COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter
Presenter
Page 1
COLLABORATE 2014 — OAUG Forum
An Introduction to Oracle’s Primavera Risk Analysis
Paul Monaghan - Presenter.
1st Milestone Ltd.
Abstract:
Primavera Risk Analysis is an ‘add-on’ module to Primavera P6. It allows the user to build task
uncertainties (three point estimates for task duration and cost) and project risks (risks you would typically
hold in a risk register) into a Primavera P6 schedule. These items are then applied to the project plan and
simulated during a ‘Monte Carlo’ risk analysis. Simulating the impact of risks on a project and
understanding the results. Comparing both pre and post mitigation scenarios and results.
Objective 1: Provide an understanding of the principles of Monte Carlo risk analysis.
Objective 2: Provide an understanding of Primavera Risk Analysis - How it works and what it does.
Objective 3: Explain the output of a risk analysis - Understanding the results.
About Milestone UK
1st Milestone Ltd (Milestone) is a UK based specialist project and performance management solutions
company. We enable organizations to maximize their operational efficiency through a range of cutting-
edge project management solutions and services. By building innovative, progressive solutions, we fulfill
the evolving needs of project-based organizations throughout the UK regardless of size or complexity.
Through a unique combination of technology and services, Milestone is able to provide an end-to-end
solution for project and program management needs including contract management, estimating, cost
management, risk management, scheduling and resource planning.
The software solutions we offer include Oracle’s Primavera P6 EPPM and PPM (Project and program
management), Oracle’s Primavera Risk Analysis (Schedule risk analysis), Deltek Acumen Fuse (Schedule
checking and forensic analysis), Legare (Primavera integration with Excel and ERP systems), Hard Dollar
(Cost estimating) and LoadSpring (Primavera application hosting).
Milestone is the largest Oracle Primavera specific training provider in the UK. We offer the full range of
Oracle University Primavera courses, plus consulting and implementation services for Primavera P6
EPPM, Primavera Risk Analysis and associated products.
Milestone is the only UK based Oracle Primavera ‘Platinum’ partner, a measurement by Oracle of the level
of expertise a services provider has.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter
Presenter
Page 2
Introduction – What does Primavera Risk Analysis do?
In summary, Primavera Risk Analysis predicts the likelihood of a project being delivered on time and on
budget, highlights the key areas where the project might fail and evaluates the effectiveness of mitigation.
Primavera Risk Analysis (formerly known as Pertmaster) is a ‘Monte Carlo’ risk analysis tool with a built-in
risk register. The tool allows the input of project uncertainty and project risks and links these items to a
Primavera P6 schedule, to simulate the impacts and likely project outcomes, using a Monte Carlo risk
analysis.
Primavera Risk Analysis provides the following capabilities and benefits to help meet the requirements of
project driven organizations:
Direct integration with Primavera P6 scheduling tools
Able connect directly to the Primavera database using usual Primavera login credentials, or simply import
an XER file and analyse that. Also integrates with MS Project.
Input of task uncertainties (variance)
E.g. Three point estimates for duration and cost (min, most likely and max estimates). Quickly input three
point estimates across many activities at the same time using ‘quick risk’ functions and templates.
Input risks in a risk register
E.g. Risk number, description, cause/effect, probability, impact on time and cost etc. Link the risk register to
the project, allowing the impacts to be simulated in the correct areas of the schedule, to determine the
overall impact on the project. Plan mitigation actions and associated costs and dates.
Monte Carlo risk analysis
Simulate the impact of risks and uncertainties and combinations of them. Simulate all risks from the register
or just specific ones. Run a Monte Carlo risk analysis to compare results of pre and post mitigated
scenarios, to judge the value mitigation actions bring and whether such actions are cost effective.
Primavera ‘Histogram’ report
Displays the likelihood of completing the project by specific dates and budgets and provides a confidence
rating e.g. 80% confidence in achieving date ‘X’ and 70% confidence of achieving budget ‘Y’. Confidence
statistics are available for any item in the project e.g. the project end date, milestones and activities.
Primavera ‘Tornado’ report
Display which risks and tasks are causing the most delay and budget to increase. Determine how critical
specific activities are, if they are always critical, or if they move on and off the critical path during analysis.
Combined Schedule and Cost Analysis
Establish both schedule and cost confidence. Scatter plot reports provide the ability to compare schedule
and cost data and the budget required to meet specific end dates.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 3
Primavera Risk Analysis - Integration with Primavera P6 and P6 EPPM
Primavera Risk Analysis supports integration with both the Primavera P6 Client (the traditional Primavera
client/server or standalone scheduling tool) and full enterprise implementations of Primavera P6 EPPM
which incorporate Primavera’s web/intranet based technologies and risk management system.
Direct integration with Primavera P6 scheduling tools
Able connect directly to the Primavera database using usual Primavera login credentials, or simply import
an XER file and analyse that.
Integration with P6EPPM
From Release 8 onwards, Primavera P6 EPPM contains a risk register within the P6 Web management
portal. This risk register tracks equivalent data to the risk register held within the Primavera Risk Analysis
application, but is instead embedded within the Primavera project management system itself, thus
providing a central repository for schedule/cost/risk data. This risk data can then be used by the Primavera
Risk Analysis module to perform risk analysis simulations.
What is a Monte Carlo risk analysis on a Primavera schedule actually doing?
Monte Carlo simulation is a mathematical method that allows project managers and risk analysts to
account for uncertainty and risk in Primavera schedules. The technique is used across many different
industries to predict the likelihood of projects finishing on time and on budget.
During a Monte Carlo analysis, the Primavera P6 project is put through a simulator. It uses a range of
values rather than specific values e.g. a task can be estimated at between 20 and 30 days duration, rather
than specifically being 25 days. Project risks are given a % chance of occurring and a likely impact if they
do. This creates a ‘probabilistic’ model of the project based on the probable ranges, which is different from
the ‘deterministic’ model of the schedule (based on single point estimates) developed in Primavera P6.
The project is simulated many hundreds of times during the Monte Carlo risk analysis, often thousands of
times, to calculate the many different outcomes that could take place. During each simulation, task duration
is applied randomly (or can be controlled) from within the specified range. Risks and their impact may occur
based on their probability in the register. This simulation produces a range of finish dates and likely
outcomes i.e. the earliest the project is likely to finish, the latest it is likely to finish and dates in between. In
other words, the project is not shown to finish on a specific date (deterministic schedule), it is shown to
finish within a range of probable dates (probabilistic schedule).
The result is a selection of graphics where dates are given a % confidence to show how likely the project is
to be delivered by a specific date e.g. 80% confidence of completing by 31st January, or 50% confidence in
1st January. This explains how realistic the P6 deterministic schedule actually is. The same exercise can
be performed on a cost model, or schedule and cost together. Results then display which activities and
risks are causing the project duration and cost to increase, so the user can focus on these areas.
The concept of using Monte Carlo simulation was developed during World War 2 by engineers and
scientists developing the atomic bomb. It is named after Monte Carlo, the town in Monaco known for its
gambling and casinos.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 4
Primavera Risk Analysis - Example Reports and Output
Schedule Check Report
Primavera Risk Analysis can run a schedule check report and ideally this should be done prior to running
a risk analysis model. The report checks for potential errors such as missing logic links between activities.
Or items such as constraints, where having too many, can hinder the results of a risk analysis.
Built-In Risk Register
Inside the Primavera Risk Analysis tool itself, you may build a qualitative risk register, the impact of which
is then simulated on the P6 schedule. Create the register by logging the project risk, risk number,
description, risk details such as cause and effect, owner, % probability of impact and an estimation of the
schedule and cost impact. A log of mitigation actions and their potential impact is also done here.
Risks are then assigned to the activities or elements of the project for simulation during a risk analysis.
Primavera P6 EPPM Risk Register
From Release 8, Primavera P6 EPPM contains a built-in risk register as part of its Web/Intranet based
project management dashboard. Risk data entered here can be exported to Primavera Risk Analysis to run
risk simulations and produce risk results.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 5
Risk Histogram Report - Schedule
Display the results of a risk analysis and the likelihood of finishing a project on time or a specific date.
Iterations: The number of times the project has been simulated during the Monte Carlo analysis.
Minimum: The best case scenario end date for the project.
Maximum: The worst case scenario end date for the project.
Deterministic: The end date predicted in a Primavera P6 schedule based on single point durations only
(no three point estimate uncertainty data or risks from a risk register included).
‘P-Dates’: The dates shown on the ‘Y’ axis have a specific % confidence next to them. This is the
confidence rating for achieving that specific end date.
Activity Tornado Chart - Schedule
Display the activities that drive the project duration and are therefore most likely to cause a delay. These
are the key activities to focus on during what-if scenarios and mitigation strategies.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 6
Activity Tornado Chart - Criticality
Display the activities in terms of their criticality i.e. whether they are always critical during all risk
simulations, or whether they fluctuate on and off the critical path. Sometimes key driving activities can be
‘sub-critical’ (critical most of the time but not always, say 90%) and these need particular attention.
Risk Histogram Report - Cost
Display the results of a risk analysis and the likelihood of finishing a project on budget or a specific cost.
Iterations: The number of times the project has been simulated during the Monte Carlo analysis.
Minimum: The best case scenario cost for the project.
Maximum: The worst case scenario cost for the project.
Deterministic: The cost predicted in a Primavera P6 schedule based on single point costs only (no three
point estimate uncertainty data or risks from a risk register included).
‘P-Costs’: The costs shown on the ‘Y’ axis have a specific % confidence next to them. This is the
confidence rating for achieving that specific budget.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 7
Risk Tornado Chart – Schedule and Cost
Display the risks that drive the project duration (pre or post mitigated state) and are therefore most likely to
cause a delay, or risks that drive the project cost and are therefore most likely to cause an overrun. These
are the key risks to focus on during what-if scenarios and mitigation strategies.
‘Re-use previous design work’ has a negative figure, which indicates it is an opportunity, rather than a risk.
Distribution Analyzer - Schedule and Cost - Pre Mitigated Vs Post Mitigated
Compare pre and most mitigated scenarios to judge the value of mitigation i.e. is the mitigated scenario
delivering the project earlier, and if so, for how much additional cost.
COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 8
Risk Scatter Plot Diagram – Schedule and Cost
Display the confidence rating of achieving both specific project end dates and projects costs e.g. a 33%
probability of achieving a budget of £26,252,210 and a corresponding finish date of 6th May.
Iterations: The number of times the project has been simulated during the Monte Carlo analysis.
The Dots: 1000 simulations produces 1000 red, green or black ‘dots’ to display on the screen.
Green Dots: The number of simulations delivering by a specified time and budget.
Red Dots: The number of simulations exceeding the specified time and budget.
Black Dots: Simulations achieve one but not the other i.e. on time but over cost, on budget but delayed.
Yellow Dot: The deterministic point i.e. the date/cost predicted in a Primavera P6 schedule based on
single point estimates only (no three point estimate uncertainty data or risks from a risk register included).
Primavera Risk Analysis - Conclusion
In summary, Primavera Risk Analysis shows the likelihood of delivering a project on time and on budget,
highlights the most important tasks and risks affecting the schedule and the effectiveness of mitigation.
This leads to increased accuracy of Primavera schedules, reduced exposure to risk for more successful
project execution and gives greater confidence in project delivery.

Contenu connexe

Tendances

Project management methodologies and planning
Project management methodologies and planningProject management methodologies and planning
Project management methodologies and planningDebashis Paul
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
Software Project Management: Risk Management
Software Project Management: Risk ManagementSoftware Project Management: Risk Management
Software Project Management: Risk ManagementMinhas Kamal
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Pedram Danesh-Mand
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniquesMarco De Santis, PMP, CFPP
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
Concepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisConcepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisp6academy
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMauro Jasse
 
Risk-management
 Risk-management Risk-management
Risk-managementUmesh Gupta
 
Project management basics
Project management basicsProject management basics
Project management basicsPlanning School
 
MICROSOFT PROJECT TUTORIAL
MICROSOFT PROJECT TUTORIALMICROSOFT PROJECT TUTORIAL
MICROSOFT PROJECT TUTORIALVismay Shah
 

Tendances (20)

Project management methodologies and planning
Project management methodologies and planningProject management methodologies and planning
Project management methodologies and planning
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Software Project Management: Risk Management
Software Project Management: Risk ManagementSoftware Project Management: Risk Management
Software Project Management: Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniques
 
Risk management
Risk management Risk management
Risk management
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
Microsoft Project
Microsoft ProjectMicrosoft Project
Microsoft Project
 
Primavera software
Primavera softwarePrimavera software
Primavera software
 
Risk management
Risk managementRisk management
Risk management
 
Concepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysisConcepts and best practices for the risk register in primavera risk analysis
Concepts and best practices for the risk register in primavera risk analysis
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Risk-management
 Risk-management Risk-management
Risk-management
 
Project management basics
Project management basicsProject management basics
Project management basics
 
MICROSOFT PROJECT TUTORIAL
MICROSOFT PROJECT TUTORIALMICROSOFT PROJECT TUTORIAL
MICROSOFT PROJECT TUTORIAL
 

Similaire à An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14

Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: BrochureCisco
 
206420 primavera enhancements survey
206420 primavera enhancements survey206420 primavera enhancements survey
206420 primavera enhancements surveyp6academy
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Mihai Buta
 
Implementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost OptimizationImplementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost OptimizationSonata Software
 
How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownAcumen
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis Shereef Sabri
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentAcumen
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaPankaj K Sinha
 
Probabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost AnalysisProbabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost AnalysisGlen Alleman
 
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011Pedram Danesh-Mand
 
The use of Monte Carlo simulation in quantitative risk assessment of IT projects
The use of Monte Carlo simulation in quantitative risk assessment of IT projectsThe use of Monte Carlo simulation in quantitative risk assessment of IT projects
The use of Monte Carlo simulation in quantitative risk assessment of IT projectsEswar Publications
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo
 
1Risk ReportingRisk ReportingRique Gidde.docx
1Risk ReportingRisk ReportingRique Gidde.docx1Risk ReportingRisk ReportingRique Gidde.docx
1Risk ReportingRisk ReportingRique Gidde.docxfelicidaddinwoodie
 
Risk Based Software Planning
Risk Based Software PlanningRisk Based Software Planning
Risk Based Software PlanningMuhammad Alhalaby
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: DatasheetCisco
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen
 
RiskyProject Software Version 7.2
RiskyProject  Software Version 7.2RiskyProject  Software Version 7.2
RiskyProject Software Version 7.2Intaver Insititute
 
Risky projectcloudpresentation
Risky projectcloudpresentationRisky projectcloudpresentation
Risky projectcloudpresentationIntaver Insititute
 
Risk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examRisk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examMaria Kirk
 

Similaire à An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14 (20)

Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: Brochure
 
206420 primavera enhancements survey
206420 primavera enhancements survey206420 primavera enhancements survey
206420 primavera enhancements survey
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]
 
Implementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost OptimizationImplementation of Risk-Based Approach for Quality & Cost Optimization
Implementation of Risk-Based Approach for Quality & Cost Optimization
 
How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us Down
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric Assessment
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K Sinha
 
Probabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost AnalysisProbabilistic Schedule and Cost Analysis
Probabilistic Schedule and Cost Analysis
 
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011
Cost Risk Analysis (CRA) by Pedram Daneshmand 19-Jan-2011
 
The use of Monte Carlo simulation in quantitative risk assessment of IT projects
The use of Monte Carlo simulation in quantitative risk assessment of IT projectsThe use of Monte Carlo simulation in quantitative risk assessment of IT projects
The use of Monte Carlo simulation in quantitative risk assessment of IT projects
 
RiskyProject Software
RiskyProject SoftwareRiskyProject Software
RiskyProject Software
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
 
1Risk ReportingRisk ReportingRique Gidde.docx
1Risk ReportingRisk ReportingRique Gidde.docx1Risk ReportingRisk ReportingRique Gidde.docx
1Risk ReportingRisk ReportingRique Gidde.docx
 
Risk Based Software Planning
Risk Based Software PlanningRisk Based Software Planning
Risk Based Software Planning
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: Datasheet
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops Overview
 
RiskyProject Software Version 7.2
RiskyProject  Software Version 7.2RiskyProject  Software Version 7.2
RiskyProject Software Version 7.2
 
Risky projectcloudpresentation
Risky projectcloudpresentationRisky projectcloudpresentation
Risky projectcloudpresentation
 
Risk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examRisk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP exam
 

Plus de p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktopp6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announcedp6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overviewp6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientationp6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Propositionp6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guidep6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guidep6academy
 

Plus de p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Dernier

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 

Dernier (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 

An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14

  • 1. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Presenter Page 1 COLLABORATE 2014 — OAUG Forum An Introduction to Oracle’s Primavera Risk Analysis Paul Monaghan - Presenter. 1st Milestone Ltd. Abstract: Primavera Risk Analysis is an ‘add-on’ module to Primavera P6. It allows the user to build task uncertainties (three point estimates for task duration and cost) and project risks (risks you would typically hold in a risk register) into a Primavera P6 schedule. These items are then applied to the project plan and simulated during a ‘Monte Carlo’ risk analysis. Simulating the impact of risks on a project and understanding the results. Comparing both pre and post mitigation scenarios and results. Objective 1: Provide an understanding of the principles of Monte Carlo risk analysis. Objective 2: Provide an understanding of Primavera Risk Analysis - How it works and what it does. Objective 3: Explain the output of a risk analysis - Understanding the results. About Milestone UK 1st Milestone Ltd (Milestone) is a UK based specialist project and performance management solutions company. We enable organizations to maximize their operational efficiency through a range of cutting- edge project management solutions and services. By building innovative, progressive solutions, we fulfill the evolving needs of project-based organizations throughout the UK regardless of size or complexity. Through a unique combination of technology and services, Milestone is able to provide an end-to-end solution for project and program management needs including contract management, estimating, cost management, risk management, scheduling and resource planning. The software solutions we offer include Oracle’s Primavera P6 EPPM and PPM (Project and program management), Oracle’s Primavera Risk Analysis (Schedule risk analysis), Deltek Acumen Fuse (Schedule checking and forensic analysis), Legare (Primavera integration with Excel and ERP systems), Hard Dollar (Cost estimating) and LoadSpring (Primavera application hosting). Milestone is the largest Oracle Primavera specific training provider in the UK. We offer the full range of Oracle University Primavera courses, plus consulting and implementation services for Primavera P6 EPPM, Primavera Risk Analysis and associated products. Milestone is the only UK based Oracle Primavera ‘Platinum’ partner, a measurement by Oracle of the level of expertise a services provider has.
  • 2. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Presenter Page 2 Introduction – What does Primavera Risk Analysis do? In summary, Primavera Risk Analysis predicts the likelihood of a project being delivered on time and on budget, highlights the key areas where the project might fail and evaluates the effectiveness of mitigation. Primavera Risk Analysis (formerly known as Pertmaster) is a ‘Monte Carlo’ risk analysis tool with a built-in risk register. The tool allows the input of project uncertainty and project risks and links these items to a Primavera P6 schedule, to simulate the impacts and likely project outcomes, using a Monte Carlo risk analysis. Primavera Risk Analysis provides the following capabilities and benefits to help meet the requirements of project driven organizations: Direct integration with Primavera P6 scheduling tools Able connect directly to the Primavera database using usual Primavera login credentials, or simply import an XER file and analyse that. Also integrates with MS Project. Input of task uncertainties (variance) E.g. Three point estimates for duration and cost (min, most likely and max estimates). Quickly input three point estimates across many activities at the same time using ‘quick risk’ functions and templates. Input risks in a risk register E.g. Risk number, description, cause/effect, probability, impact on time and cost etc. Link the risk register to the project, allowing the impacts to be simulated in the correct areas of the schedule, to determine the overall impact on the project. Plan mitigation actions and associated costs and dates. Monte Carlo risk analysis Simulate the impact of risks and uncertainties and combinations of them. Simulate all risks from the register or just specific ones. Run a Monte Carlo risk analysis to compare results of pre and post mitigated scenarios, to judge the value mitigation actions bring and whether such actions are cost effective. Primavera ‘Histogram’ report Displays the likelihood of completing the project by specific dates and budgets and provides a confidence rating e.g. 80% confidence in achieving date ‘X’ and 70% confidence of achieving budget ‘Y’. Confidence statistics are available for any item in the project e.g. the project end date, milestones and activities. Primavera ‘Tornado’ report Display which risks and tasks are causing the most delay and budget to increase. Determine how critical specific activities are, if they are always critical, or if they move on and off the critical path during analysis. Combined Schedule and Cost Analysis Establish both schedule and cost confidence. Scatter plot reports provide the ability to compare schedule and cost data and the budget required to meet specific end dates.
  • 3. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 3 Primavera Risk Analysis - Integration with Primavera P6 and P6 EPPM Primavera Risk Analysis supports integration with both the Primavera P6 Client (the traditional Primavera client/server or standalone scheduling tool) and full enterprise implementations of Primavera P6 EPPM which incorporate Primavera’s web/intranet based technologies and risk management system. Direct integration with Primavera P6 scheduling tools Able connect directly to the Primavera database using usual Primavera login credentials, or simply import an XER file and analyse that. Integration with P6EPPM From Release 8 onwards, Primavera P6 EPPM contains a risk register within the P6 Web management portal. This risk register tracks equivalent data to the risk register held within the Primavera Risk Analysis application, but is instead embedded within the Primavera project management system itself, thus providing a central repository for schedule/cost/risk data. This risk data can then be used by the Primavera Risk Analysis module to perform risk analysis simulations. What is a Monte Carlo risk analysis on a Primavera schedule actually doing? Monte Carlo simulation is a mathematical method that allows project managers and risk analysts to account for uncertainty and risk in Primavera schedules. The technique is used across many different industries to predict the likelihood of projects finishing on time and on budget. During a Monte Carlo analysis, the Primavera P6 project is put through a simulator. It uses a range of values rather than specific values e.g. a task can be estimated at between 20 and 30 days duration, rather than specifically being 25 days. Project risks are given a % chance of occurring and a likely impact if they do. This creates a ‘probabilistic’ model of the project based on the probable ranges, which is different from the ‘deterministic’ model of the schedule (based on single point estimates) developed in Primavera P6. The project is simulated many hundreds of times during the Monte Carlo risk analysis, often thousands of times, to calculate the many different outcomes that could take place. During each simulation, task duration is applied randomly (or can be controlled) from within the specified range. Risks and their impact may occur based on their probability in the register. This simulation produces a range of finish dates and likely outcomes i.e. the earliest the project is likely to finish, the latest it is likely to finish and dates in between. In other words, the project is not shown to finish on a specific date (deterministic schedule), it is shown to finish within a range of probable dates (probabilistic schedule). The result is a selection of graphics where dates are given a % confidence to show how likely the project is to be delivered by a specific date e.g. 80% confidence of completing by 31st January, or 50% confidence in 1st January. This explains how realistic the P6 deterministic schedule actually is. The same exercise can be performed on a cost model, or schedule and cost together. Results then display which activities and risks are causing the project duration and cost to increase, so the user can focus on these areas. The concept of using Monte Carlo simulation was developed during World War 2 by engineers and scientists developing the atomic bomb. It is named after Monte Carlo, the town in Monaco known for its gambling and casinos.
  • 4. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 4 Primavera Risk Analysis - Example Reports and Output Schedule Check Report Primavera Risk Analysis can run a schedule check report and ideally this should be done prior to running a risk analysis model. The report checks for potential errors such as missing logic links between activities. Or items such as constraints, where having too many, can hinder the results of a risk analysis. Built-In Risk Register Inside the Primavera Risk Analysis tool itself, you may build a qualitative risk register, the impact of which is then simulated on the P6 schedule. Create the register by logging the project risk, risk number, description, risk details such as cause and effect, owner, % probability of impact and an estimation of the schedule and cost impact. A log of mitigation actions and their potential impact is also done here. Risks are then assigned to the activities or elements of the project for simulation during a risk analysis. Primavera P6 EPPM Risk Register From Release 8, Primavera P6 EPPM contains a built-in risk register as part of its Web/Intranet based project management dashboard. Risk data entered here can be exported to Primavera Risk Analysis to run risk simulations and produce risk results.
  • 5. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 5 Risk Histogram Report - Schedule Display the results of a risk analysis and the likelihood of finishing a project on time or a specific date. Iterations: The number of times the project has been simulated during the Monte Carlo analysis. Minimum: The best case scenario end date for the project. Maximum: The worst case scenario end date for the project. Deterministic: The end date predicted in a Primavera P6 schedule based on single point durations only (no three point estimate uncertainty data or risks from a risk register included). ‘P-Dates’: The dates shown on the ‘Y’ axis have a specific % confidence next to them. This is the confidence rating for achieving that specific end date. Activity Tornado Chart - Schedule Display the activities that drive the project duration and are therefore most likely to cause a delay. These are the key activities to focus on during what-if scenarios and mitigation strategies.
  • 6. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 6 Activity Tornado Chart - Criticality Display the activities in terms of their criticality i.e. whether they are always critical during all risk simulations, or whether they fluctuate on and off the critical path. Sometimes key driving activities can be ‘sub-critical’ (critical most of the time but not always, say 90%) and these need particular attention. Risk Histogram Report - Cost Display the results of a risk analysis and the likelihood of finishing a project on budget or a specific cost. Iterations: The number of times the project has been simulated during the Monte Carlo analysis. Minimum: The best case scenario cost for the project. Maximum: The worst case scenario cost for the project. Deterministic: The cost predicted in a Primavera P6 schedule based on single point costs only (no three point estimate uncertainty data or risks from a risk register included). ‘P-Costs’: The costs shown on the ‘Y’ axis have a specific % confidence next to them. This is the confidence rating for achieving that specific budget.
  • 7. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 7 Risk Tornado Chart – Schedule and Cost Display the risks that drive the project duration (pre or post mitigated state) and are therefore most likely to cause a delay, or risks that drive the project cost and are therefore most likely to cause an overrun. These are the key risks to focus on during what-if scenarios and mitigation strategies. ‘Re-use previous design work’ has a negative figure, which indicates it is an opportunity, rather than a risk. Distribution Analyzer - Schedule and Cost - Pre Mitigated Vs Post Mitigated Compare pre and most mitigated scenarios to judge the value of mitigation i.e. is the mitigated scenario delivering the project earlier, and if so, for how much additional cost.
  • 8. COLLABORATE 14 Copyright ©2014 by Paul Monaghan - Presenter Page 8 Risk Scatter Plot Diagram – Schedule and Cost Display the confidence rating of achieving both specific project end dates and projects costs e.g. a 33% probability of achieving a budget of £26,252,210 and a corresponding finish date of 6th May. Iterations: The number of times the project has been simulated during the Monte Carlo analysis. The Dots: 1000 simulations produces 1000 red, green or black ‘dots’ to display on the screen. Green Dots: The number of simulations delivering by a specified time and budget. Red Dots: The number of simulations exceeding the specified time and budget. Black Dots: Simulations achieve one but not the other i.e. on time but over cost, on budget but delayed. Yellow Dot: The deterministic point i.e. the date/cost predicted in a Primavera P6 schedule based on single point estimates only (no three point estimate uncertainty data or risks from a risk register included). Primavera Risk Analysis - Conclusion In summary, Primavera Risk Analysis shows the likelihood of delivering a project on time and on budget, highlights the most important tasks and risks affecting the schedule and the effectiveness of mitigation. This leads to increased accuracy of Primavera schedules, reduced exposure to risk for more successful project execution and gives greater confidence in project delivery.