2. GOAL
To develop a service that allows to manage
(create/modify/delete) a service agreement
between the service provider and its third parties
(customer, supplier or internal).
3. PROJECT SCHEDULE
start date : 07.01.2013
end date : 10.05.2013
Initial estimation -60 days
Real duration - 99 days
4. RESOURCES/PROJECT
ORGANIZATION
A. Work resources
• Ionela
• Developers :R2,R3,R5
• Platform tester : R1,R4,R6
A. Material resources
• ALU platform : PC, eNodeB, bCEM,eCEM
6. PROJECT MANAGEMENT
The Project Manager puts accent on the time
allocated for the project, cost of the project and
it’s scope, in order to obtain a good quality of the
product.
In order to obtain these characteristics, he
increases competence between employers; he
organizes and manages resources
7. DESIGN PHASE
Customer’s questions list
Pre-design preparation
Hardware design (platform), software
architecture design
Document initialization (create documentation
about the design of hardware and software
architecture )
8. TESTING
Methodes:
- unit testing
- module testing
- regression testing
- system testing
- integration testing
People involved:
- testers
- developer
- customer
- vendor
9. DEVELOPMENT
The process of testing a single function can be
conceptually divided into three steps:
• Acquire a valid input for the function
• Run the function for that input and capture its
output
• Decide if the input-output pair conforms to the
function’s intended behaviour
10. PRE PROD INTEGRATION PHASE
End to End integration
enables utilities to improve power delivery, power
quality, and operational efficiency while increasing
customer intimacy. Achieving these goals requires a
robust, secure, reliable and interoperable
communications infrastructure
o Node 2 Node integration
18. TRAINING,
Alcatel-Lucent University provides courses for
system planning, engineering, and ordering, as
well as courses to train telecommunications
technicians in installation, operations, and
maintenance.
19. DOCUMENTATION
The documentation is made out of ALU internal
specification about each platform component
used and steps made by the devolopers in order
for the project to progress. It usually contains :
• a system overview
• feature lists by release
• basic GUI operation instructions
• GUI map management
20. PROJECT SUCCES
Project tied to the organization’s business goals
Detailed requirements
Realistic schedule
Good stakeholder relationships
Skilled and appropriate team members with
defined roles and responsibilities