Astute Professional with cross – cultural work experience of 10 years in QA/QC functions, currently serving for SAIPEM
ENI,Kuwait – A leading contractor Company specialized in construction jobs with jobsites worldwide.
To summarize my overall responsibility as ensuring that the project work meets the contractual requirements and the
work is planned and executed to meet with proper quality standards and established company standards. Holds the
distinction of managing QA/QC functions in projects of diversified nature across the career span.
Profile
• QA/QC ENGINEER (Mechanical) with 10 Years of experience in Oil, Petrochemical and Power Projects.
• Comprehensive Inspection experience of Welding in Versatile Oil& Gas Environment ,Sour and Non-sour.
• Experience in Inspection of Incoming Materials for Project requirement as per KOC standard and International
Specifications.
• Conversant with Construction codes such as ASME SEC-1,ASME SEC-V111,ASME B 31.1
ASME B31.3, ASME B 31.4, ASME B 31.8, API-650 & API-1104.
• Conversant with Reference codes such as ASME SEC-11,ASME SEC-V,ASME SEC 1X &
ASTM STANDARDS
• Familiarize with Welding Process such as SMAW, GTAW, SAW & FCAW.
• Experience with different materials such as Carbon steel(P1),Low alloy steels(P3,P4,P5),
Low Temperature carbon steel (Grade-6), Stainless steels (P8), Duplex stainless steels (P10H),Inconel 625(P43)
& Incoloy 825(P45).
• Familiar with Quality Management System.
• Implementation of Health & Safety Environment on workforce as per company HSE policy.
• Excellent Communication Skills.
Scholastics
BACHELOR OF MECHANICAL ENGINEERING.
(Affiliated to Visveswaraiah Technological University)
Year of Passing: 2005, Percentage: 61%
Technical Expertise
Senior Welding Inspector, Passed CSWIP 3.2.2 Level 3. Cert No # 92451/2.
Quality Management Systems ISO 9001:2008 Lead Auditor with IRCA Cert No# CC Q-14-032-01.
Certification of ASNT Level –II in Radiographic testing.
Certification of ASNT Level –II in Ultrasonic testing
Certification of ASNT Level –II in Magnetic particle testing
Certification of ASNT Level –II in Dye Penetrant testing
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
Employment Scan
Eni Saipem S.p.A , Kuwait QA/Qc Welding Inspection Engineer 2014 Jan –Till Date
Larson & Tubro, Kuwait Quality control Engineer 2012 Oct – 2013 Dec
Kharafi National, Kuwait Quality control Engineer 2007 Jun – 2012 Sept
Larson & Tubro, India Quality control Engineer 2006 July – 2007 May
M.P .Engineering Construction (I) Pvt Ltd, India Quality control Engineer 2005 April – 2006 Jun
Functional Skill Set
• Co-ordination of inspection activities such as fit-up check, dimensional check, weld visual as per Inspection and
Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.
• Monitoring the construction process from all aspects to ensure performance meets job quality and design
requirements in accordance with Company procedures and international codes.
• Interface and coordinate with clients for QC matters and coordinate with third party inspection agencies for all
related inspection activities
• Review of subcontractor’s procedure and submitting for client approval.
• Incorporating and revising the project quality documents according to client comments and whenever revision
required
• Coordinating with pre fabrication sub-contractor for weekly progress update and for Quality related assistance.
• Performs the reviews on Sub contractors submittals for WPS& PQR’s for Approval.
• Inspection of all incoming materials and review of Material Test Certificates with the specification requirements.
• Preparation of project welding consumable Technical delivery condition in line with the scope of work .
• Review and approving the welding consumable certificates prior to shipment from manufacturer.
• Experience in Witnessing of Hydro test for the Valves (Shell Test, Seat Test and Air seat Test) as per Project
requirements.
• Attends/Monitors Contractors Welder Qualification Testing as required.
• Monitor and control of Welders performance at work and to control the Repair% within the Key Performance
Indicator.
• Ensuring the preparation and submission of welder register and performance evaluation records at right time.
• Ensuring the NDT percentage coverage on weekly basis and coordinates with the respective inspector for
necessary follow up.
• Frequent orientation with welders, piping fabricators to educate about the project requirements to meet the
quality and to minimize the reworks.
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
• Interpretation of Radiography films.
• To witness and reviewing of MPT,DPT,HT,PWHT,PMI and Base line thickness survey report.
• Trouble shooting any problems related to welding/NDT during project execution. Provide advice to welding/QC
personnel to resolve any welding/NDT related problems.
• Responsible for site quality control and Inspection coordination activities.
• Plan and Supervise Subcontractor inspection activities and reviews of subcontractor QC performance.
• Coordination with Engineering department and supervisors to resolve any discrepancy in the drawing.
• Planning of manpower requirement for project quality control activities and allocating manpower as required.
• Follow up for the required corrective action for the site non conformities and the implementation of necessary
preventive actions.
• Frequent surveillance with site QC Inspectors for ensuring the works are being executed in line with project
specific requirements
• Involved in the Inspection of Corrosion coupon and Corrosion Probe Installation in Process lines.
• Coordinating with technical department for piping pressure test package preparation and compiling all relevant
documents.
• Performing piping walk down inspection ,generate the punch list, clearance of punches and Witnessing Hydro
test.
• Hydro/Pneumatic Testing of Metallic/Non Metallic Piping .
• Performing Pump alignment Inspection and Static equipment alignment Inspection and Involved in the Box-UP
Inspection of Tanks and Vessels.
• Follow up ITP of Tank fabrication and Involved in each stage of Tank Fabrication and Installation.
• Preparing and controlling of the piping and equipment documents with respect to contractual requirements for
easier traceability.
• Preparation of project specific Quality control plan, ITP and procedures in line with project spec & contractual
obligation.
• Preparing the clarification requests whenever deviation found between specification and contractual obligations
• Coordinating with Technical department for spooling and weld mapping related issues.
• Co-ordination with Material control department for forecasting and preparation of welding consumable delivery
schedule
• Preparing the NDE matrix according to project specification.
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
• Preparation of project documentation for the Internal, External and client audits according to specifications and
ISO requirement
• Assist to Prepare and maintain the project documentation register and controlling of proper filing with traceability
matrix
• Coordinating with Welding service unit for preparation of project specific WPS and PQR qualification.
• Planning and coordination for welder/Brazer training and qualification for the project
• Carry out Fit-up&Dimenssional Inspection, Weld Visual Inspection and Verify the Daily Welding Reports.
• Coordinating with NDT subcontractor for execution of the RT, PWHT & PMI activities at site.
• Planning and controlling of NDT backlog for project.
• Inspection of Boiler tubes such as furnace water wall tubes, economizer tubes, primary and secondary super
heater tubes.
• Maintenance of Steam generating boiler and boiler auxiliaries such as Feed water
heater,Deaerator,Airpreheater,Economizers,Superheaters,Sootblowers,BoilerDrum, Firing System, Peepholes,
Forced Draught fan, Air and Flue Gas Duct etc.
• Maintenance of Distillation plant and its parts such as Flash chambers, Water Boxes and Stage condensers,
Demisters, Distillate tray, Level gauges and sight glasses,Weirplates,Sacrificial Anodes, Brine Heater, Brine
Recirculation Pump, Heater drain Pump, Seawater Recirculation Pump, Distillate Pump,Blowdown Pump etc.
• Responsible for the arrangements of urgent inspection activities whenever requested by construction team
• Coordinating with construction team to follow preventive actions in order to avoid any non-conformity from
client
• Inspection of wrapping coating for U/G piping and Holiday Test of U/G Piping and Vessel/Tank Internals.
• Verification and inspection of paint material and abrasive.
• Visual inspection for surface preparation and profile checking with comparator.
• Daily inspection report generation and documentation for coating/painting activities.
• Involved in preparation ,Compiling and handover of Final Dossier.
Projects Handled
Organization: -M/s Eni Saipem S.p.A , Kuwait
• Build New Gas Booster station BS-171 at west Kuwait which cover a pipeline network from Gathering
center units to the booster station and an Intermediate slug catcher involves the scope of Civil,
mechanical, Electrical Instrumentation works with piping,equipments and structural steel for Saipem(S.p.A)
Italy& Kuwait Oil Company.
Client : Kuwait Oil Company
Consultant : Worley Parsons
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
Main contractor : Eni Saipem S.p.A,Italy
Position Held : QC Welding Inspection Engineer(QC Coordinator in Slug Catcher Area)
Duration : 2014 January – Till Date
Organization: -Larsen & Toubro Limited,Kuwait Construction,Kuwait
• Effluent Water Injection PH-1 and Central Seawater Injection PH-11 at north Kuwait Which involves the scope of
Civil,Mechanical,Electrical,Instrumentation works with piping,equipments and structural steel Erection for
Petrofac International Limited & Kuwait Oil Company.
Client : Kuwait Oil Company
Consultant : Worley Parsons
Main contractor : Petrofac International Ltd.
Position Held : QC Engineer (Mechanical&Welding)
Duration : 2012 Oct- 2013 Dec
Organization: -Kharafi National , Kuwait
• Build New Gas Booster station BS-171 at west Kuwait which cover a pipeline network from Gathering
center units to the booster station and an Intermediate slug catcher involves the scope of Civil,
mechanical, Electrical Instrumentation works with piping,equipments and structural steel for Saipem(S.p.A)
Italy& Kuwait Oil Company
Client : Kuwait Oil Company
Consultant : Worley Parsons
Main contractor : Eni Saipem S.p.A,Italy.
Position Held : QC Engineer (Mechanical&Welding)
Duration : 2012 January – September 2012
• Building of New Booster station BS-160 at south-east Kuwait which involves the scope of Civil, mechanical,
Electrical Instrumentation works with piping and equipments and structural steel for Saipem(S.p.A) Italy&
Kuwait Oil Company.
Client : Kuwait Oil Company
Consultant : Worley Parsons
Main contractor : Eni Saipem S.p.A,Italy.
Position Held : QC Engineer (Mechanical&Welding)
Duration : 2010 May – 2012 January
• Annual Maintenance work of Mechanical equipment at Doha East Power Station ,Which involves Annual
Maintenance work of Boiler,Intake,Distillation and Turbine Area for Ministry of Energy (Electricity & Water),
Gov.of Kuwait.
Client : Ministry of Energy (Electricity & Water), Gov.of Kuwait
Consultant : Bureau Veritas
Position Held : QC Engineer (Mechanical&Welding)
Duration : 2009 March – 2010 May
• Expansion of Poly ethylene production plant Olefins-11. Project constitutes of Civil, Mechanical, Electrical works
which involves 250000 inch dia of piping and 8800 MT of equipments, under the clients of Flour & Kuwait Olefins
Company.
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
Client : The Kuwait Olefins Company.
Consultant : Flour
Position Held : QC Engineer (Mechanical&Welding)
Duration : 2008 December – 2009 March
• Facility up gradation & relocation of underground process piping for Gathering centers & Booster stations.
Project constitutes of Civil, mechanical, Electrical Instrumentation works for all Gathering centers which involves
around 10,00,000 inch dia of piping and 3000 MT of equipments for Petrofac International Ltd & Kuwait Oil
Company.
Client : Kuwait Oil Company
Consultant : Amec
Main contractor : Petrofac International Ltd
Position Held : QC Engineer (Mechanical)
Duration : 2007 June – 2008 December
Organization: -Larsen& Toubro Limited ,Hazira works, India
• Booster Compressor Platform Project. Turnkey construction of Booster Compressor Platform which includes
Fabrication & Installation of Piping and Structural works for their new facility in Offshore for Siemens/Valdel & Oil
& Natural Gas Corporation Ltd, Offshore Div(ONGC).
Client : Oil & Natural Gas Corporation Ltd, Offshore Div (ONGC)
Consultant : Siemens/Valdel
Position Held : QC Engineer (Piping)
Duration : 2006 July – 2007 May
Organization: -M.P.Engineering Construction(I) Pvt Ltd, Mumbai, India
• Pipe Line Project for Loni R&D Terminal Mumbai. Turnkey Construction of new pipe line from Pune to
Solapur.This involved design, procurement, fabrication, installation and commissioning for Indian Oil Tanking
Limited & Hindustan Petroleum Corporation Loni, Mumbai.
Client : Hindustan Petroleum Corporation Loni, Mumbai
Consultant : EIL
Main contractor : Indian Oil tanking Ltd
Position Held : QA/QC Engineer
Duration : 2005 Dec – 2006 June
• New Pipe line works at Mormugoa port trust Goa. Which involves Fabrication and Installation of Pipeline and
Structural Works for their new facility in Goa Port for Indian Oil Corporation Goa.
Client : Indian Oil Corporation,Goa
Position Held : QA/QC Site Engineer
Duration : 2005 April – 2005 Nov
Prince Thomas
Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in
PERSONAL PROFILE
Nationality : Indian
Date of Birth : 07-05-1981
Languages Known : English, Hindi, Malayalam, Tamil.
Marital status : Married
Permanent address : Eattimoottil Puthen Veedu
Muthupezhumkal P.O
Vakayar, Pathanamthitta (Dist)
Kerala, India-689698
Personal email : prince_thomas_e@yahoo.co.in
Contact Numbers : 0096565146520,0096566609076 (KUWAIT)
: 91- 97034143480,91 468-2396299 (INDIA)
Driving License : Valid Kuwait License #281050705491 valid up to 17/9/2019
PASSPORT DETAILS
Passport No. : Z 2519451
Date of Expiry : 07.05.2023
Place of Issue : Kuwait
Declaration
I hereby declare that the information given above is true to the best of my knowledge and I assure that I shall discharge all
my duties to the entire satisfaction of my superiors.
( Prince Thomas)

Contenu connexe

Tendances

CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
AboEzz77
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
ramon carcido
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
prakash vijayan
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
Madan Kumar
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
Saravana Konar
 
Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15
Phil Hoggett
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
Michael Keeney
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
Mohsin Iqubal
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran
 

Tendances (20)

CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
Resume
ResumeResume
Resume
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
arun megarme
arun megarmearun megarme
arun megarme
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
 
Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15
 
KUMARESH.CV
KUMARESH.CVKUMARESH.CV
KUMARESH.CV
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
venkatesh QC resume.
venkatesh QC resume.venkatesh QC resume.
venkatesh QC resume.
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
C.V
C.VC.V
C.V
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIP
 

Similaire à PRINCE CV - (20)

QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Resume
ResumeResume
Resume
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
ars resume
ars resumears resume
ars resume
 

PRINCE CV -

  • 1. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in In quest of taking various responsibilities in the Department of QA/QC with leading organizations Abridgement Astute Professional with cross – cultural work experience of 10 years in QA/QC functions, currently serving for SAIPEM ENI,Kuwait – A leading contractor Company specialized in construction jobs with jobsites worldwide. To summarize my overall responsibility as ensuring that the project work meets the contractual requirements and the work is planned and executed to meet with proper quality standards and established company standards. Holds the distinction of managing QA/QC functions in projects of diversified nature across the career span. Profile • QA/QC ENGINEER (Mechanical) with 10 Years of experience in Oil, Petrochemical and Power Projects. • Comprehensive Inspection experience of Welding in Versatile Oil& Gas Environment ,Sour and Non-sour. • Experience in Inspection of Incoming Materials for Project requirement as per KOC standard and International Specifications. • Conversant with Construction codes such as ASME SEC-1,ASME SEC-V111,ASME B 31.1 ASME B31.3, ASME B 31.4, ASME B 31.8, API-650 & API-1104. • Conversant with Reference codes such as ASME SEC-11,ASME SEC-V,ASME SEC 1X & ASTM STANDARDS • Familiarize with Welding Process such as SMAW, GTAW, SAW & FCAW. • Experience with different materials such as Carbon steel(P1),Low alloy steels(P3,P4,P5), Low Temperature carbon steel (Grade-6), Stainless steels (P8), Duplex stainless steels (P10H),Inconel 625(P43) & Incoloy 825(P45). • Familiar with Quality Management System. • Implementation of Health & Safety Environment on workforce as per company HSE policy. • Excellent Communication Skills. Scholastics BACHELOR OF MECHANICAL ENGINEERING. (Affiliated to Visveswaraiah Technological University) Year of Passing: 2005, Percentage: 61% Technical Expertise Senior Welding Inspector, Passed CSWIP 3.2.2 Level 3. Cert No # 92451/2. Quality Management Systems ISO 9001:2008 Lead Auditor with IRCA Cert No# CC Q-14-032-01. Certification of ASNT Level –II in Radiographic testing. Certification of ASNT Level –II in Ultrasonic testing Certification of ASNT Level –II in Magnetic particle testing Certification of ASNT Level –II in Dye Penetrant testing
  • 2. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in Employment Scan Eni Saipem S.p.A , Kuwait QA/Qc Welding Inspection Engineer 2014 Jan –Till Date Larson & Tubro, Kuwait Quality control Engineer 2012 Oct – 2013 Dec Kharafi National, Kuwait Quality control Engineer 2007 Jun – 2012 Sept Larson & Tubro, India Quality control Engineer 2006 July – 2007 May M.P .Engineering Construction (I) Pvt Ltd, India Quality control Engineer 2005 April – 2006 Jun Functional Skill Set • Co-ordination of inspection activities such as fit-up check, dimensional check, weld visual as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control. • Monitoring the construction process from all aspects to ensure performance meets job quality and design requirements in accordance with Company procedures and international codes. • Interface and coordinate with clients for QC matters and coordinate with third party inspection agencies for all related inspection activities • Review of subcontractor’s procedure and submitting for client approval. • Incorporating and revising the project quality documents according to client comments and whenever revision required • Coordinating with pre fabrication sub-contractor for weekly progress update and for Quality related assistance. • Performs the reviews on Sub contractors submittals for WPS& PQR’s for Approval. • Inspection of all incoming materials and review of Material Test Certificates with the specification requirements. • Preparation of project welding consumable Technical delivery condition in line with the scope of work . • Review and approving the welding consumable certificates prior to shipment from manufacturer. • Experience in Witnessing of Hydro test for the Valves (Shell Test, Seat Test and Air seat Test) as per Project requirements. • Attends/Monitors Contractors Welder Qualification Testing as required. • Monitor and control of Welders performance at work and to control the Repair% within the Key Performance Indicator. • Ensuring the preparation and submission of welder register and performance evaluation records at right time. • Ensuring the NDT percentage coverage on weekly basis and coordinates with the respective inspector for necessary follow up. • Frequent orientation with welders, piping fabricators to educate about the project requirements to meet the quality and to minimize the reworks.
  • 3. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in • Interpretation of Radiography films. • To witness and reviewing of MPT,DPT,HT,PWHT,PMI and Base line thickness survey report. • Trouble shooting any problems related to welding/NDT during project execution. Provide advice to welding/QC personnel to resolve any welding/NDT related problems. • Responsible for site quality control and Inspection coordination activities. • Plan and Supervise Subcontractor inspection activities and reviews of subcontractor QC performance. • Coordination with Engineering department and supervisors to resolve any discrepancy in the drawing. • Planning of manpower requirement for project quality control activities and allocating manpower as required. • Follow up for the required corrective action for the site non conformities and the implementation of necessary preventive actions. • Frequent surveillance with site QC Inspectors for ensuring the works are being executed in line with project specific requirements • Involved in the Inspection of Corrosion coupon and Corrosion Probe Installation in Process lines. • Coordinating with technical department for piping pressure test package preparation and compiling all relevant documents. • Performing piping walk down inspection ,generate the punch list, clearance of punches and Witnessing Hydro test. • Hydro/Pneumatic Testing of Metallic/Non Metallic Piping . • Performing Pump alignment Inspection and Static equipment alignment Inspection and Involved in the Box-UP Inspection of Tanks and Vessels. • Follow up ITP of Tank fabrication and Involved in each stage of Tank Fabrication and Installation. • Preparing and controlling of the piping and equipment documents with respect to contractual requirements for easier traceability. • Preparation of project specific Quality control plan, ITP and procedures in line with project spec & contractual obligation. • Preparing the clarification requests whenever deviation found between specification and contractual obligations • Coordinating with Technical department for spooling and weld mapping related issues. • Co-ordination with Material control department for forecasting and preparation of welding consumable delivery schedule • Preparing the NDE matrix according to project specification.
  • 4. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in • Preparation of project documentation for the Internal, External and client audits according to specifications and ISO requirement • Assist to Prepare and maintain the project documentation register and controlling of proper filing with traceability matrix • Coordinating with Welding service unit for preparation of project specific WPS and PQR qualification. • Planning and coordination for welder/Brazer training and qualification for the project • Carry out Fit-up&Dimenssional Inspection, Weld Visual Inspection and Verify the Daily Welding Reports. • Coordinating with NDT subcontractor for execution of the RT, PWHT & PMI activities at site. • Planning and controlling of NDT backlog for project. • Inspection of Boiler tubes such as furnace water wall tubes, economizer tubes, primary and secondary super heater tubes. • Maintenance of Steam generating boiler and boiler auxiliaries such as Feed water heater,Deaerator,Airpreheater,Economizers,Superheaters,Sootblowers,BoilerDrum, Firing System, Peepholes, Forced Draught fan, Air and Flue Gas Duct etc. • Maintenance of Distillation plant and its parts such as Flash chambers, Water Boxes and Stage condensers, Demisters, Distillate tray, Level gauges and sight glasses,Weirplates,Sacrificial Anodes, Brine Heater, Brine Recirculation Pump, Heater drain Pump, Seawater Recirculation Pump, Distillate Pump,Blowdown Pump etc. • Responsible for the arrangements of urgent inspection activities whenever requested by construction team • Coordinating with construction team to follow preventive actions in order to avoid any non-conformity from client • Inspection of wrapping coating for U/G piping and Holiday Test of U/G Piping and Vessel/Tank Internals. • Verification and inspection of paint material and abrasive. • Visual inspection for surface preparation and profile checking with comparator. • Daily inspection report generation and documentation for coating/painting activities. • Involved in preparation ,Compiling and handover of Final Dossier. Projects Handled Organization: -M/s Eni Saipem S.p.A , Kuwait • Build New Gas Booster station BS-171 at west Kuwait which cover a pipeline network from Gathering center units to the booster station and an Intermediate slug catcher involves the scope of Civil, mechanical, Electrical Instrumentation works with piping,equipments and structural steel for Saipem(S.p.A) Italy& Kuwait Oil Company. Client : Kuwait Oil Company Consultant : Worley Parsons
  • 5. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in Main contractor : Eni Saipem S.p.A,Italy Position Held : QC Welding Inspection Engineer(QC Coordinator in Slug Catcher Area) Duration : 2014 January – Till Date Organization: -Larsen & Toubro Limited,Kuwait Construction,Kuwait • Effluent Water Injection PH-1 and Central Seawater Injection PH-11 at north Kuwait Which involves the scope of Civil,Mechanical,Electrical,Instrumentation works with piping,equipments and structural steel Erection for Petrofac International Limited & Kuwait Oil Company. Client : Kuwait Oil Company Consultant : Worley Parsons Main contractor : Petrofac International Ltd. Position Held : QC Engineer (Mechanical&Welding) Duration : 2012 Oct- 2013 Dec Organization: -Kharafi National , Kuwait • Build New Gas Booster station BS-171 at west Kuwait which cover a pipeline network from Gathering center units to the booster station and an Intermediate slug catcher involves the scope of Civil, mechanical, Electrical Instrumentation works with piping,equipments and structural steel for Saipem(S.p.A) Italy& Kuwait Oil Company Client : Kuwait Oil Company Consultant : Worley Parsons Main contractor : Eni Saipem S.p.A,Italy. Position Held : QC Engineer (Mechanical&Welding) Duration : 2012 January – September 2012 • Building of New Booster station BS-160 at south-east Kuwait which involves the scope of Civil, mechanical, Electrical Instrumentation works with piping and equipments and structural steel for Saipem(S.p.A) Italy& Kuwait Oil Company. Client : Kuwait Oil Company Consultant : Worley Parsons Main contractor : Eni Saipem S.p.A,Italy. Position Held : QC Engineer (Mechanical&Welding) Duration : 2010 May – 2012 January • Annual Maintenance work of Mechanical equipment at Doha East Power Station ,Which involves Annual Maintenance work of Boiler,Intake,Distillation and Turbine Area for Ministry of Energy (Electricity & Water), Gov.of Kuwait. Client : Ministry of Energy (Electricity & Water), Gov.of Kuwait Consultant : Bureau Veritas Position Held : QC Engineer (Mechanical&Welding) Duration : 2009 March – 2010 May • Expansion of Poly ethylene production plant Olefins-11. Project constitutes of Civil, Mechanical, Electrical works which involves 250000 inch dia of piping and 8800 MT of equipments, under the clients of Flour & Kuwait Olefins Company.
  • 6. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in Client : The Kuwait Olefins Company. Consultant : Flour Position Held : QC Engineer (Mechanical&Welding) Duration : 2008 December – 2009 March • Facility up gradation & relocation of underground process piping for Gathering centers & Booster stations. Project constitutes of Civil, mechanical, Electrical Instrumentation works for all Gathering centers which involves around 10,00,000 inch dia of piping and 3000 MT of equipments for Petrofac International Ltd & Kuwait Oil Company. Client : Kuwait Oil Company Consultant : Amec Main contractor : Petrofac International Ltd Position Held : QC Engineer (Mechanical) Duration : 2007 June – 2008 December Organization: -Larsen& Toubro Limited ,Hazira works, India • Booster Compressor Platform Project. Turnkey construction of Booster Compressor Platform which includes Fabrication & Installation of Piping and Structural works for their new facility in Offshore for Siemens/Valdel & Oil & Natural Gas Corporation Ltd, Offshore Div(ONGC). Client : Oil & Natural Gas Corporation Ltd, Offshore Div (ONGC) Consultant : Siemens/Valdel Position Held : QC Engineer (Piping) Duration : 2006 July – 2007 May Organization: -M.P.Engineering Construction(I) Pvt Ltd, Mumbai, India • Pipe Line Project for Loni R&D Terminal Mumbai. Turnkey Construction of new pipe line from Pune to Solapur.This involved design, procurement, fabrication, installation and commissioning for Indian Oil Tanking Limited & Hindustan Petroleum Corporation Loni, Mumbai. Client : Hindustan Petroleum Corporation Loni, Mumbai Consultant : EIL Main contractor : Indian Oil tanking Ltd Position Held : QA/QC Engineer Duration : 2005 Dec – 2006 June • New Pipe line works at Mormugoa port trust Goa. Which involves Fabrication and Installation of Pipeline and Structural Works for their new facility in Goa Port for Indian Oil Corporation Goa. Client : Indian Oil Corporation,Goa Position Held : QA/QC Site Engineer Duration : 2005 April – 2005 Nov
  • 7. Prince Thomas Mobile:+965-66609076 Email:prince_thomas_e@yahoo.co.in PERSONAL PROFILE Nationality : Indian Date of Birth : 07-05-1981 Languages Known : English, Hindi, Malayalam, Tamil. Marital status : Married Permanent address : Eattimoottil Puthen Veedu Muthupezhumkal P.O Vakayar, Pathanamthitta (Dist) Kerala, India-689698 Personal email : prince_thomas_e@yahoo.co.in Contact Numbers : 0096565146520,0096566609076 (KUWAIT) : 91- 97034143480,91 468-2396299 (INDIA) Driving License : Valid Kuwait License #281050705491 valid up to 17/9/2019 PASSPORT DETAILS Passport No. : Z 2519451 Date of Expiry : 07.05.2023 Place of Issue : Kuwait Declaration I hereby declare that the information given above is true to the best of my knowledge and I assure that I shall discharge all my duties to the entire satisfaction of my superiors. ( Prince Thomas)