 India's 1st and Asia's 5th metro rail was
introduced in Kolkata.
 Over a length of 16.45 km and the work on this
project was sanctioned on 1.6.1972
The construction work started in 1973-74.
 After crossing so many hurdles Calcutta Metro
started its journey on October 24, 1984
2
unprecedented growth of personal
vehicles.
Growing traffic congestion
Air pollution and traffic accidents has
become a major concern.
To avoid congestion at peak hours.
Time saving.
Reduced fuel consumption
3
Why it is needed
 Complement Underground Metro with existing public
transportation
 No displacement or demolition necessary
 No Land acquisition and litigation costs
 Minimal Environmental Impact
 Address socio-economic need
 Good Solution, futuristic, fast and cheap
 Preserve city's culture while being realistic towards
solution
4
Why it is needed
 Requires 1/5th energy per passenger km
compared to road-based transport system.
 Causes less noise, no air pollution and eco
friendly transport system.
 Occupies no road space if underground and only
about 2.60 meters width of the road if elevated.
 Reduces journey time.
 Cost effective mass transport system.
 Reducing traffic transport problems.
5
 Air-conditioning and ventilation system for
environmental control of stations and tunnels.
 Automatic ticket vending and checking system.
 Automatic door opening / closing .
 A public address system is provided on the trains
to announce approaching stations.
6
1. EXISTING METRO RAILWAY
Kolkata Metro Rail.
Delhi Metro Rail.
2. FUTURE & PROPOSED METRO RAILWAY
Mumbai Metro Rail
Bangalore Metro Rail.
Hydrabad Metro Rail.
Chennai Metro Rail.
Kochi Metro Rail
7
 System length - 22.3 km
 Number of lines – 2
 Number of stations - 21 (15 under ground, 1 on
surface and 5 elevated)
 Track gauge - Broad Gauge.
8
 Coaches per train - 8
 Maximum permissible speed - 55 km/h
 Average speed – 30km/h
 Voltage - 750 V D.C.
 Travel Time - 41 minutes (approx.)
 Total estimated cost of the project - Rs. 1825
crores (approx.)
9
10
o Rs 4874.58 crores project to connect Kolkata with
Howrah by an underwater metro line .
o The total length will be 14.67 km (8.9 km underground
and 5.77 km elevated).
o Metro will run under 100 ft. of Hooghly River (first
underwater metro in India).
o Completion date is targeted at 31/10/2014.
11
East- West Metro Corridor
Sl No.
Particulars
Rs. Crores
(For 30 Years)
1 Traffic Congestion (Avoidance of new buses) 2,391
2 Traffic Congestion (Avoidance of other vehicles) 5,788
3 Savings in vehicle operating cost 6,977
4 Savings in fuel price 25,884
5
Savings due to reduction in number of accidents
& pollution
4,360
Total 45,402
NOISE & AIR POLLUTION LEVELS WILL ALSO BE REDUCED 12
13
 Operator - Delhi Metro Rail Corporation Ltd.
 Begun Operation - 24th December, 2002.
 System Length - 76.7 kilometers.
 Number of stations – 68.
 The power supply is at 25 kV AC through overhead.
 In the 2008 financial year, it had revenue of $100
million.
14
15
EVALUATION CRITERIA
 Influence zone
 Feeder service and an integrated ticket
 Luggage
 Parking
 Metro will carry the same amount of
traffic as nine lanes of buses.
 It reduces journey time by 50 to 75%.
 2400 less buses on the roads…!!
 Less bus will be on the roads so less
congested roads will be.
16
17
18
Power supply in Delhi metro
CONSTRUCTION & METHODOLOGY
 Running section is of rectangular twin boxes.
 Two separate tunnel of 5.4m dia. Separated
centre to centre by two times the dia.
 Station with side platform or island platform
are housed in rectangular
 Shield tunneling method is used for 3.8 km
 1.5 km by TBM(Delhi main-chawri bazaar)
 1 km by NATM method (vishwa vidayalya-old
secretariat)
19
DESIGN RESOLUTIONMODELLING
FLAC 2D & 3D as primary geotechnical
analysis and design tool
Used to determine displacement for
use in structural analysis.
Completed in longitudinal &
transverse section
Correlated to centrifuge testing to
confirm
20
VENTILATION & AIR
CONDITION
Outside summer temp. - 43.2 ◦c
Outside temp. in monsoon - 32.0 ◦c
Permissible temp. in tunnelstation - 29.0◦c
Max. air speed in tunnel - 8 ms
Max. air speed in station area - 1.5 ms
Max. quantity of fresh air/person -25cumh
Heat given up per person - 130 kcal/h
21
22
SAFETY ACTION
 Cut & cover method with continuous diaphragm
walls.
 Diaphragm walls are constructed in advance using
slurry trench method.
 Walls are laterally supported by rolledbuilt up steel
section.
 Vertical rolledbuilt up steel section is used to satisfy
slenderness limit in diaphragm wall & support traffic
as well.
 Stretches of 6.6m in dia. With 300mm thick concrete
lining.
23
 The Mumbai Metro Railway System Will Cover A Distance Of 146
Km And Link India’s Financial And Entertainment Capital With Its
Suburbs.
 The government of the of Maharashtra and the private Reliance
Dhirubhai Ambani Group will share the costs of the corridor with the
private company picking up 74% of the tab.
 A six coach broad gauge train could have carried the same
number of passengers as an eight coach standard gauge train.
 A six coach broad gauge train could have carried the same
number of passengers as an eight coach standard gauge train.
 It means lower operational cost, lower electricity cost.
24
25
 Metro railway system was mooted for the city of Chennai by S
Shreedharan the DMRC to the Tamil Nadu CM Jay Lalitha.
 The elevated section of the project is scheduled to be operational by
2011 and the entire project is scheduled to be completed by the
financial year 2014-2015.
About 55% of the corridors in Phase I is underground and the
remaining elevated.
26
 The Metro rail project was included in the
2007-08 State Government's budget, and an
amount of Rs. 50 crores had been sanctioned for
preliminary works.
 The project is estimated to cost around
14,600 crores (approximately USD 3.5 billion) for
the two corridors totaling 50.1 km.
 The construction started in early 2009 and is
expected to be fully completed by 2014.
 A total of 34 stations have been planned along
the two corridors. As many as 19 stations are
underground and 15 are elevated.
27
28
 Estimated cost of Rs. 12,132 crores.
 The project Hyderabad metro rail is 71.16 km
long
 PPP Metro Rail Project to have been sanctioned
by Govt. of India
 Global consulting firm Deloitte is the
constructing Co. of HMR.
29
 The Metro Rail Project work will start next year
and expected to be completed by the end of 2014.
 The 71 km covering three high density traffic
corridors of Hyderabad.
 Speeds of 34 kmph on an average to 80 kmph
maximum.
30
31
 The total project outlay envisaged is Rs. 6395
crores.
 The project Bangalore metro rail is 42.3 kms
long.
 The project report of BML is prepared by DMRC.
32
 The first face of the project has
commenced in 2007 and complete by
2012.
 The number of passengers expected to
travel on the metro is estimated at 10.20
lakhs in 2012 and 16.10 lakhs in 2021.
 Phase I network to about 42 km, with 40
stations.
33
34
 Estimated to cost Rs 3,300 crore.
 The project Cochin metro rail is 25 kms long.
 The starting point of Metro rail in Cochin is in
Aluva and the proposed ending point is the place
called Pettah.
35
 The alignment was created by the DMRC and
is planned to be made on a Public-Private
Partnership basis.
 Since it has almost 24 stops between the 25
km, average speed 35kms/hour.
 The proposed gauge is standard gauge unlike
the broad gauge on the Delhi Metro.
36
37
integrated ticket for bus & metro rail.
Luggage carrying facility should be there.
To encourage people to use Metro there should be
a separate parking place for the monthly pass
holders.
Concern authority should drop their kind attention
to minimize the maintenance cost.
38
Suggestions
Although Metro systems are more reliable,
comfortable and safer than road based systems & it
reduce congestion on the roads. However
systems planned in India shows that cost
overrunning and under utilization of capacity.
Methodology and arguments used to justify
these systems needs careful analysis. High
capacity system does not necessarily generate
high demand. Estimation of passenger
demand for transit services should consider
complete journey of commuters including
access time. 39
40

Contenu connexe

Tendances

Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
Jaspal Singh
 

Tendances (20)

Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkata
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUT
 
History of roads
History of roadsHistory of roads
History of roads
 
Metro Rail and the City
Metro Rail and the CityMetro Rail and the City
Metro Rail and the City
 
CHENAB BRIDGE
CHENAB BRIDGECHENAB BRIDGE
CHENAB BRIDGE
 
Metro ppt-180628112005
Metro ppt-180628112005Metro ppt-180628112005
Metro ppt-180628112005
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
 
Diiferent types of road
Diiferent types of roadDiiferent types of road
Diiferent types of road
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metro
 
Expressway plan
Expressway planExpressway plan
Expressway plan
 
Classification of roads PPT
Classification of roads PPTClassification of roads PPT
Classification of roads PPT
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 

En vedette

L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3
Ramesh Satyam
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
Vimal Maurya
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
Vikas Saini
 
Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project report
Manish Singh
 

En vedette (15)

Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs Metrorail
 
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS ReddyHyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy
 
Calligraphy as a hobby
Calligraphy as a hobbyCalligraphy as a hobby
Calligraphy as a hobby
 
L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3L & T Metro Rail Impact Assessment Study - Stage 3
L & T Metro Rail Impact Assessment Study - Stage 3
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
Tp metro
Tp metroTp metro
Tp metro
 
Intern final report
Intern final reportIntern final report
Intern final report
 
case study of netaji metro station
case study of netaji metro station case study of netaji metro station
case study of netaji metro station
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
Hyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedureHyderabad metro rail L&T | Construction sequence and procedure
Hyderabad metro rail L&T | Construction sequence and procedure
 
Hyderabad Metro Rail Project
Hyderabad Metro Rail ProjectHyderabad Metro Rail Project
Hyderabad Metro Rail Project
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project report
 

Similaire à Metro project in inda

Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
Prabhat Taneja
 

Similaire à Metro project in inda (20)

Metro project
Metro project Metro project
Metro project
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
delhimetro
delhimetrodelhimetro
delhimetro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Summer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling StockSummer Internship Report on DMRC Rolling Stock
Summer Internship Report on DMRC Rolling Stock
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
final report
final reportfinal report
final report
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
Driverless metro
Driverless metroDriverless metro
Driverless metro
 
vikanksh
vikankshvikanksh
vikanksh
 
Sarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportSarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training report
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Metro project in inda

  • 1. 1Underground metro project Presented by: PINTU KUMAR 2008JE0056
  • 2.  India's 1st and Asia's 5th metro rail was introduced in Kolkata.  Over a length of 16.45 km and the work on this project was sanctioned on 1.6.1972 The construction work started in 1973-74.  After crossing so many hurdles Calcutta Metro started its journey on October 24, 1984 2
  • 3. unprecedented growth of personal vehicles. Growing traffic congestion Air pollution and traffic accidents has become a major concern. To avoid congestion at peak hours. Time saving. Reduced fuel consumption 3 Why it is needed
  • 4.  Complement Underground Metro with existing public transportation  No displacement or demolition necessary  No Land acquisition and litigation costs  Minimal Environmental Impact  Address socio-economic need  Good Solution, futuristic, fast and cheap  Preserve city's culture while being realistic towards solution 4 Why it is needed
  • 5.  Requires 1/5th energy per passenger km compared to road-based transport system.  Causes less noise, no air pollution and eco friendly transport system.  Occupies no road space if underground and only about 2.60 meters width of the road if elevated.  Reduces journey time.  Cost effective mass transport system.  Reducing traffic transport problems. 5
  • 6.  Air-conditioning and ventilation system for environmental control of stations and tunnels.  Automatic ticket vending and checking system.  Automatic door opening / closing .  A public address system is provided on the trains to announce approaching stations. 6
  • 7. 1. EXISTING METRO RAILWAY Kolkata Metro Rail. Delhi Metro Rail. 2. FUTURE & PROPOSED METRO RAILWAY Mumbai Metro Rail Bangalore Metro Rail. Hydrabad Metro Rail. Chennai Metro Rail. Kochi Metro Rail 7
  • 8.  System length - 22.3 km  Number of lines – 2  Number of stations - 21 (15 under ground, 1 on surface and 5 elevated)  Track gauge - Broad Gauge. 8
  • 9.  Coaches per train - 8  Maximum permissible speed - 55 km/h  Average speed – 30km/h  Voltage - 750 V D.C.  Travel Time - 41 minutes (approx.)  Total estimated cost of the project - Rs. 1825 crores (approx.) 9
  • 10. 10
  • 11. o Rs 4874.58 crores project to connect Kolkata with Howrah by an underwater metro line . o The total length will be 14.67 km (8.9 km underground and 5.77 km elevated). o Metro will run under 100 ft. of Hooghly River (first underwater metro in India). o Completion date is targeted at 31/10/2014. 11 East- West Metro Corridor
  • 12. Sl No. Particulars Rs. Crores (For 30 Years) 1 Traffic Congestion (Avoidance of new buses) 2,391 2 Traffic Congestion (Avoidance of other vehicles) 5,788 3 Savings in vehicle operating cost 6,977 4 Savings in fuel price 25,884 5 Savings due to reduction in number of accidents & pollution 4,360 Total 45,402 NOISE & AIR POLLUTION LEVELS WILL ALSO BE REDUCED 12
  • 13. 13
  • 14.  Operator - Delhi Metro Rail Corporation Ltd.  Begun Operation - 24th December, 2002.  System Length - 76.7 kilometers.  Number of stations – 68.  The power supply is at 25 kV AC through overhead.  In the 2008 financial year, it had revenue of $100 million. 14
  • 15. 15 EVALUATION CRITERIA  Influence zone  Feeder service and an integrated ticket  Luggage  Parking  Metro will carry the same amount of traffic as nine lanes of buses.  It reduces journey time by 50 to 75%.  2400 less buses on the roads…!!  Less bus will be on the roads so less congested roads will be.
  • 16. 16
  • 17. 17
  • 18. 18 Power supply in Delhi metro
  • 19. CONSTRUCTION & METHODOLOGY  Running section is of rectangular twin boxes.  Two separate tunnel of 5.4m dia. Separated centre to centre by two times the dia.  Station with side platform or island platform are housed in rectangular  Shield tunneling method is used for 3.8 km  1.5 km by TBM(Delhi main-chawri bazaar)  1 km by NATM method (vishwa vidayalya-old secretariat) 19
  • 20. DESIGN RESOLUTIONMODELLING FLAC 2D & 3D as primary geotechnical analysis and design tool Used to determine displacement for use in structural analysis. Completed in longitudinal & transverse section Correlated to centrifuge testing to confirm 20
  • 21. VENTILATION & AIR CONDITION Outside summer temp. - 43.2 ◦c Outside temp. in monsoon - 32.0 ◦c Permissible temp. in tunnelstation - 29.0◦c Max. air speed in tunnel - 8 ms Max. air speed in station area - 1.5 ms Max. quantity of fresh air/person -25cumh Heat given up per person - 130 kcal/h 21
  • 22. 22
  • 23. SAFETY ACTION  Cut & cover method with continuous diaphragm walls.  Diaphragm walls are constructed in advance using slurry trench method.  Walls are laterally supported by rolledbuilt up steel section.  Vertical rolledbuilt up steel section is used to satisfy slenderness limit in diaphragm wall & support traffic as well.  Stretches of 6.6m in dia. With 300mm thick concrete lining. 23
  • 24.  The Mumbai Metro Railway System Will Cover A Distance Of 146 Km And Link India’s Financial And Entertainment Capital With Its Suburbs.  The government of the of Maharashtra and the private Reliance Dhirubhai Ambani Group will share the costs of the corridor with the private company picking up 74% of the tab.  A six coach broad gauge train could have carried the same number of passengers as an eight coach standard gauge train.  A six coach broad gauge train could have carried the same number of passengers as an eight coach standard gauge train.  It means lower operational cost, lower electricity cost. 24
  • 25. 25
  • 26.  Metro railway system was mooted for the city of Chennai by S Shreedharan the DMRC to the Tamil Nadu CM Jay Lalitha.  The elevated section of the project is scheduled to be operational by 2011 and the entire project is scheduled to be completed by the financial year 2014-2015. About 55% of the corridors in Phase I is underground and the remaining elevated. 26
  • 27.  The Metro rail project was included in the 2007-08 State Government's budget, and an amount of Rs. 50 crores had been sanctioned for preliminary works.  The project is estimated to cost around 14,600 crores (approximately USD 3.5 billion) for the two corridors totaling 50.1 km.  The construction started in early 2009 and is expected to be fully completed by 2014.  A total of 34 stations have been planned along the two corridors. As many as 19 stations are underground and 15 are elevated. 27
  • 28. 28
  • 29.  Estimated cost of Rs. 12,132 crores.  The project Hyderabad metro rail is 71.16 km long  PPP Metro Rail Project to have been sanctioned by Govt. of India  Global consulting firm Deloitte is the constructing Co. of HMR. 29
  • 30.  The Metro Rail Project work will start next year and expected to be completed by the end of 2014.  The 71 km covering three high density traffic corridors of Hyderabad.  Speeds of 34 kmph on an average to 80 kmph maximum. 30
  • 31. 31
  • 32.  The total project outlay envisaged is Rs. 6395 crores.  The project Bangalore metro rail is 42.3 kms long.  The project report of BML is prepared by DMRC. 32
  • 33.  The first face of the project has commenced in 2007 and complete by 2012.  The number of passengers expected to travel on the metro is estimated at 10.20 lakhs in 2012 and 16.10 lakhs in 2021.  Phase I network to about 42 km, with 40 stations. 33
  • 34. 34
  • 35.  Estimated to cost Rs 3,300 crore.  The project Cochin metro rail is 25 kms long.  The starting point of Metro rail in Cochin is in Aluva and the proposed ending point is the place called Pettah. 35
  • 36.  The alignment was created by the DMRC and is planned to be made on a Public-Private Partnership basis.  Since it has almost 24 stops between the 25 km, average speed 35kms/hour.  The proposed gauge is standard gauge unlike the broad gauge on the Delhi Metro. 36
  • 37. 37
  • 38. integrated ticket for bus & metro rail. Luggage carrying facility should be there. To encourage people to use Metro there should be a separate parking place for the monthly pass holders. Concern authority should drop their kind attention to minimize the maintenance cost. 38 Suggestions
  • 39. Although Metro systems are more reliable, comfortable and safer than road based systems & it reduce congestion on the roads. However systems planned in India shows that cost overrunning and under utilization of capacity. Methodology and arguments used to justify these systems needs careful analysis. High capacity system does not necessarily generate high demand. Estimation of passenger demand for transit services should consider complete journey of commuters including access time. 39
  • 40. 40