Keywords - Model Progression Specification, BIM, IPD, LOD, BIM Practice, 3D Geometry

Model Progression Specification (MPS) can enhance the Building
Information Modeling process

The MPS is a language suitable for owners, designers, and builders for identifying every
component and task in the building construction procedure. The MPS makes the communication
between the architect, design team, estimators and schedulers and steers the procedure of
design progression. It brings all the information about the building - what components should be
modeled, and to what level of detail the components are being modeled, estimated, and
scheduled. It presents the efficient outline for the project stakeholders. It can be termed as written
checklist that grown-up from a very representation level of detail to a high level of detail on the
basis of 3D geometry, cost, and time. The predictable cost and schedule becomes more and
more precise as the level of detail enhances all through the design procedure.

It arises from the need to define the representations of building elements in a BIM (it is possible to
use a BIM for many purposes - costing, scheduling, performance simulation, code checking, and
visualization etc.) and a framework for BIM’s precision and suitability for specific uses. MPS
methodically categorize project data for every single checkpoint in the BIM practice.

Webcor Builders tied up with Vico build up the concept and submit it to the technology
subcommittee of the AIA California Council’s Integrated Project Delivery (IPD) Task Force. In
order to expand the usefulness of the MPS all the opinions of architects, contractors, engineers,
subcontractors, owners, and software developers were taken into consideration. The AIA National
Documents Committee has approved the approach, provided further development, and included it
into the new E202, an exhibit, in the fall of 2008.

Besides its 3-dimentional demonstration, a great deal of information can be associated with an
element in a BIM. The information can be achieved from a variety of people. As for instance,
while a 3-dimentional illustration of a wall is generated by the architect, the GC may offer a cost,
the HVAC engineer a U-value and thermal mass, an acoustical consultant an STC rating, etc. To
deal with this variety of input, the AIA Documents Committee came up with the concept of “Model
Component Author” (MCA), liable for formation of the 3-dimensional representation of the
component.

Level of Detail (LOD).
In the centre part of MPS there exist the LOD definitions. It is depictions of the steps, in the
course of which a BIM element can rationally progress from the lowest level of conceptual
estimate to the highest level of representational precision. Five levels were sufficient to define the
progression from conceptual through as-built. However, to allocate for future intermediate levels
the levels are termed as 100 through 500. In real meaning, the levels are as follows:
1100. Conceptual
        200. Approximate geometry
        300. Precise geometry
        400. Fabrication
        500. As-built

At LOD 100 the cost of a groundwork structure is an standard of 30 dollars per square foot and
that the building requires a foundation structure. Neither dimensions nor production processes
are recognized at this level of detail. At LOD 200 the rough location and indicative dimensions of
the foundation elements. At LOD 300, the structural analysis results are acknowledged indicating
that the real dimensions of the foundation elements are verified and that a decision concerning
the production system to be utilized (cast in place or prefab?) is prepared.
As the design extends, various elements of the model will step forward from one LOD to the next
at different rates. For instance, in the conventional phases, most elements must be at LOD 300
at the conclusion of the CD phase, and many will be moved to LOD 400 in the shop drawing
procedure throughout the construction phase. Some elements like paint will never be in use
beyond LOD 100, i.e., the layer of paint is not modeled in reality, but its cost and other properties
are connected to the suitable wall assembly.

With MPS moving from one project stage to the next is transformed escalating the level of detail
in one or more sections of your model specification. The ‘Owner’ concept permits for successful
management of work needed for completion of the required work. Identical and repeatable, the
MPS is redeployed on several projects (since each component is matchless, the progression on
specificity stays by and large the same).




Functionality of MPS in brief :-
  • Define a "purpose-based model" so that you include elements for estimating and
      scheduling
  • Create Resource-loaded schedule by location that contains all the Methods and
      Resources
  • Devise a model-based flow-line schedule with the estimating data extracted from the
      model
  • With the cost-loaded schedule you can create cash-flow diagrams for the Owner
  • With the location-based schedule and control chart connect to cost data, checking the
      schedule status becomes an easy task
  • Plot planned versus actual progress on EVA curve, highlighting schedule performance
      indicators

With the application of BIM MPS is exceptionally helpful for any project, the profundity of
collaboration in IPD creates some sort of organized approach like this essential. Keeping this in
mind, the MPS is developed to deal with two principles of IPD:

    1. The requirement “that phase outcomes – milestones and deliverables – be defined
       succinctly” in order that team members “identify with the level of detail upon which they
       should be functioning, and what decisions have (and have not) been finalized”.
2. The idea of assigning tasks “on a best person basis, even when that differs from
       traditional role allocations”

In an IPD project, with tasks assigned “on a best person basis,” it is likely that handoffs will occur
at various points in the design process. For example, the mechanical subcontractor may take
over as MCA for ductwork during the Detailed Design phase.

References:
http://www.aecbytes.com/feature/2008/MPSforBIM.html
http://www.vicosoftware.com/community/conceptual-estimate-and-the-
mps/tabid/87169/Default.aspx

Description:
This publication provides information on “How Model Progression Specification (MPS)
can simplifies Building Information Modeling process for owners, designers, and
builders”

Useful Links:
http://www.pinnaclecad.com/bimServices.html
http://www.pinnaclecad.com/index.html

Company Information:
Pinnacle Infotech Solutions is the market leader in the Building Information Modeling
industry. The company's core competency lies in solving complex problems in the AEC
domain. Pinnacle has been thrice selected among the top 50 IT innovators by Nasscom,
the premier trade body and the chamber of commerce of the IT-BPO industries in India.

Company Address:
Pinnacle Infotech.,
9950,Westpark Dr., Suite 205,
Houston, TX 77063
Website: http://www.pinnaclecad.com/
E-mail: pr@pinnaclecad.com
Contact Number:
Toll Free : 888 876 8783
Cell : 832 283 6628
Phone : 713 780 2135
Fax : 713 780 8784

Contenu connexe

En vedette (12)

My_CV (1)
My_CV (1)My_CV (1)
My_CV (1)
 
M. Hall Resume 2015
M. Hall Resume 2015M. Hall Resume 2015
M. Hall Resume 2015
 
Borges, jorge luis livro dos sonhos
Borges, jorge luis   livro dos sonhosBorges, jorge luis   livro dos sonhos
Borges, jorge luis livro dos sonhos
 
Senior Year SoC Job Search Timeline Fall V4
Senior Year SoC Job Search Timeline Fall V4Senior Year SoC Job Search Timeline Fall V4
Senior Year SoC Job Search Timeline Fall V4
 
Sistema seguridad
Sistema seguridadSistema seguridad
Sistema seguridad
 
Black
BlackBlack
Black
 
MEMORIAS INSTITUCIONALES FECOER AÑO 2013
MEMORIAS INSTITUCIONALES FECOER AÑO 2013MEMORIAS INSTITUCIONALES FECOER AÑO 2013
MEMORIAS INSTITUCIONALES FECOER AÑO 2013
 
Word grafics
Word graficsWord grafics
Word grafics
 
Structure of human heart
Structure of human heartStructure of human heart
Structure of human heart
 
DIA MUNDIAL DE ENFERMEDADES RARAS 2015 FECOER
DIA MUNDIAL DE ENFERMEDADES RARAS 2015 FECOER DIA MUNDIAL DE ENFERMEDADES RARAS 2015 FECOER
DIA MUNDIAL DE ENFERMEDADES RARAS 2015 FECOER
 
DIA MUNDIAL DE ENFERMEDADES RARAS 2013 COLOMBIA
DIA MUNDIAL DE ENFERMEDADES RARAS 2013 COLOMBIADIA MUNDIAL DE ENFERMEDADES RARAS 2013 COLOMBIA
DIA MUNDIAL DE ENFERMEDADES RARAS 2013 COLOMBIA
 
Strath Parenteral 2009 Annotated
Strath Parenteral 2009 AnnotatedStrath Parenteral 2009 Annotated
Strath Parenteral 2009 Annotated
 

Dernier

一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
balqisyamutia
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
210303105569
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
mark11275
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
RawalRafiqLeghari
 

Dernier (20)

一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Abu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
Abu Dhabi Call girls Service0556255850 Call girls in Abu DhabiAbu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
Abu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
 
Hackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdfHackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdf
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
 

Model Progression Specification (Mps) Can Enhance The Building Information Modeling Process

  • 1. Keywords - Model Progression Specification, BIM, IPD, LOD, BIM Practice, 3D Geometry Model Progression Specification (MPS) can enhance the Building Information Modeling process The MPS is a language suitable for owners, designers, and builders for identifying every component and task in the building construction procedure. The MPS makes the communication between the architect, design team, estimators and schedulers and steers the procedure of design progression. It brings all the information about the building - what components should be modeled, and to what level of detail the components are being modeled, estimated, and scheduled. It presents the efficient outline for the project stakeholders. It can be termed as written checklist that grown-up from a very representation level of detail to a high level of detail on the basis of 3D geometry, cost, and time. The predictable cost and schedule becomes more and more precise as the level of detail enhances all through the design procedure. It arises from the need to define the representations of building elements in a BIM (it is possible to use a BIM for many purposes - costing, scheduling, performance simulation, code checking, and visualization etc.) and a framework for BIM’s precision and suitability for specific uses. MPS methodically categorize project data for every single checkpoint in the BIM practice. Webcor Builders tied up with Vico build up the concept and submit it to the technology subcommittee of the AIA California Council’s Integrated Project Delivery (IPD) Task Force. In order to expand the usefulness of the MPS all the opinions of architects, contractors, engineers, subcontractors, owners, and software developers were taken into consideration. The AIA National Documents Committee has approved the approach, provided further development, and included it into the new E202, an exhibit, in the fall of 2008. Besides its 3-dimentional demonstration, a great deal of information can be associated with an element in a BIM. The information can be achieved from a variety of people. As for instance, while a 3-dimentional illustration of a wall is generated by the architect, the GC may offer a cost, the HVAC engineer a U-value and thermal mass, an acoustical consultant an STC rating, etc. To deal with this variety of input, the AIA Documents Committee came up with the concept of “Model Component Author” (MCA), liable for formation of the 3-dimensional representation of the component. Level of Detail (LOD). In the centre part of MPS there exist the LOD definitions. It is depictions of the steps, in the course of which a BIM element can rationally progress from the lowest level of conceptual estimate to the highest level of representational precision. Five levels were sufficient to define the progression from conceptual through as-built. However, to allocate for future intermediate levels the levels are termed as 100 through 500. In real meaning, the levels are as follows: 1100. Conceptual 200. Approximate geometry 300. Precise geometry 400. Fabrication 500. As-built At LOD 100 the cost of a groundwork structure is an standard of 30 dollars per square foot and that the building requires a foundation structure. Neither dimensions nor production processes are recognized at this level of detail. At LOD 200 the rough location and indicative dimensions of the foundation elements. At LOD 300, the structural analysis results are acknowledged indicating that the real dimensions of the foundation elements are verified and that a decision concerning the production system to be utilized (cast in place or prefab?) is prepared.
  • 2. As the design extends, various elements of the model will step forward from one LOD to the next at different rates. For instance, in the conventional phases, most elements must be at LOD 300 at the conclusion of the CD phase, and many will be moved to LOD 400 in the shop drawing procedure throughout the construction phase. Some elements like paint will never be in use beyond LOD 100, i.e., the layer of paint is not modeled in reality, but its cost and other properties are connected to the suitable wall assembly. With MPS moving from one project stage to the next is transformed escalating the level of detail in one or more sections of your model specification. The ‘Owner’ concept permits for successful management of work needed for completion of the required work. Identical and repeatable, the MPS is redeployed on several projects (since each component is matchless, the progression on specificity stays by and large the same). Functionality of MPS in brief :- • Define a "purpose-based model" so that you include elements for estimating and scheduling • Create Resource-loaded schedule by location that contains all the Methods and Resources • Devise a model-based flow-line schedule with the estimating data extracted from the model • With the cost-loaded schedule you can create cash-flow diagrams for the Owner • With the location-based schedule and control chart connect to cost data, checking the schedule status becomes an easy task • Plot planned versus actual progress on EVA curve, highlighting schedule performance indicators With the application of BIM MPS is exceptionally helpful for any project, the profundity of collaboration in IPD creates some sort of organized approach like this essential. Keeping this in mind, the MPS is developed to deal with two principles of IPD: 1. The requirement “that phase outcomes – milestones and deliverables – be defined succinctly” in order that team members “identify with the level of detail upon which they should be functioning, and what decisions have (and have not) been finalized”.
  • 3. 2. The idea of assigning tasks “on a best person basis, even when that differs from traditional role allocations” In an IPD project, with tasks assigned “on a best person basis,” it is likely that handoffs will occur at various points in the design process. For example, the mechanical subcontractor may take over as MCA for ductwork during the Detailed Design phase. References: http://www.aecbytes.com/feature/2008/MPSforBIM.html http://www.vicosoftware.com/community/conceptual-estimate-and-the- mps/tabid/87169/Default.aspx Description: This publication provides information on “How Model Progression Specification (MPS) can simplifies Building Information Modeling process for owners, designers, and builders” Useful Links: http://www.pinnaclecad.com/bimServices.html http://www.pinnaclecad.com/index.html Company Information: Pinnacle Infotech Solutions is the market leader in the Building Information Modeling industry. The company's core competency lies in solving complex problems in the AEC domain. Pinnacle has been thrice selected among the top 50 IT innovators by Nasscom, the premier trade body and the chamber of commerce of the IT-BPO industries in India. Company Address: Pinnacle Infotech., 9950,Westpark Dr., Suite 205, Houston, TX 77063 Website: http://www.pinnaclecad.com/ E-mail: pr@pinnaclecad.com Contact Number: Toll Free : 888 876 8783 Cell : 832 283 6628 Phone : 713 780 2135 Fax : 713 780 8784