The document summarizes the construction of a new administration and archive building from 2007 to 2013. It describes how the foundation was laid in 2006 and 2007 and the lower section was raised by local students. Over subsequent years, the roof, windows, siding, and other exterior features were added. Interior work such as drywall, HVAC systems, and finishing touches occurred from 2012 to 2013. The project was funded by various sources including Heritage Canada and received support from the local community.