INTRODUCTION ABOUT BHEL
 BHEL, Hyderabad unit manufactures Turbo
Generators of rating up to 200 MW for industrial
applications and for power generation in Steam Power
Plants.
 Turbo Generators manufactured here range from 4
MW to 200 MW
RATINGS OF TURBO GENERATOR
 Rated output:200MW
 Rated kva capacity:247KVA
 Rated voltage:15.75kv
 Rated current:9050A
Rated speed:3000rpm
Rated frequency:50hz
efficiency:98.5%
INTRODUCTION TO TURBO
GENERATORS
 A turbo generator is a turbine directly connected to an
electric generator for the generation of electric power.
 OPERATING PRINCIPLE:” FARADY’S LAW OF
ELECTRO MAGNETIC INDUCTION
 whenever conductor cuts magnetic flux, dynamically
induced EMF is produced. This EMF causes a current
flow if the circuit is closed
 e = -N d/dt
The general components of a turbo
generator are
 Stator- Stator Frame
- Stator Core
- Stator Windings
 Rotor-
 Rotor Shaft
 - Rotor Windings
 Cooling System
STATOR FRAME
STATOR FRAME
The stator frame is of welded steel single piece
construction.
It supports the laminated core and winding.
Guide bars are welded or bolted inside the stator
frame over which the core is assembled
STATOR CORE
 Stator core is made up of silicon steel sheets which are
suspended in the frame from guide bars
 Purpose of stator core:
 1.to support the stator winding
 To carry the magnetic flux generated by rotor winding
 Losses in core:
 1.hysteresis
 2.eddy current
 In order to reduce hysteresis losses steel alloy is used for
the building up of core
 In order to reduce eddy currents thin laminations(0.5mm)
are used.
STATOR CORE
PREPARATION OF LAMINATIONS
 COLD ROLLED NON GRAINED ORIENTD (CRNGO)
Steel sheets are used
 PRESS TOOLS are used in manfacturing of
laminations
 1.compounding tools
 2.Blanking and slot notching tools
 Compounding tools: in this method stamping with all
the core bolt holes and winding slots in single
operation
 Used for the machines rated above 40 MW
 BLANKNG AND NOTCHING OPERATION:
 Core bolt holes are made using blanking tools
 Winding slots are made using notching tools
 Used for smaller rated machines
 500 tons of crank press is used for this purpose
 VARNISHING: After this process laminations should
be varnished for the insulation
 Varnishing thickness should be 12-18mm
 Sheets are dries at a temperature of 260-350 deg
centigrade.
STATOR COILS AND WINDING
stator coil is made up of Copper bars or conductors
High voltage insulation(resin poor mica tape) is provided
over the bars
Winding:
The bars are located in slots of rectangular cross section
which are uniformly distributed on the circumference of
the stator core
To minimize the stator losses in the winding, the strands of
the top and bottom bars are separately brazed and
insulated from each other
It is three phase layer lap winding
STATOR WINDING
RESISTANCE TEMPERATURE
DETECTORS
 The temperature measurements on the generator are
made with RTDs They are placed at various sections of
the core and winding
 The RTD works on the principle of the change in
electrical resistance of a conductor due to temperature
 R=R0(1+Kt)
 R0=resistance refer to room temperature
 K=coefficient of resistance
 T=temperature difference
INSULATION OF STATOR
 High voltage insulation(resin poor mica tape) is
provided over the bars
 VACCUM PRESSURE IMPREGNATION SYSTEM(VPI)
 1.stator coils are taped with poor resin mica type before
inserting in the slots of cage stator subsequently
wounded stator is subjected to vpi process in which
first the stator is vacuum dries and then impregnated
in resin bath under the pressure of nitrogen gas
 Process:
 1.stator is initially heated minimum for one hour to
remove moisture
 Heated stator shall be inserted in heated impregnating
vessel. stator shall be dried under vaccum (should not
exceed 50hrs.
 Stator is to be flooded with impregnation resin
mixture so that highest point of winding lies at least
100mm below resin level pressure is applied so that
resin penetrates in the tape to fill all the gaps
Vacuum Pressure Impregnation
Plant
ROTOR
 Solid rotors are manufactured from forged alloy steel
with suitable alloying elements to achieve very high
mechanical and superior magnetic properties
 Rotor consists of electrically active portion and two
shaft ends
 60% of rotor body circumference has longitudinal slots
which hold the field winding
 Rotor Winding: The field winding consists of several
series connected coils inserted into the longitudinal
slots of the rotor body. The coils are wound so those
two poles(one north pole and south pole) are obtained
 COILS MATERIAL: made up of copper with silver content
of approximately 0.1% .
 Silver alloyed copper have a high strength properties at
high temperature so that coil deformation due to thermal
stresses are eliminated.
 INSULATION: The coils are insulated from the rotor body
with L-shaped strips of glass fibre
 ROTOR SLOT WEDGES:To protect the winding against the
effects of centrifugal forces, the winding is secured in the
slots with wedges. The slot wedges are made of copper alloy
featuring high strength and good electrical conductivity.
ROTOR
VENTILATION AND COOLING
 Losses in the generator raise the temperature of the
generator .due to temperature the insulation will be
effected .
 Various methods of cooling:
 1.air cooling
 2.hydrogen cooling
 3.hydrogen and water cooling
 Closed circuit hydrogen cooling mounted axially on
stator frame
 For the rotor two axial fans are located at each shaft
end.
 Draws the cool air from the atmosphere
 Flowpath1:to the rotor winding
 Flow path 2:to the stator winding
TESTING
 MECHANICAL RUN AND MEASUREMENT OF
VIBRATIONS AT RATED SPEED: machine should be run at
rated speed and the vibrations are measured in all
directions.
 Vibrations should be less than 5 microns and noise level
should be in b/w 75-90db
 SHORT CIRCUIT TEST: in this machine should run at
rated speed. output terminals of stator are short circuited
and excitation gradually increases up to the rated current
in the winding. winding temperature should be less than
60deg centigrade. we will get copper loss
 Open circuit test: machine should be run at rated speed
and excitation increases gradually up to the rated voltage
 From this test:
 1.core loss can be calculated
 Shaft voltage :when the rotor shaft rotates inside the stator
there will be induced emf in rotor in addition to this
voltage will go to the bearings at the shafts of rotor . Shaft
voltage measures with high impedance voltmetres.
 This increase the heating in rotor .to avoid this bearings
placed on insulation HGL
 FLUX TEST ON STATOR CORE: before winding in the
slots flux is generated in the core by passing current .if
there any break of inter laminations or shorts between
laminations eddy current flows which raises the
temperature called hotspots . This test is used to
detect the hot spot.
 INTER TURN INSULATION TEST: insulation between
the windings of rotor is tested by applying current at a
frequency of 500HZ . Insulation should be withstand
to this test
 HIGH VOLTAGE TEST ON STATOR AND ROTOR
WINDINGS: high voltage is applied to windings by
increasing gradually to required value and mainted for
1 minute and reduces gradually
High voltage test levels:
Stator winding-(2*ratedvoltage+1)kv
Rotor winding-(10*excitation voltage)v
 1.INSULATION RESISTANCE MEASUREMENT TEST:
Resistance is measured by placing two copper plates
above and below the laminations .maximum
acceptable value should be 1Mohm per kv of rated
voltage. This test ensures the quality of varnish on
laminations
 TESTING OF STATOR BARS: after laying of top and
bottom bars their balancing is done and then they are
tested for voltage of 2(rated voltage)+3kv
 In front of customer test it is carried out 2(rated
voltage)+1KV
ADVANTAGES AND DISADVANTAGES
 The life span of machine is long
 Cost is low compared to the other generators
 In US 90% electrical generation done by turbo
generators.
 Disadvantages:
 Repairing and maintaining cost is high


Contenu connexe

Tendances

Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA Manraj Meena
 
Manufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barManufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barAvinash Kumar
 
Presentation on Power Transformer
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power TransformerAjay Maurya
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorPRAKHAR MEHROTRA
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionStudent
 
Manufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATORManufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATORVinitMP
 
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWAR
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWARPPT ON INDUSTRIAL TRAINING IN BHEL HARIDWAR
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWARAnil Gupta
 
Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Dheeraj Upadhyay
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction reportSumit Singh
 
Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating StationVasanthan Ravichandran
 
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI... PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI...
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...Adarsh Singh
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTSai Chandu Chandu
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformerSudarshan Pandey
 
Bhel haridwar new turbine shop
Bhel haridwar   new turbine shop Bhel haridwar   new turbine shop
Bhel haridwar new turbine shop Anuj Gupta
 
Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar Harshit Bhandari
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functionsSourabh sharma
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 

Tendances (20)

Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA
 
Manufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding barManufacturing process of 500/600MW stator winding bar
Manufacturing process of 500/600MW stator winding bar
 
Presentation on Power Transformer
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power Transformer
 
A presentation on turbogenerator and excitor
A presentation on turbogenerator and excitorA presentation on turbogenerator and excitor
A presentation on turbogenerator and excitor
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer Construction
 
BHEL Trainning Report
BHEL Trainning ReportBHEL Trainning Report
BHEL Trainning Report
 
Manufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATORManufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATOR
 
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWAR
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWARPPT ON INDUSTRIAL TRAINING IN BHEL HARIDWAR
PPT ON INDUSTRIAL TRAINING IN BHEL HARIDWAR
 
Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
 
Different types of Transformers used in Generating Station
Different types of Transformers used in Generating StationDifferent types of Transformers used in Generating Station
Different types of Transformers used in Generating Station
 
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI... PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI...
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORT
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformer
 
Bhel haridwar new turbine shop
Bhel haridwar   new turbine shop Bhel haridwar   new turbine shop
Bhel haridwar new turbine shop
 
Training at BHEL Haridwar
Training at BHEL Haridwar Training at BHEL Haridwar
Training at BHEL Haridwar
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Turbo generator
Turbo generator Turbo generator
Turbo generator
 

En vedette

Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2Mohammad Basid
 
Three Phase Synchonours Generator and AVR
Three Phase Synchonours Generator and AVR Three Phase Synchonours Generator and AVR
Three Phase Synchonours Generator and AVR Emre Öztoklu
 
Static excitation-system
Static excitation-systemStatic excitation-system
Static excitation-systemDeepak Jha
 
Alternatorexcitation
AlternatorexcitationAlternatorexcitation
AlternatorexcitationRanjan Naik
 
BHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTBHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTyash Natani
 
Ac electrical generators
Ac electrical generatorsAc electrical generators
Ac electrical generatorsNadir Baloch
 
VPI for turbo generator
VPI for turbo generatorVPI for turbo generator
VPI for turbo generatorRajuEEE
 

En vedette (16)

Turbo-Generator
Turbo-GeneratorTurbo-Generator
Turbo-Generator
 
synchronous generator excitation
synchronous generator excitationsynchronous generator excitation
synchronous generator excitation
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
Three Phase Synchonours Generator and AVR
Three Phase Synchonours Generator and AVR Three Phase Synchonours Generator and AVR
Three Phase Synchonours Generator and AVR
 
Static excitation-system
Static excitation-systemStatic excitation-system
Static excitation-system
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 
Training report
Training reportTraining report
Training report
 
Motor book
Motor bookMotor book
Motor book
 
ALTERNATOR DESIGN
ALTERNATOR DESIGNALTERNATOR DESIGN
ALTERNATOR DESIGN
 
Alternatorexcitation
AlternatorexcitationAlternatorexcitation
Alternatorexcitation
 
Bhel training report
Bhel training reportBhel training report
Bhel training report
 
BHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTBHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORT
 
Manufacturing Process
Manufacturing  ProcessManufacturing  Process
Manufacturing Process
 
Ac electrical generators
Ac electrical generatorsAc electrical generators
Ac electrical generators
 
Training Report CEB
Training Report CEBTraining Report CEB
Training Report CEB
 
VPI for turbo generator
VPI for turbo generatorVPI for turbo generator
VPI for turbo generator
 

Similaire à Manfacturing of turbo generators at BHEL

TC-MODULE – 2.pdf
TC-MODULE – 2.pdfTC-MODULE – 2.pdf
TC-MODULE – 2.pdfNayan351985
 
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdfssuserad9a2a
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARABHISHEK SINGH
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR Shubham Kulshreshtha
 
industrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantindustrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantPurnachand Battula
 
Wings automobile products pvt
Wings automobile products pvtWings automobile products pvt
Wings automobile products pvtVikram Singh
 
Wringer_roll_Position_control_final(edited)
Wringer_roll_Position_control_final(edited)Wringer_roll_Position_control_final(edited)
Wringer_roll_Position_control_final(edited)SHASHANK KUMAR
 
(9) Synchronous Alternator Capability Graph
(9) Synchronous Alternator Capability Graph(9) Synchronous Alternator Capability Graph
(9) Synchronous Alternator Capability GraphDaniel Gray
 
Transformer Designing
Transformer Designing Transformer Designing
Transformer Designing Praveen Sharma
 
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Baviskar Sales & Service
 
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Baviskar Sales & Service
 
RGPV First sem BE104 Unit iii
RGPV First sem BE104 Unit iiiRGPV First sem BE104 Unit iii
RGPV First sem BE104 Unit iiiMani Deep Dutt
 

Similaire à Manfacturing of turbo generators at BHEL (20)

TC-MODULE – 2.pdf
TC-MODULE – 2.pdfTC-MODULE – 2.pdf
TC-MODULE – 2.pdf
 
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
GenDesign
GenDesignGenDesign
GenDesign
 
BHELppt
BHELpptBHELppt
BHELppt
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
industrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plantindustrial training at vishakhapatnam steel plant
industrial training at vishakhapatnam steel plant
 
Wings automobile products pvt
Wings automobile products pvtWings automobile products pvt
Wings automobile products pvt
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
 
Wringer_roll_Position_control_final(edited)
Wringer_roll_Position_control_final(edited)Wringer_roll_Position_control_final(edited)
Wringer_roll_Position_control_final(edited)
 
5.2.c gen basics
5.2.c gen basics5.2.c gen basics
5.2.c gen basics
 
(9) Synchronous Alternator Capability Graph
(9) Synchronous Alternator Capability Graph(9) Synchronous Alternator Capability Graph
(9) Synchronous Alternator Capability Graph
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
TELK Industrial Visit Report
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit Report
 
Transformer Designing
Transformer Designing Transformer Designing
Transformer Designing
 
(9) limitations
(9) limitations(9) limitations
(9) limitations
 
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
 
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
Crompton-greaves-tefc-squirrel-cage-motors-Catalogue (eff level 2)
 
RGPV First sem BE104 Unit iii
RGPV First sem BE104 Unit iiiRGPV First sem BE104 Unit iii
RGPV First sem BE104 Unit iii
 

Dernier

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 

Dernier (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Manfacturing of turbo generators at BHEL

  • 2. STUDY OF TURBO GENEATORS    AT  BHEL, HYDERABAD
  • 3. INTRODUCTION ABOUT BHEL  BHEL, Hyderabad unit manufactures Turbo Generators of rating up to 200 MW for industrial applications and for power generation in Steam Power Plants.  Turbo Generators manufactured here range from 4 MW to 200 MW
  • 4. RATINGS OF TURBO GENERATOR  Rated output:200MW  Rated kva capacity:247KVA  Rated voltage:15.75kv  Rated current:9050A Rated speed:3000rpm Rated frequency:50hz efficiency:98.5%
  • 5. INTRODUCTION TO TURBO GENERATORS  A turbo generator is a turbine directly connected to an electric generator for the generation of electric power.  OPERATING PRINCIPLE:” FARADY’S LAW OF ELECTRO MAGNETIC INDUCTION  whenever conductor cuts magnetic flux, dynamically induced EMF is produced. This EMF causes a current flow if the circuit is closed  e = -N d/dt
  • 6. The general components of a turbo generator are  Stator- Stator Frame - Stator Core - Stator Windings  Rotor-  Rotor Shaft  - Rotor Windings  Cooling System
  • 8. STATOR FRAME The stator frame is of welded steel single piece construction. It supports the laminated core and winding. Guide bars are welded or bolted inside the stator frame over which the core is assembled
  • 9. STATOR CORE  Stator core is made up of silicon steel sheets which are suspended in the frame from guide bars  Purpose of stator core:  1.to support the stator winding  To carry the magnetic flux generated by rotor winding  Losses in core:  1.hysteresis  2.eddy current  In order to reduce hysteresis losses steel alloy is used for the building up of core  In order to reduce eddy currents thin laminations(0.5mm) are used.
  • 11. PREPARATION OF LAMINATIONS  COLD ROLLED NON GRAINED ORIENTD (CRNGO) Steel sheets are used  PRESS TOOLS are used in manfacturing of laminations  1.compounding tools  2.Blanking and slot notching tools  Compounding tools: in this method stamping with all the core bolt holes and winding slots in single operation  Used for the machines rated above 40 MW
  • 12.  BLANKNG AND NOTCHING OPERATION:  Core bolt holes are made using blanking tools  Winding slots are made using notching tools  Used for smaller rated machines  500 tons of crank press is used for this purpose  VARNISHING: After this process laminations should be varnished for the insulation  Varnishing thickness should be 12-18mm  Sheets are dries at a temperature of 260-350 deg centigrade.
  • 13. STATOR COILS AND WINDING stator coil is made up of Copper bars or conductors High voltage insulation(resin poor mica tape) is provided over the bars Winding: The bars are located in slots of rectangular cross section which are uniformly distributed on the circumference of the stator core To minimize the stator losses in the winding, the strands of the top and bottom bars are separately brazed and insulated from each other It is three phase layer lap winding
  • 15. RESISTANCE TEMPERATURE DETECTORS  The temperature measurements on the generator are made with RTDs They are placed at various sections of the core and winding  The RTD works on the principle of the change in electrical resistance of a conductor due to temperature  R=R0(1+Kt)  R0=resistance refer to room temperature  K=coefficient of resistance  T=temperature difference
  • 16. INSULATION OF STATOR  High voltage insulation(resin poor mica tape) is provided over the bars  VACCUM PRESSURE IMPREGNATION SYSTEM(VPI)  1.stator coils are taped with poor resin mica type before inserting in the slots of cage stator subsequently wounded stator is subjected to vpi process in which first the stator is vacuum dries and then impregnated in resin bath under the pressure of nitrogen gas
  • 17.  Process:  1.stator is initially heated minimum for one hour to remove moisture  Heated stator shall be inserted in heated impregnating vessel. stator shall be dried under vaccum (should not exceed 50hrs.  Stator is to be flooded with impregnation resin mixture so that highest point of winding lies at least 100mm below resin level pressure is applied so that resin penetrates in the tape to fill all the gaps
  • 19. ROTOR  Solid rotors are manufactured from forged alloy steel with suitable alloying elements to achieve very high mechanical and superior magnetic properties  Rotor consists of electrically active portion and two shaft ends  60% of rotor body circumference has longitudinal slots which hold the field winding  Rotor Winding: The field winding consists of several series connected coils inserted into the longitudinal slots of the rotor body. The coils are wound so those two poles(one north pole and south pole) are obtained
  • 20.  COILS MATERIAL: made up of copper with silver content of approximately 0.1% .  Silver alloyed copper have a high strength properties at high temperature so that coil deformation due to thermal stresses are eliminated.  INSULATION: The coils are insulated from the rotor body with L-shaped strips of glass fibre  ROTOR SLOT WEDGES:To protect the winding against the effects of centrifugal forces, the winding is secured in the slots with wedges. The slot wedges are made of copper alloy featuring high strength and good electrical conductivity.
  • 21. ROTOR
  • 22. VENTILATION AND COOLING  Losses in the generator raise the temperature of the generator .due to temperature the insulation will be effected .  Various methods of cooling:  1.air cooling  2.hydrogen cooling  3.hydrogen and water cooling  Closed circuit hydrogen cooling mounted axially on stator frame
  • 23.  For the rotor two axial fans are located at each shaft end.  Draws the cool air from the atmosphere  Flowpath1:to the rotor winding  Flow path 2:to the stator winding
  • 24. TESTING  MECHANICAL RUN AND MEASUREMENT OF VIBRATIONS AT RATED SPEED: machine should be run at rated speed and the vibrations are measured in all directions.  Vibrations should be less than 5 microns and noise level should be in b/w 75-90db  SHORT CIRCUIT TEST: in this machine should run at rated speed. output terminals of stator are short circuited and excitation gradually increases up to the rated current in the winding. winding temperature should be less than 60deg centigrade. we will get copper loss
  • 25.  Open circuit test: machine should be run at rated speed and excitation increases gradually up to the rated voltage  From this test:  1.core loss can be calculated  Shaft voltage :when the rotor shaft rotates inside the stator there will be induced emf in rotor in addition to this voltage will go to the bearings at the shafts of rotor . Shaft voltage measures with high impedance voltmetres.  This increase the heating in rotor .to avoid this bearings placed on insulation HGL
  • 26.  FLUX TEST ON STATOR CORE: before winding in the slots flux is generated in the core by passing current .if there any break of inter laminations or shorts between laminations eddy current flows which raises the temperature called hotspots . This test is used to detect the hot spot.  INTER TURN INSULATION TEST: insulation between the windings of rotor is tested by applying current at a frequency of 500HZ . Insulation should be withstand to this test
  • 27.  HIGH VOLTAGE TEST ON STATOR AND ROTOR WINDINGS: high voltage is applied to windings by increasing gradually to required value and mainted for 1 minute and reduces gradually High voltage test levels: Stator winding-(2*ratedvoltage+1)kv Rotor winding-(10*excitation voltage)v
  • 28.  1.INSULATION RESISTANCE MEASUREMENT TEST: Resistance is measured by placing two copper plates above and below the laminations .maximum acceptable value should be 1Mohm per kv of rated voltage. This test ensures the quality of varnish on laminations
  • 29.  TESTING OF STATOR BARS: after laying of top and bottom bars their balancing is done and then they are tested for voltage of 2(rated voltage)+3kv  In front of customer test it is carried out 2(rated voltage)+1KV