent Car Spaces (ECS) per 100 sq m. of floor area HOSPITALS, SOCIAL, CULTURAL AND OTHER INSTITUTIONS, GOVERNMENT AND SEMI- GOVERNMENT OFFICES. 0.50 - 1.50 EDUCATIONAL INSTITUTIONS 0.25 - 0.75 One car parking space For the provision of car parking spaces, the space standards shall be as under: i) For open parking 20.0 sq m. per equivalent car space. ii) For ground floor covered parking 25.0 sq m. per equivalent car space. iii) For basement 30.0 sq m. per equivalent car space
  • 36. WATER REQUIREMENT BUILDINGS Liters per head per day NURSING HOME, HOSPITALS 340 (per bed) SOCIAL, CULTURAL AND OTHER INSTITUTIONS 15 GOVERNMENT AND SEMI- GOVERNMENT OFFICES 45 EDUCATIONAL INSTITUTIONS 135
  • 37. SANITATION REQUIREMENT Fitments For Male Public For Female Public For Male Staff For Female Staff Water closets 1 per 100 persons up to 400 persons; and for over 400 persons, add at the rate of 1 per 250 persons or part thereof 3 per 100 persons up to 200 persons; and for over 200 persons add at the rate of 2 per 100 persons or part thereof 1 for 1 to 15 persons 2 for 16 to 35 Persons 1 for 1 to 12 persons 2 for 13 to 25 persons Ablution taps 1 in each water closet 1 in each water closet 1 in each water closet 1 in each water closet Urinals 1 for 25 persons Nil up to 6 persons;1 for 7 to 20 persons 2 for 21 to 45 persons Wash basins 1 for every 200 persons 1 for every 200 persons 1 for 1 to 15 persons 2 for 16 to 35 persons 1 for 1 to 12 persons 2 for 13 to 25 persons