SlideShare une entreprise Scribd logo
1  sur  30
Smart Assemblies A quick overview of Timberline Smart Assemblies By David Nicholson [email_address] A configurable Bill of Materials (BOM)
An Assembly
An Assembly Consist of ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Assembly Elements Items Item Tables Fixed quantity Custom Calculation Stored Formulas Select at Takeoff
Other Options ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
One Dimensional Item Table A Variable, Formula, or Formula Table Numeric Values Only Any formula in this field overrides the Assembly Formula Item or Phase Description
Two Dimensional Item Table A  Formula,  Variable , or   Formula Table Numeric Values Only A  Formula Table ,   Formula ,   or  Variable Item Phase
Item Table Constraints ,[object Object],[object Object],[object Object],[object Object]
Formula Options ,[object Object],[object Object],[object Object],[object Object],A formula can use any combination of these functions
Formula Creation Enter Formula Here – If you can create an Excel Formula, you can create a Timberline Formula! Be Consistent with Naming Structure
Variables Numeric  Values Only Creativity In Simplicity
A Sample Formula with all Functions Variables in Blue Formulas in Green Formula Tables in Purple Names are Case Sensitive Functions in Black
Formula Tables ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Formula Table Variable, Formula, or Formula Table Variable, Formula, or Formula Table Returns a Numeric Value, Variable, Formula, or Formula Table
Formula Table in Action Returns the minimum stud size allowed in a 14’ high wall with double studs at 24” o/c in an exterior wall
Why the effort ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Reduced Errors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Reduced Errors This Prompt varies based on previous Selection Your Choice to Include or Exclude This also drive the Anchor Bolt required for the Selected Hold-Down
Hold-down Anchor Bolts Selection Based on the Hold-down device   required
How is this Accomplished This Formula Table Calls other Formula Tables Based on the Series Selected
Assembly Calculations Assembly Calculations Assembly Formula must be included in all assembly quantity Calculations
Wall Assembly Calculation Formula Assembly Formula must be included in all assembly quantity Calculations Prompts are the first in the Assembly Takeoff
Included Assembly Calculation The Assembly Calculation
The Assembly Takeoff Variable Help Variable Prompts Change an Estimate with Replace Pass Multiple Passes Include items that can be calculated from the dimensions entered
Accuracy ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Jack Stud Requirements ,[object Object],[object Object],[object Object],[object Object],[object Object]
Jack Studs By Width & Floor 5’ will fined the next Value in the table 3 required
Header Length Header Calculation Rough Opening +( (# Jack Studs * 2 Sides)* Stud Width)  (36+ 2+ ( 3 * 2) * .125) / 12
Material Length Required Thus a 3’ door would require a 5’ Header Item Description Item Calculation Override Formula Divide the quantity by the yield Use the most cost effective item 16’ cost less per lf than 12’ etc
The Conclusion ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Contenu connexe

En vedette

California New Client Invitation Overview
California New Client Invitation OverviewCalifornia New Client Invitation Overview
California New Client Invitation Overviewslingenfelder
 
Elia vision utility week 2013
Elia vision utility week 2013Elia vision utility week 2013
Elia vision utility week 2013Elia
 
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso SolutionsBOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso SolutionsPanso Solutions India Pvt Ltd
 
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D Exp
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D ExpArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D Exp
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D ExpBrion Carroll
 
Phantom bills of material
Phantom bills of materialPhantom bills of material
Phantom bills of materialLarry Sherrod
 
Bill Of Materials
Bill Of MaterialsBill Of Materials
Bill Of MaterialsJonGrigg
 
Bill of material
Bill of materialBill of material
Bill of materialBhaskar Das
 

En vedette (10)

California New Client Invitation Overview
California New Client Invitation OverviewCalifornia New Client Invitation Overview
California New Client Invitation Overview
 
Elia vision utility week 2013
Elia vision utility week 2013Elia vision utility week 2013
Elia vision utility week 2013
 
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso SolutionsBOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
 
SAP Bill of Material: HALB vs ZKON
SAP Bill of Material: HALB vs ZKONSAP Bill of Material: HALB vs ZKON
SAP Bill of Material: HALB vs ZKON
 
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D Exp
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D ExpArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D Exp
ArcherGrey Bill Of Material (BOM) Product Uploader 2016x 3D Exp
 
Phantom bills of material
Phantom bills of materialPhantom bills of material
Phantom bills of material
 
Bill Of Materials
Bill Of MaterialsBill Of Materials
Bill Of Materials
 
16.bill of material
16.bill of material16.bill of material
16.bill of material
 
Bill of material
Bill of materialBill of material
Bill of material
 
SAP BOM Redlining
SAP BOM RedliningSAP BOM Redlining
SAP BOM Redlining
 

Similaire à Smart Assemblies

Presentation top tips for getting optimal sql execution
Presentation    top tips for getting optimal sql executionPresentation    top tips for getting optimal sql execution
Presentation top tips for getting optimal sql executionxKinAnx
 
ABB Software Tools - CAT
ABB  Software Tools - CATABB  Software Tools - CAT
ABB Software Tools - CATguestd22d2b
 
ETL Validator Usecase - Input/Output Fields Comparison
ETL Validator Usecase - Input/Output Fields ComparisonETL Validator Usecase - Input/Output Fields Comparison
ETL Validator Usecase - Input/Output Fields ComparisonDatagaps Inc
 
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docx
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docxA_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docx
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docxikirkton
 
Microsoft Excel- basics
Microsoft Excel-  basicsMicrosoft Excel-  basics
Microsoft Excel- basicsjeshin jose
 
Processes in Query Optimization in (ABMS) Advanced Database Management Systems
Processes in Query Optimization in (ABMS) Advanced Database Management Systems Processes in Query Optimization in (ABMS) Advanced Database Management Systems
Processes in Query Optimization in (ABMS) Advanced Database Management Systems gamemaker762
 
Dimensional modelling-mod-3
Dimensional modelling-mod-3Dimensional modelling-mod-3
Dimensional modelling-mod-3Malik Alig
 
Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing Joshua Miranda
 
Exp2003 exl ppt_04
Exp2003 exl ppt_04Exp2003 exl ppt_04
Exp2003 exl ppt_04lonetree
 
SQL200.2 Module 2
SQL200.2 Module 2SQL200.2 Module 2
SQL200.2 Module 2Dan D'Urso
 
Course Presentation.pdf
Course Presentation.pdfCourse Presentation.pdf
Course Presentation.pdfBiniyamTezera1
 
Simplifying SQL with CTE's and windowing functions
Simplifying SQL with CTE's and windowing functionsSimplifying SQL with CTE's and windowing functions
Simplifying SQL with CTE's and windowing functionsClayton Groom
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec domsBabasab Patil
 
Excel Power Query Secrets: How to Cut Data Prep Time by 75%
Excel Power Query Secrets: How to Cut Data Prep Time by 75%Excel Power Query Secrets: How to Cut Data Prep Time by 75%
Excel Power Query Secrets: How to Cut Data Prep Time by 75%Doug Burke
 
Advanced Filter Concepts in MS-Excel
Advanced Filter Concepts in MS-ExcelAdvanced Filter Concepts in MS-Excel
Advanced Filter Concepts in MS-ExcelP. SUNDARI ARUN
 

Similaire à Smart Assemblies (20)

Presentation top tips for getting optimal sql execution
Presentation    top tips for getting optimal sql executionPresentation    top tips for getting optimal sql execution
Presentation top tips for getting optimal sql execution
 
003.query
003.query003.query
003.query
 
ABB Software Tools - CAT
ABB  Software Tools - CATABB  Software Tools - CAT
ABB Software Tools - CAT
 
ETL Validator Usecase - Input/Output Fields Comparison
ETL Validator Usecase - Input/Output Fields ComparisonETL Validator Usecase - Input/Output Fields Comparison
ETL Validator Usecase - Input/Output Fields Comparison
 
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docx
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docxA_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docx
A_CH04_EXPV1_H1_Instructions.docxOffice 2013 – myitlabgra.docx
 
Microsoft Excel- basics
Microsoft Excel-  basicsMicrosoft Excel-  basics
Microsoft Excel- basics
 
Dimensional Modeling
Dimensional ModelingDimensional Modeling
Dimensional Modeling
 
Processes in Query Optimization in (ABMS) Advanced Database Management Systems
Processes in Query Optimization in (ABMS) Advanced Database Management Systems Processes in Query Optimization in (ABMS) Advanced Database Management Systems
Processes in Query Optimization in (ABMS) Advanced Database Management Systems
 
Dimensional modelling-mod-3
Dimensional modelling-mod-3Dimensional modelling-mod-3
Dimensional modelling-mod-3
 
Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing
 
Exp2003 exl ppt_04
Exp2003 exl ppt_04Exp2003 exl ppt_04
Exp2003 exl ppt_04
 
Bis 345-week-4-i lab-new
Bis 345-week-4-i lab-newBis 345-week-4-i lab-new
Bis 345-week-4-i lab-new
 
Getting power bi
Getting power biGetting power bi
Getting power bi
 
Tableau.pdf
Tableau.pdfTableau.pdf
Tableau.pdf
 
SQL200.2 Module 2
SQL200.2 Module 2SQL200.2 Module 2
SQL200.2 Module 2
 
Course Presentation.pdf
Course Presentation.pdfCourse Presentation.pdf
Course Presentation.pdf
 
Simplifying SQL with CTE's and windowing functions
Simplifying SQL with CTE's and windowing functionsSimplifying SQL with CTE's and windowing functions
Simplifying SQL with CTE's and windowing functions
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec doms
 
Excel Power Query Secrets: How to Cut Data Prep Time by 75%
Excel Power Query Secrets: How to Cut Data Prep Time by 75%Excel Power Query Secrets: How to Cut Data Prep Time by 75%
Excel Power Query Secrets: How to Cut Data Prep Time by 75%
 
Advanced Filter Concepts in MS-Excel
Advanced Filter Concepts in MS-ExcelAdvanced Filter Concepts in MS-Excel
Advanced Filter Concepts in MS-Excel
 

Smart Assemblies

  • 1. Smart Assemblies A quick overview of Timberline Smart Assemblies By David Nicholson [email_address] A configurable Bill of Materials (BOM)
  • 3.
  • 4. Assembly Elements Items Item Tables Fixed quantity Custom Calculation Stored Formulas Select at Takeoff
  • 5.
  • 6. One Dimensional Item Table A Variable, Formula, or Formula Table Numeric Values Only Any formula in this field overrides the Assembly Formula Item or Phase Description
  • 7. Two Dimensional Item Table A Formula, Variable , or Formula Table Numeric Values Only A Formula Table , Formula , or Variable Item Phase
  • 8.
  • 9.
  • 10. Formula Creation Enter Formula Here – If you can create an Excel Formula, you can create a Timberline Formula! Be Consistent with Naming Structure
  • 11. Variables Numeric Values Only Creativity In Simplicity
  • 12. A Sample Formula with all Functions Variables in Blue Formulas in Green Formula Tables in Purple Names are Case Sensitive Functions in Black
  • 13.
  • 14. Formula Table Variable, Formula, or Formula Table Variable, Formula, or Formula Table Returns a Numeric Value, Variable, Formula, or Formula Table
  • 15. Formula Table in Action Returns the minimum stud size allowed in a 14’ high wall with double studs at 24” o/c in an exterior wall
  • 16.
  • 17.
  • 18. Reduced Errors This Prompt varies based on previous Selection Your Choice to Include or Exclude This also drive the Anchor Bolt required for the Selected Hold-Down
  • 19. Hold-down Anchor Bolts Selection Based on the Hold-down device required
  • 20. How is this Accomplished This Formula Table Calls other Formula Tables Based on the Series Selected
  • 21. Assembly Calculations Assembly Calculations Assembly Formula must be included in all assembly quantity Calculations
  • 22. Wall Assembly Calculation Formula Assembly Formula must be included in all assembly quantity Calculations Prompts are the first in the Assembly Takeoff
  • 23. Included Assembly Calculation The Assembly Calculation
  • 24. The Assembly Takeoff Variable Help Variable Prompts Change an Estimate with Replace Pass Multiple Passes Include items that can be calculated from the dimensions entered
  • 25.
  • 26.
  • 27. Jack Studs By Width & Floor 5’ will fined the next Value in the table 3 required
  • 28. Header Length Header Calculation Rough Opening +( (# Jack Studs * 2 Sides)* Stud Width) (36+ 2+ ( 3 * 2) * .125) / 12
  • 29. Material Length Required Thus a 3’ door would require a 5’ Header Item Description Item Calculation Override Formula Divide the quantity by the yield Use the most cost effective item 16’ cost less per lf than 12’ etc
  • 30.