PDCA APPROACH TO WASTE ELIMINATION
VALUE-ADD VS. NON-VALUE ADD
1. Define value from the customer’s
perspective and provide what they
want
2. Identify the value stream or process
for each product or service and
reduce or eliminate steps that do not
add value
3. Align the value-added steps so they
flow continuously
4. Allow the level of customer demand
to pull the process, i.e., produce only
what is ordered
5. Pursue perfection through
continuous improvement
LEAN MANAGEMENT FRAMEWORK
LEAN PRINCIPLESWORK VS. WASTE
Over-production
Producing more than
what the customer
needs
Inventory
Building and storing
extra products the
customer has not
ordered
Transportation
Moving product from
one place to another
Defects
Reprocessing, or
correcting work
Over-processing
Adding excess value
when the customer does
not require it
Motion
Extra physical or mental
motion that does not add
value
Intellect
Not using employees’
full intellectual
contribution
Waiting
Employees waiting for
another process or a
machine/tool
Waste
§ Transform or shape
material or information
§ Customer wants it and
willing to pay for it
§ Done right the first time
§ No value created but
required by current
thinking
§ No value created but
required by process
limitations
§ No value created but
required by current
technology
§ No value created but
required by government/
business regulations
§ Consume resources but
creates no value for the
customer
§ Could be stopped and it
would be invisible to the
customer
Value-Added
Activities
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Value-Add
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
EIGHT TYPES OF WASTE
Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5
Stability
Just-In-Time
• Continuous flow
• Takt time
• Pull system
• Flexible workforce
Jidoka
• Separate man &
machine work
• Abnormality
Identification
• Poka yoke
• Visual Control
Goals:
highest quality,
lowest cost, shortest lead times
Involvement
1
3 4
5
Heijunka Standardized Work Kaizen2
Select the Theme
Plan the Schedule
Grasp the Present Situation
Establish the Target
Analyze the Cause & Identify Corrective Action
Implement Corrective Action
Evaluate the Result
Standardize & Follow-up
1
2
3
4
5
6
7
8
PLAN
ACT
CHECK
DO
Lean Concepts &
Principles
© Operational Excellence Consulting. All rights reserved.
PDCA APPROACH TO WASTE ELIMINATION
VALUE-ADD VS. NON-VALUE ADD
1. Define value from the customer’s
perspective and provide what they
want
2. Identify the value stream or process
for each product or service and
reduce or eliminate steps that do not
add value
3. Align the value-added steps so they
flow continuously
4. Allow the level of customer demand
to pull the process, i.e., produce only
what is ordered
5. Pursue perfection through
continuous improvement
LEAN MANAGEMENT FRAMEWORK
LEAN PRINCIPLESWORK VS. WASTE
Over-production
Producing more than
what the customer
needs
Inventory
Building and storing
extra products the
customer has not
ordered
Transportation
Moving product from
one place to another
Defects
Reprocessing, or
correcting work
Over-processing
Adding excess value
when the customer does
not require it
Motion
Extra physical or mental
motion that does not add
value
Intellect
Not using employees’
full intellectual
contribution
Waiting
Employees waiting for
another process or a
machine/tool
Waste
§ Transform or shape
material or information
§ Customer wants it and
willing to pay for it
§ Done right the first time
§ No value created but
required by current
thinking
§ No value created but
required by process
limitations
§ No value created but
required by current
technology
§ No value created but
required by government/
business regulations
§ Consume resources but
creates no value for the
customer
§ Could be stopped and it
would be invisible to the
customer
Value-Added
Activities
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Value-Add
Non-Value Add:
Incidental Waste
Non-Value Add:
Pure Waste
Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5
Stability
Just-In-Time
• Continuous flow
• Takt time
• Pull system
• Flexible workforce
Jidoka
• Separate man &
machine work
• Abnormality
Identification
• Poka yoke
• Visual Control
Goals:
highest quality,
lowest cost, shortest lead times
Involvement
1
3 4
5
Heijunka Standardized Work Kaizen2
EIGHT TYPES OF WASTE
Select the Theme
Plan the Schedule
Grasp the Present Situation
Establish the Target
Analyze the Cause & Identify Corrective Action
Implement Corrective Action
Evaluate the Result
Standardize & Follow-up
1
2
3
4
5
6
7
8
PLAN
ACT
CHECK
DO
© Operational Excellence Consulting. All rights reserved. 3
Operational Excellence Consulting is a management training and consulting
firm that assists organizations in improving business performance and
effectiveness. Based in Singapore, the firm’s mission is to create business
value for organizations through innovative design and operational excellence
management training and consulting solutions. For more information, please
visit www.oeconsulting.com.sg

Contenu connexe

Plus de Operational Excellence Consulting

Digital Strategic Business Planning Methodology
Digital Strategic Business Planning MethodologyDigital Strategic Business Planning Methodology
Digital Strategic Business Planning Methodology
Operational Excellence Consulting
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
Operational Excellence Consulting
 
Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
Operational Excellence Consulting
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
Operational Excellence Consulting
 
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Operational Excellence Consulting
 
Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)
Operational Excellence Consulting
 
Problem Solving & Visualization Tools
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
Operational Excellence Consulting
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
Operational Excellence Consulting
 
8D Problem Solving Process & Tools
8D Problem Solving Process & Tools8D Problem Solving Process & Tools
8D Problem Solving Process & Tools
Operational Excellence Consulting
 
Digital Transformation Process Poster
Digital Transformation Process PosterDigital Transformation Process Poster
Digital Transformation Process Poster
Operational Excellence Consulting
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
Operational Excellence Consulting
 
Four Steps of Jidoka Poster
Four Steps of Jidoka PosterFour Steps of Jidoka Poster
Four Steps of Jidoka Poster
Operational Excellence Consulting
 
Lean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process PosterLean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process Poster
Operational Excellence Consulting
 
AIDA Marketing Model Poster
AIDA Marketing Model PosterAIDA Marketing Model Poster
AIDA Marketing Model Poster
Operational Excellence Consulting
 
TPM: One-Point Lessons Poster
TPM: One-Point Lessons PosterTPM: One-Point Lessons Poster
TPM: One-Point Lessons Poster
Operational Excellence Consulting
 
4M Analysis Poster
4M Analysis Poster4M Analysis Poster
Hoshin Planning Poster
Hoshin Planning PosterHoshin Planning Poster
Hoshin Planning Poster
Operational Excellence Consulting
 
Customer-Centricity
Customer-CentricityCustomer-Centricity
Lean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) PosterLean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) Poster
Operational Excellence Consulting
 
Business Model Canvas
Business Model CanvasBusiness Model Canvas
Business Model Canvas
Operational Excellence Consulting
 

Plus de Operational Excellence Consulting (20)

Digital Strategic Business Planning Methodology
Digital Strategic Business Planning MethodologyDigital Strategic Business Planning Methodology
Digital Strategic Business Planning Methodology
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
 
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
 
Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)
 
Problem Solving & Visualization Tools
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
8D Problem Solving Process & Tools
8D Problem Solving Process & Tools8D Problem Solving Process & Tools
8D Problem Solving Process & Tools
 
Digital Transformation Process Poster
Digital Transformation Process PosterDigital Transformation Process Poster
Digital Transformation Process Poster
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
 
Four Steps of Jidoka Poster
Four Steps of Jidoka PosterFour Steps of Jidoka Poster
Four Steps of Jidoka Poster
 
Lean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process PosterLean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process Poster
 
AIDA Marketing Model Poster
AIDA Marketing Model PosterAIDA Marketing Model Poster
AIDA Marketing Model Poster
 
TPM: One-Point Lessons Poster
TPM: One-Point Lessons PosterTPM: One-Point Lessons Poster
TPM: One-Point Lessons Poster
 
4M Analysis Poster
4M Analysis Poster4M Analysis Poster
4M Analysis Poster
 
Hoshin Planning Poster
Hoshin Planning PosterHoshin Planning Poster
Hoshin Planning Poster
 
Customer-Centricity
Customer-CentricityCustomer-Centricity
Customer-Centricity
 
Lean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) PosterLean Daily Management System (LDMS) Poster
Lean Daily Management System (LDMS) Poster
 
Business Model Canvas
Business Model CanvasBusiness Model Canvas
Business Model Canvas
 

Dernier

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Dernier (20)

Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 

Lean Poster

  • 1. Lean Concepts & Principles © Operational Excellence Consulting. All rights reserved. PDCA APPROACH TO WASTE ELIMINATION VALUE-ADD VS. NON-VALUE ADD 1. Define value from the customer’s perspective and provide what they want 2. Identify the value stream or process for each product or service and reduce or eliminate steps that do not add value 3. Align the value-added steps so they flow continuously 4. Allow the level of customer demand to pull the process, i.e., produce only what is ordered 5. Pursue perfection through continuous improvement LEAN MANAGEMENT FRAMEWORK LEAN PRINCIPLESWORK VS. WASTE Over-production Producing more than what the customer needs Inventory Building and storing extra products the customer has not ordered Transportation Moving product from one place to another Defects Reprocessing, or correcting work Over-processing Adding excess value when the customer does not require it Motion Extra physical or mental motion that does not add value Intellect Not using employees’ full intellectual contribution Waiting Employees waiting for another process or a machine/tool Waste § Transform or shape material or information § Customer wants it and willing to pay for it § Done right the first time § No value created but required by current thinking § No value created but required by process limitations § No value created but required by current technology § No value created but required by government/ business regulations § Consume resources but creates no value for the customer § Could be stopped and it would be invisible to the customer Value-Added Activities Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Value-Add Non-Value Add: Incidental Waste Non-Value Add: Pure Waste EIGHT TYPES OF WASTE Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5 Stability Just-In-Time • Continuous flow • Takt time • Pull system • Flexible workforce Jidoka • Separate man & machine work • Abnormality Identification • Poka yoke • Visual Control Goals: highest quality, lowest cost, shortest lead times Involvement 1 3 4 5 Heijunka Standardized Work Kaizen2 Select the Theme Plan the Schedule Grasp the Present Situation Establish the Target Analyze the Cause & Identify Corrective Action Implement Corrective Action Evaluate the Result Standardize & Follow-up 1 2 3 4 5 6 7 8 PLAN ACT CHECK DO
  • 2. Lean Concepts & Principles © Operational Excellence Consulting. All rights reserved. PDCA APPROACH TO WASTE ELIMINATION VALUE-ADD VS. NON-VALUE ADD 1. Define value from the customer’s perspective and provide what they want 2. Identify the value stream or process for each product or service and reduce or eliminate steps that do not add value 3. Align the value-added steps so they flow continuously 4. Allow the level of customer demand to pull the process, i.e., produce only what is ordered 5. Pursue perfection through continuous improvement LEAN MANAGEMENT FRAMEWORK LEAN PRINCIPLESWORK VS. WASTE Over-production Producing more than what the customer needs Inventory Building and storing extra products the customer has not ordered Transportation Moving product from one place to another Defects Reprocessing, or correcting work Over-processing Adding excess value when the customer does not require it Motion Extra physical or mental motion that does not add value Intellect Not using employees’ full intellectual contribution Waiting Employees waiting for another process or a machine/tool Waste § Transform or shape material or information § Customer wants it and willing to pay for it § Done right the first time § No value created but required by current thinking § No value created but required by process limitations § No value created but required by current technology § No value created but required by government/ business regulations § Consume resources but creates no value for the customer § Could be stopped and it would be invisible to the customer Value-Added Activities Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Value-Add Non-Value Add: Incidental Waste Non-Value Add: Pure Waste Stability Standardization Just-In-Time Jidoka Involvement1 2 3 4 5 Stability Just-In-Time • Continuous flow • Takt time • Pull system • Flexible workforce Jidoka • Separate man & machine work • Abnormality Identification • Poka yoke • Visual Control Goals: highest quality, lowest cost, shortest lead times Involvement 1 3 4 5 Heijunka Standardized Work Kaizen2 EIGHT TYPES OF WASTE Select the Theme Plan the Schedule Grasp the Present Situation Establish the Target Analyze the Cause & Identify Corrective Action Implement Corrective Action Evaluate the Result Standardize & Follow-up 1 2 3 4 5 6 7 8 PLAN ACT CHECK DO
  • 3. © Operational Excellence Consulting. All rights reserved. 3 Operational Excellence Consulting is a management training and consulting firm that assists organizations in improving business performance and effectiveness. Based in Singapore, the firm’s mission is to create business value for organizations through innovative design and operational excellence management training and consulting solutions. For more information, please visit www.oeconsulting.com.sg