Low Cost Roads
“Roads Constructed at low cost and capable of being
maintained at low cost are termed as low cost roads”
 The low cost roads are meant for low intensity of traffic.
 This road are provided in localities where traffic volume does not
exceed 500 tonnes /day with a maximum of one third bullock carts
or other slow moving vehicles and a truck load of 3 tonnes with a
maximum of 5 tonnes depending upon local conditions.
 The low cost roads are constructed with the maximum use of locally
available road materials.
• The standards for low cost roads:
 Route
 Right of way
 Formation level
 Geometrics, i.e. grades, curves, visibility etc.
• The standards for carriage way width ,
formation width and nature of crust for low cost
roads should be such that
 No alteration may be required when these roads are upgraded in
future.
 With the increase in traffic, it should be possible to strengthen the
pavement in stages with the maximum utilization of the existing
pavement
 ECAFE(Economic commission for Asia and Far East) suggested
the Desirable and minimum width for Right of way are 30m and
18m respectively for low cost roads.
• Classification of low cost roads:
 The low cost roads may be broadly divided in the following five
categories
1. Earth roads
2. Kankar roads
3. Gravel Roads
4. Water bound macadam roads (WBM)
5. Wet mix macadam roads (WMM)
• Earth Roads
General :
 Earth road is a type of road whose whole pavement section is
constructed with the locally available earth material preferably.
Borrow pits are located at the nearby sites preferably outside the
land width where, the required earth is available.
 Sub-grade and the surface of the earth roads are given larger
camber of 1in 33 to 1 in 25 because they need faster drainage to
be safe from the moisture. A maximum value of camber of 1 in 25 is
the limit because higher camber will result in the formation of cross
ruts and corrosion of pavement soils
• Specifications of Materials:
 The soil survey is carried out and suitable borrow pits are located
within nearer distances.
 The trees ,grass roots and other organic matter are removed before
excavating earth for construction
 The earth material used for the construction of earth roads are
termed as satisfactory if they possess the following properties:
Base Course Wearing Course
 Clay content <5% 10 to 18%
 Silt content 9 to 32% 5 to 15%
 Sand content 60 to 80% 65 to 80%
 Liquid limit <35% <35%
 Plasticity Index <6% 4 to 10%
• Location of the centre line:
 The centre line and the road boundaries are marked on the ground
by driving the wooden pegs. To follow the desired vertical profile of
the road, reference pegs are also driven at a certain spacing which
depends upon the estimated length of the road construction per
day.
 Centre line pegs are fixed at 500 m interval.
construction procedure of earth road
1. Preparing the subgrade :- The subgrade is prepared and
the surface is brought to the required camber and gradient.
2. Rolling an watering :- The surface is rolle properly and well wetted
with water.
3. Spreading the soil :- After watering, a layer of graded soil, about 10
cm thick is evenly spread.
4. Rolling :- The layer of soil is rolled at optimum moisture content
(OMC ) with a suitable roller and finally finished with a light roller.
The type of roller for compaction is decided based on soil type, desired
amount of compaction and availability of equipment. Atleast 95 per cent
of dry density of its light compaction is considered desirable.
Cont…
5. Checking :-The camber of the finished surface is checked an
corrected, if necessary.
6. Curing :- The rolled surface is watered for four or five days for
curing. No traffic should be allowed to pass over the road surface
during this period.
7. Opening to traffic :- After curing, the traffic is allowed to pass but the
surface is sprinkled over with water for a period of 10 to 1 days
• Kankar Roads
 Kankar is an impure limestone and it is available as a natural
deposit.
 A good quality kankar will show a bluish surface on being fractured.
 Kankar is found as “Block Kankar” or as “Nodular Kankar”. In the
past block kankar has been used as building material while nodular
kankar is even today used for VR and ODR as a subgrade material
for WBM roads
Cont…
 Some times road is built in stages starting from earth formation
which is allowed to settle for two to three monsoons and
subsequently when the surface is to improved, the kankar forms the
subgrade material for such roads
 For road work kankar is broken into sizes varying from 20 to 63
mm.
 The largest size are used for bottom layer and the smallest size is
used for top layer
 Kankar is normally spread at the 15 mm layer
Cont…
 The size supplied varies from 12 mm to 80 mm as specified below
1. Passing 80 mm sieve 100%
2. Retrained of 63 mm sieve 20%
3. Passing 25 mm sieve…Not more than 10%
4. Passing 12 mm sieve NIL
• The following sequence is followed in the
construction of the kankar roads
 Spreading of kankar over the section
 Ramming over stretch of 3.66 mm road at a time with the help of at
least 16 workers
 Ramming to continue till the surface has been thoroughly
compacted
 Surface to be kept well watered during the process of ramming
 Road to be opened traffic such that the traffic is spread over the
whole road width
• Gravel Roads
 A gravel road consists of a carriageway made of a layer of
compacted gravel.
 The gravel used consists of irregular stones mixed with a varying
amount of sand, silt, and clay, which can act as a binder.
 Following consideration govern the construction of gravel roads
(A) The carriageway of the gravel road should be provided with a
camber of 1 in 25 to 1in 30 to achieve good drainage of the road
surface
(B) It should be composed of pebbles which are hard, tough and
durable rock particles to resist abrasion
Cont…
(C) For making a good road surface, the pebbles should be held together by some
cementing material such as clay which is the most generally available binder.
 Following procedure is adopted in the construction of a gravel road
1. Material Gravel to be used for the construction is staked along the sides of the
proposed road
2. The pegs are driven to show the limits of excavation, The site is cleared and the
subgrade is then prepared to receive the layer of gravel
Cont…
3. The first layer of gravel is spread in the prepared trench. The
compacted depth of gravel road is generally 20 cm and it is
obtained in two layers. The layers is rolled by using smooth
wheeled light rollers starting from the edges and proceeding
towards entre.
4. Some quantity of water is then sprayed and rolling is done again.
5. The final rolling is carried out when the moisture content is at its
optimum so that completed surface which is formed is firm.
6. A few days after the final rolling and drying out, the road is opening
the road traffic.
c
Water bound macadam roads:
 The water bound macadam road construction technique was
given by the John Macadam. This technique in present day is
used as given below.
 For WBM construction we use three materials:
1. Aggregates
2. Screeners
3. Binders.
• Construction of water bound macadam road involves the
following 6 basic steps as given below
1. Preparation of sub-grade
2. Preparation of sub-base
3. Preparation of base
4. Preparation of wearing course
5. Preparation of shoulders
6. Opening to traffic
• CONSTRUCTION OF SUB-GRADE
 Sub-grade act as a cushion for other layers i.e. In order to achieve
durable road sub-grade should be strong.
 The sub-grade is thoroughly compacted by rollers weighing 8
tonnes by sprinkling water one night before.
 In rocky regions the sub-grades are not rolled whereas in region of
clay soils, a layer to natural sand, moorum or gravel, is provided
over sub-grade.
Sub grade preparation
• CONSTRUCTION OF SUB-BASE
 On a well compacted sub-grade, aggregates having size of 90 mm
to 40 mm are preferred for the sub-base material, or over burnt
bricks in layers of 15 cm thickness
 total width of the sub-base to be kept 60 cm wider than pavement
width, projecting 30 cm on each side.
 The sub-base should be compacted by a roller to provide an even
surface.
• CONSTRUCTION OF BASE
 The specified materials of the base course is spread and proper
grade, thickness and cross sections maintained as per design
shown on the supplied drawings.
 Aggregates having size of 63 to 40 mm are preferred for the base
material
 For economic considerations IRC has suggested non plastic
materials such as, crushed over burnt bricks, moorum, gravels, etc.
provided the liquid limit of the material is less than 20%, plasticity
index is less than 6.0% and the portion of fines passing 0.075 mm
sieve is less than 10%.
 This course may be laid in one or two layers according to the total
designed thickness and the thickness of each layer should not
exceed 10 cm
 Provide either bricks on end edging or earthen kerbs strong enough
to prevent the new road material from spreading outward and also
to retain water used in consolidation of the wearing course
 Spread the road metal evenly over the prepared base to the
specified thickness and hand pack them so that the finished surface
is brought to the required camber.
Cont…
 Spread the coarse aggregate over the surface and roll it dry with
a suitable roller till interlocking of the aggregate is achieved with
sufficient void space. The rolling is started from the edges and
gradually shifted towards the centre.
 After dry rolling, spread the screening materials (stones up to 12
mm size) with uniform rate so that voids of coarse aggregates get
filled properly.
 After spreading the screening material, sprinkle sufficient quantity
of water, sweep the surface and roll it with roller again
Preparation of wearing course
 Now apply the binding material in two to three thick layers at a slow
and uniform rate. Each layer of binding material is rolled after
adding sufficient water. The slurry is swept in with brooms to fill the
void properly. The moving wheel of the roller should be cleaned
with water.
 After proper compacting allow it to dry over night. Spread a layer of
sand or earth, about 6 mm thick and roll the surface again after
sprinkling water lightly.
 The surface may be allowed for 7 to 10 days of curing.
Spreading binder material
• CONSTRUCTION OF SHOULDERS
 While curing the pavement surface, prepare the shoulders by filling
earth to the specified cross slope and compact them properly by
rolling or by tamping.
 Width and thickness of the shoulder should be as per specification.
• OPENING TO TRAFFIC
 After properly drying, the road pavement may now be opened to
traffic, ensuring that the traffic is distributed uniformly over the full
width of the pavement.
Wet mix macadam roads:
 Laying and compacting clean, crushed, graded aggregate and
granular material, premixed with water, to a dense mass on
prepared sub-grade or existing pavement
 Thickness of single compacted Wet Mix Macadam layer shall
not be less than 75 mm
 Coarse aggregate shall be crushed stone
 If crushed gravel is used, not less than 90% by Wt. of gravel
pieces retained on 4.75 mm sieve shall have at least two
fractured faces
 If water absorption value of coarse aggregate is greater than
2%, the soundness test shall be carried out as per
IS:2386(Part-5)
Physical Requirement of Coarse
Aggregate for WMM
1. Los Angeles Abrasion IS:2386(Part-4) 40% Value
or
Aggregate Impact Value IS:2386(Part-4) or IS:5640 30%
2. Combined Flakiness and Elongation indices (Total)
IS:2386(Part-1) 30%
Grading Requirement for WMM
IS Sieve Destination Percent by Wt. Passing IS Sieve
Destination the IS Sieve
53.00 mm
45.00 mm
26.50 mm
22.40 mm
11.20 mm
4.75 mm
2.36 mm
600 micron
75 micron
100
95-100
-
60-80
40-60
25-40
15-30
8-22
0-8
Materials finer than 425 micron shall have Plasticity Index (PI) not
exceeding 6.
 Construction of wet mix macadam road involves the following
basic steps as given below.
1. Weather
2. Preparation of Base
3. Provision of Lateral Confinement of Wet Mix
4. Spreading of Mix and Compaction
5. Setting and Drying
6. Opening to Traffic
• weather
 The work of laying of wet mix macadam is not done during rainy
season
• Preparation of Base
The surface of the sub-grade/sub-base/base to receive the WMM
course shall be prepared to the specified lines and cross-fall (camber)
and made free of dust and other extraneous matter. Any ruts or softy
yielding places shall be corrected and rolled until firm surface is
obtained, if necessary by sprinkling water.
• Provision of Lateral Confinement of Wet Mix
 This shall be done by laying materials adjoining shoulders along
with that of wet mix layer. The sequence of operations shall be such
that the construction of the shoulder is done in layers each
matching the thickness of the adjoining pavement layer.
Spreading of Mix and compaction
• Preparation of mix
 WMM shall be prepared in an approved mixing plant of suitable capacity
having provision for controlled addition of water
 Optimum moisture for mixing shall be determined in accordance with IS:
2720 (Part-8) after replacing the aggregate fraction retained on 22.4 mm
sieve with material of 4.75 mm to 22.4 mm size
• Spreading of mix
 Immediately after mixing, the aggregate shall spread uniformly and
evenly upon the prepared sub-grade in required quantities by paver or
motor grader
• Compaction
After the mix has been laid to the required thickness, grade and
cross fall/camber the same shall be uniformly compacted to the full
depth with suitable roller
• Setting and Drying
 After final compaction of wet-mix macadam course, the road shall be
allowed to dry for 24 hours
• Opening to Traffic
 Preferably no vehicular traffic of any kind should be allowed on the
finished wet-mix macadam surface till it has dried and the wearing course
laid
• References
 S.G. RANGWALA “Highway engineering” by Charotar Publication House
 S.P. Chandola “A text book of Transportation engineering” by S.Chand
Publication
 L.R. Kadiyali “principles and practices of Highway Engineering “by Khanna
Publishers
 IRC-19-1977 , IRC-109-1997 Guidelines
THANK YOU

Contenu connexe

Tendances

Tendances (20)

Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage System
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coat
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highways
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Unit 2
Unit 2Unit 2
Unit 2
 
Pavement design
Pavement designPavement design
Pavement design
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Types of pavements
Types of pavementsTypes of pavements
Types of pavements
 
Geometric design
Geometric designGeometric design
Geometric design
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
 

En vedette

Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
Sayali Darakh
 
Mukesh ppt
Mukesh pptMukesh ppt
Mukesh ppt
HJ Sims
 
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINESEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
Darshiini Vig
 

En vedette (20)

4. wbm roads 10 sep
4. wbm roads 10 sep4. wbm roads 10 sep
4. wbm roads 10 sep
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
road construction project
road construction projectroad construction project
road construction project
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 
Road Subgrade Design- Sustainable ecologically friendly road construction
Road Subgrade Design- Sustainable ecologically friendly road constructionRoad Subgrade Design- Sustainable ecologically friendly road construction
Road Subgrade Design- Sustainable ecologically friendly road construction
 
Mukesh ppt
Mukesh pptMukesh ppt
Mukesh ppt
 
Basic soils presentation
Basic soils presentation Basic soils presentation
Basic soils presentation
 
Bitumen materials in road transport
Bitumen materials in road transportBitumen materials in road transport
Bitumen materials in road transport
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINESEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
 
Recommendation letter BY Ponikie
Recommendation letter BY PonikieRecommendation letter BY Ponikie
Recommendation letter BY Ponikie
 
Training PPT
Training PPTTraining PPT
Training PPT
 
Soil stabilization techniques
Soil stabilization techniquesSoil stabilization techniques
Soil stabilization techniques
 
Roadwork from CPWD specification
Roadwork from CPWD specificationRoadwork from CPWD specification
Roadwork from CPWD specification
 
Foundry Slag Waste to Building Material
Foundry Slag Waste to Building MaterialFoundry Slag Waste to Building Material
Foundry Slag Waste to Building Material
 
Bitumen roads
Bitumen roadsBitumen roads
Bitumen roads
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
Roller compaction machines
Roller compaction machinesRoller compaction machines
Roller compaction machines
 

Similaire à Low cost road

foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
fazl ullah
 

Similaire à Low cost road (20)

Road bridge &amp; railway construction pdf
Road bridge &amp; railway construction pdfRoad bridge &amp; railway construction pdf
Road bridge &amp; railway construction pdf
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
Roads in desert, swamp & black cotton
Roads in desert, swamp & black cottonRoads in desert, swamp & black cotton
Roads in desert, swamp & black cotton
 
Low Cost Road Methods and Units with detailed elabroration
Low Cost Road Methods and Units with detailed elabrorationLow Cost Road Methods and Units with detailed elabroration
Low Cost Road Methods and Units with detailed elabroration
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Construction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roadsConstruction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roads
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
 
Road construction
Road constructionRoad construction
Road construction
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
 
Road-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testingRoad-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testing
 
SUBMITTED TO -.pptx
SUBMITTED TO -.pptxSUBMITTED TO -.pptx
SUBMITTED TO -.pptx
 
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Roads design as per IRC 37
Roads design as per IRC 37Roads design as per IRC 37
Roads design as per IRC 37
 

Plus de pradip dangar

Plus de pradip dangar (15)

Shear walls
Shear wallsShear walls
Shear walls
 
Best civil engineering structures
Best civil engineering structuresBest civil engineering structures
Best civil engineering structures
 
Airpot design
Airpot designAirpot design
Airpot design
 
Interface treatment
Interface treatmentInterface treatment
Interface treatment
 
hot mix plant
hot mix plant hot mix plant
hot mix plant
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Cold mix bituminous plant
Cold mix bituminous plantCold mix bituminous plant
Cold mix bituminous plant
 
Cement and cement concrete
Cement and cement concreteCement and cement concrete
Cement and cement concrete
 
pavement materials:aggregates
pavement materials:aggregates pavement materials:aggregates
pavement materials:aggregates
 
Superpavemixdesign
Superpavemixdesign Superpavemixdesign
Superpavemixdesign
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
 
Roads in difficult areas
Roads in difficult areasRoads in difficult areas
Roads in difficult areas
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumen
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 

Dernier

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Dernier (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 

Low cost road

  • 2. “Roads Constructed at low cost and capable of being maintained at low cost are termed as low cost roads”  The low cost roads are meant for low intensity of traffic.  This road are provided in localities where traffic volume does not exceed 500 tonnes /day with a maximum of one third bullock carts or other slow moving vehicles and a truck load of 3 tonnes with a maximum of 5 tonnes depending upon local conditions.  The low cost roads are constructed with the maximum use of locally available road materials.
  • 3. • The standards for low cost roads:  Route  Right of way  Formation level  Geometrics, i.e. grades, curves, visibility etc.
  • 4. • The standards for carriage way width , formation width and nature of crust for low cost roads should be such that  No alteration may be required when these roads are upgraded in future.  With the increase in traffic, it should be possible to strengthen the pavement in stages with the maximum utilization of the existing pavement  ECAFE(Economic commission for Asia and Far East) suggested the Desirable and minimum width for Right of way are 30m and 18m respectively for low cost roads.
  • 5. • Classification of low cost roads:  The low cost roads may be broadly divided in the following five categories 1. Earth roads 2. Kankar roads 3. Gravel Roads 4. Water bound macadam roads (WBM) 5. Wet mix macadam roads (WMM)
  • 6. • Earth Roads General :  Earth road is a type of road whose whole pavement section is constructed with the locally available earth material preferably. Borrow pits are located at the nearby sites preferably outside the land width where, the required earth is available.  Sub-grade and the surface of the earth roads are given larger camber of 1in 33 to 1 in 25 because they need faster drainage to be safe from the moisture. A maximum value of camber of 1 in 25 is the limit because higher camber will result in the formation of cross ruts and corrosion of pavement soils
  • 7. • Specifications of Materials:  The soil survey is carried out and suitable borrow pits are located within nearer distances.  The trees ,grass roots and other organic matter are removed before excavating earth for construction  The earth material used for the construction of earth roads are termed as satisfactory if they possess the following properties: Base Course Wearing Course  Clay content <5% 10 to 18%  Silt content 9 to 32% 5 to 15%  Sand content 60 to 80% 65 to 80%  Liquid limit <35% <35%  Plasticity Index <6% 4 to 10%
  • 8. • Location of the centre line:  The centre line and the road boundaries are marked on the ground by driving the wooden pegs. To follow the desired vertical profile of the road, reference pegs are also driven at a certain spacing which depends upon the estimated length of the road construction per day.  Centre line pegs are fixed at 500 m interval.
  • 9. construction procedure of earth road 1. Preparing the subgrade :- The subgrade is prepared and the surface is brought to the required camber and gradient. 2. Rolling an watering :- The surface is rolle properly and well wetted with water. 3. Spreading the soil :- After watering, a layer of graded soil, about 10 cm thick is evenly spread. 4. Rolling :- The layer of soil is rolled at optimum moisture content (OMC ) with a suitable roller and finally finished with a light roller. The type of roller for compaction is decided based on soil type, desired amount of compaction and availability of equipment. Atleast 95 per cent of dry density of its light compaction is considered desirable.
  • 10. Cont… 5. Checking :-The camber of the finished surface is checked an corrected, if necessary. 6. Curing :- The rolled surface is watered for four or five days for curing. No traffic should be allowed to pass over the road surface during this period. 7. Opening to traffic :- After curing, the traffic is allowed to pass but the surface is sprinkled over with water for a period of 10 to 1 days
  • 11. • Kankar Roads  Kankar is an impure limestone and it is available as a natural deposit.  A good quality kankar will show a bluish surface on being fractured.  Kankar is found as “Block Kankar” or as “Nodular Kankar”. In the past block kankar has been used as building material while nodular kankar is even today used for VR and ODR as a subgrade material for WBM roads
  • 12. Cont…  Some times road is built in stages starting from earth formation which is allowed to settle for two to three monsoons and subsequently when the surface is to improved, the kankar forms the subgrade material for such roads  For road work kankar is broken into sizes varying from 20 to 63 mm.  The largest size are used for bottom layer and the smallest size is used for top layer  Kankar is normally spread at the 15 mm layer
  • 13. Cont…  The size supplied varies from 12 mm to 80 mm as specified below 1. Passing 80 mm sieve 100% 2. Retrained of 63 mm sieve 20% 3. Passing 25 mm sieve…Not more than 10% 4. Passing 12 mm sieve NIL
  • 14. • The following sequence is followed in the construction of the kankar roads  Spreading of kankar over the section  Ramming over stretch of 3.66 mm road at a time with the help of at least 16 workers  Ramming to continue till the surface has been thoroughly compacted  Surface to be kept well watered during the process of ramming  Road to be opened traffic such that the traffic is spread over the whole road width
  • 15. • Gravel Roads  A gravel road consists of a carriageway made of a layer of compacted gravel.  The gravel used consists of irregular stones mixed with a varying amount of sand, silt, and clay, which can act as a binder.  Following consideration govern the construction of gravel roads (A) The carriageway of the gravel road should be provided with a camber of 1 in 25 to 1in 30 to achieve good drainage of the road surface (B) It should be composed of pebbles which are hard, tough and durable rock particles to resist abrasion
  • 16. Cont… (C) For making a good road surface, the pebbles should be held together by some cementing material such as clay which is the most generally available binder.  Following procedure is adopted in the construction of a gravel road 1. Material Gravel to be used for the construction is staked along the sides of the proposed road 2. The pegs are driven to show the limits of excavation, The site is cleared and the subgrade is then prepared to receive the layer of gravel
  • 17. Cont… 3. The first layer of gravel is spread in the prepared trench. The compacted depth of gravel road is generally 20 cm and it is obtained in two layers. The layers is rolled by using smooth wheeled light rollers starting from the edges and proceeding towards entre. 4. Some quantity of water is then sprayed and rolling is done again. 5. The final rolling is carried out when the moisture content is at its optimum so that completed surface which is formed is firm. 6. A few days after the final rolling and drying out, the road is opening the road traffic.
  • 18. c
  • 19. Water bound macadam roads:  The water bound macadam road construction technique was given by the John Macadam. This technique in present day is used as given below.  For WBM construction we use three materials: 1. Aggregates 2. Screeners 3. Binders.
  • 20. • Construction of water bound macadam road involves the following 6 basic steps as given below 1. Preparation of sub-grade 2. Preparation of sub-base 3. Preparation of base 4. Preparation of wearing course 5. Preparation of shoulders 6. Opening to traffic
  • 21. • CONSTRUCTION OF SUB-GRADE  Sub-grade act as a cushion for other layers i.e. In order to achieve durable road sub-grade should be strong.  The sub-grade is thoroughly compacted by rollers weighing 8 tonnes by sprinkling water one night before.  In rocky regions the sub-grades are not rolled whereas in region of clay soils, a layer to natural sand, moorum or gravel, is provided over sub-grade.
  • 23. • CONSTRUCTION OF SUB-BASE  On a well compacted sub-grade, aggregates having size of 90 mm to 40 mm are preferred for the sub-base material, or over burnt bricks in layers of 15 cm thickness  total width of the sub-base to be kept 60 cm wider than pavement width, projecting 30 cm on each side.  The sub-base should be compacted by a roller to provide an even surface.
  • 24. • CONSTRUCTION OF BASE  The specified materials of the base course is spread and proper grade, thickness and cross sections maintained as per design shown on the supplied drawings.  Aggregates having size of 63 to 40 mm are preferred for the base material  For economic considerations IRC has suggested non plastic materials such as, crushed over burnt bricks, moorum, gravels, etc. provided the liquid limit of the material is less than 20%, plasticity index is less than 6.0% and the portion of fines passing 0.075 mm sieve is less than 10%.
  • 25.  This course may be laid in one or two layers according to the total designed thickness and the thickness of each layer should not exceed 10 cm  Provide either bricks on end edging or earthen kerbs strong enough to prevent the new road material from spreading outward and also to retain water used in consolidation of the wearing course  Spread the road metal evenly over the prepared base to the specified thickness and hand pack them so that the finished surface is brought to the required camber.
  • 26. Cont…  Spread the coarse aggregate over the surface and roll it dry with a suitable roller till interlocking of the aggregate is achieved with sufficient void space. The rolling is started from the edges and gradually shifted towards the centre.  After dry rolling, spread the screening materials (stones up to 12 mm size) with uniform rate so that voids of coarse aggregates get filled properly.  After spreading the screening material, sprinkle sufficient quantity of water, sweep the surface and roll it with roller again
  • 27. Preparation of wearing course  Now apply the binding material in two to three thick layers at a slow and uniform rate. Each layer of binding material is rolled after adding sufficient water. The slurry is swept in with brooms to fill the void properly. The moving wheel of the roller should be cleaned with water.  After proper compacting allow it to dry over night. Spread a layer of sand or earth, about 6 mm thick and roll the surface again after sprinkling water lightly.  The surface may be allowed for 7 to 10 days of curing.
  • 29. • CONSTRUCTION OF SHOULDERS  While curing the pavement surface, prepare the shoulders by filling earth to the specified cross slope and compact them properly by rolling or by tamping.  Width and thickness of the shoulder should be as per specification.
  • 30. • OPENING TO TRAFFIC  After properly drying, the road pavement may now be opened to traffic, ensuring that the traffic is distributed uniformly over the full width of the pavement.
  • 31. Wet mix macadam roads:  Laying and compacting clean, crushed, graded aggregate and granular material, premixed with water, to a dense mass on prepared sub-grade or existing pavement  Thickness of single compacted Wet Mix Macadam layer shall not be less than 75 mm  Coarse aggregate shall be crushed stone  If crushed gravel is used, not less than 90% by Wt. of gravel pieces retained on 4.75 mm sieve shall have at least two fractured faces  If water absorption value of coarse aggregate is greater than 2%, the soundness test shall be carried out as per IS:2386(Part-5)
  • 32. Physical Requirement of Coarse Aggregate for WMM 1. Los Angeles Abrasion IS:2386(Part-4) 40% Value or Aggregate Impact Value IS:2386(Part-4) or IS:5640 30% 2. Combined Flakiness and Elongation indices (Total) IS:2386(Part-1) 30%
  • 33. Grading Requirement for WMM IS Sieve Destination Percent by Wt. Passing IS Sieve Destination the IS Sieve 53.00 mm 45.00 mm 26.50 mm 22.40 mm 11.20 mm 4.75 mm 2.36 mm 600 micron 75 micron 100 95-100 - 60-80 40-60 25-40 15-30 8-22 0-8 Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding 6.
  • 34.  Construction of wet mix macadam road involves the following basic steps as given below. 1. Weather 2. Preparation of Base 3. Provision of Lateral Confinement of Wet Mix 4. Spreading of Mix and Compaction 5. Setting and Drying 6. Opening to Traffic
  • 35. • weather  The work of laying of wet mix macadam is not done during rainy season • Preparation of Base The surface of the sub-grade/sub-base/base to receive the WMM course shall be prepared to the specified lines and cross-fall (camber) and made free of dust and other extraneous matter. Any ruts or softy yielding places shall be corrected and rolled until firm surface is obtained, if necessary by sprinkling water. • Provision of Lateral Confinement of Wet Mix  This shall be done by laying materials adjoining shoulders along with that of wet mix layer. The sequence of operations shall be such that the construction of the shoulder is done in layers each matching the thickness of the adjoining pavement layer.
  • 36. Spreading of Mix and compaction • Preparation of mix  WMM shall be prepared in an approved mixing plant of suitable capacity having provision for controlled addition of water  Optimum moisture for mixing shall be determined in accordance with IS: 2720 (Part-8) after replacing the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size • Spreading of mix  Immediately after mixing, the aggregate shall spread uniformly and evenly upon the prepared sub-grade in required quantities by paver or motor grader
  • 37. • Compaction After the mix has been laid to the required thickness, grade and cross fall/camber the same shall be uniformly compacted to the full depth with suitable roller • Setting and Drying  After final compaction of wet-mix macadam course, the road shall be allowed to dry for 24 hours • Opening to Traffic  Preferably no vehicular traffic of any kind should be allowed on the finished wet-mix macadam surface till it has dried and the wearing course laid
  • 38. • References  S.G. RANGWALA “Highway engineering” by Charotar Publication House  S.P. Chandola “A text book of Transportation engineering” by S.Chand Publication  L.R. Kadiyali “principles and practices of Highway Engineering “by Khanna Publishers  IRC-19-1977 , IRC-109-1997 Guidelines