  h*p://www.netobjec4ves.com/system/files/DotGame_vas11_0.pdf	
  
§  Illustrate Little’s law
§  Visualize why high resource utilization might be bad for
flow efficiency
§  Create an understanding that the most efficient way of
getting flow is adapting to constraints
§  Show how people in front of a bottleneck are actually
causing problems when adding more work
§  Show that its better not to work in many situations
§  Show the effects of big batches
§  Show that much work in progress adds waste and make
it harder to fix and detect problems
§  Show the value of customer collaboration
§  Show the value of in process testing
Purpose
Peter Antman
§  Material
–  3x3 yellow post-its (300 post-its)
–  Color dots
§  Team of 8 persons and at least a couple of
observers
§  The game is played in 3 round
–  5 min pre
–  5 min running
–  10 min discussion
Set up
Peter Antman
§  From queuing theory
§  The number of items in a system (WIP) equals
the arrival rate (or throughout) times the average
time an item spend in the system (lead time).
§  WIP = TP * LT
Little’s law
Peter Antman
We are a software shop, that
produces this:
Peter Antman
The group roles
§  Business Analyst - Picks 6 post-its
§  Technical Analyst - Puts on yellow dot
§  Designer - Puts on red dot
§  UI Developer - Puts on green dot
§  Developer - puts on both blue dots
§  Tester - discards anything of poor quality
§  Project Manager - uses stopwatch
§  Customer - receives the finished product
Peter Antman
Workflow
Business	
  analyst	
  
peels	
  of	
  6	
  post-­‐its	
  
Technical	
  analyst	
  
put	
  yellow	
  dot	
  on	
  
Designer	
  
put	
  red	
  dot	
  on	
  
UI	
  designer	
  	
  
put	
  both	
  green	
  dots	
  on	
  
Developer	
  	
  
put	
  both	
  blue	
  dots	
  on	
  
Make	
  those	
  blue	
  dots	
  touch,	
  but	
  not	
  overlap!	
  
Tester	
  check	
  against	
  spec	
  
Puts	
  in	
  defect	
  area,	
  or	
  give	
  to	
  customer	
  
Peter Antman
§  It’s important that every one work on maximum
capacity
§  Everyone is a specialist
§  We work in big batches (6)
§  You hand of your work to the next inbox when
finished
§  You are not allowed to talk with each other
Round 1
Peter Antman
Setup
BA	
  
TA	
  
Design	
   UI	
  
Dev	
  
Test	
  
Material	
  PM	
  
Times	
  5	
  minute	
  round	
  
Times	
  first	
  batch	
  
Warns	
  team	
  1	
  min	
  before	
  	
  
finish	
  
Customer	
  
Accepts	
  deliveries	
  
Peter Antman
§  Don’t accept anything where the blue dots are
overlapping or not touching
§  The dots in the corners should be fairly well
spaced from the two sides
§  Respond to people when asked, but don’t
volunteer information
To customer
Peter Antman
§  PM counts
–  # of completed post-its
–  # of accepted post-its
–  # of post-its that are in progress (WIP)
§  How long did the first batch take? Lead time?
§  Throughput # of completed post-its/5 minutes
§  Lead time (now) WIP/TP
Debrief
Round	
   WIP	
   Total	
   Defects	
   OK	
   TP	
   LT	
  
60	
   18	
   16	
   2	
   3,6	
   16,7	
  
Peter Antman
§  Only do work when the ”outbox” is empty – pull
§  Once piece flow (not 6 post-its a time)
§  Could you do in-place testing (test should not
find any errors)
§  PM measures several post-its lead time
§  Customer answers questions
Round 2
Peter Antman
§  PM counts
–  # of completed post-its
–  # of accepted post-its
–  # of post-its that are in progress (WIP)
§  How long did the first batch take? Lead time
§  Throughput # of completed post-its/5 minutes
§  Lead time (now) WIP/TP
Debrief 2
Round	
   WIP	
   Total	
   Defects	
   OK	
   TP	
   LT	
  
4	
   24	
   1	
   23	
   4,8	
   24s	
  
Peter Antman
§  Grab one post-it and work as a team
§  Honor your specialties
§  Discuss first how to organize team work
§  Customer allowed to intervene
§  Testing part of work
Round 3
Peter Antman
Peter Antman

Contenu connexe

Tendances

The Lego Lean Game
The Lego Lean GameThe Lego Lean Game
The Lego Lean Game
frankmt
 

Tendances (20)

Kanban 101 - 3 - Kanban Essentials
Kanban 101 - 3 - Kanban EssentialsKanban 101 - 3 - Kanban Essentials
Kanban 101 - 3 - Kanban Essentials
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for Beginners
 
Pass the pennies - Lean game simulation
Pass the pennies - Lean game simulationPass the pennies - Lean game simulation
Pass the pennies - Lean game simulation
 
Lean Lego Game
Lean Lego GameLean Lego Game
Lean Lego Game
 
The Lego Lean Game
The Lego Lean GameThe Lego Lean Game
The Lego Lean Game
 
Agile Methodology
Agile MethodologyAgile Methodology
Agile Methodology
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)
 
The Importance of having a Sprint Goal
The Importance of having a Sprint GoalThe Importance of having a Sprint Goal
The Importance of having a Sprint Goal
 
Agile scrum roles
Agile scrum rolesAgile scrum roles
Agile scrum roles
 
Kanban step bystep
Kanban step bystepKanban step bystep
Kanban step bystep
 
Lean game air plane
Lean game air planeLean game air plane
Lean game air plane
 
An Introduction to kanban
An Introduction to kanbanAn Introduction to kanban
An Introduction to kanban
 
Lean Office
Lean OfficeLean Office
Lean Office
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Scrum 101
Scrum 101Scrum 101
Scrum 101
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Kanban introduction
Kanban introductionKanban introduction
Kanban introduction
 

Similaire à Lean Dot Game

Similaire à Lean Dot Game (7)

How I failed to build a runbook automation system
How I failed to build a runbook automation systemHow I failed to build a runbook automation system
How I failed to build a runbook automation system
 
APIdays Singapore 2019 - Building Applications in the Cloud: Best Practices F...
APIdays Singapore 2019 - Building Applications in the Cloud: Best Practices F...APIdays Singapore 2019 - Building Applications in the Cloud: Best Practices F...
APIdays Singapore 2019 - Building Applications in the Cloud: Best Practices F...
 
Tips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewTips n' Tricks - Sprint Review
Tips n' Tricks - Sprint Review
 
Automated University Timetabling
Automated University TimetablingAutomated University Timetabling
Automated University Timetabling
 
Software Craftsmanship
Software CraftsmanshipSoftware Craftsmanship
Software Craftsmanship
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
DevOPs Transformation Workshop
DevOPs Transformation WorkshopDevOPs Transformation Workshop
DevOPs Transformation Workshop
 

Plus de Peter Antman

Plus de Peter Antman (20)

Core Protocols - A workshop
Core Protocols - A workshopCore Protocols - A workshop
Core Protocols - A workshop
 
Growing up with agile - how the Spotify 'model' has evolved
Growing up with agile - how the Spotify 'model' has evolved Growing up with agile - how the Spotify 'model' has evolved
Growing up with agile - how the Spotify 'model' has evolved
 
Fluent at agile - agile sverige 2014
Fluent at agile - agile sverige 2014Fluent at agile - agile sverige 2014
Fluent at agile - agile sverige 2014
 
Pirateship - growing a great crew: workshop facilitation guide
Pirateship - growing a great crew: workshop facilitation guidePirateship - growing a great crew: workshop facilitation guide
Pirateship - growing a great crew: workshop facilitation guide
 
Facilitating the Elephant carpaccio exercise
Facilitating the Elephant carpaccio exerciseFacilitating the Elephant carpaccio exercise
Facilitating the Elephant carpaccio exercise
 
User Story Workshop
User Story WorkshopUser Story Workshop
User Story Workshop
 
Lean Canvas - a hypotheses board
Lean Canvas - a hypotheses boardLean Canvas - a hypotheses board
Lean Canvas - a hypotheses board
 
Strong decisions with consensus, Agila Sverige 2014
Strong decisions with consensus, Agila Sverige 2014Strong decisions with consensus, Agila Sverige 2014
Strong decisions with consensus, Agila Sverige 2014
 
Stop the line @spotify
Stop the line @spotifyStop the line @spotify
Stop the line @spotify
 
Tear Down the Pyramid Again - Agile Management from the trenches
Tear Down the Pyramid Again - Agile Management from the trenchesTear Down the Pyramid Again - Agile Management from the trenches
Tear Down the Pyramid Again - Agile Management from the trenches
 
Piemonte vin
Piemonte vinPiemonte vin
Piemonte vin
 
The Bespoke Software Product Factory (2007)
The Bespoke Software Product Factory (2007)The Bespoke Software Product Factory (2007)
The Bespoke Software Product Factory (2007)
 
Java 1.5 - whats new and modern patterns (2007)
Java 1.5 - whats new and modern patterns (2007)Java 1.5 - whats new and modern patterns (2007)
Java 1.5 - whats new and modern patterns (2007)
 
Java Server Faces 1.2 presented (2007)
Java Server Faces 1.2 presented (2007)Java Server Faces 1.2 presented (2007)
Java Server Faces 1.2 presented (2007)
 
EJB 3.0 Walkthrough (2006)
EJB 3.0 Walkthrough (2006)EJB 3.0 Walkthrough (2006)
EJB 3.0 Walkthrough (2006)
 
Så funkar det (del 3) - webben
Så funkar det (del 3) -  webbenSå funkar det (del 3) -  webben
Så funkar det (del 3) - webben
 
Så funkar det (del 2) - mail
Så funkar det (del 2) - mailSå funkar det (del 2) - mail
Så funkar det (del 2) - mail
 
Så funkar det (del 1) - word
Så funkar det (del 1) - wordSå funkar det (del 1) - word
Så funkar det (del 1) - word
 
eXtreme Programming
eXtreme Programming eXtreme Programming
eXtreme Programming
 
SCRUM at Polopoly - or building a lean culture
SCRUM at Polopoly - or building a lean cultureSCRUM at Polopoly - or building a lean culture
SCRUM at Polopoly - or building a lean culture
 

Dernier

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Dernier (14)

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 

Lean Dot Game

  • 1. - or use the Flow Luke Peter Antman Based  on  h*p://www.netobjec4ves.com/system/files/DotGame_vas11_0.pdf  
  • 2. §  Illustrate Little’s law §  Visualize why high resource utilization might be bad for flow efficiency §  Create an understanding that the most efficient way of getting flow is adapting to constraints §  Show how people in front of a bottleneck are actually causing problems when adding more work §  Show that its better not to work in many situations §  Show the effects of big batches §  Show that much work in progress adds waste and make it harder to fix and detect problems §  Show the value of customer collaboration §  Show the value of in process testing Purpose Peter Antman
  • 3. §  Material –  3x3 yellow post-its (300 post-its) –  Color dots §  Team of 8 persons and at least a couple of observers §  The game is played in 3 round –  5 min pre –  5 min running –  10 min discussion Set up Peter Antman
  • 4. §  From queuing theory §  The number of items in a system (WIP) equals the arrival rate (or throughout) times the average time an item spend in the system (lead time). §  WIP = TP * LT Little’s law Peter Antman
  • 5. We are a software shop, that produces this: Peter Antman
  • 6. The group roles §  Business Analyst - Picks 6 post-its §  Technical Analyst - Puts on yellow dot §  Designer - Puts on red dot §  UI Developer - Puts on green dot §  Developer - puts on both blue dots §  Tester - discards anything of poor quality §  Project Manager - uses stopwatch §  Customer - receives the finished product Peter Antman
  • 7. Workflow Business  analyst   peels  of  6  post-­‐its   Technical  analyst   put  yellow  dot  on   Designer   put  red  dot  on   UI  designer     put  both  green  dots  on   Developer     put  both  blue  dots  on   Make  those  blue  dots  touch,  but  not  overlap!   Tester  check  against  spec   Puts  in  defect  area,  or  give  to  customer   Peter Antman
  • 8. §  It’s important that every one work on maximum capacity §  Everyone is a specialist §  We work in big batches (6) §  You hand of your work to the next inbox when finished §  You are not allowed to talk with each other Round 1 Peter Antman
  • 9. Setup BA   TA   Design   UI   Dev   Test   Material  PM   Times  5  minute  round   Times  first  batch   Warns  team  1  min  before     finish   Customer   Accepts  deliveries   Peter Antman
  • 10. §  Don’t accept anything where the blue dots are overlapping or not touching §  The dots in the corners should be fairly well spaced from the two sides §  Respond to people when asked, but don’t volunteer information To customer Peter Antman
  • 11. §  PM counts –  # of completed post-its –  # of accepted post-its –  # of post-its that are in progress (WIP) §  How long did the first batch take? Lead time? §  Throughput # of completed post-its/5 minutes §  Lead time (now) WIP/TP Debrief Round   WIP   Total   Defects   OK   TP   LT   60   18   16   2   3,6   16,7   Peter Antman
  • 12. §  Only do work when the ”outbox” is empty – pull §  Once piece flow (not 6 post-its a time) §  Could you do in-place testing (test should not find any errors) §  PM measures several post-its lead time §  Customer answers questions Round 2 Peter Antman
  • 13. §  PM counts –  # of completed post-its –  # of accepted post-its –  # of post-its that are in progress (WIP) §  How long did the first batch take? Lead time §  Throughput # of completed post-its/5 minutes §  Lead time (now) WIP/TP Debrief 2 Round   WIP   Total   Defects   OK   TP   LT   4   24   1   23   4,8   24s   Peter Antman
  • 14. §  Grab one post-it and work as a team §  Honor your specialties §  Discuss first how to organize team work §  Customer allowed to intervene §  Testing part of work Round 3 Peter Antman