Closing and opening an existing fireplace
                   sponsored by:




   Closing:
A fireplace, which is not used anymore, can be successfully closed to allow
more wall space…

 The insertion of an air-brick is required in the closing of the fireplace to allow
air to circulate between the room and the top of the chimney, via the flue and
fireplace. This will stop moisture collecting in the soot and smoke deposits
within them and forming damp areas.

It is also advisable to cap the chimney with a ventilated cowl, which will
allow air in and out, but not water. We are working with
www.chimneycap.co.uk who produce just such a vent. The advantage of
C-cap is that it will not leak, and it can be fitted in seconds. Your
chimney is protected from the elements and from nesting
birds...Chimney Caps ventilated cowls will not leak and blend in with the
pots to maintain the traditional appearance of the stack.




 First measure the opening in square metres and multiply by 60. This will tell
you how many bricks you will need. (An average fireplace will measure
approx 400mm x 550mm or 0.4m x 0.55m…. Equalling 0.22 sq. m. x 60 = 13
bricks) you will need one 9 inch x 3 inch air- brick. Common bricks can be
used for building, as they are the cheapest.

Sand and cement is obviously needed and this should be mixed at 4 sand to 1
cement for building the brickwork…The same mortar can be used for the
render to cover the bricks with later, but you will have to wet it down a little to
apply it.

For an average fireplace you will also need 2 “frame cramps” which are
normally fixed to a door or window frame and built into the brickwork joints.
These 2 however, will be plugged and screwed to the inside of the fireplace
and be built into brickwork you are building. (See diagram)




The brickwork can now be built into the opening; it should be set back half an
inch from the existing face of the plasterwork surrounding the fireplace. The
air-brick however should be built out a little so that its face is flush with the
existing plaster. You can check this by placing a spirit level across the
opening. It should touch both sides of the fireplace, and the air-brick.



The air-brick should be in the middle of the new brickwork and as low as you
can get it without any of it being masked by new skirting




board.



A & B represent the positions of the frame cramps.
When the brickwork is built, “rake” out the joints by about 10mm. This will
give a good key for the render you will apply when the brickwork is firm
enough to withstand the pressure of applying it.

 To render, spread the sand and cement as evenly as you can over the
brickwork; preferably using a plasterers trowel, but it is possible to use the
back of the trowel you used to lay the bricks with. When you think you have
enough on, use the spirit level, laid across the opening as before, and
“dragged” upward. This will pull off all render that is “proud” of the existing
plasterwork. You may have to apply a bit more to any depressions, but by
repeating the process you will finish with a rendered section, which is flush
with the existing plaster. The air-brick of course will already be at this level.

 You must now use a wooden or plastic “float” to rub over this surface. Do not
do this immediately after you have finished the render. Allow the render to dry
out for a while. This is ready to “rub in” when you can move the float on the
surface of the render without the render moving, but all pin-holes fill up with
the deposits of render left on the trowel. Rub in a circular motion, with steady,
not firm, pressure and you will be left with a nice flat surface, which should be
2 or 3mm below the level of the existing plaster.

 This new surface must now be “scratched”. Use a nail and put light scratches
all over it. This is to give a good key for the final coat of plaster called “skim”.

 When you are buying skim, most merchants will know what you mean, but its
real name is multi purpose top coat plaster. This must be mixed to a very
creamy consistency (runny custard) and applied using a plasterer’s trowel.

 When you have covered the area, leave for a minute or two and trowel up
again. Repeat this 2 or 3 times (more if necessary) and the trowel marks will
disappear, as the plaster gets harder. Timing is the essence of this type of
plastering and you will not have time to go shopping when this stuff is on the
wall.

Your surface is now complete and you can fix the skirting boards in place.

 Finally you will need a grill to cover the air-brick. These can be found at
Builders merchants and diy stores. They are either plastic or brass effect and
can be screwed or glued in place.

       Don't forget you now need to cap the top of the pot or flue. See
                          www.chimneycap.co.uk




  OPENING A FIREPLACE.
In most situations the above operations will be done in reverse. It is unlikely that any
structural alteration will have been done to your fireplace when it was bricked up, but
you must still proceed with caution. Do not attempt to make the opening any larger
than it was originally. Fire openings are quite an exact science. Altering their
shape and size will affect the efficiency of the fire and possibly lead to a
“blowback” of smoke etc.

Determine the centre of the section to be removed and make a hole at floor level, this
 hole can then be widened and raised until you meet the sides and top of the original
opening. Clean off any jagged bits of brick and plaster etc and remove all debris from
  inside the opening. You should be able to reach up at least an arms length without
       obstruction. Do not attempt to look up until you have done this arm test.

It is at this stage you will need to check the builders have not capped off the chimney.
 Call in a Corgi registered plumber to test the flue. Please do not assume that because
it looks clear it is suitable for a fire that has any kind of exhaust fumes. At worst, your
                                  flue may have to be lined.

You can now make good any areas of brickwork and plaster that have been damaged.
  This should be done using lime mortar, which is less susceptible to cracking in the
heat. The mix for this will be 4 parts soft sand, 2 parts lime and 1 part cement. All of
 the materials mentioned in these help sheets are available from builders merchants.

 The area you are making good needs to be free from soot and any flaking material.

 Corners can be reinstated by tacking a piece of timber to the face of the existing wall
and rendering up to it. The timber can be removed the following day leaving a straight
edge. If top coat plaster (skim) is required to the
surface, some scratch marks should be placed in
  the render to give a key, i.e. allow a stronger
 bond between the two surfaces. (see closing a
                    fireplace).
                                                        A. Hearth formed as you wish,
                                                            generally stone slabs,
                                                            quarry tiles or bricks.
                                                        B. Concrete base.
                                                        C. Throat lintel, this will be
                                                            an integral part of the
                                                            existing fireplace.
                                                        D. Plaster/render (containing
                                                            lime)
                                                        E. Timber tacked on to form
                                                            straight edge to D & C if
                                                            necessary
                                                        F. Flue. Must be checked by
                                                            corgi-registered fitter.
If a hearth is required this can be formed in front of the opening either by paving
slabs, or a bed of sharp sand and cement with quarry tiles laid over. The bed for the
slabs or quarry tiles should be 4 parts sharp sand and 1 part cement. The gap between
the back edge of your new hearth and the back of the fireplace opening can be filled
with either concrete or the same mix of sharp sand and cement. Please check for any
cowl or cap that is on top of your existing chimney. If it is, it must now be removed

Contenu connexe

Plus de Praveen Sudarsan

Plus de Praveen Sudarsan (20)

How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
Hanging wallpaper
Hanging wallpaperHanging wallpaper
Hanging wallpaper
 
Hanging a door
Hanging a doorHanging a door
Hanging a door
 
Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Timber care
Timber careTimber care
Timber care
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 
Fitting a mortice latch
Fitting a mortice latchFitting a mortice latch
Fitting a mortice latch
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
 

Dernier

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Dernier (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

Closing and opening an existing fireplace

  • 1. Closing and opening an existing fireplace sponsored by: Closing: A fireplace, which is not used anymore, can be successfully closed to allow more wall space… The insertion of an air-brick is required in the closing of the fireplace to allow air to circulate between the room and the top of the chimney, via the flue and fireplace. This will stop moisture collecting in the soot and smoke deposits within them and forming damp areas. It is also advisable to cap the chimney with a ventilated cowl, which will allow air in and out, but not water. We are working with www.chimneycap.co.uk who produce just such a vent. The advantage of C-cap is that it will not leak, and it can be fitted in seconds. Your chimney is protected from the elements and from nesting birds...Chimney Caps ventilated cowls will not leak and blend in with the pots to maintain the traditional appearance of the stack. First measure the opening in square metres and multiply by 60. This will tell you how many bricks you will need. (An average fireplace will measure approx 400mm x 550mm or 0.4m x 0.55m…. Equalling 0.22 sq. m. x 60 = 13 bricks) you will need one 9 inch x 3 inch air- brick. Common bricks can be used for building, as they are the cheapest. Sand and cement is obviously needed and this should be mixed at 4 sand to 1 cement for building the brickwork…The same mortar can be used for the render to cover the bricks with later, but you will have to wet it down a little to apply it. For an average fireplace you will also need 2 “frame cramps” which are normally fixed to a door or window frame and built into the brickwork joints.
  • 2. These 2 however, will be plugged and screwed to the inside of the fireplace and be built into brickwork you are building. (See diagram) The brickwork can now be built into the opening; it should be set back half an inch from the existing face of the plasterwork surrounding the fireplace. The air-brick however should be built out a little so that its face is flush with the existing plaster. You can check this by placing a spirit level across the opening. It should touch both sides of the fireplace, and the air-brick. The air-brick should be in the middle of the new brickwork and as low as you can get it without any of it being masked by new skirting board. A & B represent the positions of the frame cramps.
  • 3. When the brickwork is built, “rake” out the joints by about 10mm. This will give a good key for the render you will apply when the brickwork is firm enough to withstand the pressure of applying it. To render, spread the sand and cement as evenly as you can over the brickwork; preferably using a plasterers trowel, but it is possible to use the back of the trowel you used to lay the bricks with. When you think you have enough on, use the spirit level, laid across the opening as before, and “dragged” upward. This will pull off all render that is “proud” of the existing plasterwork. You may have to apply a bit more to any depressions, but by repeating the process you will finish with a rendered section, which is flush with the existing plaster. The air-brick of course will already be at this level. You must now use a wooden or plastic “float” to rub over this surface. Do not do this immediately after you have finished the render. Allow the render to dry out for a while. This is ready to “rub in” when you can move the float on the surface of the render without the render moving, but all pin-holes fill up with the deposits of render left on the trowel. Rub in a circular motion, with steady, not firm, pressure and you will be left with a nice flat surface, which should be 2 or 3mm below the level of the existing plaster. This new surface must now be “scratched”. Use a nail and put light scratches all over it. This is to give a good key for the final coat of plaster called “skim”. When you are buying skim, most merchants will know what you mean, but its real name is multi purpose top coat plaster. This must be mixed to a very creamy consistency (runny custard) and applied using a plasterer’s trowel. When you have covered the area, leave for a minute or two and trowel up again. Repeat this 2 or 3 times (more if necessary) and the trowel marks will disappear, as the plaster gets harder. Timing is the essence of this type of plastering and you will not have time to go shopping when this stuff is on the wall. Your surface is now complete and you can fix the skirting boards in place. Finally you will need a grill to cover the air-brick. These can be found at Builders merchants and diy stores. They are either plastic or brass effect and can be screwed or glued in place. Don't forget you now need to cap the top of the pot or flue. See www.chimneycap.co.uk OPENING A FIREPLACE.
  • 4. In most situations the above operations will be done in reverse. It is unlikely that any structural alteration will have been done to your fireplace when it was bricked up, but you must still proceed with caution. Do not attempt to make the opening any larger than it was originally. Fire openings are quite an exact science. Altering their shape and size will affect the efficiency of the fire and possibly lead to a “blowback” of smoke etc. Determine the centre of the section to be removed and make a hole at floor level, this hole can then be widened and raised until you meet the sides and top of the original opening. Clean off any jagged bits of brick and plaster etc and remove all debris from inside the opening. You should be able to reach up at least an arms length without obstruction. Do not attempt to look up until you have done this arm test. It is at this stage you will need to check the builders have not capped off the chimney. Call in a Corgi registered plumber to test the flue. Please do not assume that because it looks clear it is suitable for a fire that has any kind of exhaust fumes. At worst, your flue may have to be lined. You can now make good any areas of brickwork and plaster that have been damaged. This should be done using lime mortar, which is less susceptible to cracking in the heat. The mix for this will be 4 parts soft sand, 2 parts lime and 1 part cement. All of the materials mentioned in these help sheets are available from builders merchants. The area you are making good needs to be free from soot and any flaking material. Corners can be reinstated by tacking a piece of timber to the face of the existing wall and rendering up to it. The timber can be removed the following day leaving a straight edge. If top coat plaster (skim) is required to the surface, some scratch marks should be placed in the render to give a key, i.e. allow a stronger bond between the two surfaces. (see closing a fireplace). A. Hearth formed as you wish, generally stone slabs, quarry tiles or bricks. B. Concrete base. C. Throat lintel, this will be an integral part of the existing fireplace. D. Plaster/render (containing lime) E. Timber tacked on to form straight edge to D & C if necessary F. Flue. Must be checked by corgi-registered fitter.
  • 5. If a hearth is required this can be formed in front of the opening either by paving slabs, or a bed of sharp sand and cement with quarry tiles laid over. The bed for the slabs or quarry tiles should be 4 parts sharp sand and 1 part cement. The gap between the back edge of your new hearth and the back of the fireplace opening can be filled with either concrete or the same mix of sharp sand and cement. Please check for any cowl or cap that is on top of your existing chimney. If it is, it must now be removed