Soumettre la recherche
Mettre en ligne
Dar Training
•
Télécharger en tant que PPT, PDF
•
1 j'aime
•
3,021 vues
P
piman31415
Suivre
Affichage du diaporama
Signaler
Partager
Affichage du diaporama
Signaler
Partager
1 sur 26
Télécharger maintenant
Recommandé
It will help people to take decision and resolve problem in daily life
Decision Analysis and Resolution
Decision Analysis and Resolution
Mohammad Shahadat Hossain Chowdhury, CSSB,ITIL, PRINCE2
Process Mapping
Process Mapping
Muhamad Sugian Nor
Requirements of Process Auditing as per VDA 6.3 (2016) for Product Development
Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)
Kiran Walimbe
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
pankajsh10
Software Configuration Management
Software Configuration Management
Chandan Chaurasia
This Template is created for helping the quality or continuous improvement professionals to generate a step by step problem solving report, which include the guidance on each steps in a 8D process, also include the templates of popular quality tools such as 5-Why and Fishbone Diagram. 想学习六西格玛?可以看看ucourse.org的网上课程。 http://ucourse.org/ssgb
8D Problem Solving Report Template with Guidance
8D Problem Solving Report Template with Guidance
Siu Wai Au, MBB, ASQ CSSBB, CMQ/OE, CQA, LBC, PMP®
ISO 9001-2015 clause 10.2 is different from ISO 9001-2008 corrective action requirements, i tried to capture the updated requirements and with a suggested format for deal with the updated requirements.
Non conformity and corrective action
Non conformity and corrective action
Raghu Malayanuru
It desscribe Gantt, PERT and CPM (activity on node method)
Gantt PERT and CPM
Gantt PERT and CPM
Gurbakash Phonsa
Recommandé
It will help people to take decision and resolve problem in daily life
Decision Analysis and Resolution
Decision Analysis and Resolution
Mohammad Shahadat Hossain Chowdhury, CSSB,ITIL, PRINCE2
Process Mapping
Process Mapping
Muhamad Sugian Nor
Requirements of Process Auditing as per VDA 6.3 (2016) for Product Development
Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)
Kiran Walimbe
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
pankajsh10
Software Configuration Management
Software Configuration Management
Chandan Chaurasia
This Template is created for helping the quality or continuous improvement professionals to generate a step by step problem solving report, which include the guidance on each steps in a 8D process, also include the templates of popular quality tools such as 5-Why and Fishbone Diagram. 想学习六西格玛?可以看看ucourse.org的网上课程。 http://ucourse.org/ssgb
8D Problem Solving Report Template with Guidance
8D Problem Solving Report Template with Guidance
Siu Wai Au, MBB, ASQ CSSBB, CMQ/OE, CQA, LBC, PMP®
ISO 9001-2015 clause 10.2 is different from ISO 9001-2008 corrective action requirements, i tried to capture the updated requirements and with a suggested format for deal with the updated requirements.
Non conformity and corrective action
Non conformity and corrective action
Raghu Malayanuru
It desscribe Gantt, PERT and CPM (activity on node method)
Gantt PERT and CPM
Gantt PERT and CPM
Gurbakash Phonsa
CMMI (Capability Maturity Model Integration)
Capability Maturity Model Integration
Capability Maturity Model Integration
university of Gujrat, pakistan
I've taught many workshops on basic problem solving over the years at various companies. This 3 part presentation collects tools and methods that I've found useful and that most people tend to be able to put into practice quickly. Problem solving is ground that has been covered by many people many times in the past and this presentation builds on that work, incorporates my experience and hopefully integrates it in a way that provides some new insights. This is the 2nd of a 3 part presentation.
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2
Tony Alvarez
tools
7 qc tools
7 qc tools
Jitesh Gaurav
Free Video Training on Youtube - PMBOK6th edition: 1. Integration Management: https://youtu.be/NdzADFfoRxA 2. Scope Management: https://youtu.be/9u6f2NXlGnI 3. Quality Management: https://youtu.be/8zteKSxDyt4 4. Stakeholder management: https://youtu.be/Vhjc6T9R4d8 https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview https://www.slideshare.net/anandbobade/chap-71-plan-cost-management https://www.slideshare.net/anandbobade/chap-72-estimate-cost https://www.slideshare.net/anandbobade/chap-73-determine-budget https://www.slideshare.net/anandbobade/chap-74-control-cost
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
Anand Bobade
Tips to accelerate the rate of improvement, When to Use the PDCA Cycle, The Plan-do-check-act Procedure, Benefits of PDSA Cycle
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Dr.Raja R
SDLC Models and their implementations. Almong with the flow of each model. The PPT contains implementations of each model for various software development phases
SDLC Models and Their Implementation
SDLC Models and Their Implementation
Sonal Tiwari
The three-day course, "Introduction to CMMI", introduces participants to the fundamental concepts of the CMMI model. The course assists companies in integrating best practices from proven discipline-specific process improvement models, including systems engineering, software engineering, integrated product and process development and supplier sourcing. The course is composed of lectures and class exercises with ample opportunity for participant questions and discussions. After attending the course, participants will be able to describe the components of CMMI, discuss the process areas in CMMI, and locate relevant information in the model. The workshop will help the participants to: Understand the CMMI framework Understand the detailed requirements of the process areas in the CMMI V1.3 Make valid judgments regarding the organization's implementation of process areas Identify issues that should be addressed in performing process improvements using the CMMI V1.3
Introduction to CMMI-DEV v1.3 - Day 2
Introduction to CMMI-DEV v1.3 - Day 2
Sherif Salah, MBA, ITIL, CMMI, MCSA, TQM
Here is a simple presentation on the basics of a corrective action system
Corrective Action And Root Cause Analysis
Corrective Action And Root Cause Analysis
sjlines
Risk Management
Risk Management
Risk Management
Stefan Csosz
Move from Current (As~Is) to Future (To~Be) State
Process Mapping
Process Mapping
Anand Subramaniam
Project design and management
Project design and management
Andrew Zolnai
The VDA recommends it’s members to apply VDA 6.3 (2010) standard for the implementation and maintenance of Quality management System. This presentation explains the features and plus points of this system of process auditing, which sets it apart from other methods in today's automotive industry.
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
Kiran Walimbe
Statistical process control (spc)
Statistical process control (spc)
Statistical process control (spc)
Ashish Chaudhari
Progress control
Progress control
ashamarsha
Chapter 4 TQM
Chapter 4 TQM
Franklin Go
PMP-Schedule Management area
PMP-Schedule Management area
PMP-Schedule Management area
Zaur Ahmadov, PMP
Project Quality Management as described in PMBOK Guide 5th edition
Project quality management
Project quality management
Mohammad Ashraf Khan, PMP
Episode 21 : Project Scope Management Introduction to Project scope management Initiation Scope Planning Scope Definition Scope Verification Scope Change Control SAJJAD KHUDHUR ABBAS Chemical Engineering , Al-Muthanna University, Iraq Oil & Gas Safety and Health Professional – OSHACADEMY Trainer of Trainers (TOT) - Canadian Center of Human Development
Episode 21 : Project Scope Management
Episode 21 : Project Scope Management
SAJJAD KHUDHUR ABBAS
CMMI (Capability Maturity Model Integration) is a proven industry framework to improve product quality and development efficiency for both hardware and software CMMI, staged, uses 5 levels to describe the maturity of the organization CMMI has been established as a model to improve business results
CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)
Akshat Gupta
Área de Conocimiento 02, Gestión de Alcance
Project Scope Management
Project Scope Management
Andersson Lujan Ojeda
SPPT Course Sample
Decision analysis
Decision analysis
Norahim Ibrahim
Problem Analysis Framework
Problem Analysis Framework
kelly kusmulyono
Contenu connexe
Tendances
CMMI (Capability Maturity Model Integration)
Capability Maturity Model Integration
Capability Maturity Model Integration
university of Gujrat, pakistan
I've taught many workshops on basic problem solving over the years at various companies. This 3 part presentation collects tools and methods that I've found useful and that most people tend to be able to put into practice quickly. Problem solving is ground that has been covered by many people many times in the past and this presentation builds on that work, incorporates my experience and hopefully integrates it in a way that provides some new insights. This is the 2nd of a 3 part presentation.
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2
Tony Alvarez
tools
7 qc tools
7 qc tools
Jitesh Gaurav
Free Video Training on Youtube - PMBOK6th edition: 1. Integration Management: https://youtu.be/NdzADFfoRxA 2. Scope Management: https://youtu.be/9u6f2NXlGnI 3. Quality Management: https://youtu.be/8zteKSxDyt4 4. Stakeholder management: https://youtu.be/Vhjc6T9R4d8 https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview https://www.slideshare.net/anandbobade/chap-71-plan-cost-management https://www.slideshare.net/anandbobade/chap-72-estimate-cost https://www.slideshare.net/anandbobade/chap-73-determine-budget https://www.slideshare.net/anandbobade/chap-74-control-cost
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
Anand Bobade
Tips to accelerate the rate of improvement, When to Use the PDCA Cycle, The Plan-do-check-act Procedure, Benefits of PDSA Cycle
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Dr.Raja R
SDLC Models and their implementations. Almong with the flow of each model. The PPT contains implementations of each model for various software development phases
SDLC Models and Their Implementation
SDLC Models and Their Implementation
Sonal Tiwari
The three-day course, "Introduction to CMMI", introduces participants to the fundamental concepts of the CMMI model. The course assists companies in integrating best practices from proven discipline-specific process improvement models, including systems engineering, software engineering, integrated product and process development and supplier sourcing. The course is composed of lectures and class exercises with ample opportunity for participant questions and discussions. After attending the course, participants will be able to describe the components of CMMI, discuss the process areas in CMMI, and locate relevant information in the model. The workshop will help the participants to: Understand the CMMI framework Understand the detailed requirements of the process areas in the CMMI V1.3 Make valid judgments regarding the organization's implementation of process areas Identify issues that should be addressed in performing process improvements using the CMMI V1.3
Introduction to CMMI-DEV v1.3 - Day 2
Introduction to CMMI-DEV v1.3 - Day 2
Sherif Salah, MBA, ITIL, CMMI, MCSA, TQM
Here is a simple presentation on the basics of a corrective action system
Corrective Action And Root Cause Analysis
Corrective Action And Root Cause Analysis
sjlines
Risk Management
Risk Management
Risk Management
Stefan Csosz
Move from Current (As~Is) to Future (To~Be) State
Process Mapping
Process Mapping
Anand Subramaniam
Project design and management
Project design and management
Andrew Zolnai
The VDA recommends it’s members to apply VDA 6.3 (2010) standard for the implementation and maintenance of Quality management System. This presentation explains the features and plus points of this system of process auditing, which sets it apart from other methods in today's automotive industry.
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
Kiran Walimbe
Statistical process control (spc)
Statistical process control (spc)
Statistical process control (spc)
Ashish Chaudhari
Progress control
Progress control
ashamarsha
Chapter 4 TQM
Chapter 4 TQM
Franklin Go
PMP-Schedule Management area
PMP-Schedule Management area
PMP-Schedule Management area
Zaur Ahmadov, PMP
Project Quality Management as described in PMBOK Guide 5th edition
Project quality management
Project quality management
Mohammad Ashraf Khan, PMP
Episode 21 : Project Scope Management Introduction to Project scope management Initiation Scope Planning Scope Definition Scope Verification Scope Change Control SAJJAD KHUDHUR ABBAS Chemical Engineering , Al-Muthanna University, Iraq Oil & Gas Safety and Health Professional – OSHACADEMY Trainer of Trainers (TOT) - Canadian Center of Human Development
Episode 21 : Project Scope Management
Episode 21 : Project Scope Management
SAJJAD KHUDHUR ABBAS
CMMI (Capability Maturity Model Integration) is a proven industry framework to improve product quality and development efficiency for both hardware and software CMMI, staged, uses 5 levels to describe the maturity of the organization CMMI has been established as a model to improve business results
CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)
Akshat Gupta
Área de Conocimiento 02, Gestión de Alcance
Project Scope Management
Project Scope Management
Andersson Lujan Ojeda
Tendances
(20)
Capability Maturity Model Integration
Capability Maturity Model Integration
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2
7 qc tools
7 qc tools
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
Plan, Do, Study, Act (PDSA) Cycle in Total Quality Management
SDLC Models and Their Implementation
SDLC Models and Their Implementation
Introduction to CMMI-DEV v1.3 - Day 2
Introduction to CMMI-DEV v1.3 - Day 2
Corrective Action And Root Cause Analysis
Corrective Action And Root Cause Analysis
Risk Management
Risk Management
Process Mapping
Process Mapping
Project design and management
Project design and management
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
Statistical process control (spc)
Statistical process control (spc)
Progress control
Progress control
Chapter 4 TQM
Chapter 4 TQM
PMP-Schedule Management area
PMP-Schedule Management area
Project quality management
Project quality management
Episode 21 : Project Scope Management
Episode 21 : Project Scope Management
CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)
Project Scope Management
Project Scope Management
En vedette
SPPT Course Sample
Decision analysis
Decision analysis
Norahim Ibrahim
Problem Analysis Framework
Problem Analysis Framework
kelly kusmulyono
Hypothesis testing ppt final
Hypothesis testing ppt final
piyushdhaker
basics of pharmacoeconomics
Pharmacoeconomics by harsh
Pharmacoeconomics by harsh
Harsh Yadav
DO Logic Tree
DO Logic Tree
Ken Hashizume
a
Oms part1
Oms part1
babutiru
brief on pharmacoeconomics
Pharmacoeconomics
Pharmacoeconomics
Ijeh Cyril
Problem-Solving and Decision-Making requires a change in thinking first before the skills and processes are learned and applied.
Problem-Solving & Decision-Making workshop
Problem-Solving & Decision-Making workshop
dijoe331
Software Development Process
CMMI V1.3
CMMI V1.3
Coupons Fantasy
t
Decision analysis
Decision analysis
Harry Potter
Meet the experts and find out how technology is changing the future of healthcare, quality of life trends and figures, how to help patients adapt to a change in rhythm, how to train a staff that CARES, holistic approaches to patient care, mealtime management and news around the world.
Quality of life experiences No.2
Quality of life experiences No.2
Innovations2Solutions
Mohammed A Mohammed; pharmacoeconomics; Cost effectiveness analysis; pharmacy
Clinical pharmacy
Clinical pharmacy
Mohammed Mohammed
Managing formularies
Pharmacy Practice: Managing Formularies
Pharmacy Practice: Managing Formularies
Anas Bahnassi أنس البهنسي
Decision making
Decision making
Krishna Kanth
We've all made rational decisions and forecasts based on individually analyzing the best available data. But there are many other aspects of decision making. This session will examine some of those. When can groups of non-expert individuals beat some of the best experts? What are some of the common biases that cause ordinary people to make decisions differently from those that they "should" make. Can you take advantage of the ways other makes decisions or is this unwarranted manipulation?
Tools for decision making (Brian Haff) ProductCamp Boston 2014
Tools for decision making (Brian Haff) ProductCamp Boston 2014
ProductCamp Boston
Class lecture on Planning and decision making
Planning and Decision Making process
Planning and Decision Making process
Chittagoang University of Engineering and Technology
A sistematic and bullet proof approach to solve complex problems!
7 steps to master problem solving
7 steps to master problem solving
Yuri Kaminski
Steps to decision amaking
Problem solving & decision making
Problem solving & decision making
Ajith S
A beginner's guide to understanding what pharmacoeconomics is all about!!!!
Intro to pharmacoeconomics
Intro to pharmacoeconomics
samthamby79
How to make effective decisions to make life meaningful
Decision making and problem solving
Decision making and problem solving
Krishantha Jayasundara
En vedette
(20)
Decision analysis
Decision analysis
Problem Analysis Framework
Problem Analysis Framework
Hypothesis testing ppt final
Hypothesis testing ppt final
Pharmacoeconomics by harsh
Pharmacoeconomics by harsh
DO Logic Tree
DO Logic Tree
Oms part1
Oms part1
Pharmacoeconomics
Pharmacoeconomics
Problem-Solving & Decision-Making workshop
Problem-Solving & Decision-Making workshop
CMMI V1.3
CMMI V1.3
Decision analysis
Decision analysis
Quality of life experiences No.2
Quality of life experiences No.2
Clinical pharmacy
Clinical pharmacy
Pharmacy Practice: Managing Formularies
Pharmacy Practice: Managing Formularies
Decision making
Decision making
Tools for decision making (Brian Haff) ProductCamp Boston 2014
Tools for decision making (Brian Haff) ProductCamp Boston 2014
Planning and Decision Making process
Planning and Decision Making process
7 steps to master problem solving
7 steps to master problem solving
Problem solving & decision making
Problem solving & decision making
Intro to pharmacoeconomics
Intro to pharmacoeconomics
Decision making and problem solving
Decision making and problem solving
Similaire à Dar Training
Define phase of six sigma
Define
Define
ssuser3312b4
Running head: TECHNOLOGY EVALUATION 1 TECHNOLOGY EVALUATION 2 Technology Evaluation Student’s Name Institutional Affiliation Background In 2004, the MITRE Intelligence Community Test and Integration Center in GO24 started to develop Standardized Technical Evaluation Process (STEP), with the aim of tracing previous assessment work and make sure there are superior, objective and reliable in future appraisals. From that time, Standardized Technical Evaluation Process (STEP) has grown by leaps and bounds in GO24 and GO25, GO27 as well as in G151 assessment tasks. Standardized Technical Evaluation Process’s (STEP) four stages follow a familiar structure for carrying out technological assessment. During the development and refining of Standardized Technical Evaluation Process (STEP), different resources and subject matter professionals were conducted both within and outside MITRE to have a broader understanding of assessment performance as well as theory. The workflow and method of Standardized Technical Evaluation Process (STEP) includes many of these practices and their recommendations. MITRE carries out several technological appraisals meant for its sponsors every year. The appraisals have taken place for some time involving a number of products and technologies. To keep up with the dynamic technology and the requirements of the sponsors, the team needs a well-defined appraisal process that is cost-effective, repeatable and as fair as possible. Below are the benefits that accrue to adhering to a standardized, cost effective process; · Reliability and better traceability through permanent steps and deliverables. · Better effectiveness resulting in little effort needed for every assessment. · Secure and repeatable outcomes. · Improved communication within and among the assessment teams. · Assessment that are comparable and can also be shared easily throughout the sponsor foundation. · Provides a chance to develop leadership and file the lessons-learned for future appraisal. Intended Audience The Standardized Technical Evaluation Process is meant for MITRE programs leads and engineers carrying out technological assessments of one or more products, and is suitable for both experienced and in-experienced evaluators. The Standardized Technical Evaluation Process is also suitable for any software or data technology assessment, irrespective of the fact that it is meant for various GO24 security tool assessment (Sarah, 2007). Due to the tendency of evaluations to differ extensively in size and range, the Standardized Technical Evaluation Process offers alternatives for the evaluation teams that perfo ...
Running head TECHNOLOGY EVALUATION .docx
Running head TECHNOLOGY EVALUATION .docx
toltonkendal
Software Proposal Défense
Remade Slides.pptx
Remade Slides.pptx
AshokKumar705948
Software Testing adds organizational value in quantitative and qualitative ways. Successful organizations recognize the importance of quality. Establishing a quality-oriented mindset is the responsibility of business leadership.
Value of software testing
Value of software testing
Transpose Solutions Inc
Ch 4 components of the sqa system
Ch 4 components of the sqa system
Kittitouch Suteeca
Helpful for Development Projects : Managers
General checklist for the development project
General checklist for the development project
keshav2011
Learn Six Sigma details quickly and easily
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
Asadullah Malik P.Eng., PMP, PMI-ACP
Quality management procedures
Quality management procedures
selinasimpson1201
This is PMBOK Guide Planning Process Group Part one. It includes two Knowledge Area - Integration and Scope management - with five processes - Develop Project Management Plan, Plan Scope Management, Collect Requirements, Define Scope, and Create WBS -.
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
Hossam Maghrabi
Work experience & education
Profolio
Profolio
VanWert
SMT - DMAIC
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
PhngPhmTrung
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
Leanleaders.org
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
Leanleaders.org
Asq toronto10 jan2007effectcorraction
Asq toronto10 jan2007effectcorraction
Omnex Inc.
Rational Unified Process(Rup)
Rational Unified Process(Rup)
pawanonline83
Redefining best practices, processes, and standards for project delivery? Innovate Vancouver can help Travis Barker, MPA GCPM Consulting@innovatevancouver.org
Project delivery standardization framework innovate vancouver
Project delivery standardization framework innovate vancouver
Innovate Vancouver
Process mapping
Process mapping
Inga Tanaino-Mitenberga
Name of Project Student Name Independent Research Project Project OverviewProject scopeProject management approach (AGILE, waterfall, etc)Major milestonesMajor deliverablesMajor risksHow could the project portfolio process be improved?MilestoneDescriptionDate Strategic AlignmentDescribe which tools / processes were used and whyStrategic management processProject portfolio managementFinancial criteriaNon-financial criteriaProject screening matrixMajor project proposal formRisk analysis formProject screening processPriority analysis formProject priority matrixDid the needs / market analysis / business case identify all the project deliverables that the project eventually produced?How could the project portfolio process be improved? Example below Requirements ManagementRequirements management approachRequirements prioritization processProduct metricsCostQualityPerformanceHow accurate were the requirements?How could the requirements management process have been improved?Requirement InformationRelationship TraceabilityIDRequirementPriorityCategorySourceRelates to ObjectiveManifests in WBS DeliverableVerificationValidation Scope ManagementInsert WBS (Tree format)Scope management approachRoles and responsibilitiesScope definitionProject scope statementScope verificationScope controlHow could the scope management process have been improved? Risk ManagementInsert completed risk severity matrix Discuss which tools used and whyRisk event graph (p 198)Risk management process (p 199)Risk breakdown structure (p 200)Defined conditions for impact scales (p 203)Risk assessment form (p 203)Risk severity matrix (p 204)Risk response matrix (p 209)Change control process (p 216)Sample change request (p 217)PERT (p 227)Quantitative risk analysisQualitative risk analysisSWOTRisk probability and impact assessment ScheduleDiscuss the approach / process of analyzing:activity sequencesDurationsresource requirementsschedule constraintsWhat changes were made to the original baseline?How did this affect the project and what did you do to resolve? Insert your project schedule Cost Management Discuss how project costs were measuredSVCVSPICPICost variance response processReporting and variance response processHow could the estimating process have been improved? EstimatingInsert high level budget Major cost element: $xxx,xxx.xx Major cost element $xxx,xxx.xx Major cost element $xxx,xxx.xx Risk reserve $xx,xxx.xx Total Project Cost $xxx,xxx.xx Management Reserve $x,xxx.xx Discuss which tools were used and whyTop DownConsensus method (p 123)Ratio method (p 124)Apportion method (p 124)Function point method (p 125)Learning curves (p 126)Bottoms up Template (p 127)Parametric procedures (p 127)Detailed estimates (p 127)Expert judgementAnalogous estimatingParametric estimatingBottom up estimatingThree point estimates (PERT)Reserve analysisPhase estimating (p 128-129)How accurate were the estimates?How could the estima.
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docx
rosemarybdodson23141
Pm Communication Reporting
Pm Communication Reporting
jonathan077070
Basic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
Similaire à Dar Training
(20)
Define
Define
Running head TECHNOLOGY EVALUATION .docx
Running head TECHNOLOGY EVALUATION .docx
Remade Slides.pptx
Remade Slides.pptx
Value of software testing
Value of software testing
Ch 4 components of the sqa system
Ch 4 components of the sqa system
General checklist for the development project
General checklist for the development project
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
Quality management procedures
Quality management procedures
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
Profolio
Profolio
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
Asq toronto10 jan2007effectcorraction
Asq toronto10 jan2007effectcorraction
Rational Unified Process(Rup)
Rational Unified Process(Rup)
Project delivery standardization framework innovate vancouver
Project delivery standardization framework innovate vancouver
Process mapping
Process mapping
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docx
Pm Communication Reporting
Pm Communication Reporting
Basic Six Sigma Presentation
Basic Six Sigma Presentation
Dar Training
1.
Decision Analysis and
Resolution (DAR) Process Nova Technologies Systems and Software Engineering Processes
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Process Workflow
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Télécharger maintenant