20. Step 1.
Detach Cutting
Mechanism
from liner bag
sprout cover
Pg 20/31 Operating Manual for Cube1000™
21. Step 2.
Insert Cutting
Mechanism
into discharge
sprout of liner
bag
Pg 21/31 Operating Manual for Cube1000™
22. Step 3.
Insert PE/PP
Valve into the
IBC discharge
hole
Pg 22/31 Operating Manual for Cube1000™
23. Step 4.
.
Apply
considerable
force while
turning Valve.
Ensure cutting
mechanism cuts
through the
discharge
opening
Pg 23/31 Operating Manual for Cube1000™