Tremie concreting
 The most satisfactory method of placing
concret under water is by the use of tremie
pipe.
 The word tremie is derived from the French
word hopper.
Tremie method
 A tremie is a watertight pipe.
 Generally 250mm in dia.
 Funnel shaped hopper at its upper
end and a loose plug at the bottom.
 It is supported on a working
platform above water level.
Method of tremie concreting
 A tremie pipe of 200mm to 250mm diameter is used. The length of pipe
can be easily increased or deceased by using coupling. A funnel is provide
at the top end of pipe to facilitate pouring of concrete. The bottom end is
closed with a plug or thick polyethylene sheet to prevent entry of water
into the pipe.
 The pipe is lowered and made to rest at the point where the concrete is
going to be placed. The concrete having a very high slump of about 15 to
20 cm is poured into the funnel. When the whole length of pipe is filled up
with the concrete. The tremie pipe is lifted up and a slight jerk the plug is
forced out and the concrete gets discharged.
 After concreting has started the lower end of the tremie should be kept as
deeply submerged in the previously placed concrete to prevent entry of water
into the pipe from bottom end.
 The tremie should be lifted slowly to prermit the concrete to flow out, care
being taken not to loose the seal at the bottom. In this way, concrete work is
progressed without stopping till the concrete level comes above the water
level.
Precautions to be taken during
concreting by tremie method
 Cofferdams or forms should be sufficiently tight to reduce the flow of
water to less than 3m per minute through the space to be concreted.
 All the time, the lower end of the tremie pipe should be kept well
embedded in the wet concrete.
 Once concreting has started the tremie should not be moved laterally
through the deposited concrete as this will again disturb the concrete. If it
is necessary to shift the tremie. It should be lifted out and moved to the
new position.
 Pumping of water should not be allowed whilst concrete is being placed, nor
24hr thereafter. If simultaneous pumping is done it may suck the cement
particles.
 Under water concreting need not be compacted. As concrete gets
automatically compacted by the hydrostatic pressure of water.
 High water ratio is required for high consistency which reduces the strength
of concrete. But at present with the use of super plasticizers it is possible to
place a concrete with as low a water ratio as 0.3.
 When large quantities of concrete are required to be placed over an extensive
area it is advisable to use a number of tremies.
Thank you

Contenu connexe

Tendances

rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
Gautam Sharma
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
Subham Kundu
 

Tendances (20)

Excavation in hard rock
Excavation in hard rockExcavation in hard rock
Excavation in hard rock
 
Under water concreting
Under water concretingUnder water concreting
Under water concreting
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
 
PPT OF LG
PPT OF LGPPT OF LG
PPT OF LG
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Methods of concreting
Methods of concretingMethods of concreting
Methods of concreting
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concrete
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Caissons
Caissons Caissons
Caissons
 
Geogrid-As a soil reinforcement
Geogrid-As a soil reinforcementGeogrid-As a soil reinforcement
Geogrid-As a soil reinforcement
 
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh GhuraiyaPrestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Construction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roadsConstruction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roads
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkage
 
Grouting
GroutingGrouting
Grouting
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
CASSION AND COFFER DAM.pptx
CASSION AND COFFER DAM.pptxCASSION AND COFFER DAM.pptx
CASSION AND COFFER DAM.pptx
 

En vedette

Remote Sensing Lec 11
Remote Sensing Lec 11Remote Sensing Lec 11
Remote Sensing Lec 11
polylsgiedx
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
Raghavendra Raghu
 

En vedette (19)

Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
 
Basics of Remote Sensing
Basics of Remote SensingBasics of Remote Sensing
Basics of Remote Sensing
 
Image classification in remote sensing
Image classification in remote sensingImage classification in remote sensing
Image classification in remote sensing
 
Remote sensing
Remote sensingRemote sensing
Remote sensing
 
Remote Sensing Lec 11
Remote Sensing Lec 11Remote Sensing Lec 11
Remote Sensing Lec 11
 
Shotcrete
ShotcreteShotcrete
Shotcrete
 
Digital image processing and interpretation
Digital image processing and interpretationDigital image processing and interpretation
Digital image processing and interpretation
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistance
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Durability of Concrete
Durability of Concrete Durability of Concrete
Durability of Concrete
 
A Seminar on Under Water Concreting
A Seminar on Under Water ConcretingA Seminar on Under Water Concreting
A Seminar on Under Water Concreting
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTION
 
Advantages and disadvantages of Remote Sensing
Advantages and disadvantages of Remote SensingAdvantages and disadvantages of Remote Sensing
Advantages and disadvantages of Remote Sensing
 
Presentation by abhijith suresh
Presentation by abhijith sureshPresentation by abhijith suresh
Presentation by abhijith suresh
 
Basic of Remote Sensing
Basic of Remote SensingBasic of Remote Sensing
Basic of Remote Sensing
 
Remote Sensing PPT
Remote Sensing PPTRemote Sensing PPT
Remote Sensing PPT
 
Marvellous 'Baha'i Temple' or ' Lotus Temple'
Marvellous 'Baha'i Temple' or ' Lotus Temple'Marvellous 'Baha'i Temple' or ' Lotus Temple'
Marvellous 'Baha'i Temple' or ' Lotus Temple'
 
REMOTE SENSING A VERY USEFUL TECHNOLOGY TO MANKIND
REMOTE SENSING A VERY USEFUL TECHNOLOGY TO MANKINDREMOTE SENSING A VERY USEFUL TECHNOLOGY TO MANKIND
REMOTE SENSING A VERY USEFUL TECHNOLOGY TO MANKIND
 

Similaire à Tremie concreting

Similaire à Tremie concreting (20)

UNDERWATER CONCRETING TECHNIQUES
UNDERWATER CONCRETING TECHNIQUESUNDERWATER CONCRETING TECHNIQUES
UNDERWATER CONCRETING TECHNIQUES
 
Preperation of concrete
Preperation of concretePreperation of concrete
Preperation of concrete
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptx
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Concrete checking test
Concrete checking testConcrete checking test
Concrete checking test
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx
 
GUNITING
GUNITINGGUNITING
GUNITING
 
Water proofing in buildings
Water proofing in buildingsWater proofing in buildings
Water proofing in buildings
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Traps
TrapsTraps
Traps
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Waterproofing and insulaton
Waterproofing and insulatonWaterproofing and insulaton
Waterproofing and insulaton
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
 
Dmc pile
Dmc pileDmc pile
Dmc pile
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
Water proofing in islamabad
Water proofing in islamabadWater proofing in islamabad
Water proofing in islamabad
 

Dernier

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Dernier (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

Tremie concreting

  • 2.  The most satisfactory method of placing concret under water is by the use of tremie pipe.  The word tremie is derived from the French word hopper.
  • 3. Tremie method  A tremie is a watertight pipe.  Generally 250mm in dia.  Funnel shaped hopper at its upper end and a loose plug at the bottom.  It is supported on a working platform above water level.
  • 4. Method of tremie concreting  A tremie pipe of 200mm to 250mm diameter is used. The length of pipe can be easily increased or deceased by using coupling. A funnel is provide at the top end of pipe to facilitate pouring of concrete. The bottom end is closed with a plug or thick polyethylene sheet to prevent entry of water into the pipe.  The pipe is lowered and made to rest at the point where the concrete is going to be placed. The concrete having a very high slump of about 15 to 20 cm is poured into the funnel. When the whole length of pipe is filled up with the concrete. The tremie pipe is lifted up and a slight jerk the plug is forced out and the concrete gets discharged.
  • 5.  After concreting has started the lower end of the tremie should be kept as deeply submerged in the previously placed concrete to prevent entry of water into the pipe from bottom end.  The tremie should be lifted slowly to prermit the concrete to flow out, care being taken not to loose the seal at the bottom. In this way, concrete work is progressed without stopping till the concrete level comes above the water level.
  • 6.
  • 7.
  • 8. Precautions to be taken during concreting by tremie method  Cofferdams or forms should be sufficiently tight to reduce the flow of water to less than 3m per minute through the space to be concreted.  All the time, the lower end of the tremie pipe should be kept well embedded in the wet concrete.  Once concreting has started the tremie should not be moved laterally through the deposited concrete as this will again disturb the concrete. If it is necessary to shift the tremie. It should be lifted out and moved to the new position.
  • 9.  Pumping of water should not be allowed whilst concrete is being placed, nor 24hr thereafter. If simultaneous pumping is done it may suck the cement particles.  Under water concreting need not be compacted. As concrete gets automatically compacted by the hydrostatic pressure of water.  High water ratio is required for high consistency which reduces the strength of concrete. But at present with the use of super plasticizers it is possible to place a concrete with as low a water ratio as 0.3.  When large quantities of concrete are required to be placed over an extensive area it is advisable to use a number of tremies.