1. Patrick S. Muga
Cv Presentation
Palawan Offshore Facility Nov. 2010
2. Overview
Thirty three (33) years of project management which includes :
Contracting and engineering design
Construction and installation,
Pre-commissioning, commissioning
Safety management
Instrumenmtation & Electrical EPC management
28 years of which were in the oil, gas and shipping industry and EPC projects that
include the following: QHSSE management, conceptual, feasibility and risk and safety
assessment studies, FEED and detailed safety and process control design engineering,
procurement, planning, organizing, QA /QC, construction, offshore installation,
modification, upgrades, pre-commissioning, start-up and commissioning, drilling
operations coordination.
Experienced production operator and maintenance of international projects and gas plant
operations for onshore & offshore oil and gas facilities. Said facilities cover FPSO,
FLNG, gas plant, terminal, oil refinery, petrochemical and oil gathering station
operations, and offshore topsides with accommodation platforms.
3. Overview Continued
Led and organized a team of people of various nationalities, including multi-
discipline engineers (mech., piping, elec., civil, structural, instr. and process),
who worked on different projects in FEED, detailed design, contract
administration, construction and commissioning activities; assured the flow
and completion of work schedule in these projects; monitored expenditures,
organizational targets, delivery schedules; and ensured that such projects
were implemented with strict compliance for safety, quality and
environment standards.
Lecturer/ Trainer /Resource Speaker/ facilitator for international and local
events, conferences and workshops for oil and gas topics including EPCM
project management, FPSO and Floating LNG risk assessment,
HAZID/HAZOP studies, instrumentation and electrical control, I&E safety,
project controls, safety systems, leadership and QC management.
4. Position
Senior Project Engineer/ HSSE/ I&E /Commissioning
Engineer
Special Skills:
My personal attributes includes the following:
Excellent interpersonal skills, team-building and communication skills
coupled with pragmatism/ flexibility to build good relationship with clients
and people of different cultures and discipline; have a sense of urgency;
goal and task oriented; posses leadership, initiative and strong motivation;
very resourceful, high moral values and dedication to the work and to the
project in particular .. Proactive and common sense approach to decision
making and time management. Always organized, able to take the lead in
tough situations, sensitive to the needs of others, and doing the best quality
and safety to deliver multi-tasks on time within the budget.
5. Contact Information
Home Address:
14 Kalantiao St., Novaliches, Caloocan City, Philippines
Home Tel./ Fax No. +632 753 8227
CP +63 921 485 0490
E mail: psmuga@yahoo.com or rdvmuga@yahoo.com,
website: http://ph.linkedin.com/in/patrickmuga
skypeID: psmuga9
6. Projects Successfully Completed
Saudi Arabia : Maintenance, construction and commissioning in Aramco and SCECO
modification projects.
Libya; Zueitina Oil Company- Zella and Fidda facilities- Natural Gas Plant Projects.
Malaysia; PETRONAS / Conoco-Phillips-West Natuna-Duyong gas tie-in Project,
Exxon Mobil Nigeria - YOHO Topsides Project and EPMI Larut A Topsides project(800
million Dollar project), Shell SSB & SSPC Technical Integrity IR Project (350 Million
USD project)
Singapore; Shell Malampaya oil and gas production topsides Project (Upstream cost
2 billion USD)
Myanmar; Premier Oil ,Yetagun Topsides -Oil and Gas Production Platform Project.
Indonesia; Conoco- Phillips – Wellhead Platform and FPSO Belanak Project.
Vietnam; JVPC (Japan Vietnam Petroleum Corp.) Topsides Oil and gas platform
Randong I Project.
Azerbaijan; AIOC, BP (British Petroleum), Central and West Azeri Topsides and
drilling offshore platform Project.
China; Bayer Polymers Petrochemical Facilities INFRA II Project (polycarbonate &
polyurethane production).
Angola: Chevron onshore Malongo terminal facilities Kerosene Tank Project, Esso
FPSO (Kiz A and B) offshore multi-discipline brown field maintenance support
projects, Sonangol SNLPP Block 3 offshore Fire and Gas system upgrade, and PAC
F4 /F1 Infill project, Chevron Block 14 BBLT offshore flotation water treatment project,
and Sonangol Refinaria De Luanda onshore Refinery Boiler Upgrades Project.
Philippines: NIDO Petroleum Oil production facility (AQ Vantage Rig Tindalo 1
offshore facility)
7. Career summary and Capabilities:
Project and Contract Management:
Fifteen (15) years managing, facilitating, coordinating and assisting
project team and contract administration for brown field and capital
projects. Monitor and evaluate subcontract administrators on the
following :
Prepare and review technical bid specifications and proposals, CTR’s, vendor
data, resources, and liaise with clients, designers, PMT, vendors and
subcontractors.
Budget control, Close-out of Subcontractor commercial issues.
Identify back charges and ensure notification to affected parties.
Identification of insurance claims. Issue of Field or Site Instructions.
Input to management of change, schedule change, and progress evaluations.
Ensure full understanding, implementation and full compliance with prevailing
company and country pertinent rules and regulations.
Provide weekly status on contractual issues to senior management, and
recommend innovation to improve operation and minimize cost without
compromising safety, productivity and environmental standards.
8. Career summary and Capabilities continued:
Project safety, pre-commissioning and Commissioning:
Management/Supervision of up to 300 multi-discipline / multi-cultural Engineers and
Technicians with experience on construction, pre-commissioning and commissioning
of instrumentation and control systems, including supervision of engineers; safety
management, mechanical alignments, motor and transformer tests, hydro testing, leak
testing, pigging, cleaning, flushing, blowing, flooding, re-instatement, preservation,
vendor equipment, start-up and testing, etc., QA/QC, procedure development,
operations supervision, maintenance coordination, punch listing for pipe
specifications, equipment and vessel completion, drawings, operator training.
Commissioning Management experience includes the following:
Preparing monthly/weekly reports and continuous progress monitoring of projects;
Interaction and coordination amongst various stakeholders, managers, clients, contractors, third
party consultants and government agencies;
Conduct frequent site visits to monitor method of execution, safety and progress of project works
as well as decision-making and authority that includes contracting issues, safety, quality
assurance, management of change, and schedule. Familiar with ExxonMobil, PETRONAS, Total
and Shell project process roadmap for value assurance and governance.
Develop plans for safety talks, tool box talks and development of site HSE Procedure and
guideline, and Communicate HSE policies, guidelines and standards to all staff through
presentation.
Prepare and supervise pre-commissioning and commissioning procedures.
9. Career summary and Capabilities continued:
Instrumentation Design and HSE Engineering Mentor
Manage, prepare and ensure specifications and design basis for instrument
and control systems applicable codes and standards
Supervise Contractors to validate integrated control and safety system
architecture and design, ensuring that it meets legislation, codes standards
and client requirements.
Ensure instrumentation and data communications system specifications and
technical requisitions correctly define client requirements to meet project
design objectives for control performance and reliability and that test
inspection and other requirements are appropriately defined.
Complete instrument and control design work and deliverables in
accordance with schedule and budget. - Ensure design interfaces are
correctly managed with other disciplines in the Project Management Team
Supervise /coach junior engineers including development of National staff .
Participate in safety and risk studies including HAZID, and HAZOP.
Provided lecture and training pertaining to safety, risk assessment,
instrumentation, project management to local engineers and technicians for
25 years.
10. Achievements:
Received certificate of Appreciation from Top link Event organizers(JB Malaysia) for the
successful presentation of “Measuring, monitoring and improving project performance” as a guest
speaker for the Successful Project Management conference held at Corus Hotel KL Malaysia,
Sept.27,2010
Received certificate of Appreciation from Red Carpet Events Pte Ltd.(Singapore) for the
successful presentation as a guest speaker for the World round Shape FPSO Platform for
Offshore Oil and Gas Conference 2010 (22 April 2010). Topics presented was Risk Assessment
and Hazop on an FPSO, and Reducing Hazards and Operability problems.
Received commendation Petronas CARIGALI HUC, Operations and SARKU management for the
successful first gas project completion held last August 8, 2002 (West Natuna- Duyong gas Tie-
in Project) witnessed by both Indonesia and Malaysia Head of state . A fast tract project
completed on time , with simultaneous production and construction activities.
Received certificate of Appreciation from Malaysian Shipyard Engineering (MSE) and Esso
Production Malaysia Inc. (EPMI)- Larut-A CPP) Project Management, acknowledging the
contribution for the participation, dedication and tireless efforts (as Lead commissioning engineer)
in achieving high standards of quality and promoting the maintenance of safety throughout the
project execution up to the successful scheduled load-out. Completed 81% onshore pre-
commissioning and commissioning of the Topsides Platform. One of the most satisfying aspects
of the Larut development is that it was the safest project in ExxonMobil’s history in Malaysia. Over
4.6 million work hours were completed over a four year period without a single employee or
contractor Lost Time Injury.
Received commendation for preparing technical proposals which includes preparation and
implementation of Almutawa Company Policy, maintenance standard manual, safety and Loss
prevention Manual, QC manual, and securing several awarded contracts from Aramco and Sceco
for oil & gas refinery maintenance; during the three years as senior E&I, safety & contracts
engineer.
Philippine Asst. Electrical Engineering. Board exam. result released 1984 with 82.4 % board
rating.
11. Educational Attainment:
College Degree : BS Electrical Engineering. Cebu Institute of
Technology, 1979 Graduate.
: BS Electronics and Comm. Eng'g, Cebu Institute of
Technology, 1988 Graduate
: Masters in Eng’g CIT, 1983 , (undergraduate)
Professional Licensure : Registered Electrical Engineer. Philippine
Registration No. 0025580
Past Member IEEE ( Institute of Elect.& Electronic Engrs.) member no. 3963485
Professional Drivers license - Philippines, Malaysia, Indonesia and Libya
Holder of Petronas Malaysia Offshore safety passport
Member-Consultant, Society of Industry Leaders
ISNetworld ID No. 01541922
Member LinkedIn: http://ph.linkedin.com/in/patrickmuga
12. Training
Safety Instrumented Systems (SIS) Fundamentals Presentation for Management (ETC), Dec 19, 2011
SASBU Offshore Water Injection Quality and Facilities Overview. CABGOC angola Nov.4, 2011
Managing Process Safety in OE & Mgt. of Change (MOC) Training for Managers CABGOC Nov.11,2011
Chevron Project Management Dev. and Execution Process Training, CABGOC Angola, 18 Oct.2011
Environmental Management, Mod 1: General Awareness, Geology & Exploration Process Oct.28, 2011
Electrical Safe Work Practice, Chevron (SOP 43) CABGOC Cabinda Angola, August 1-3, 2011
H2S training, Business Conduct Code Ethics Code, CABGOC Cabinda Angola, 19 July 2011
Essentials for Enterprise Excellence, WFT health and safety, Weatherford Philippines, Oct, 2010
BOSIET, HUET and H2S Training, CTSI Manila Philippines, (OPITO accredited) Oct 20 to Oct.22. 2010
Successful Project Management in Energy, Power & Utilities Industry, Malaysia, Sept-30 2010
Project Management on line Training, PRW Malaysia Jan. 2010
Fire and Gas systems mapping and survey SSB,Lutong Malaysia Oct, 2009
Contracts administration and Management, Ranhill Worley, Malaysia Sept.17, 2009.
Offshore Onshore Oil and Gas HSE Training, ( HSEMS OHSAS 18001) Philippines Mar 30, 2009
Safety training : LNG safety, PTW, H2S, compliance , Risk assessment, Habitat & accident investigation
H2S Training, Boat transfer compliance, Swing rope compliance, Chevron, Angola 14 Nov.2007
HUET and sea survival training, Sonangol training center, Luanda Angola, Jan 2007.
INTOOLS Basic operations training, Bayer Integrated site, Shanghai China, Nov-27, 2005
Primavera P3 (Computer aided Construction Project management) Manila, 14 Feb,2005
Several Safety Induction Training , BOSET, HUET, Permit to work system 2003
Construction Project Management (Planning, organizing, Scheduling and control) 21 Feb.,01
Programmable Logic Controllers (PLC) Allen Bradley 5/15, Zueitina Oil Company, Libya 1996
Electrical Energy Efficiency, U.P. ( University of the Philippines) Diliman Q.C. July, 1994
Maintenance Management Course, People Management: Counseling U.P. Feb. 1989
Security Systems, SENELCO, Madrid Spain, April 1986