Project Execution Excellence
On-Time and On-Budget
Nilanjan BANDYOPADHYAY
Senior Industry Consultant – Energy, Process, Utilities & Industrial Equipment
:nilanjan.BANDYOPADHYAY@3ds.com
+91 9818851114
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
2
• Introduction to Dassault Systemes
• The 3DEXPERIENCE Platform
• Energy, Process & Utilities – Sectors and Challenges
• Optimized Plant Construction ISE (Deliver Capital Projects On Time & On Budget)
• Customer References
• Questions and Answers
Agenda
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
3
Our Company
a Scientific
company
Combining Science,
Technology and Art
for a sustainable society
12,400
passionate people
• 112 nationalities
• One global R&D / 53 labs
• Game changing 3DEXPERIENCE
solutions
190,000 enterprise
customers
• 12 industries in 140 countries
• >10 million on premise users
• >100 million online users
3,500
partners
• Research & Education
• Software & Technology
• Sales & Services
Long-term
driven
• Majority shareholder control
• Revenue: $ 2.8 Bn*
• Operating margin: 31.5%*
* Non-IFRS
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
4
The 3DEXPERIENCE Platform
Social & Collaborative Apps
3D Modeling Apps
Simulation Apps
Information Intelligence Apps
Real time 3DEXPERIENCE
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
5
SOCIAL &
COLLABORATIVE
APPLICATIONS
Working in
unstructured
& structured
environments
Connectivity Quadrant
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
6
3D Quadrant
3D MODELING
APPLICATIONS
Shaping ideas
into reality
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
7
Virtual + Real Quadrant
SIMULATION
APPLICATIONS
Where
virtual worlds
meet reality
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
8
INFORMATION
INTELLIGENCE
APPLICATIONS
Revealing &
dashboarding
BIG DATA
Information Intelligence Quadrant
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
9
Value based “Industry Solution Experiences”
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
11
Energy, Process & Utilities - Sectors
• Design
• Contracting
• Generators
• Turbines
• Boilers
• Wind turbines
• Petrochemical
• Oil refinery plants
• Pipelines
• Storage
• Nuclear Plants
• Thermal Plants
• Inland & Offshore
Wind
• Hydroelectric Dams
Power
• Agrochemical
• Paper
• Polymers
• Industrial Gases
Chemical
• Water
• Waste
• Minerals, Glass
• Metals
ProcessOil & Gas
• Transmission, sales &
marketing
• Water, Electricity
• Natural Gas
• Waste
Utilities
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
12
Energy, Process & Utilities Business Processes
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
13
Optimized Plant
Construction
Safe Plant Engineering
Safe Plant Operation
Energy, Process & Utilities Solution Experiences
Consumer Driven Supply
1
3
6
4
2
5
Sustainable Power
Equipment
“Design it for Performance
& Robustness”
“Deliver it on time &
on budget”
“Engineer it for
Compliance and Safety”
“Operate it for
Efficiency & Safety”
“Plan it & Monitor it
for Consumer”
Winning Tender
“When to Bid, Bid
to Win”
7
Sustainable Plant
Decommissioning
“for Safety & Less
Environmental Impact”
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
14
More than 35% of projects exceed budget & cycle time
by more than 10%
Source: Booz Allen Hamilton
Percentage of Projects Exceeding Budget and Cycle
Time by More Than 10%
How we deliver plant construction
on time & on budget?
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
15
IF Project Manager Has Perfect Visibility on His Project…
Executable plan
Secure QCD
Risk mitigation
Resolving issues
Negotiation with stake holders
…
Analogy… Captain of Ocean Freight
INFORMATION
Key for Successful Project
But Capital projects need more
Visibility, Consistency & Traceability
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
16
Optimized Plant Construction
4 Key Values
Visibility
Project status is available
real time
Provide necessary or
meaningful information out
of the flood
No Ambiguity with 3D
Clear understanding of
complex plant 3D for a
common language for
communication
Consistency &
Traceability
Single source of the truth
Information is consistent all
the time across the global
operation
Minimize Waste
Achieve minimum waste (=
LEAN) with executable &
reasonable plan based on the
real state of the project
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
17
Optimized Plant Construction
Reduce Time to Start-up & Cost with Digital Plant Construction Planning
Construction
Engineering
Expeditor
Buyer Quality Control
Schedule ControllerCost Controller
Project Manager
Risk
Management
Bidding
Management
Deliverable
Management
Work Package
Management
Milestone
Management
Issues and
Change
Management
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
18
2
4
5
3
Optimized Plant Construction
Deliver it on time & on budget
Construction Field
Planning & Execution
Lean Construction Execution
Engineering Work Package
Digital engineering management
from plan, execution, approval to
change
Collaborative Digital Procurement
Productivity for requisitioning & manage
procurement lifecycle
Requirements Driven
Project Management & Monitoring
Project management & execution integrated with
Quality Management System
6
Virtual Construction
4D/5D Simulation
Construction plan optimization &
validation
3D Construction Instructions
Intuitive work instruction for safety,
quality & efficiency
1
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
19
Engineering Work Package
Digital engineering management from plan, execution, approval to change
Challenges
Pressure for low cost engineering & global operation / on time
engineering delivery / securing engineering quality
Manage huge amount of information, requirements, deliverables,
comments, changes, etc.
Efficient engineering while more demand on global operation
Secure ERD (Engineering Required Date)
Secure engineering quality even in frequent changes / Secure traceability
Value
Proposal
Access to up-to-date information reduce re-work / secure engineering
quality
Speed up engineering cycle time
Earlier risk identification and decision make
Lower management cost
Lower document handling cost
Rigorous change management for engineering quality and traceability
Targeted
Users
Project Manager
Engineering Manager
Lead Engineer
Engineer
Baseline
Deliverable
List
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
20
Requirement Driven Project Management & Monitoring
Project management & execution integrated with Quality Management System
Challenges
While globalizing business, projects MUST comply with local regulation,
industry standards and project requirements. Pressure for short schedule,
low cost and global operation, but yet Quality (= products and services
consistently meet customer’s requirements) is invariable essential.
Value
Proposal
Enforce standard delivery processes with, input, output and procedures.
/ Enforce standard review processes.
Integrated Quality Audit and CAR (Collective Action Report) process.
Recognize each requirement inside documents. Secure its fulfilment.
Trace impact of change across deliverables.
Task execution status immediately update project status report. Real-
time project KPI.
Manage issues & risks with associated information. Monitor status of
issues & risks real-time.
Integrated lesson & leant for continuous improvement.
Targeted
Users
Project Manager
QA/QC
Schedule Controller
Engineering Manager
Lead Engineer
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
21
Collaborative Digital Procurement
Productivity for requisitioning & manage procurement lifecycle
Challenges
Pressure for low budget procurement / on time material delivery /
securing required quality
Requisitioning (RFQ) process depends on engineering progress
Secure PO schedule with limited procurement resource
Place PO at lowest cost while securing required quality
Avoid unexpected delay of material delivery by vendor (supplier)
Value
Proposal
Requisition (RFQ) integrated with engineering secure procurement is
based on valid information
Effective procurement execution / minimum resource
Real time status helps procurement people’s right decision / Earlier risk
identification enable effective corrective action
Avoid dispute with vendors (suppliers) on such as change orders by
providing traceability linking all related information during procurement
execution
Targeted
Users
Procurement Management
Buyer
Expeditor
Project Manager
Engineering Manager
Lead Engineer / Engineer
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
22
Virtual Construction 4D/5D Simulation
Construction plan optimization & validation
Challenges
Market demand from plant owner on shorter delivery of plant
construction project for better financial profitability.
Less schedule merging while minimizing risk of schedule delay
How to verify new construction method or approach
Dependency on aging & experienced people
Cope with Health, Safety & Environment while challenging plan
Value
Proposal
Validate and optimize construction schedule in 3D
Collaborative Construction innovation through Plan , Visualize and
Execute in 3D
Concurrent Engineering where construction is going on in parallel with
engineering
Enhance Health & Safety with human simulation and detailed ergonomic
analysis
Capture and reuse knowledge and best practices using “Single Version of
Truth” platform
Integrate with any scheduling system
Targeted
Users
Construction Manager
Construction Superintendent
Project Manager
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
23
3D Construction Instructions
Intuitive work instruction for safety, quality & efficiency
Challenges
Pressure for short schedule and low cost / new construction method /
global operation / securing quality / Health, Safety & Environment
Faults from the low level of site execution lead to the costly updates
(time & money) on construction site
Execute first-time-right new construction method for quicker and shorter
construction / more complicated construction / new technology
Quality communication across joint venture / multi location / multi
national / multi language
Value
Proposal
Multilingual understanding / minimize risk of misunderstanding of field
work instruction
Leaning retention
Secure field workers referring to the latest information
Enable paperless operation
IP protection in Join Venture operation
Targeted
Users
Construction Manager
Construction Superintendent
Project Manager
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
24
Construction Field Planning & Execution
Lean Construction Execution
Challenges
Construction industry has been less productive compared to manufacturing industry /
Huge wastes of time, effort and material
An average of 49.6% of operational efforts are devoted to non-value adding activities
Up to 57% of construction spending in our current business model is non-value-added
effort or waste
Value
Proposal
“Last Planner System” integrated with “Virtual Construction 4D Simulation” turns
construction plan optimized in virtual space to real value in the field, and enable real
“Lean Construction”.
“Construction Field Planning & Execution” implements “Last Planner System” and
enables field planner to plan day-to-day activity taking real situation and constraints,
material availability, precedence task state, etc., into account and eliminates various
reason for “wastes”.
Enable optimized field work plan, and improve filed workers productivity / Eliminate
wastes of time, effort and material
FIWP (Field Installation Work Package) with comprehensive information and intuitive
3D Construction Instructions helps field workers understanding on the processes,
and enable safe work
Electronic work reporting enables real-time status report for construction managers
and field planners, and helps timely decision making
Work reporting equipped with intelligent identification eliminates data entry errors
Targeted
Users
Construction Manager
Construction Superintendent
Foreman
Project Manager
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
25
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2012
New paradigm:
3D is integrated into project execution
and used for planning and
communication, not only just for design
Old paradigm:
3D only for design but communication
is 2D and textual
3DExperience Platform – A paradigm shift
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
26
2
4
5
3
Optimized Plant Construction – Reference Customers
Deliver it on time & on budget
Construction Field
Planning & Execution
Lean Construction Execution
Engineering Work Package
Digital engineering management
from plan, execution, approval to
change
Collaborative Digital Procurement
Productivity for requisitioning & manage
procurement lifecycle
Requirements Driven
Project Management & Monitoring
Project management & execution integrated with
Quality Management System
6
Virtual Construction
4D Simulation
Construction plan optimization &
validation
3D Construction Instructions
Intuitive work instruction for safety,
quality & efficiency
1
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
27
Reliance Power
 Reliance Group’s brand, experience and position in the Indian Power Sector
 One of the leading power development companies in India
 Largest portfolio of power projects under construction and development in
the private sector in India
Challenges
Create an Integrated platform for Project and Document Management with Collaboration with
Consultants, Owner – Operator and EPC
Establish Business Processes in all Phases of Plant Life Cycle
Integrate the Processes and Technology for monitoring the Projects in terms of Time, Materials and
Resources
Consolidated Real-Time Dashboards – Physical Monitoring (CCTV), Project Status in terms of Time
and progress (Physical and Financial), Supply Chain Logistics from the Equipment Suppliers
Extending the application to mobile devices – Smart Phones and IPADs
Long term vision: Create Simulation and 3D models of plants for a Virtual View
Values
Improvement in ability to manage a portfolio of multiple large projects with improved
planning, schedule, collaboration, cost control and online visibility
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
28
CHIDI
Founded in 1955, the biggest hydro power investigation and design institute in
China
Holds overall Grade A engineering design qualifications and can undertake
construction project design, general construction project contracting, project
management and related technical and management services in 21 industries,
including electric power, water conservancy, construction…
Challenges
 Manage complex project cost overrun
 Improve Project information search and sharing
 Dam design in 2D is difficult to reuse. No knowledge capture. No efficient collaboration design
between different disciplines
Values
 Applied for over 200 project / Over 80 departments,1500 user use / Manage over 30000
tasks, 16000 equipment and 26000 project files
 Visual, accurate and prompt statistical analysis provides executives with a monitoring and
decision support / Reduce project delay risk
 Achieve design quality fingerprint and traceability / Truthfulness of sampling inspection
 Ensure design drawing and equipment procurement meet the needs of the construction
schedule / Support supplier relationship management and strategic procurement
 Delivery of digital design results reduced the number of drawings produced
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
29
Skanska
Challenges
 Weak project transparency: Plan, cost estimation, forecast and actual were not in sync
 Information discontinuity between Design, Planning, Construction and Maintenance
phases
 Project documentation not under control
 Procurement spend too high, lacking process and transparency
Values
The number of unprofitable projects was reported to have decreased dramatically
during the first months after going live with the solution
 Better visibility improved decision-making and closer project control
 Collaboration between design partners and subcontractors
 With site sourcing, aiming to save 2-5% from overall procurement spend
Skanska Finland is part of the 120-year-old Skanska Group, one of the world’s
leading construction and project development companies
With headquarters in Sweden and more than 53,000 employees in local offices
throughout Europe, the UK, North America, Latin America and around the world,
the company’s revenue in 2009 was €14.9 billion
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
30
Lawrence Livermore National Laboratory
Challenges
 Integrations needed to CAD and ERP
 Paper-based system lacked controls mandated by DOE for equipment design and nuclear safety
 Manage hundreds of thousands of documents and critical processes for multiple complex projects
that span decades
 Demonstrate responsible management of taxpayer resources
 Manage archives of documents per DOE and National Archives Records Administration (NARA)
guidelines
Values
 Reduced CAD drawing access from 2 days to 5 minutes
 Increased engineering record center throughput 6X – from 15 to more than 100 drawings per day
 BOM data transfer process reduced from days to real time
 Reduced procurement package creation from 1 week to 1 day
U.S. DOE National Laboratory: Founded in 1952 / ~7000 Employees
The National Ignition Facility:
 World’s largest laser / Stadium-sized facility
 30-year research program
 Over 4 million parts & components / Over 22 thousand optical elements
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
31
Keppel Offshore & Marine
One of the largest offshore and marine groups in the world, leading designer,
builder and repairer of mobile offshore rigs (jackups and semisubmersibles)
20 yards serving regions including Asia Pacific, Gulf of Mexico, Brazil, Caspian
Sea, Middle East and the North Sea, enables effective execution Near Market,
Near Customer strategy
Challenges
Accelerate global project execution
Collaborate Project Information across the globe
Provide visibility on status to Project Management and Production Operations
Reduce labor intensive documentation work including generating reports and handling
correspondence
Manage customer change request, feedback and variation orders
Enhance Engineering knowledge capture
Values
One Stop Center for Engineering Project Information
Management able to identify potential impact to project early
Problems in projects are visible immediately
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
32
NIAEP
Nizhny Novgorod Engineering Company ATOMENERGOPROJECT
Challenges
NPP construction time & costs
 Construction delays, Schedule shifts, costly resources idle time due to inaccurate planning
(loses up to $1M per day)
 Faults from the low level of the construction technology lead to the costly updates (time &
money) on construction site
Lack of the experience from the side of the workers responsible for project critical operations;
safeguarding of workers security at the construction site
Values
 Reduce building duration, ability to build each new nuclear station block within 48 months
 Unified approach to nuclear plant construction to be prepared to build 20 new nuclear
blocks
 Control time and control costs : deadline driven approach
Russian leading EPC in the nuclear industry with over 4000 employees and
over 7000 personnel including subsidiaries, executing currently 20 projects in
Russia and abroad
NIAEP and ROSATOM have launched significant investment programs to
accelerate and deploy new applications and innovative processes, out of which
DS PLM solutions were selected
Industry Process Module
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
33
Nilanjan BANDYOPADHYAY
Senior Industry Consultant – Energy, Process, Utilities & Industrial Equipment
:nilanjan.BANDYOPADHYAY@3ds.com
+91 9818851114
3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014
34

Contenu connexe

En vedette

Management tools
Management toolsManagement tools
Management toolsmaelwardany
 
The Power of Storytelling - The Execution Shortcut
The Power of Storytelling - The Execution ShortcutThe Power of Storytelling - The Execution Shortcut
The Power of Storytelling - The Execution ShortcutJeroen De Flander
 
Excellence in Execution with speakers notes
Excellence in Execution with speakers notesExcellence in Execution with speakers notes
Excellence in Execution with speakers notesRobin Speculand
 
Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10Msizi Mkhize
 
Strategy Execution Masterclass Jeroen De Flander Nyenrode
Strategy Execution Masterclass Jeroen De Flander NyenrodeStrategy Execution Masterclass Jeroen De Flander Nyenrode
Strategy Execution Masterclass Jeroen De Flander NyenrodeJeroen De Flander
 
Peex Consulting Services
Peex Consulting ServicesPeex Consulting Services
Peex Consulting ServicesMohammad Hijazi
 
Strategy Execution at Strategy Leaders Qatar_Jeroen De Flander
Strategy Execution at Strategy Leaders Qatar_Jeroen De FlanderStrategy Execution at Strategy Leaders Qatar_Jeroen De Flander
Strategy Execution at Strategy Leaders Qatar_Jeroen De FlanderJeroen De Flander
 
Why Strategy Fails...and How You Can Make it Work
Why Strategy Fails...and How You Can Make it WorkWhy Strategy Fails...and How You Can Make it Work
Why Strategy Fails...and How You Can Make it Workleepublish
 
Balanced Scorecard Master Class pdf
Balanced Scorecard Master Class pdf Balanced Scorecard Master Class pdf
Balanced Scorecard Master Class pdf Jeroen De Flander
 
Execution Excellence @ HR By Naveen Bhatia Bharti
Execution Excellence @ HR By Naveen Bhatia BhartiExecution Excellence @ HR By Naveen Bhatia Bharti
Execution Excellence @ HR By Naveen Bhatia BhartiNational HRD Network
 
Strategic Innovation Process
Strategic Innovation ProcessStrategic Innovation Process
Strategic Innovation ProcessCijo Abraham Mani
 
GS1 université d'été 2015
GS1 université d'été 2015GS1 université d'été 2015
GS1 université d'été 2015David Nahon
 
001-Creating the Sketch 草圖
001-Creating the Sketch 草圖001-Creating the Sketch 草圖
001-Creating the Sketch 草圖LUKE CHEN
 
unified skeleton for real time mocap
unified skeleton for real time mocapunified skeleton for real time mocap
unified skeleton for real time mocapDavid Nahon
 
00-3dexperience platform 入門
00-3dexperience platform 入門00-3dexperience platform 入門
00-3dexperience platform 入門LUKE CHEN
 
[Presales Training]82 演讲 体验时代的智能创新研发平台体系
[Presales Training]82 演讲   体验时代的智能创新研发平台体系[Presales Training]82 演讲   体验时代的智能创新研发平台体系
[Presales Training]82 演讲 体验时代的智能创新研发平台体系Jimmy Chang
 
3D體驗平台-模組(角色)說明
3D體驗平台-模組(角色)說明3D體驗平台-模組(角色)說明
3D體驗平台-模組(角色)說明Jimmy Chang
 

En vedette (20)

COE
COECOE
COE
 
Digital India
Digital IndiaDigital India
Digital India
 
Management tools
Management toolsManagement tools
Management tools
 
The Power of Storytelling - The Execution Shortcut
The Power of Storytelling - The Execution ShortcutThe Power of Storytelling - The Execution Shortcut
The Power of Storytelling - The Execution Shortcut
 
Excellence in Execution with speakers notes
Excellence in Execution with speakers notesExcellence in Execution with speakers notes
Excellence in Execution with speakers notes
 
point of sale excecution
point of sale excecutionpoint of sale excecution
point of sale excecution
 
Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10
 
Strategy Execution Masterclass Jeroen De Flander Nyenrode
Strategy Execution Masterclass Jeroen De Flander NyenrodeStrategy Execution Masterclass Jeroen De Flander Nyenrode
Strategy Execution Masterclass Jeroen De Flander Nyenrode
 
Peex Consulting Services
Peex Consulting ServicesPeex Consulting Services
Peex Consulting Services
 
Strategy Execution at Strategy Leaders Qatar_Jeroen De Flander
Strategy Execution at Strategy Leaders Qatar_Jeroen De FlanderStrategy Execution at Strategy Leaders Qatar_Jeroen De Flander
Strategy Execution at Strategy Leaders Qatar_Jeroen De Flander
 
Why Strategy Fails...and How You Can Make it Work
Why Strategy Fails...and How You Can Make it WorkWhy Strategy Fails...and How You Can Make it Work
Why Strategy Fails...and How You Can Make it Work
 
Balanced Scorecard Master Class pdf
Balanced Scorecard Master Class pdf Balanced Scorecard Master Class pdf
Balanced Scorecard Master Class pdf
 
Execution Excellence @ HR By Naveen Bhatia Bharti
Execution Excellence @ HR By Naveen Bhatia BhartiExecution Excellence @ HR By Naveen Bhatia Bharti
Execution Excellence @ HR By Naveen Bhatia Bharti
 
Strategic Innovation Process
Strategic Innovation ProcessStrategic Innovation Process
Strategic Innovation Process
 
GS1 université d'été 2015
GS1 université d'été 2015GS1 université d'été 2015
GS1 université d'été 2015
 
001-Creating the Sketch 草圖
001-Creating the Sketch 草圖001-Creating the Sketch 草圖
001-Creating the Sketch 草圖
 
unified skeleton for real time mocap
unified skeleton for real time mocapunified skeleton for real time mocap
unified skeleton for real time mocap
 
00-3dexperience platform 入門
00-3dexperience platform 入門00-3dexperience platform 入門
00-3dexperience platform 入門
 
[Presales Training]82 演讲 体验时代的智能创新研发平台体系
[Presales Training]82 演讲   体验时代的智能创新研发平台体系[Presales Training]82 演讲   体验时代的智能创新研发平台体系
[Presales Training]82 演讲 体验时代的智能创新研发平台体系
 
3D體驗平台-模組(角色)說明
3D體驗平台-模組(角色)說明3D體驗平台-模組(角色)說明
3D體驗平台-模組(角色)說明
 

Similaire à Optimized Plant Construction (project execution excellence for on-time and on-budget delivery)

건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)
건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)
건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)다쏘시스템코리아
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxiFieldsmart Technologies
 
CFD analysis for Product Engineers
CFD analysis for Product EngineersCFD analysis for Product Engineers
CFD analysis for Product EngineersDelphine Genouvrier
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfiFieldsmart Technologies
 
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...IngridBuenaventura
 
The Connected Industrial Workforce
The Connected Industrial WorkforceThe Connected Industrial Workforce
The Connected Industrial Workforceaccenture
 
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)다쏘시스템코리아
 
Optimized Planning Industry Process Experience
Optimized Planning Industry Process ExperienceOptimized Planning Industry Process Experience
Optimized Planning Industry Process ExperienceDassault Systemes
 
COMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAPCOMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAPComit Projects Ltd
 
MODS USA brochure email
MODS  USA brochure emailMODS  USA brochure email
MODS USA brochure emailJon Bell
 
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)Logical Data Fabric: Maturing Implementation from Small to Big (APAC)
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)Denodo
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit
 
Avoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAvoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAconex
 
Pivoting event streaming, from PROJECTS to a PLATFORM
Pivoting event streaming, from PROJECTS to a PLATFORMPivoting event streaming, from PROJECTS to a PLATFORM
Pivoting event streaming, from PROJECTS to a PLATFORMconfluent
 
S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)Predix
 
AVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA-Americas
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10CADISON
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10CADISON
 
Pitch Deck Teardown: Transcend's $20M Series B deck
Pitch Deck Teardown: Transcend's $20M Series B deckPitch Deck Teardown: Transcend's $20M Series B deck
Pitch Deck Teardown: Transcend's $20M Series B deckHajeJanKamps
 

Similaire à Optimized Plant Construction (project execution excellence for on-time and on-budget delivery) (20)

건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)
건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)
건설산업의 End to-end 협업을 위한 선진 BIM 방법론 (다쏘시스템)
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptx
 
CFD analysis for Product Engineers
CFD analysis for Product EngineersCFD analysis for Product Engineers
CFD analysis for Product Engineers
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdf
 
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...
By Thoughtworks | Building data as a product: The key to unlocking Data Mesh'...
 
The Connected Industrial Workforce
The Connected Industrial WorkforceThe Connected Industrial Workforce
The Connected Industrial Workforce
 
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)
글로벌 건설산업 최신 동향 및 선진 BIM 전략 (다쏘시스템)
 
Optimized Planning Industry Process Experience
Optimized Planning Industry Process ExperienceOptimized Planning Industry Process Experience
Optimized Planning Industry Process Experience
 
COMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAPCOMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAP
 
MODS USA brochure email
MODS  USA brochure emailMODS  USA brochure email
MODS USA brochure email
 
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)Logical Data Fabric: Maturing Implementation from Small to Big (APAC)
Logical Data Fabric: Maturing Implementation from Small to Big (APAC)
 
Exalead OneCall
Exalead OneCallExalead OneCall
Exalead OneCall
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
 
Avoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAvoid the risk and streamline your project controls
Avoid the risk and streamline your project controls
 
Pivoting event streaming, from PROJECTS to a PLATFORM
Pivoting event streaming, from PROJECTS to a PLATFORMPivoting event streaming, from PROJECTS to a PLATFORM
Pivoting event streaming, from PROJECTS to a PLATFORM
 
S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)
 
AVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsons
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10
 
Pitch Deck Teardown: Transcend's $20M Series B deck
Pitch Deck Teardown: Transcend's $20M Series B deckPitch Deck Teardown: Transcend's $20M Series B deck
Pitch Deck Teardown: Transcend's $20M Series B deck
 

Dernier

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Dernier (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Optimized Plant Construction (project execution excellence for on-time and on-budget delivery)

  • 1. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 1 Project Execution Excellence On-Time and On-Budget Nilanjan BANDYOPADHYAY Senior Industry Consultant – Energy, Process, Utilities & Industrial Equipment :nilanjan.BANDYOPADHYAY@3ds.com +91 9818851114
  • 2. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 2 • Introduction to Dassault Systemes • The 3DEXPERIENCE Platform • Energy, Process & Utilities – Sectors and Challenges • Optimized Plant Construction ISE (Deliver Capital Projects On Time & On Budget) • Customer References • Questions and Answers Agenda
  • 3. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 3 Our Company a Scientific company Combining Science, Technology and Art for a sustainable society 12,400 passionate people • 112 nationalities • One global R&D / 53 labs • Game changing 3DEXPERIENCE solutions 190,000 enterprise customers • 12 industries in 140 countries • >10 million on premise users • >100 million online users 3,500 partners • Research & Education • Software & Technology • Sales & Services Long-term driven • Majority shareholder control • Revenue: $ 2.8 Bn* • Operating margin: 31.5%* * Non-IFRS
  • 4. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 4 The 3DEXPERIENCE Platform Social & Collaborative Apps 3D Modeling Apps Simulation Apps Information Intelligence Apps Real time 3DEXPERIENCE
  • 7. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 7 Virtual + Real Quadrant SIMULATION APPLICATIONS Where virtual worlds meet reality
  • 10. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 11 Energy, Process & Utilities - Sectors • Design • Contracting • Generators • Turbines • Boilers • Wind turbines • Petrochemical • Oil refinery plants • Pipelines • Storage • Nuclear Plants • Thermal Plants • Inland & Offshore Wind • Hydroelectric Dams Power • Agrochemical • Paper • Polymers • Industrial Gases Chemical • Water • Waste • Minerals, Glass • Metals ProcessOil & Gas • Transmission, sales & marketing • Water, Electricity • Natural Gas • Waste Utilities
  • 12. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 13 Optimized Plant Construction Safe Plant Engineering Safe Plant Operation Energy, Process & Utilities Solution Experiences Consumer Driven Supply 1 3 6 4 2 5 Sustainable Power Equipment “Design it for Performance & Robustness” “Deliver it on time & on budget” “Engineer it for Compliance and Safety” “Operate it for Efficiency & Safety” “Plan it & Monitor it for Consumer” Winning Tender “When to Bid, Bid to Win” 7 Sustainable Plant Decommissioning “for Safety & Less Environmental Impact”
  • 13. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 14 More than 35% of projects exceed budget & cycle time by more than 10% Source: Booz Allen Hamilton Percentage of Projects Exceeding Budget and Cycle Time by More Than 10% How we deliver plant construction on time & on budget?
  • 14. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 15 IF Project Manager Has Perfect Visibility on His Project… Executable plan Secure QCD Risk mitigation Resolving issues Negotiation with stake holders … Analogy… Captain of Ocean Freight INFORMATION Key for Successful Project But Capital projects need more Visibility, Consistency & Traceability
  • 15. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 16 Optimized Plant Construction 4 Key Values Visibility Project status is available real time Provide necessary or meaningful information out of the flood No Ambiguity with 3D Clear understanding of complex plant 3D for a common language for communication Consistency & Traceability Single source of the truth Information is consistent all the time across the global operation Minimize Waste Achieve minimum waste (= LEAN) with executable & reasonable plan based on the real state of the project
  • 16. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 17 Optimized Plant Construction Reduce Time to Start-up & Cost with Digital Plant Construction Planning Construction Engineering Expeditor Buyer Quality Control Schedule ControllerCost Controller Project Manager Risk Management Bidding Management Deliverable Management Work Package Management Milestone Management Issues and Change Management
  • 17. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 18 2 4 5 3 Optimized Plant Construction Deliver it on time & on budget Construction Field Planning & Execution Lean Construction Execution Engineering Work Package Digital engineering management from plan, execution, approval to change Collaborative Digital Procurement Productivity for requisitioning & manage procurement lifecycle Requirements Driven Project Management & Monitoring Project management & execution integrated with Quality Management System 6 Virtual Construction 4D/5D Simulation Construction plan optimization & validation 3D Construction Instructions Intuitive work instruction for safety, quality & efficiency 1
  • 18. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 19 Engineering Work Package Digital engineering management from plan, execution, approval to change Challenges Pressure for low cost engineering & global operation / on time engineering delivery / securing engineering quality Manage huge amount of information, requirements, deliverables, comments, changes, etc. Efficient engineering while more demand on global operation Secure ERD (Engineering Required Date) Secure engineering quality even in frequent changes / Secure traceability Value Proposal Access to up-to-date information reduce re-work / secure engineering quality Speed up engineering cycle time Earlier risk identification and decision make Lower management cost Lower document handling cost Rigorous change management for engineering quality and traceability Targeted Users Project Manager Engineering Manager Lead Engineer Engineer Baseline Deliverable List
  • 19. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 20 Requirement Driven Project Management & Monitoring Project management & execution integrated with Quality Management System Challenges While globalizing business, projects MUST comply with local regulation, industry standards and project requirements. Pressure for short schedule, low cost and global operation, but yet Quality (= products and services consistently meet customer’s requirements) is invariable essential. Value Proposal Enforce standard delivery processes with, input, output and procedures. / Enforce standard review processes. Integrated Quality Audit and CAR (Collective Action Report) process. Recognize each requirement inside documents. Secure its fulfilment. Trace impact of change across deliverables. Task execution status immediately update project status report. Real- time project KPI. Manage issues & risks with associated information. Monitor status of issues & risks real-time. Integrated lesson & leant for continuous improvement. Targeted Users Project Manager QA/QC Schedule Controller Engineering Manager Lead Engineer
  • 20. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 21 Collaborative Digital Procurement Productivity for requisitioning & manage procurement lifecycle Challenges Pressure for low budget procurement / on time material delivery / securing required quality Requisitioning (RFQ) process depends on engineering progress Secure PO schedule with limited procurement resource Place PO at lowest cost while securing required quality Avoid unexpected delay of material delivery by vendor (supplier) Value Proposal Requisition (RFQ) integrated with engineering secure procurement is based on valid information Effective procurement execution / minimum resource Real time status helps procurement people’s right decision / Earlier risk identification enable effective corrective action Avoid dispute with vendors (suppliers) on such as change orders by providing traceability linking all related information during procurement execution Targeted Users Procurement Management Buyer Expeditor Project Manager Engineering Manager Lead Engineer / Engineer
  • 21. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 22 Virtual Construction 4D/5D Simulation Construction plan optimization & validation Challenges Market demand from plant owner on shorter delivery of plant construction project for better financial profitability. Less schedule merging while minimizing risk of schedule delay How to verify new construction method or approach Dependency on aging & experienced people Cope with Health, Safety & Environment while challenging plan Value Proposal Validate and optimize construction schedule in 3D Collaborative Construction innovation through Plan , Visualize and Execute in 3D Concurrent Engineering where construction is going on in parallel with engineering Enhance Health & Safety with human simulation and detailed ergonomic analysis Capture and reuse knowledge and best practices using “Single Version of Truth” platform Integrate with any scheduling system Targeted Users Construction Manager Construction Superintendent Project Manager
  • 22. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 23 3D Construction Instructions Intuitive work instruction for safety, quality & efficiency Challenges Pressure for short schedule and low cost / new construction method / global operation / securing quality / Health, Safety & Environment Faults from the low level of site execution lead to the costly updates (time & money) on construction site Execute first-time-right new construction method for quicker and shorter construction / more complicated construction / new technology Quality communication across joint venture / multi location / multi national / multi language Value Proposal Multilingual understanding / minimize risk of misunderstanding of field work instruction Leaning retention Secure field workers referring to the latest information Enable paperless operation IP protection in Join Venture operation Targeted Users Construction Manager Construction Superintendent Project Manager
  • 23. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 24 Construction Field Planning & Execution Lean Construction Execution Challenges Construction industry has been less productive compared to manufacturing industry / Huge wastes of time, effort and material An average of 49.6% of operational efforts are devoted to non-value adding activities Up to 57% of construction spending in our current business model is non-value-added effort or waste Value Proposal “Last Planner System” integrated with “Virtual Construction 4D Simulation” turns construction plan optimized in virtual space to real value in the field, and enable real “Lean Construction”. “Construction Field Planning & Execution” implements “Last Planner System” and enables field planner to plan day-to-day activity taking real situation and constraints, material availability, precedence task state, etc., into account and eliminates various reason for “wastes”. Enable optimized field work plan, and improve filed workers productivity / Eliminate wastes of time, effort and material FIWP (Field Installation Work Package) with comprehensive information and intuitive 3D Construction Instructions helps field workers understanding on the processes, and enable safe work Electronic work reporting enables real-time status report for construction managers and field planners, and helps timely decision making Work reporting equipped with intelligent identification eliminates data entry errors Targeted Users Construction Manager Construction Superintendent Foreman Project Manager
  • 24. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 25 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2012 New paradigm: 3D is integrated into project execution and used for planning and communication, not only just for design Old paradigm: 3D only for design but communication is 2D and textual 3DExperience Platform – A paradigm shift
  • 25. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 26 2 4 5 3 Optimized Plant Construction – Reference Customers Deliver it on time & on budget Construction Field Planning & Execution Lean Construction Execution Engineering Work Package Digital engineering management from plan, execution, approval to change Collaborative Digital Procurement Productivity for requisitioning & manage procurement lifecycle Requirements Driven Project Management & Monitoring Project management & execution integrated with Quality Management System 6 Virtual Construction 4D Simulation Construction plan optimization & validation 3D Construction Instructions Intuitive work instruction for safety, quality & efficiency 1
  • 26. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 27 Reliance Power  Reliance Group’s brand, experience and position in the Indian Power Sector  One of the leading power development companies in India  Largest portfolio of power projects under construction and development in the private sector in India Challenges Create an Integrated platform for Project and Document Management with Collaboration with Consultants, Owner – Operator and EPC Establish Business Processes in all Phases of Plant Life Cycle Integrate the Processes and Technology for monitoring the Projects in terms of Time, Materials and Resources Consolidated Real-Time Dashboards – Physical Monitoring (CCTV), Project Status in terms of Time and progress (Physical and Financial), Supply Chain Logistics from the Equipment Suppliers Extending the application to mobile devices – Smart Phones and IPADs Long term vision: Create Simulation and 3D models of plants for a Virtual View Values Improvement in ability to manage a portfolio of multiple large projects with improved planning, schedule, collaboration, cost control and online visibility Industry Process Module
  • 27. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 28 CHIDI Founded in 1955, the biggest hydro power investigation and design institute in China Holds overall Grade A engineering design qualifications and can undertake construction project design, general construction project contracting, project management and related technical and management services in 21 industries, including electric power, water conservancy, construction… Challenges  Manage complex project cost overrun  Improve Project information search and sharing  Dam design in 2D is difficult to reuse. No knowledge capture. No efficient collaboration design between different disciplines Values  Applied for over 200 project / Over 80 departments,1500 user use / Manage over 30000 tasks, 16000 equipment and 26000 project files  Visual, accurate and prompt statistical analysis provides executives with a monitoring and decision support / Reduce project delay risk  Achieve design quality fingerprint and traceability / Truthfulness of sampling inspection  Ensure design drawing and equipment procurement meet the needs of the construction schedule / Support supplier relationship management and strategic procurement  Delivery of digital design results reduced the number of drawings produced Industry Process Module
  • 28. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 29 Skanska Challenges  Weak project transparency: Plan, cost estimation, forecast and actual were not in sync  Information discontinuity between Design, Planning, Construction and Maintenance phases  Project documentation not under control  Procurement spend too high, lacking process and transparency Values The number of unprofitable projects was reported to have decreased dramatically during the first months after going live with the solution  Better visibility improved decision-making and closer project control  Collaboration between design partners and subcontractors  With site sourcing, aiming to save 2-5% from overall procurement spend Skanska Finland is part of the 120-year-old Skanska Group, one of the world’s leading construction and project development companies With headquarters in Sweden and more than 53,000 employees in local offices throughout Europe, the UK, North America, Latin America and around the world, the company’s revenue in 2009 was €14.9 billion Industry Process Module
  • 29. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 30 Lawrence Livermore National Laboratory Challenges  Integrations needed to CAD and ERP  Paper-based system lacked controls mandated by DOE for equipment design and nuclear safety  Manage hundreds of thousands of documents and critical processes for multiple complex projects that span decades  Demonstrate responsible management of taxpayer resources  Manage archives of documents per DOE and National Archives Records Administration (NARA) guidelines Values  Reduced CAD drawing access from 2 days to 5 minutes  Increased engineering record center throughput 6X – from 15 to more than 100 drawings per day  BOM data transfer process reduced from days to real time  Reduced procurement package creation from 1 week to 1 day U.S. DOE National Laboratory: Founded in 1952 / ~7000 Employees The National Ignition Facility:  World’s largest laser / Stadium-sized facility  30-year research program  Over 4 million parts & components / Over 22 thousand optical elements Industry Process Module
  • 30. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 31 Keppel Offshore & Marine One of the largest offshore and marine groups in the world, leading designer, builder and repairer of mobile offshore rigs (jackups and semisubmersibles) 20 yards serving regions including Asia Pacific, Gulf of Mexico, Brazil, Caspian Sea, Middle East and the North Sea, enables effective execution Near Market, Near Customer strategy Challenges Accelerate global project execution Collaborate Project Information across the globe Provide visibility on status to Project Management and Production Operations Reduce labor intensive documentation work including generating reports and handling correspondence Manage customer change request, feedback and variation orders Enhance Engineering knowledge capture Values One Stop Center for Engineering Project Information Management able to identify potential impact to project early Problems in projects are visible immediately Industry Process Module
  • 31. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 32 NIAEP Nizhny Novgorod Engineering Company ATOMENERGOPROJECT Challenges NPP construction time & costs  Construction delays, Schedule shifts, costly resources idle time due to inaccurate planning (loses up to $1M per day)  Faults from the low level of the construction technology lead to the costly updates (time & money) on construction site Lack of the experience from the side of the workers responsible for project critical operations; safeguarding of workers security at the construction site Values  Reduce building duration, ability to build each new nuclear station block within 48 months  Unified approach to nuclear plant construction to be prepared to build 20 new nuclear blocks  Control time and control costs : deadline driven approach Russian leading EPC in the nuclear industry with over 4000 employees and over 7000 personnel including subsidiaries, executing currently 20 projects in Russia and abroad NIAEP and ROSATOM have launched significant investment programs to accelerate and deploy new applications and innovative processes, out of which DS PLM solutions were selected Industry Process Module
  • 32. 3DS.COM©DassaultSystèmes|ConfidentialInformation|12-May-15|ref.:3DS_Document_2014 33 Nilanjan BANDYOPADHYAY Senior Industry Consultant – Energy, Process, Utilities & Industrial Equipment :nilanjan.BANDYOPADHYAY@3ds.com +91 9818851114