RISK-ADJUSTED DISCOUNT
RATE
 An estimation of the present value of cash for
high risk investments is known as risk-
adjusted discount rate.
Example:A very common example of risky
investment is the real estate.
 It is generally calculated as a sum of risk free
rate and risk premium.
 Risk-adjusted discount rate = Risk free rate +
Risk premium.
 The variation of risk premium is depending on
the risk aversion of investor and the perception
of investor about the size of property’s
investment risk.
 Risk free rate: it is the rate at which the future
cash in-inflows should be discounted , if they
had no risk.
 Risk premium rate: it is the extra return
expected by the investors over the normal rate
on the account of project being risk.
 For higher risk investment project a higher rate
will be used and for a lower risk investment
project, a low rate will be used.
 The risk adjusted discount rate can be used
with IRR and NPV methods.
 If NPV is positive, then the project may be
considered.
 In the case of IRR method, the internal rate of
return is compared with the risk adjusted rate
of return and if the former exceeds the latter,
the project can be accepted.
Advantages
 Simple to calculate.
 Easy to understand.
 Risk adjusted rate has a good deal of intuitive
appeal in the eyes of risk averse business
person.
Disadvantages
 It is completely relay on the assumption that
investors are risk averse. Through it is mostly
true; however, a group of seekers also exists
who never demand premium for risk
assumption. They willingly paying premium to
take risks. Accordingly, with the level of
increase, discount rate will decrease.
Mini case study
 A company X is undertaking a project for a
period of 3 years. The cash out flow for this
project is 1,10,000. the cash inflows for each
year are 35,000;42,500; 50,000 respectively.
The risk free rate is 8% and the risk premium
rate is 4%.
Consider NPV method
Total rate of discount is rate of discount=8+4
=12%
year CFAT Discount factor PV of cash flow
1 35,000 0.893 31,255
2 45,200 0.797 36,025
3 50,000 0.712 35600
 Net present value=
Present value of cash inflow-cash out flow
Sum of all cash inflows=1,02,880
NPV=1,02,880-1,10,000
=-7,120
 If for the above case assume risk free return is
5% and risk premium rate is 2%
The total discounted rate is now 7%
year CFAT Discount
factor
PV of cash
flow
1 35,000 0.935 32,725
2 45,200 0.873 39460
3 50,000 0.816 40800
 Sum of all cash inflows=1,12,985
 NPV=1,12,985-1,10,000
=2,985.
hence here we can accept the project.
CERTAINTIY EQUIVALENT
METHOD
 procedure for dealing with risk in capital
budgeting is to reduce the forecasts of cash
flows to some conservative levels.
 Under the CE approach, the decision maker
must first evaluate a cash flow’s risk and then
specify how much money, to be received with
certainty, will make him or her indifferent
between the riskless and the risky cash flows.
Equivalent coefficient
 Certainty equivalent =riskless cash flows
risky cash flows
 Riskless cash flows mean the cash flow which
the management is prepared to accept in case
there is no risk involved.
 It assumes a value between 0 and 1
Acceptance of a project
 Certainty equivalent method can be used
either with NPV method or IRR method.
 In NPV method, a project is accepted if NPV of
certainty equivalent cash flow > 0.
 In IRR method, a project is accepted if the IRR
> risk free rate.
Advantages
 The certainty equivalent method is simple and
neat
 It can easily accommodate differential risk
among cash flows.
Disadvantages
 There is no practical way to estimate certainty
equivalents. Each individual would have his or
her own estimate, and these could vary
significantly.
 To further complicate matters, certainty
equivalents should reflect shareholders’ risk
preferences rather than those of management.
For these reasons, the certainty equivalent
method is not used very often in corporate
decision making.
Mini case study
 A company is considering an investment
proposal whose cost is rs.2,10,000. its
economic life is 4 years. Risk free rate is 11%.
Use IRR method for validating the proposal.
The cash flows and certainty equivalent
coefficient are as follows:
year Cash inflows Certainty coef.
1 70,000 0.8
2 90,000 0.9
3 60,000 0.85
4 1,30,000 0.75
Solution
 Calculation of cash inflows with certainty
year Cash inflow Coef. Risk less
cash flow
1 70,000 0.8 56,000
2 90,000 0.9 81,000
3 60,000 0.85 51,000
4 1,30,000 0.75 97,500
 Assuming return of 14% PVs of cash flows:
year Cash inflow pvf Present
value
1 56,000 0.877 49,112
2 81,000 0.769 62,289
3 51,000 0.675 34,425
4 97,500 0.592 57,720
 Sum of all present values=2,03,546.
 Net present value=2,03,546-2,10,000
= -6,454.
 Now assuming a return of 10%
year Cash in
flow
pvf Present
value
1 56,000 0.909 50,904
2 81,000 0.826 66,906
3 51,000 0.751 38,301
4 97,500 0.683 66592.5
 Sum of resent values=2,22,704.
 Net present value=2,22,704-2,10,000
=12,704.
 There fore IRR= 10+(12,704/12,704+6,454)x4
= 12.65%
Hence the proposal can be accepted.
Radr and certainty equivalent techniques

Contenu connexe

Tendances

Tendances (20)

Portfolio selection, markowitz model
Portfolio selection, markowitz modelPortfolio selection, markowitz model
Portfolio selection, markowitz model
 
Cost of capital
Cost  of capitalCost  of capital
Cost of capital
 
Net income approach
Net income approachNet income approach
Net income approach
 
Portfolio construction
Portfolio        constructionPortfolio        construction
Portfolio construction
 
CAPM
CAPMCAPM
CAPM
 
Weighted average cost of capital
Weighted average cost of capitalWeighted average cost of capital
Weighted average cost of capital
 
Leasing and hire purchase
Leasing and hire purchaseLeasing and hire purchase
Leasing and hire purchase
 
corporate risk management
 corporate risk management corporate risk management
corporate risk management
 
portfolio risk
portfolio riskportfolio risk
portfolio risk
 
International project appraisal
International project appraisalInternational project appraisal
International project appraisal
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Valuation of securities
Valuation of securitiesValuation of securities
Valuation of securities
 
Classification of working capital
Classification of working capitalClassification of working capital
Classification of working capital
 
Profit maximization vs wealth maximization
Profit maximization vs wealth maximizationProfit maximization vs wealth maximization
Profit maximization vs wealth maximization
 
Factoring
FactoringFactoring
Factoring
 
Capital structure theories
Capital structure theoriesCapital structure theories
Capital structure theories
 
Bond valuation
Bond valuationBond valuation
Bond valuation
 
Portfolio Revision
Portfolio RevisionPortfolio Revision
Portfolio Revision
 
Capital structure
Capital structureCapital structure
Capital structure
 
Dividend policy
Dividend policyDividend policy
Dividend policy
 

En vedette

Risk analysis in capital bugeting
Risk analysis in capital bugetingRisk analysis in capital bugeting
Risk analysis in capital bugetingDr. Ravneet Kaur
 
Calculation of cost of equity
Calculation of cost of equityCalculation of cost of equity
Calculation of cost of equityAmardeep Kaur
 
RISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGRISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGPANKAJ PANDEY
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital BudgetingDayasagar S
 
Application of Decision Analysis & Portfolio Management to the Generic Drug I...
Application of Decision Analysis & Portfolio Management to the Generic Drug I...Application of Decision Analysis & Portfolio Management to the Generic Drug I...
Application of Decision Analysis & Portfolio Management to the Generic Drug I...Richard Bayney
 
2013 An Introduction to Development Appraisal
2013 An Introduction to Development Appraisal2013 An Introduction to Development Appraisal
2013 An Introduction to Development AppraisalSimon Wainwright
 
Calculating risk-adjusted NPV (eNPV) - The right way
Calculating risk-adjusted NPV (eNPV) - The right wayCalculating risk-adjusted NPV (eNPV) - The right way
Calculating risk-adjusted NPV (eNPV) - The right wayRichard Bayney
 
56617 Sfm Class 3 And 4
56617 Sfm   Class 3 And 456617 Sfm   Class 3 And 4
56617 Sfm Class 3 And 4GOEL'S WORLD
 
Acquisition of Mercury Athletic
Acquisition of Mercury AthleticAcquisition of Mercury Athletic
Acquisition of Mercury AthleticJB Gough
 
Presentation on capital budgeting
Presentation on capital budgetingPresentation on capital budgeting
Presentation on capital budgetingAshima Thakur
 
UBC Phar400-startup or buy pharmacy-23mar2012
UBC Phar400-startup or buy pharmacy-23mar2012UBC Phar400-startup or buy pharmacy-23mar2012
UBC Phar400-startup or buy pharmacy-23mar2012Gerry Spitzner
 
scenario analysis
scenario analysisscenario analysis
scenario analysisjoerizk
 
Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Muhammad Ijaz Syed
 
Chapter 13 Capital Structure And Leverage
Chapter 13 Capital Structure And LeverageChapter 13 Capital Structure And Leverage
Chapter 13 Capital Structure And LeverageAlamgir Alwani
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital BudgetingNoman
 
SOCIAL COST BENIFIT ANALYSIS
SOCIAL COST BENIFIT ANALYSISSOCIAL COST BENIFIT ANALYSIS
SOCIAL COST BENIFIT ANALYSISKumar Pankaj
 

En vedette (20)

Risk analysis in capital bugeting
Risk analysis in capital bugetingRisk analysis in capital bugeting
Risk analysis in capital bugeting
 
Calculation of cost of equity
Calculation of cost of equityCalculation of cost of equity
Calculation of cost of equity
 
RISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGRISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETING
 
Risk analysis in capital budgeting
Risk analysis in capital budgeting Risk analysis in capital budgeting
Risk analysis in capital budgeting
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Sources of finance
Sources of financeSources of finance
Sources of finance
 
Application of Decision Analysis & Portfolio Management to the Generic Drug I...
Application of Decision Analysis & Portfolio Management to the Generic Drug I...Application of Decision Analysis & Portfolio Management to the Generic Drug I...
Application of Decision Analysis & Portfolio Management to the Generic Drug I...
 
2013 An Introduction to Development Appraisal
2013 An Introduction to Development Appraisal2013 An Introduction to Development Appraisal
2013 An Introduction to Development Appraisal
 
Calculating risk-adjusted NPV (eNPV) - The right way
Calculating risk-adjusted NPV (eNPV) - The right wayCalculating risk-adjusted NPV (eNPV) - The right way
Calculating risk-adjusted NPV (eNPV) - The right way
 
56617 Sfm Class 3 And 4
56617 Sfm   Class 3 And 456617 Sfm   Class 3 And 4
56617 Sfm Class 3 And 4
 
Acquisition of Mercury Athletic
Acquisition of Mercury AthleticAcquisition of Mercury Athletic
Acquisition of Mercury Athletic
 
Presentation on capital budgeting
Presentation on capital budgetingPresentation on capital budgeting
Presentation on capital budgeting
 
Ch 4
Ch 4Ch 4
Ch 4
 
UBC Phar400-startup or buy pharmacy-23mar2012
UBC Phar400-startup or buy pharmacy-23mar2012UBC Phar400-startup or buy pharmacy-23mar2012
UBC Phar400-startup or buy pharmacy-23mar2012
 
scenario analysis
scenario analysisscenario analysis
scenario analysis
 
Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2
 
Chapter 13 Capital Structure And Leverage
Chapter 13 Capital Structure And LeverageChapter 13 Capital Structure And Leverage
Chapter 13 Capital Structure And Leverage
 
Decision trees
Decision treesDecision trees
Decision trees
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital Budgeting
 
SOCIAL COST BENIFIT ANALYSIS
SOCIAL COST BENIFIT ANALYSISSOCIAL COST BENIFIT ANALYSIS
SOCIAL COST BENIFIT ANALYSIS
 

Similaire à Radr and certainty equivalent techniques

Similaire à Radr and certainty equivalent techniques (20)

Risk analysis in investment
Risk analysis in investmentRisk analysis in investment
Risk analysis in investment
 
Ch 08
Ch 08Ch 08
Ch 08
 
CAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.pptCAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.ppt
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Unit III.pptx
Unit III.pptxUnit III.pptx
Unit III.pptx
 
Time value concepts
Time value conceptsTime value concepts
Time value concepts
 
Financial Management- Making Capital Investment Decision
Financial Management- Making Capital Investment DecisionFinancial Management- Making Capital Investment Decision
Financial Management- Making Capital Investment Decision
 
Pm 6
Pm 6Pm 6
Pm 6
 
Capital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decisionCapital Budgeting : capital budgeting decision
Capital Budgeting : capital budgeting decision
 
Topic 1 Npv And Other Investment Creteria
Topic 1 Npv And Other Investment CreteriaTopic 1 Npv And Other Investment Creteria
Topic 1 Npv And Other Investment Creteria
 
Capital investment appraisal.ppt
Capital investment appraisal.pptCapital investment appraisal.ppt
Capital investment appraisal.ppt
 
Internal rate of return
Internal rate of returnInternal rate of return
Internal rate of return
 
Payback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. MohitePayback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. Mohite
 
Ch_02_revised.ppt
Ch_02_revised.pptCh_02_revised.ppt
Ch_02_revised.ppt
 
Cooperate finance
Cooperate financeCooperate finance
Cooperate finance
 
Capital budgeting i
Capital budgeting iCapital budgeting i
Capital budgeting i
 
Evaluation techniques
Evaluation techniquesEvaluation techniques
Evaluation techniques
 
Capital budgeting decisions
Capital budgeting decisionsCapital budgeting decisions
Capital budgeting decisions
 
THAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eTHAI MUSIC-Mariestela e
THAI MUSIC-Mariestela e
 

Dernier

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 

Dernier (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 

Radr and certainty equivalent techniques

  • 1. RISK ADJUSTED DISCOUNT RATE CERTAINITY EQUIVALENT METHOD K.PREETHI 09011U0107
  • 2. RISK-ADJUSTED DISCOUNT RATE  An estimation of the present value of cash for high risk investments is known as risk- adjusted discount rate. Example:A very common example of risky investment is the real estate.
  • 3.  It is generally calculated as a sum of risk free rate and risk premium.  Risk-adjusted discount rate = Risk free rate + Risk premium.  The variation of risk premium is depending on the risk aversion of investor and the perception of investor about the size of property’s investment risk.
  • 4.  Risk free rate: it is the rate at which the future cash in-inflows should be discounted , if they had no risk.  Risk premium rate: it is the extra return expected by the investors over the normal rate on the account of project being risk.
  • 5.  For higher risk investment project a higher rate will be used and for a lower risk investment project, a low rate will be used.  The risk adjusted discount rate can be used with IRR and NPV methods.
  • 6.  If NPV is positive, then the project may be considered.  In the case of IRR method, the internal rate of return is compared with the risk adjusted rate of return and if the former exceeds the latter, the project can be accepted.
  • 7. Advantages  Simple to calculate.  Easy to understand.  Risk adjusted rate has a good deal of intuitive appeal in the eyes of risk averse business person.
  • 8. Disadvantages  It is completely relay on the assumption that investors are risk averse. Through it is mostly true; however, a group of seekers also exists who never demand premium for risk assumption. They willingly paying premium to take risks. Accordingly, with the level of increase, discount rate will decrease.
  • 9. Mini case study  A company X is undertaking a project for a period of 3 years. The cash out flow for this project is 1,10,000. the cash inflows for each year are 35,000;42,500; 50,000 respectively. The risk free rate is 8% and the risk premium rate is 4%. Consider NPV method Total rate of discount is rate of discount=8+4 =12%
  • 10. year CFAT Discount factor PV of cash flow 1 35,000 0.893 31,255 2 45,200 0.797 36,025 3 50,000 0.712 35600
  • 11.  Net present value= Present value of cash inflow-cash out flow Sum of all cash inflows=1,02,880 NPV=1,02,880-1,10,000 =-7,120
  • 12.  If for the above case assume risk free return is 5% and risk premium rate is 2% The total discounted rate is now 7% year CFAT Discount factor PV of cash flow 1 35,000 0.935 32,725 2 45,200 0.873 39460 3 50,000 0.816 40800
  • 13.  Sum of all cash inflows=1,12,985  NPV=1,12,985-1,10,000 =2,985. hence here we can accept the project.
  • 14. CERTAINTIY EQUIVALENT METHOD  procedure for dealing with risk in capital budgeting is to reduce the forecasts of cash flows to some conservative levels.  Under the CE approach, the decision maker must first evaluate a cash flow’s risk and then specify how much money, to be received with certainty, will make him or her indifferent between the riskless and the risky cash flows.
  • 15. Equivalent coefficient  Certainty equivalent =riskless cash flows risky cash flows  Riskless cash flows mean the cash flow which the management is prepared to accept in case there is no risk involved.  It assumes a value between 0 and 1
  • 16. Acceptance of a project  Certainty equivalent method can be used either with NPV method or IRR method.  In NPV method, a project is accepted if NPV of certainty equivalent cash flow > 0.  In IRR method, a project is accepted if the IRR > risk free rate.
  • 17. Advantages  The certainty equivalent method is simple and neat  It can easily accommodate differential risk among cash flows.
  • 18. Disadvantages  There is no practical way to estimate certainty equivalents. Each individual would have his or her own estimate, and these could vary significantly.  To further complicate matters, certainty equivalents should reflect shareholders’ risk preferences rather than those of management. For these reasons, the certainty equivalent method is not used very often in corporate decision making.
  • 19. Mini case study  A company is considering an investment proposal whose cost is rs.2,10,000. its economic life is 4 years. Risk free rate is 11%. Use IRR method for validating the proposal. The cash flows and certainty equivalent coefficient are as follows: year Cash inflows Certainty coef. 1 70,000 0.8 2 90,000 0.9 3 60,000 0.85 4 1,30,000 0.75
  • 20. Solution  Calculation of cash inflows with certainty year Cash inflow Coef. Risk less cash flow 1 70,000 0.8 56,000 2 90,000 0.9 81,000 3 60,000 0.85 51,000 4 1,30,000 0.75 97,500
  • 21.  Assuming return of 14% PVs of cash flows: year Cash inflow pvf Present value 1 56,000 0.877 49,112 2 81,000 0.769 62,289 3 51,000 0.675 34,425 4 97,500 0.592 57,720
  • 22.  Sum of all present values=2,03,546.  Net present value=2,03,546-2,10,000 = -6,454.
  • 23.  Now assuming a return of 10% year Cash in flow pvf Present value 1 56,000 0.909 50,904 2 81,000 0.826 66,906 3 51,000 0.751 38,301 4 97,500 0.683 66592.5
  • 24.  Sum of resent values=2,22,704.  Net present value=2,22,704-2,10,000 =12,704.
  • 25.  There fore IRR= 10+(12,704/12,704+6,454)x4 = 12.65% Hence the proposal can be accepted.