WHAT IS A CIRCUIT BREAKER?
A circuit breaker is an equipment that breaks a
circuit either manually or automatically
under all conditions at no load, full load or
short circuit.
TYPES OF
CIRCUIT
BREAKER
OIL
CIRCUIT
BREAKER
AIR BLAST
CIRCUIT
BREAKER
SF6
CIRCUIT
BREAKER
VACCUM
CIRCUIT
BREAKER
Breaker Used In 132KV Grid
Station
• Oil Circuit Breaker
• Vacuum Circuit breaker
• SF6 Circuit Breaker
1) Vacuum interrupters installed in indoor switchgear and
kiosks rated up to 36 KV.
Vacuum circuit breakers can be classified
in the following two categories:
2) Vacuum circuit breakers suitable for outdoor
installation and having two or more interrupters in series
per pole
VACUUM CIRCUIT BREAKER
• Vacuum is used as an arc quenching medium.
• Have greatest insulating strength.
• 10-7
to 10-5
pressure is to be maintained.
• Used in 11KV panel in control room of grid
station.
VACUUM CIRCUIT BREAKER
•When contacts of a breaker are opened in
•Vacuum is being used as the arc quenching
medium.
•Vacuum offers highest insulating strength.
Vacuum Circuit Breaker
vacuum, the interruption occurs at first
current zero with dielectric strength
between the contacts building up at a rate
thousands of times that obtained with
other circuit breakers.
ABOUT CIRCUIT BREAKER
PRINCIPLE:
•When the contacts of the breaker are opened in
vacuum (10 -7 to 10 -5 torr), an arc is
produced between the contacts by the ionization of
metal vapours of contacts.
•The arc is quickly extinguished because the metallic
vapours, electrons, and ions
produced during arc condense quickly on the surfaces
of the circuit breaker contacts,
resulting in quick recovery of dielectric strength.
CONSTRUCTION:
• It consists of fixed contact, moving contact and arc
shield mounted inside a vacuum
chamber.
•The movable member is connected to the control
mechanism by stainless steel bellows .
•This enables the permanent sealing of the vacuum
chamber so as to eliminate the
possibility of leak .
•A glass vessel or ceramic vessel is used as the outer
insulating body
WORKING OF VCB
WORKING:
•When the breaker operates the moving contacts
separates from the fixed contacts and
an arc is struck between the contacts.
•The production of arc is due to the ionization of metal
ions and depends very much
upon the material of contacts.
•The arc is quickly extinguished because the metallic
vapours, electrons and ions
produced during arc are diffused in short time and
seized by the surfaces of moving
and fixed members and shields.
WORKING:
.
•Vacuum Circuit Breaker in a vacuum breaker
occurs with a short contact separation
ADVANTAGES
• Compact, reliable and have longer life.
• No fire hazards.
• No generation of gas during and after
operation.
• Can interrupt any fault current.
• No noise is produced while operating.
• Require less power for control operation.
DISADVANTAGES
• It needs additional surge suppressors.
• vacuum circuit breakers are uneconomical
above 36kV.
• Advance technology is used for production of
vacuum interrupters.
APPLICATIONS:
•For outdoor applications ranging from 22 kV to
66 kV. Suitable for majority of
• applications in rural area.
Vacuum circuit breaker

Contenu connexe

Tendances

HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Shankar Singh
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
Ankit Vij
 

Tendances (20)

Sf6 circuit breakers
Sf6 circuit breakersSf6 circuit breakers
Sf6 circuit breakers
 
Lightning Arrester Working Principle & Types
Lightning Arrester Working Principle & TypesLightning Arrester Working Principle & Types
Lightning Arrester Working Principle & Types
 
Circuit breakers
Circuit breakers Circuit breakers
Circuit breakers
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
transformer protection
transformer protection transformer protection
transformer protection
 
Unit 02 - Fuse and circuit breakers
Unit  02 -  Fuse and circuit breakersUnit  02 -  Fuse and circuit breakers
Unit 02 - Fuse and circuit breakers
 
INSULATORS AND ITS TYPES
INSULATORS AND ITS TYPESINSULATORS AND ITS TYPES
INSULATORS AND ITS TYPES
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 
Planning and modern trends in hvdc
Planning and modern trends in hvdcPlanning and modern trends in hvdc
Planning and modern trends in hvdc
 
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 

En vedette

DM water conservation
DM water conservationDM water conservation
DM water conservation
Dilip Kumar
 
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Living Online
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety Professionals
Living Online
 
Ro system animation
Ro system animationRo system animation
Ro system animation
Indiana Agak
 
Ro Operation And Maintenance Manual
Ro Operation And Maintenance ManualRo Operation And Maintenance Manual
Ro Operation And Maintenance Manual
Deivanayagam Pillai
 

En vedette (20)

DM water conservation
DM water conservationDM water conservation
DM water conservation
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
How Reverse Osmosis Water Purification Systems Work
How Reverse Osmosis Water Purification Systems WorkHow Reverse Osmosis Water Purification Systems Work
How Reverse Osmosis Water Purification Systems Work
 
BASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERINGBASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERING
 
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
 
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaning
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety Professionals
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Ro system animation
Ro system animationRo system animation
Ro system animation
 
Sewerage Treatment Plant (stp) 2016
Sewerage Treatment Plant (stp) 2016Sewerage Treatment Plant (stp) 2016
Sewerage Treatment Plant (stp) 2016
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
Air Circuit breaker
Air Circuit breakerAir Circuit breaker
Air Circuit breaker
 
Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 
Water test methods
Water test methodsWater test methods
Water test methods
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
Ro Operation And Maintenance Manual
Ro Operation And Maintenance ManualRo Operation And Maintenance Manual
Ro Operation And Maintenance Manual
 

Similaire à Vacuum circuit breaker

Circuitbreaker 140425132435nn
Circuitbreaker 140425132435nnCircuitbreaker 140425132435nn
Circuitbreaker 140425132435nn
Ponlue Smile
 
I am sharing 'CIRCUIT BREAKER PPT' with you.pptx
I am sharing 'CIRCUIT BREAKER PPT' with you.pptxI am sharing 'CIRCUIT BREAKER PPT' with you.pptx
I am sharing 'CIRCUIT BREAKER PPT' with you.pptx
AjitAntil1
 
Circuitbreakers 140829234332-phpapp01
Circuitbreakers 140829234332-phpapp01Circuitbreakers 140829234332-phpapp01
Circuitbreakers 140829234332-phpapp01
rana usman
 
Switchgear and protection engineering Lecture 03.pptx
Switchgear and protection engineering Lecture 03.pptxSwitchgear and protection engineering Lecture 03.pptx
Switchgear and protection engineering Lecture 03.pptx
LoitaFredy
 

Similaire à Vacuum circuit breaker (20)

vacuum CBs
vacuum CBsvacuum CBs
vacuum CBs
 
Metalclad switchgear
Metalclad switchgearMetalclad switchgear
Metalclad switchgear
 
Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakers
 
Get Complete Information about Circuit Breaker
Get Complete Information about Circuit BreakerGet Complete Information about Circuit Breaker
Get Complete Information about Circuit Breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Circuitbreaker 140425132435nn
Circuitbreaker 140425132435nnCircuitbreaker 140425132435nn
Circuitbreaker 140425132435nn
 
Circuit breaker by Anurag Vinayak
Circuit breaker by Anurag VinayakCircuit breaker by Anurag Vinayak
Circuit breaker by Anurag Vinayak
 
Switchgear and protection lecture 2 type of circuit breakers and applications
Switchgear and protection lecture 2 type of circuit breakers and applicationsSwitchgear and protection lecture 2 type of circuit breakers and applications
Switchgear and protection lecture 2 type of circuit breakers and applications
 
Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breaker
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Circuit breaker 1
Circuit breaker 1Circuit breaker 1
Circuit breaker 1
 
I am sharing 'CIRCUIT BREAKER PPT' with you.pptx
I am sharing 'CIRCUIT BREAKER PPT' with you.pptxI am sharing 'CIRCUIT BREAKER PPT' with you.pptx
I am sharing 'CIRCUIT BREAKER PPT' with you.pptx
 
Circuitbreakers 140829234332-phpapp01
Circuitbreakers 140829234332-phpapp01Circuitbreakers 140829234332-phpapp01
Circuitbreakers 140829234332-phpapp01
 
Ca vd4 50k-a(en)y_1vcp000001
Ca vd4 50k-a(en)y_1vcp000001Ca vd4 50k-a(en)y_1vcp000001
Ca vd4 50k-a(en)y_1vcp000001
 
ELECTRICAL INSTALLATIONS PPT (1).pptx
ELECTRICAL INSTALLATIONS PPT (1).pptxELECTRICAL INSTALLATIONS PPT (1).pptx
ELECTRICAL INSTALLATIONS PPT (1).pptx
 
Switchgear and protection engineering Lecture 03.pptx
Switchgear and protection engineering Lecture 03.pptxSwitchgear and protection engineering Lecture 03.pptx
Switchgear and protection engineering Lecture 03.pptx
 
Seminar on circuit breaker
Seminar on circuit breakerSeminar on circuit breaker
Seminar on circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
VCB.pptx
VCB.pptxVCB.pptx
VCB.pptx
 
Equipments of power transmission
Equipments of power transmissionEquipments of power transmission
Equipments of power transmission
 

Dernier

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

Vacuum circuit breaker

  • 2. WHAT IS A CIRCUIT BREAKER? A circuit breaker is an equipment that breaks a circuit either manually or automatically under all conditions at no load, full load or short circuit.
  • 4. Breaker Used In 132KV Grid Station • Oil Circuit Breaker • Vacuum Circuit breaker • SF6 Circuit Breaker
  • 5. 1) Vacuum interrupters installed in indoor switchgear and kiosks rated up to 36 KV. Vacuum circuit breakers can be classified in the following two categories: 2) Vacuum circuit breakers suitable for outdoor installation and having two or more interrupters in series per pole
  • 6. VACUUM CIRCUIT BREAKER • Vacuum is used as an arc quenching medium. • Have greatest insulating strength. • 10-7 to 10-5 pressure is to be maintained. • Used in 11KV panel in control room of grid station.
  • 8. •When contacts of a breaker are opened in •Vacuum is being used as the arc quenching medium. •Vacuum offers highest insulating strength. Vacuum Circuit Breaker vacuum, the interruption occurs at first current zero with dielectric strength between the contacts building up at a rate thousands of times that obtained with other circuit breakers. ABOUT CIRCUIT BREAKER
  • 9. PRINCIPLE: •When the contacts of the breaker are opened in vacuum (10 -7 to 10 -5 torr), an arc is produced between the contacts by the ionization of metal vapours of contacts. •The arc is quickly extinguished because the metallic vapours, electrons, and ions produced during arc condense quickly on the surfaces of the circuit breaker contacts, resulting in quick recovery of dielectric strength.
  • 10. CONSTRUCTION: • It consists of fixed contact, moving contact and arc shield mounted inside a vacuum chamber. •The movable member is connected to the control mechanism by stainless steel bellows . •This enables the permanent sealing of the vacuum chamber so as to eliminate the possibility of leak . •A glass vessel or ceramic vessel is used as the outer insulating body
  • 12. WORKING: •When the breaker operates the moving contacts separates from the fixed contacts and an arc is struck between the contacts. •The production of arc is due to the ionization of metal ions and depends very much upon the material of contacts. •The arc is quickly extinguished because the metallic vapours, electrons and ions produced during arc are diffused in short time and seized by the surfaces of moving and fixed members and shields.
  • 13. WORKING: . •Vacuum Circuit Breaker in a vacuum breaker occurs with a short contact separation
  • 14. ADVANTAGES • Compact, reliable and have longer life. • No fire hazards. • No generation of gas during and after operation. • Can interrupt any fault current. • No noise is produced while operating. • Require less power for control operation.
  • 15. DISADVANTAGES • It needs additional surge suppressors. • vacuum circuit breakers are uneconomical above 36kV. • Advance technology is used for production of vacuum interrupters.
  • 16. APPLICATIONS: •For outdoor applications ranging from 22 kV to 66 kV. Suitable for majority of • applications in rural area.