Hyderabad Metro Rail Project
- A case study
Topics
• Metro Network
• FinancialAspects
• Sub-structure
- Foundation
• Super structure
- Piers, Bearings, Pre-Cast Segments
• Station Concept
• Rolling Stock
• AutomaticTrain Operation (ATO)
• Summary
Metro Network
MIYAPUR
L B NAGAR
FALAKNUMA
JBS
NAGOLE
SHILPARAMAM
CORRIDOR I - RED
CORRIDOR II - GREEN
CORRIDOR III - BLUE
Financial Aspects
Total cost of Project Rs.14,320 Cr.
Central GOVT 10% of Total cost
L&T Metro Rail Hyderabad limited Remaining Total cost
State GOVT (Telangana) Ready to bear the extra cost
State GOVT (Andhra Pradesh) 0%
• Initially allotted to MAYTAS, but, was cancelled
due to delay in Financial closure.
• Allotted to L&T in PPP mode, DBFOT basis.
Structure - Overview
Foundation
• Soil Investigation
• Shifting of Services and Amenities
• Foundation
• Open foundation
• Pile foundation
Concrete/
Rock Breaker
Vibrator
Compactor
Pile driving equipment
Piers
Boom Placer
Transit Mixer
Shuttering
• Inner surface of Formwork coated with ‘Mould
Releasing Agent’; to prevent adhesion of
Concrete to the Formwork.
Security
Barricade
Piers (Contd.)
Piers
Total distance covered 72 KM
Total no. of piers 2748
Piers in corridor – I 1109
Piers in corridor – II 588
Piers in corridor – III 1051
Piers completed till now 1635
Piers
Bearings
• Bearings are used for resisting the rotatory loads
Pre-Fabrication
• Piers hold the viaduct, this is done by stringing and sticking the Segments together.
Segments
Gantry andTravel for Lifting and
Loading Segments in theYard
Pre-Cast Segments
• In gen, 10 Segments between 2 Piers, each Segment about 40Tons.
• PlacingViaduct Segments with the help of Launching Gantry.
Launching Gantry
Viaduct Segments
under-slung during
Sticking and
Stitching process
Slings for holding
Viaduct Segments
Traveler
For Lifting
And Shifting
Segments
VIADUCT
VIADUCT
P
I
E
R
Pre-Cast Segments (Contd.)
Sticking the Pre-Cast Segments
Application of
Epoxy on surface
of Segment
Pre-Cast Segments (Contd.)
Stringing of Pre-Cast Segments
Stringing
Cable
Duct in
Pre-Cast
Segment
Station Concept
• The Stations, being windows to the Metro Service, are tastefully designed
reflecting local culture.
Uppal stationInterior view of station
Station Concept (Contd.)
Station Design
• Stations are covered by an overlapping
roofing system, open at sides, covering
the platform
• Staircases & Escalators designed based
on
• Architectural Elements
• Functional Aspects.
Rolling Stock
• LTHMR has given Rolling Stock contract to
Hyundai Rotem Company (South Korea).
• Total 57Three-CarTrain Sets.
Measurement of car 21.7 X 2.9 X 3.8 (meters)
Material of car Stainless steel
Gauge length 1435 mm
Max. Design Speed 90 Km/h
Signal System ATO/ATP
Capacity (per train set) 126 seats
Power supply 25 KV AC
Rolling Stock
AutomaticTrain Operation (ATO)
Train
controls
Interior view
• LTHMR has given the Communication Based Train Control (CBTC) system
to TheThales Company .
• Thales will Design, Build, Deliver and Manage the installation of the fully
automatedCBTC.
Summary
• Faster :
- JourneyTime  Reduced
• Greater traffic capacity equivalent to:
• 7 lanes of BusTraffic (or)
• 24 lanes of CarTraffic
• Low Energy Consumption per Passenger Km:
• 20% only  in comparison to Road-based Systems.
• Eco-Friendly :
• Air Pollution  Nil
• Sound Pollution  Negligible
Development never ENDS
Thank u !!!!!!!!!!

Contenu connexe

Tendances

Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Jayesh Kambli
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Apparao Gandi
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiJaspal Singh
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyIPPAI
 
role of IRC in transportation development in india
role of IRC in transportation development in indiarole of IRC in transportation development in india
role of IRC in transportation development in indiaRAJPREMANI
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Hyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureHyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureAravind Samala
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportAnkita Kolamkar
 
Light rail transit system
Light rail transit systemLight rail transit system
Light rail transit systemashik ks
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literatureGargee Ghosh
 

Tendances (20)

Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
BRTS
BRTSBRTS
BRTS
 
Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
 
role of IRC in transportation development in india
role of IRC in transportation development in indiarole of IRC in transportation development in india
role of IRC in transportation development in india
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Hyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureHyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedure
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Light rail transit system
Light rail transit systemLight rail transit system
Light rail transit system
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literature
 

En vedette

Hyderabad metro rail reducing the negative impact on city environment - env...
Hyderabad metro rail   reducing the negative impact on city environment - env...Hyderabad metro rail   reducing the negative impact on city environment - env...
Hyderabad metro rail reducing the negative impact on city environment - env...Umamaheswara Rao
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewR K DHIMAN
 
Hyderabad Metro Rail Project team sets benchmark-6657
Hyderabad Metro Rail Project team sets benchmark-6657Hyderabad Metro Rail Project team sets benchmark-6657
Hyderabad Metro Rail Project team sets benchmark-6657MOHAN PRADEEP Y
 
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15Manish Kumar
 
Branding at Delhi Metro; TDI, Delhi Metro Advertising
Branding at Delhi Metro; TDI, Delhi Metro AdvertisingBranding at Delhi Metro; TDI, Delhi Metro Advertising
Branding at Delhi Metro; TDI, Delhi Metro Advertisingguestda02173
 
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...Organized Outdoor Options
 
Traffic Analysis of The Culver Road and East Main Street Intersection
Traffic Analysis of The Culver Road and East Main Street IntersectionTraffic Analysis of The Culver Road and East Main Street Intersection
Traffic Analysis of The Culver Road and East Main Street IntersectionNicholas Yager
 
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...Organized Outdoor Options
 
Metro Rail Advertising Across India - Metro Train Branding
Metro Rail Advertising Across India - Metro Train BrandingMetro Rail Advertising Across India - Metro Train Branding
Metro Rail Advertising Across India - Metro Train BrandingOrganized Outdoor Options
 
National geographic abu dhabi
National geographic abu dhabiNational geographic abu dhabi
National geographic abu dhabimrvanarsdale
 
L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3Ramesh Satyam
 

En vedette (20)

Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
Hyderabad metro rail reducing the negative impact on city environment - env...
Hyderabad metro rail   reducing the negative impact on city environment - env...Hyderabad metro rail   reducing the negative impact on city environment - env...
Hyderabad metro rail reducing the negative impact on city environment - env...
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
REPORT
REPORTREPORT
REPORT
 
Action plan
Action planAction plan
Action plan
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over view
 
Hyderabad Metro Rail Project team sets benchmark-6657
Hyderabad Metro Rail Project team sets benchmark-6657Hyderabad Metro Rail Project team sets benchmark-6657
Hyderabad Metro Rail Project team sets benchmark-6657
 
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
 
Branding at Delhi Metro; TDI, Delhi Metro Advertising
Branding at Delhi Metro; TDI, Delhi Metro AdvertisingBranding at Delhi Metro; TDI, Delhi Metro Advertising
Branding at Delhi Metro; TDI, Delhi Metro Advertising
 
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...
Railway Station Advertising Chennai - Chennai MRTS (Suburban) Railway Station...
 
Traffic Analysis of The Culver Road and East Main Street Intersection
Traffic Analysis of The Culver Road and East Main Street IntersectionTraffic Analysis of The Culver Road and East Main Street Intersection
Traffic Analysis of The Culver Road and East Main Street Intersection
 
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...
Outdoor Advertising Options in Bangalore - OOH Outdoor Advertising Bangalore ...
 
Metro Rail Advertising Across India - Metro Train Branding
Metro Rail Advertising Across India - Metro Train BrandingMetro Rail Advertising Across India - Metro Train Branding
Metro Rail Advertising Across India - Metro Train Branding
 
National geographic abu dhabi
National geographic abu dhabiNational geographic abu dhabi
National geographic abu dhabi
 
L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3
 
Intern final report
Intern final reportIntern final report
Intern final report
 

Similaire à Hyderabad Metro Rail Project

Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportGAURAV KUMAR CHAUBEY
 
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo
 
West Station Reference Concept Design Online Consultation
West Station Reference Concept Design Online ConsultationWest Station Reference Concept Design Online Consultation
West Station Reference Concept Design Online ConsultationCrosstown TO
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Roland_Nikles
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfRoshani Shahi
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project JumpingJaq
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfEr. Bam Bhandari
 
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
108  barreras&accesos función justificaciónseleccióncomportamiento puerto...108  barreras&accesos función justificaciónseleccióncomportamiento puerto...
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...Sierra Francisco Justo
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptxRAKESHPANDEY754083
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3Bruce Brymer
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Chandan Singh
 
highway development in india
highway development in indiahighway development in india
highway development in indiaPrathi Baa
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Newton Montano
 
Refining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityRefining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityAshish Shah
 
Capacity management in large projects
Capacity management in large projectsCapacity management in large projects
Capacity management in large projectsTristan Wiggill
 

Similaire à Hyderabad Metro Rail Project (20)

Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training report
 
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
 
West Station Reference Concept Design Online Consultation
West Station Reference Concept Design Online ConsultationWest Station Reference Concept Design Online Consultation
West Station Reference Concept Design Online Consultation
 
TRB Managed Lane Design Build
TRB Managed Lane Design BuildTRB Managed Lane Design Build
TRB Managed Lane Design Build
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
 
Eglinton Park
Eglinton ParkEglinton Park
Eglinton Park
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
108  barreras&accesos función justificaciónseleccióncomportamiento puerto...108  barreras&accesos función justificaciónseleccióncomportamiento puerto...
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
Metro Work
Metro WorkMetro Work
Metro Work
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
highway development in india
highway development in indiahighway development in india
highway development in india
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
 
Refining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityRefining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainability
 
Capacity management in large projects
Capacity management in large projectsCapacity management in large projects
Capacity management in large projects
 

Hyderabad Metro Rail Project

  • 1. Hyderabad Metro Rail Project - A case study
  • 2. Topics • Metro Network • FinancialAspects • Sub-structure - Foundation • Super structure - Piers, Bearings, Pre-Cast Segments • Station Concept • Rolling Stock • AutomaticTrain Operation (ATO) • Summary
  • 3. Metro Network MIYAPUR L B NAGAR FALAKNUMA JBS NAGOLE SHILPARAMAM CORRIDOR I - RED CORRIDOR II - GREEN CORRIDOR III - BLUE
  • 4. Financial Aspects Total cost of Project Rs.14,320 Cr. Central GOVT 10% of Total cost L&T Metro Rail Hyderabad limited Remaining Total cost State GOVT (Telangana) Ready to bear the extra cost State GOVT (Andhra Pradesh) 0% • Initially allotted to MAYTAS, but, was cancelled due to delay in Financial closure. • Allotted to L&T in PPP mode, DBFOT basis.
  • 6. Foundation • Soil Investigation • Shifting of Services and Amenities • Foundation • Open foundation • Pile foundation Concrete/ Rock Breaker Vibrator Compactor
  • 8. Piers Boom Placer Transit Mixer Shuttering • Inner surface of Formwork coated with ‘Mould Releasing Agent’; to prevent adhesion of Concrete to the Formwork. Security Barricade
  • 9. Piers (Contd.) Piers Total distance covered 72 KM Total no. of piers 2748 Piers in corridor – I 1109 Piers in corridor – II 588 Piers in corridor – III 1051 Piers completed till now 1635 Piers
  • 10. Bearings • Bearings are used for resisting the rotatory loads
  • 11. Pre-Fabrication • Piers hold the viaduct, this is done by stringing and sticking the Segments together. Segments Gantry andTravel for Lifting and Loading Segments in theYard
  • 12. Pre-Cast Segments • In gen, 10 Segments between 2 Piers, each Segment about 40Tons. • PlacingViaduct Segments with the help of Launching Gantry. Launching Gantry Viaduct Segments under-slung during Sticking and Stitching process Slings for holding Viaduct Segments Traveler For Lifting And Shifting Segments VIADUCT VIADUCT P I E R
  • 13. Pre-Cast Segments (Contd.) Sticking the Pre-Cast Segments Application of Epoxy on surface of Segment
  • 14. Pre-Cast Segments (Contd.) Stringing of Pre-Cast Segments Stringing Cable Duct in Pre-Cast Segment
  • 15. Station Concept • The Stations, being windows to the Metro Service, are tastefully designed reflecting local culture. Uppal stationInterior view of station
  • 16. Station Concept (Contd.) Station Design • Stations are covered by an overlapping roofing system, open at sides, covering the platform • Staircases & Escalators designed based on • Architectural Elements • Functional Aspects.
  • 17. Rolling Stock • LTHMR has given Rolling Stock contract to Hyundai Rotem Company (South Korea). • Total 57Three-CarTrain Sets. Measurement of car 21.7 X 2.9 X 3.8 (meters) Material of car Stainless steel Gauge length 1435 mm Max. Design Speed 90 Km/h Signal System ATO/ATP Capacity (per train set) 126 seats Power supply 25 KV AC Rolling Stock
  • 18. AutomaticTrain Operation (ATO) Train controls Interior view • LTHMR has given the Communication Based Train Control (CBTC) system to TheThales Company . • Thales will Design, Build, Deliver and Manage the installation of the fully automatedCBTC.
  • 19. Summary • Faster : - JourneyTime  Reduced • Greater traffic capacity equivalent to: • 7 lanes of BusTraffic (or) • 24 lanes of CarTraffic • Low Energy Consumption per Passenger Km: • 20% only  in comparison to Road-based Systems. • Eco-Friendly : • Air Pollution  Nil • Sound Pollution  Negligible