SlideShare une entreprise Scribd logo
1  sur  25
Manufacturing Industry Overview | 2013
           Trends
           Opportunities
           Changes




Beaver Group and Autodesk PLM 360


© 2012 Autodesk
© 2012 Autodesk
WHO ARE
BEAVER GROUP?
•        Operating since 1998
•        Award winning Digital Media Agency
         Marketing Week Award 2011, Digital Signage Project of the Year 2008 and 2010

•        Variety of Services
         Digital Signage, Digital Signage, Interactive Way-finding, Web Design, Mobile Apps,
         Print, Audio Visual, Video & Photography

•        UK-wide deployments and support for leading brands
         P&O Cruises, Showcase Cinemas, Burger King, Piccadilly Circus and Whitbread




    © 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
SHOWCASE CINEMAS




© 2012 Autodesk
BURGER KING




© 2012 Autodesk
ERICSSON




© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
WEB DESIGN




© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
OUR ACHIEVEMENTS




© 2012 Autodesk
Why Autodesk PLM 360…
the new way…NOT the old way




© 2012 Autodesk
What we were looking for..
    Product & Project                     Quality and Compliance
    • Project Management                  • Corrective and Preventative Actions
    • Project Costing                     • Non-Conformance
    • New Product Introduction            • Document Control


                                     PLM 360


    Engineering                           Procurement
    • Change Requests                     • Approved Vendors (AVL / AML)
    • Change Orders                       • Supplier Evaluations
    • Items and Bills of Materials        • RFQ



© 2012 Autodesk
Management




                                             Procurement
                            Engineering




                                                                             Operations




                                                                                                                           Reference
                                                                                          Marketing




                                                                                                         Service &
            Program




                                                                                                          Support
                                                              Quality




                                                                                            Sales &
         Project        Items and                                          Accident                        Service       Approval
                                           Suppliers       Inspections                     Customers
       Management         BOMs                                             Reports                         Request         Lists



                                                                                                            Return        ISO9001
          Project        Change                                Non
                                              RFQ                         Calibration     Sales Quotes   Merchandise
                         Request                           Conformances                                                   Sections
          Costing                                                                                        Authorization



                                                           Corrective /                    Marketing                      Material
                         Change                                            Equipment
       New Product                        RFQ Projects     Preventative                     Assets                       Properties
                         Orders                                           Maintenance
       Introduction                                          Actions



                                           Warranty                                                                      Inspection
                         Material                             Audits
                       Specifications      Recovery                                                                      Templates
           Tasks


                                                           Procedures,                                                      Item
                          Design                           Guidelines,                                                   Categories
                          Review                            and Specs
        Requirements


                                                            Document                                                     Calibration
                                                             Change                                                       Providers
                                                              Order




© 2012 Autodesk
Instant on, no setup and
    available to all our customers,
    supply chain and Internal stuff
    with NO costly infrastructure


© 2012 Autodesk
© 2012 Autodesk
© 2012 Autodesk
In Summary, why we like Autodesk PLM 360




         Cloud-based,     Accessible      Up and running in
       zero deployment   on any device   minutes, not months




© 2012 Autodesk
Thank you, any questions




© 2012 Autodesk

Contenu connexe

Tendances

Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...RIA RUI Society
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMDinesh Kumar P
 
Managing And Tracking Eto Manufacturing With Oracle Apps
Managing And Tracking Eto Manufacturing With Oracle AppsManaging And Tracking Eto Manufacturing With Oracle Apps
Managing And Tracking Eto Manufacturing With Oracle Appsjbletz
 
Processes and Performance
Processes and PerformanceProcesses and Performance
Processes and Performancepwa81497
 
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...Oow 2011, Simplifying Work Order Management in the utility market with Oracle...
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...Leon Smiers
 
Downstream Automation Provider K
Downstream Automation Provider KDownstream Automation Provider K
Downstream Automation Provider KSteveSussman
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideAericon
 
SAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningSAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningEric Stajda
 
Product Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProduct Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProductCamp Atlanta
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Business Service Management for Life Sciences
Business Service Management for Life SciencesBusiness Service Management for Life Sciences
Business Service Management for Life SciencesNiamh Cahill
 
Service Contracts Lifecycle Management
Service Contracts Lifecycle ManagementService Contracts Lifecycle Management
Service Contracts Lifecycle ManagementMohan Dutt
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras
 
Kedar Pujari - SAP Vistex
Kedar Pujari - SAP VistexKedar Pujari - SAP Vistex
Kedar Pujari - SAP VistexKedar Pujari
 
Consulting poster
Consulting posterConsulting poster
Consulting posterSimon Shott
 
Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers IBM WebSphereIndia
 
Microsoft Business Intelligence Performance Management Dan Bulos_2011
Microsoft Business Intelligence Performance Management Dan Bulos_2011Microsoft Business Intelligence Performance Management Dan Bulos_2011
Microsoft Business Intelligence Performance Management Dan Bulos_2011Mark Ginnebaugh
 

Tendances (17)

Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPM
 
Managing And Tracking Eto Manufacturing With Oracle Apps
Managing And Tracking Eto Manufacturing With Oracle AppsManaging And Tracking Eto Manufacturing With Oracle Apps
Managing And Tracking Eto Manufacturing With Oracle Apps
 
Processes and Performance
Processes and PerformanceProcesses and Performance
Processes and Performance
 
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...Oow 2011, Simplifying Work Order Management in the utility market with Oracle...
Oow 2011, Simplifying Work Order Management in the utility market with Oracle...
 
Downstream Automation Provider K
Downstream Automation Provider KDownstream Automation Provider K
Downstream Automation Provider K
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slide
 
SAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) RedliningSAP PLM BOM (Bill of Material) Redlining
SAP PLM BOM (Bill of Material) Redlining
 
Product Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProduct Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software Tools
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Business Service Management for Life Sciences
Business Service Management for Life SciencesBusiness Service Management for Life Sciences
Business Service Management for Life Sciences
 
Service Contracts Lifecycle Management
Service Contracts Lifecycle ManagementService Contracts Lifecycle Management
Service Contracts Lifecycle Management
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration Basics
 
Kedar Pujari - SAP Vistex
Kedar Pujari - SAP VistexKedar Pujari - SAP Vistex
Kedar Pujari - SAP Vistex
 
Consulting poster
Consulting posterConsulting poster
Consulting poster
 
Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers
 
Microsoft Business Intelligence Performance Management Dan Bulos_2011
Microsoft Business Intelligence Performance Management Dan Bulos_2011Microsoft Business Intelligence Performance Management Dan Bulos_2011
Microsoft Business Intelligence Performance Management Dan Bulos_2011
 

En vedette

Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009
Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009
Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009Razorleaf Corporation
 
COE2010 Razorleaf ENOVIA SmarTeam and V6 Readiness
COE2010 Razorleaf ENOVIA SmarTeam and V6 ReadinessCOE2010 Razorleaf ENOVIA SmarTeam and V6 Readiness
COE2010 Razorleaf ENOVIA SmarTeam and V6 ReadinessRazorleaf Corporation
 
Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...
  Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...  Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...
Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...Autodesk
 
The Presentation Come-Back Kid
The Presentation Come-Back KidThe Presentation Come-Back Kid
The Presentation Come-Back KidEthos3
 

En vedette (6)

Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009
Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009
Merging PLM and Microsoft SharePoint Strategies from GPDIS 2009
 
Why Product Structure Matters
Why Product Structure MattersWhy Product Structure Matters
Why Product Structure Matters
 
COE2010 Razorleaf ENOVIA SmarTeam and V6 Readiness
COE2010 Razorleaf ENOVIA SmarTeam and V6 ReadinessCOE2010 Razorleaf ENOVIA SmarTeam and V6 Readiness
COE2010 Razorleaf ENOVIA SmarTeam and V6 Readiness
 
Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...
  Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...  Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...
Forge - DevCon 2016: Integrate & extend your construction ecosystem with BI...
 
Autodesk bim 360
Autodesk bim 360Autodesk bim 360
Autodesk bim 360
 
The Presentation Come-Back Kid
The Presentation Come-Back KidThe Presentation Come-Back Kid
The Presentation Come-Back Kid
 

Similaire à Beaver Group

Radovan Janecek Avoiding S O A Pitfalls
Radovan  Janecek   Avoiding  S O A  PitfallsRadovan  Janecek   Avoiding  S O A  Pitfalls
Radovan Janecek Avoiding S O A PitfallsSOA Symposium
 
Ifp Brochure A4 Format 3mb
Ifp Brochure A4 Format 3mbIfp Brochure A4 Format 3mb
Ifp Brochure A4 Format 3mbcarrime_78
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsWynyard Group
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total costKobi Vider
 
Value Reference Model - Development
Value Reference Model - DevelopmentValue Reference Model - Development
Value Reference Model - DevelopmentArnaldo Colombo
 
ITIL - mita se on?
ITIL - mita se on?ITIL - mita se on?
ITIL - mita se on?Ben Kalland
 
The Product Management Value Chain
The Product Management Value ChainThe Product Management Value Chain
The Product Management Value Chainktrexler
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Digite Inc
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changesIIBA Romania Chapter
 
V-Empower Technical Competence Workflow
V-Empower Technical Competence WorkflowV-Empower Technical Competence Workflow
V-Empower Technical Competence WorkflowHannan Ahmed
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...IIBA Rochester NY
 
Sage er px3-puerto rico
Sage er px3-puerto ricoSage er px3-puerto rico
Sage er px3-puerto ricoSuzanne Spear
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshotmelvinyou
 
Chris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionChris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionTomOwenHughes
 
Performance Management Overview
Performance Management OverviewPerformance Management Overview
Performance Management OverviewRichard Merrick
 
Dialogue partners Contact Center Consultancy
Dialogue partners   Contact Center ConsultancyDialogue partners   Contact Center Consultancy
Dialogue partners Contact Center ConsultancyDialogue Partners
 
Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0anusharaju38
 
Operation in service sector
Operation in service sectorOperation in service sector
Operation in service sectorPraveen Sidola
 

Similaire à Beaver Group (20)

Radovan Janecek Avoiding S O A Pitfalls
Radovan  Janecek   Avoiding  S O A  PitfallsRadovan  Janecek   Avoiding  S O A  Pitfalls
Radovan Janecek Avoiding S O A Pitfalls
 
ParaVent
ParaVentParaVent
ParaVent
 
Ifp Brochure A4 Format 3mb
Ifp Brochure A4 Format 3mbIfp Brochure A4 Format 3mb
Ifp Brochure A4 Format 3mb
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business Requirements
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
 
Value Reference Model - Development
Value Reference Model - DevelopmentValue Reference Model - Development
Value Reference Model - Development
 
ITIL - mita se on?
ITIL - mita se on?ITIL - mita se on?
ITIL - mita se on?
 
The Product Management Value Chain
The Product Management Value ChainThe Product Management Value Chain
The Product Management Value Chain
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?
 
Business analysis and project changes
Business analysis and project changesBusiness analysis and project changes
Business analysis and project changes
 
V-Empower Technical Competence Workflow
V-Empower Technical Competence WorkflowV-Empower Technical Competence Workflow
V-Empower Technical Competence Workflow
 
Zigzag Marketing Product Management Framework
Zigzag Marketing Product Management FrameworkZigzag Marketing Product Management Framework
Zigzag Marketing Product Management Framework
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
 
Sage er px3-puerto rico
Sage er px3-puerto ricoSage er px3-puerto rico
Sage er px3-puerto rico
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
 
Chris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionChris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management Solution
 
Performance Management Overview
Performance Management OverviewPerformance Management Overview
Performance Management Overview
 
Dialogue partners Contact Center Consultancy
Dialogue partners   Contact Center ConsultancyDialogue partners   Contact Center Consultancy
Dialogue partners Contact Center Consultancy
 
Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0Overseeing it process implementations with project managemen tv1.0
Overseeing it process implementations with project managemen tv1.0
 
Operation in service sector
Operation in service sectorOperation in service sector
Operation in service sector
 

Beaver Group

  • 1. Manufacturing Industry Overview | 2013  Trends  Opportunities  Changes Beaver Group and Autodesk PLM 360 © 2012 Autodesk
  • 3. WHO ARE BEAVER GROUP? • Operating since 1998 • Award winning Digital Media Agency Marketing Week Award 2011, Digital Signage Project of the Year 2008 and 2010 • Variety of Services Digital Signage, Digital Signage, Interactive Way-finding, Web Design, Mobile Apps, Print, Audio Visual, Video & Photography • UK-wide deployments and support for leading brands P&O Cruises, Showcase Cinemas, Burger King, Piccadilly Circus and Whitbread © 2012 Autodesk
  • 13. WEB DESIGN © 2012 Autodesk
  • 18. Why Autodesk PLM 360… the new way…NOT the old way © 2012 Autodesk
  • 19. What we were looking for.. Product & Project Quality and Compliance • Project Management • Corrective and Preventative Actions • Project Costing • Non-Conformance • New Product Introduction • Document Control PLM 360 Engineering Procurement • Change Requests • Approved Vendors (AVL / AML) • Change Orders • Supplier Evaluations • Items and Bills of Materials • RFQ © 2012 Autodesk
  • 20. Management Procurement Engineering Operations Reference Marketing Service & Program Support Quality Sales & Project Items and Accident Service Approval Suppliers Inspections Customers Management BOMs Reports Request Lists Return ISO9001 Project Change Non RFQ Calibration Sales Quotes Merchandise Request Conformances Sections Costing Authorization Corrective / Marketing Material Change Equipment New Product RFQ Projects Preventative Assets Properties Orders Maintenance Introduction Actions Warranty Inspection Material Audits Specifications Recovery Templates Tasks Procedures, Item Design Guidelines, Categories Review and Specs Requirements Document Calibration Change Providers Order © 2012 Autodesk
  • 21. Instant on, no setup and available to all our customers, supply chain and Internal stuff with NO costly infrastructure © 2012 Autodesk
  • 24. In Summary, why we like Autodesk PLM 360 Cloud-based, Accessible Up and running in zero deployment on any device minutes, not months © 2012 Autodesk