SlideShare une entreprise Scribd logo
1  sur  22
Clean Water Facility
Hoffman Construction
Guaranteed Maximum Price #7
Deep Concrete Work
4/5/2016
City Council Meeting
Tonight’s Topics
4/5/2016City Council Meeting 2
• Reminder of GCCM decision process
• Overview of GMP #7
• Definition of “Heavy Civil” and reasoning for self-performed work
• Third party validation process for GMP #7 cost
• Recommended action
Why GC/CM?
4/5/2016City Council Meeting 3
• Why GC/CM?
• Allows the City to identify project risks early in the project
• Added value by including contractor feedback early
• Allows the project to be constructed quicker than design-bid-build
• Selection based on fee, in addition to other factors
• Hoffman was low bid at 4.28% which includes bonds & insurance (±2%)
• Actual profit to manage project = ±2.28%
• GMP#7 includes the following
• GE/Zenon (GMP#1) contract revisions
• Sheet pile change of conditions (shattering erratic rocks)
• Allowances
• water testing
• crack repair
• mechanical detailing
• Emergency repair to RBC surge tank (not charged to project)
• Deep concrete work for MBR & aeration structures
GMP #7 Overview
4/5/2016City Council Meeting 4
Needed whether
we bid or
negotiate the
concrete work
GMP #7 Summary
4/5/2016City Council Meeting 5
Category Amount
Direct Costs $ 6,239,185
Negotiated Support Services $ 1,697,069
Risk Contingency (3.5%) per RCW 39.10 $ 277,769
Owner Contingency (2.0%) $ 158,752
Specified General Conditions $ 599,200
GCCM Fee (4.28%) $ 384,400
GMP Total (w/o sales tax) $9,355,968
Sales Tax $813,969
GMP Total (w/o sales tax) $10,169,937
Cost Item Amount
Deep Concrete Work $5,444,830
GE/Zenon Changes $42,278
Sheet Pile Change of
Conditions
$76,942
Allowances $225,000
Emergency repair $45,000
Other site work $405,135
Total Direct Costs $6,239,185
Direct Costs
4/5/2016City Council Meeting 6
Negotiated
“Heavy Civil”
Why use “Heavy Civil”?
4/5/2016City Council Meeting 7
• Greater control of the schedule
• Fewer change orders
• Reduction in management costs
• Larger number of knowns vs. unknowns in the concrete work
• Increased ability to find cost savings
• Already value engineered -$100k
• Greater savings possible if schedule and manpower can be reduced
• Ability to make changes on the fly as the plans are finished
Deep Concrete Work
4/5/2016City Council Meeting 8
• “Heavy Civil” per RCW 39.10 (Negotiated Work)
• Cost plus
• Known Elements
• Concrete cost and quantity (validated cost per yard)
• Rebar cost (bid)
• Good estimate of manpower (resource loaded schedule)
• Managed Elements
• Manpower & Schedule
Deep Concrete Work
Validation of Negotiated Work
4/5/2016City Council Meeting 9
• Cost must be independently validated per RCW 39.10.350(5)
• Cost Negotiation
• Staff
• Cost Validation
• KBA Cost Validation Letter (Attachment C)
• Reviewed by OAC
• Cost Accounting
• System in place to monitor resource loaded schedule
• Daily, weekly and monthly project tracking
Why is there a “Heavy Civil” fee?
4/5/2016City Council Meeting 10
• Hoffman is assuming greater risk
• If the concrete work were bid, the fee would be included in the bid
• If we were bidding, any efficiencies wouldn’t be transparent
• If we cut a month off the schedule, the City wouldn’t see the benefit.
Is the “Heavy Civil” fee reasonable?
4/5/2016City Council Meeting 11
• Data on other recent “Heavy Civil” Bids - Hoffman
Negotiated Work Profit
4/5/2016City Council Meeting 12
Is the “Heavy Civil” fee reasonable?
4/5/2016City Council Meeting 13
• Data on other recent “Heavy Civil” Bids - Hoffman
• What about the industry publications? – OAC
4/5/2016City Council Meeting 14
Is the “Heavy Civil” fee reasonable?
4/5/2016City Council Meeting 15
• Data on other recent “Heavy Civil” Bids - Hoffman
• What about the industry publications? – OAC
• How does WSDOT look at this type of work? - KBA
• Percentages for overhead, general company overhead, profit,
bonding, insurance, B&O tax and any other costs incurred
(WSDOT 1-09.6)
• Labor = 29%
• Materials = 21%
• Equipment = 21%
• Services = 21%
• Subcontractor markup = 7% for amounts greater than $100,000
WSDOT Force Account
4/5/2016City Council Meeting 16
Is the “Heavy Civil” fee reasonable?
4/5/2016City Council Meeting 17
• Data on other recent “Heavy Civil” Bids - Hoffman
• What about the industry publications? – OAC
• How does WSDOT look at this type of work? – KBA
• How do “Heavy Civil” and Bid work compare? - Staff
“Heavy Civil” vs. Bid
“Heavy Civil”
Direct Cost $ 4,427,156
GC's $ 614,354
Insurance and bonds 0% $ -
Profit 8% $ 403,321
Subtotal $ 5,444,830
GC/CM Fee 4.28% $ 233,039
Total $ 5,677,869
Bid (5% profit)
4/5/2016City Council Meeting 18
Direct Cost $ 4,341,510
GC's $ 700,000
Insurance and bonds 2% $ 100,830
Profit 5% $ 252,075
Subtotal $ 5,394,415
GC/CM Fee 4.28% $ 230,881
Total $ 5,625,296
“Heavy Civil” vs. Bid
“Heavy Civil”
Direct Cost $ 4,427,156
GC's $ 614,354
Insurance and bonds 0% $ -
Profit 8% $ 403,321
Subtotal $ 5,444,830
GC/CM Fee 4.28% $ 233,039
Total $ 5,677,869
Bid (10% profit)
4/5/2016City Council Meeting 19
Direct Cost $ 4,341,510
GC's $ 700,000
Insurance and bonds 2% $ 100,830
Profit 10% $ 504,151
Subtotal $ 5,646,491
GC/CM Fee 4.28% $ 241,670
Total $ 5,888,161
Hoffman Contract Summary
4/5/2016City Council Meeting 20
Service
Contract Amount
w/o Sales Tax
Preconstruction $ 790,050
GMP#1 - MBR/UV $ 2,553,317
GMP#2 - Outfall $ 1,991,249
GMP#3 - Site Prep A $ 836,130
GMP#4 - Site Prep B $ 5,109,549
GMP#5 - Solids Dryer $ 2,028,222
GMP#7 - Site Prep C $ 3,966,503
GMP#7 – Deep Concrete $ 9,355,968
Total $ 26,630,988
• Authorize the Mayor to sign AIA Document A133 – 2009 Exhibit A
(GMP #7) in the amount of $9,355,968 plus Sales Tax ($813,969)
with Hoffman Construction for Deep Concrete Work at Area 30 &
Misc. Changes.
Recommended Action
4/5/2016City Council Meeting 21
4/5/2016City Council Meeting 22

Contenu connexe

Tendances

Tendances (20)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation
 
Community Development Budget & Action Plan
Community Development Budget & Action PlanCommunity Development Budget & Action Plan
Community Development Budget & Action Plan
 
Oak Harbor Design Open House
Oak Harbor Design Open HouseOak Harbor Design Open House
Oak Harbor Design Open House
 
CIL implementation
CIL implementationCIL implementation
CIL implementation
 
CIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notesCIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notes
 
PAS S106 Intro and Context
PAS S106 Intro and ContextPAS S106 Intro and Context
PAS S106 Intro and Context
 
Jim Cliffe - Viability - A local authority perspective
Jim Cliffe - Viability - A local authority perspectiveJim Cliffe - Viability - A local authority perspective
Jim Cliffe - Viability - A local authority perspective
 
Project management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plantProject management strategy – HTDS treatment plant
Project management strategy – HTDS treatment plant
 
FY18 Proposed Budget Overview
FY18 Proposed Budget OverviewFY18 Proposed Budget Overview
FY18 Proposed Budget Overview
 
Surrey CC: County Council CIL Seminar
Surrey CC: County Council CIL SeminarSurrey CC: County Council CIL Seminar
Surrey CC: County Council CIL Seminar
 
CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: Evidence
 
Andrew Parkinson - S106 case law update
Andrew Parkinson - S106 case law update Andrew Parkinson - S106 case law update
Andrew Parkinson - S106 case law update
 
Preston Implementing CIL Jan 2016 – Mike M
Preston Implementing CIL Jan 2016 – Mike MPreston Implementing CIL Jan 2016 – Mike M
Preston Implementing CIL Jan 2016 – Mike M
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
 
PViability slides april 2015 session 5
PViability slides april 2015 session 5PViability slides april 2015 session 5
PViability slides april 2015 session 5
 
Darren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we areDarren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we are
 
S106 case law update
S106 case law updateS106 case law update
S106 case law update
 
Viability Session 4: You have viability evidence – so what?
Viability Session 4: You have viability evidence – so what?Viability Session 4: You have viability evidence – so what?
Viability Session 4: You have viability evidence – so what?
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 

En vedette

C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_final
publicinvolvement
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
publicinvolvement
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
publicinvolvement
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshop
publicinvolvement
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
publicinvolvement
 
C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1
publicinvolvement
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
publicinvolvement
 

En vedette (20)

Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Council
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Update
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_final
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
December 6 Public Forum
December 6 Public ForumDecember 6 Public Forum
December 6 Public Forum
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
T5 further refine alts min
T5 further refine alts minT5 further refine alts min
T5 further refine alts min
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshop
 
2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm
 
C7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_finalC7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_final
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
 
C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
 
Oh workshop02 full_final
Oh workshop02 full_finalOh workshop02 full_final
Oh workshop02 full_final
 

Similaire à Oak Harbor Clean Water Facility GMP #7

Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal
Sandy Gutner
 
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 New Trump Administration Updates: Federal, State and Local Energy & Specialt... New Trump Administration Updates: Federal, State and Local Energy & Specialt...
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
Ryan Slack
 

Similaire à Oak Harbor Clean Water Facility GMP #7 (20)

Enbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial ResultsEnbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial Results
 
Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal
 
beach corridor pec presentation
beach corridor pec presentationbeach corridor pec presentation
beach corridor pec presentation
 
Miramar commission mtg 3 20-12 solid waste disposal rfp
Miramar commission mtg 3 20-12 solid waste disposal rfp Miramar commission mtg 3 20-12 solid waste disposal rfp
Miramar commission mtg 3 20-12 solid waste disposal rfp
 
PPM presentation
PPM presentation PPM presentation
PPM presentation
 
SBC 2020-Left Brain Professionals: Developing Your First Cost & Price Proposal
SBC 2020-Left Brain Professionals: Developing Your First Cost & Price Proposal SBC 2020-Left Brain Professionals: Developing Your First Cost & Price Proposal
SBC 2020-Left Brain Professionals: Developing Your First Cost & Price Proposal
 
Tollgate Presentation
Tollgate PresentationTollgate Presentation
Tollgate Presentation
 
Earn More with Carbon Offsets for Charging
Earn More with Carbon Offsets for ChargingEarn More with Carbon Offsets for Charging
Earn More with Carbon Offsets for Charging
 
TDS - USC Q4 2016 operating results final
TDS - USC Q4 2016 operating results finalTDS - USC Q4 2016 operating results final
TDS - USC Q4 2016 operating results final
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysis77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysis
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 
Real Estate Development Case Presentation
Real Estate Development Case PresentationReal Estate Development Case Presentation
Real Estate Development Case Presentation
 
AVEVA World Conference NA - Justin Weaver, Southern Company
AVEVA World Conference NA - Justin Weaver, Southern CompanyAVEVA World Conference NA - Justin Weaver, Southern Company
AVEVA World Conference NA - Justin Weaver, Southern Company
 
Mayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost ReviewMayor's City Hall Complex Cost Review
Mayor's City Hall Complex Cost Review
 
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 New Trump Administration Updates: Federal, State and Local Energy & Specialt... New Trump Administration Updates: Federal, State and Local Energy & Specialt...
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 
Cost effective construction and green building
Cost effective construction and green buildingCost effective construction and green building
Cost effective construction and green building
 
Natural Gas Roundtable - GTI Presentation
Natural Gas Roundtable - GTI PresentationNatural Gas Roundtable - GTI Presentation
Natural Gas Roundtable - GTI Presentation
 

Plus de publicinvolvement

130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
publicinvolvement
 

Plus de publicinvolvement (10)

Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Council
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1
 
Oak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor PlanOak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor Plan
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
 
Volume i executive summary
Volume i executive summaryVolume i executive summary
Volume i executive summary
 

Dernier

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 

Oak Harbor Clean Water Facility GMP #7

  • 1. Clean Water Facility Hoffman Construction Guaranteed Maximum Price #7 Deep Concrete Work 4/5/2016 City Council Meeting
  • 2. Tonight’s Topics 4/5/2016City Council Meeting 2 • Reminder of GCCM decision process • Overview of GMP #7 • Definition of “Heavy Civil” and reasoning for self-performed work • Third party validation process for GMP #7 cost • Recommended action
  • 3. Why GC/CM? 4/5/2016City Council Meeting 3 • Why GC/CM? • Allows the City to identify project risks early in the project • Added value by including contractor feedback early • Allows the project to be constructed quicker than design-bid-build • Selection based on fee, in addition to other factors • Hoffman was low bid at 4.28% which includes bonds & insurance (±2%) • Actual profit to manage project = ±2.28%
  • 4. • GMP#7 includes the following • GE/Zenon (GMP#1) contract revisions • Sheet pile change of conditions (shattering erratic rocks) • Allowances • water testing • crack repair • mechanical detailing • Emergency repair to RBC surge tank (not charged to project) • Deep concrete work for MBR & aeration structures GMP #7 Overview 4/5/2016City Council Meeting 4 Needed whether we bid or negotiate the concrete work
  • 5. GMP #7 Summary 4/5/2016City Council Meeting 5 Category Amount Direct Costs $ 6,239,185 Negotiated Support Services $ 1,697,069 Risk Contingency (3.5%) per RCW 39.10 $ 277,769 Owner Contingency (2.0%) $ 158,752 Specified General Conditions $ 599,200 GCCM Fee (4.28%) $ 384,400 GMP Total (w/o sales tax) $9,355,968 Sales Tax $813,969 GMP Total (w/o sales tax) $10,169,937
  • 6. Cost Item Amount Deep Concrete Work $5,444,830 GE/Zenon Changes $42,278 Sheet Pile Change of Conditions $76,942 Allowances $225,000 Emergency repair $45,000 Other site work $405,135 Total Direct Costs $6,239,185 Direct Costs 4/5/2016City Council Meeting 6 Negotiated “Heavy Civil”
  • 7. Why use “Heavy Civil”? 4/5/2016City Council Meeting 7 • Greater control of the schedule • Fewer change orders • Reduction in management costs • Larger number of knowns vs. unknowns in the concrete work • Increased ability to find cost savings • Already value engineered -$100k • Greater savings possible if schedule and manpower can be reduced • Ability to make changes on the fly as the plans are finished
  • 8. Deep Concrete Work 4/5/2016City Council Meeting 8 • “Heavy Civil” per RCW 39.10 (Negotiated Work) • Cost plus • Known Elements • Concrete cost and quantity (validated cost per yard) • Rebar cost (bid) • Good estimate of manpower (resource loaded schedule) • Managed Elements • Manpower & Schedule
  • 9. Deep Concrete Work Validation of Negotiated Work 4/5/2016City Council Meeting 9 • Cost must be independently validated per RCW 39.10.350(5) • Cost Negotiation • Staff • Cost Validation • KBA Cost Validation Letter (Attachment C) • Reviewed by OAC • Cost Accounting • System in place to monitor resource loaded schedule • Daily, weekly and monthly project tracking
  • 10. Why is there a “Heavy Civil” fee? 4/5/2016City Council Meeting 10 • Hoffman is assuming greater risk • If the concrete work were bid, the fee would be included in the bid • If we were bidding, any efficiencies wouldn’t be transparent • If we cut a month off the schedule, the City wouldn’t see the benefit.
  • 11. Is the “Heavy Civil” fee reasonable? 4/5/2016City Council Meeting 11 • Data on other recent “Heavy Civil” Bids - Hoffman
  • 13. Is the “Heavy Civil” fee reasonable? 4/5/2016City Council Meeting 13 • Data on other recent “Heavy Civil” Bids - Hoffman • What about the industry publications? – OAC
  • 15. Is the “Heavy Civil” fee reasonable? 4/5/2016City Council Meeting 15 • Data on other recent “Heavy Civil” Bids - Hoffman • What about the industry publications? – OAC • How does WSDOT look at this type of work? - KBA
  • 16. • Percentages for overhead, general company overhead, profit, bonding, insurance, B&O tax and any other costs incurred (WSDOT 1-09.6) • Labor = 29% • Materials = 21% • Equipment = 21% • Services = 21% • Subcontractor markup = 7% for amounts greater than $100,000 WSDOT Force Account 4/5/2016City Council Meeting 16
  • 17. Is the “Heavy Civil” fee reasonable? 4/5/2016City Council Meeting 17 • Data on other recent “Heavy Civil” Bids - Hoffman • What about the industry publications? – OAC • How does WSDOT look at this type of work? – KBA • How do “Heavy Civil” and Bid work compare? - Staff
  • 18. “Heavy Civil” vs. Bid “Heavy Civil” Direct Cost $ 4,427,156 GC's $ 614,354 Insurance and bonds 0% $ - Profit 8% $ 403,321 Subtotal $ 5,444,830 GC/CM Fee 4.28% $ 233,039 Total $ 5,677,869 Bid (5% profit) 4/5/2016City Council Meeting 18 Direct Cost $ 4,341,510 GC's $ 700,000 Insurance and bonds 2% $ 100,830 Profit 5% $ 252,075 Subtotal $ 5,394,415 GC/CM Fee 4.28% $ 230,881 Total $ 5,625,296
  • 19. “Heavy Civil” vs. Bid “Heavy Civil” Direct Cost $ 4,427,156 GC's $ 614,354 Insurance and bonds 0% $ - Profit 8% $ 403,321 Subtotal $ 5,444,830 GC/CM Fee 4.28% $ 233,039 Total $ 5,677,869 Bid (10% profit) 4/5/2016City Council Meeting 19 Direct Cost $ 4,341,510 GC's $ 700,000 Insurance and bonds 2% $ 100,830 Profit 10% $ 504,151 Subtotal $ 5,646,491 GC/CM Fee 4.28% $ 241,670 Total $ 5,888,161
  • 20. Hoffman Contract Summary 4/5/2016City Council Meeting 20 Service Contract Amount w/o Sales Tax Preconstruction $ 790,050 GMP#1 - MBR/UV $ 2,553,317 GMP#2 - Outfall $ 1,991,249 GMP#3 - Site Prep A $ 836,130 GMP#4 - Site Prep B $ 5,109,549 GMP#5 - Solids Dryer $ 2,028,222 GMP#7 - Site Prep C $ 3,966,503 GMP#7 – Deep Concrete $ 9,355,968 Total $ 26,630,988
  • 21. • Authorize the Mayor to sign AIA Document A133 – 2009 Exhibit A (GMP #7) in the amount of $9,355,968 plus Sales Tax ($813,969) with Hoffman Construction for Deep Concrete Work at Area 30 & Misc. Changes. Recommended Action 4/5/2016City Council Meeting 21