Camp Rota KiwanCamp Rota Kiwan
Master Site Plan UpdateMaster Site Plan Update
Significant Historical Events for Rota Kiwan
•1921 Initial 10-acre site on Bass Lake founded
•1926 Fruitbelt Area Council formed
•1935 First eight cabins erected
•1938/1940 “Hill” and “Dickerson Woods” parcels were added
•1944 Camp roads added by County
•1952 Jackson and Littler parcels were added
•1953 Gildea Farm was acquired
•1961 Loving and Hammond parcels were acquired
•1968 Fath parcel was obtained
•1973 Three area Councils merged into Southwest Michigan Council
•1979 Fath and Hammon parcels were sold
•1984 Property exchange with Todd bringing the camp to its current size
of 197 acres
•1987 Started construction of the new Cub camp
•2005 RK Strategic Plan was published
RK Master Site Planning Overview
•New camp master site planning initiative called for in the new
RK Strategic Plan
•Three day-long site planning meetings were held this past
November and December at camp
•Professional leadership of the planning process was provided by
OCBA, Bosch Architectural, Prein and Newhof, Lamar
Construction and Midwest Realty Group
•Approximately 20 individuals joined us for these planning
meetings for input – participants ranged from existing scouts, to
adult leaders, to program instructors, Board members, donors,
and others
•Our goal is to provide a physical site concept of camp for the
next 50+ years, developed from a programming perspective,
while considerate of our existing infrastructure, ideally serving
up to 450 participants per summer camp session
•The final plan will be published for our general memberships’
review and comment for completing
Initial Planning
Discussions
•Divided Cub and Boy
Scout camps vs. single-
purpose camp concept.
•Internal traffic
routing and related
issues.
•Primary camp access.
•Primary area uses.
•Existing
infrastructure.
•Contiguous land uses &
possibility to expand.
•Security issues.
Secondary
Camp Layout
Considering the
possibility for limited
common elements like a
shared dining hall and
welcome center, but
keeping the existing
Boy and Cub Scout
camps separate.
Short discussion on use
of 8th
Street property
for the relocation of
the Scout Service
Center.
Camp Programming
Discussion
Based upon the perceived
merits of a single-purpose
camp concept, the following
conceptual programming map
was completed.
•Shared improvements like
main dining hall, new welcome
center, shared waterfronts,
new sports fields, improved
gun and archery range, etc.
•New entry feature with
proposed land acquisition.
•New “staff village” housing
concept.
•Demolition of several older
cabins, with some being
replaced.
Our Final Vision . . .
The RK Master Site Plan
Designed for single-use
operation with all program
areas and lodging updated or
replaced and the acquisition
or perpetual easement of an
additional 150+/- acres east
of camp.
This design will accommodate
450 campers weekly through
each summer camp session.
Total project cost including
connection to municipal water
and sewer is currently
estimated at $12,000,000
before any donations of time
or materials or the cost of a
new on-site Scout Office.
7 – New chapel at former Cedars site.
8 – Former dining hall renovated as program
center.
9 – Former admin bldg renovated for T-1
program.
11 – Replacement of Oaks cabin.
13 – Addition of new “all sports fields”.
14 – New seating added to fire bowl.
15 – Waterfront renovated as new boat livery.
16 – Eagle pavilion renovated.
17 – New main dining hall structure.
18 – New staff village cabins.
19 – New “Welcome Center”.
20 – New shared entry, signage and paved
roadway.
21 – Reconfigured home site with new garage.
22 – New parking for 150 vehicles.
23 – New “Adirondack” shelters for
programming.
24 – Replacement of Spruce cabin.
25 – Expansion of former cub waterfront as
new swimming and training area.
Exploded View
Bird’s-Eye Perspective
Conceptual of new dining hall right center, with the new staff village just
left center and the new “Welcome Center” left front. Note the new
sports fields in the immediate foreground.
New Camp
Entry Concept
•New shared entry
access with Al Sabo
Trailhead.
•Improved road and
entry signage,
landscaping and paved
and lighted entry and
parking.
•New ‘Welcome Center’
at entry for improved
property management
and internal security.
•Improved parking,
vehicle staging and
landscaping. Statue
moved to front turn
about.
New “Welcome
Center” Concept
This new facility would
include business offices,
a health center,
conference room and
“Campmaster” quarters.
Dining Hall Concept
Initial dining hall concept to seat 300 inside and another 150
under roof outside. Full commercial kitchen, scoutmaster
lounge, health area, trading post, and full walk-out basement.
Post and beam construction with open ceiling and large walk-in
fireplace. Ample skylights and outdoor BBQ.
New “Dining Hall”
Interior Concept
Adirondack Shelter Concept
Initial concept of the program shelters to be built into the
upper south ridge overlooking Baas Lake. These may also be
used for off-season troop camping.
New Cabin Proto-Type
To be used to replace Oaks, Tamaracks and Spruce cabins,
as well as for developing the new “Staff Village” cabins.
Interior Plan 
Common Building Materials & Colors
(to be used throughout camp for all new construction and renovation work)
•Stone or rock base wall with cap.
•Log veneer exterior or similar design material.
•Standing-seam steel roofing on 10’x12’ pitch.
•Additional skylight and roof overhangs where possible.
•Natural stain, brown paint, green anodized metal roofing
and brown anodized metal window and door trim.
Additional Areas Being
Developed . . .
•Redevelopment and expansion of the former gun
range with black powder, shot gun, expanded .22
cal rifle range and buckskin sports
•Renovation of former Dining Halls as year-round
program centers
•Development of a new ecological stations on
Scouters Pond
•Development of a new themed fishing camp
•Redevelopment of the Boy Scout waterfront as a
boat livery
•Improvements to the roads and infrastructure
•Addition of a new climbing tower, high copes
course and wilderness camping area
•Fire bowl improvements
•Addition of a new all-sports activity field and
equipment building
•And other areas
Next Steps . . .
1. Complete formal RK Site Master Plan by mid-March and
post on our web site (http://bsa.midwestrealty.com) for comment
by our general membership. Continue District meetings.
2. RK Steering Committee to conduct final meeting in April
to review comments and evaluate possible final changes to
the Plan prior to completing.
3. RK Site Master Plan would then be finalized and
republished for the RK Steering Committee to
recommend adoption of the final Plan to the Council Board
for approval, which is estimated to be completed by June.
Questions or Comments?
Call Rick DeKam at 269-207-5430
(or post to our web site)

Contenu connexe

Tendances

Wmt why kimberley why sullivan-why now ! (31-dec-2012)
Wmt why kimberley why sullivan-why now ! (31-dec-2012)Wmt why kimberley why sullivan-why now ! (31-dec-2012)
Wmt why kimberley why sullivan-why now ! (31-dec-2012)
HaleyB19
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
RamaChilamkurthy
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Application
heppellf
 
Congregation2
Congregation2Congregation2
Congregation2
whitera
 

Tendances (18)

02.07.2019 Planning Commission Informational Hearing
02.07.2019 Planning Commission Informational Hearing02.07.2019 Planning Commission Informational Hearing
02.07.2019 Planning Commission Informational Hearing
 
Workhouse Campus Redevelopment
Workhouse Campus RedevelopmentWorkhouse Campus Redevelopment
Workhouse Campus Redevelopment
 
Wmt why kimberley why sullivan-why now ! (31-dec-2012)
Wmt why kimberley why sullivan-why now ! (31-dec-2012)Wmt why kimberley why sullivan-why now ! (31-dec-2012)
Wmt why kimberley why sullivan-why now ! (31-dec-2012)
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
 
portfolio TUdelft τελικο
portfolio TUdelft τελικοportfolio TUdelft τελικο
portfolio TUdelft τελικο
 
Northpoint Crossing Rezoning
Northpoint Crossing RezoningNorthpoint Crossing Rezoning
Northpoint Crossing Rezoning
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Point Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, COPoint Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, CO
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization Presentation
 
Tantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccTantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwcc
 
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
 
About latham
About lathamAbout latham
About latham
 
Nethermayne Site Planning Application
Nethermayne Site Planning ApplicationNethermayne Site Planning Application
Nethermayne Site Planning Application
 
Boyton House Rehabilitation
Boyton House RehabilitationBoyton House Rehabilitation
Boyton House Rehabilitation
 
Stringfellow Park and Ride Expansion
Stringfellow Park and Ride ExpansionStringfellow Park and Ride Expansion
Stringfellow Park and Ride Expansion
 
Congregation2
Congregation2Congregation2
Congregation2
 

En vedette

Futbol
FutbolFutbol
Futbol
elpeo
 
Boletín informativo agosto última version
Boletín informativo agosto última versionBoletín informativo agosto última version
Boletín informativo agosto última version
luissalamanca22
 
JÖBSTL Firmenvorstellung 2016 (BG-EN)
JÖBSTL Firmenvorstellung 2016 (BG-EN)JÖBSTL Firmenvorstellung 2016 (BG-EN)
JÖBSTL Firmenvorstellung 2016 (BG-EN)
Atanas Vassilev
 
Michiel Frederik Botha Resume
Michiel Frederik Botha ResumeMichiel Frederik Botha Resume
Michiel Frederik Botha Resume
Frikkie Botha
 
5. PresentacióN Supersuple
5.  PresentacióN Supersuple5.  PresentacióN Supersuple
5. PresentacióN Supersuple
guest04f40bd
 
A farewell letter from supplier-Grunewald.gif
A farewell letter from supplier-Grunewald.gifA farewell letter from supplier-Grunewald.gif
A farewell letter from supplier-Grunewald.gif
YIFAT BEN ARIE
 

En vedette (20)

Futbol
FutbolFutbol
Futbol
 
I1M2010-T24: Programación dinámica en Haskell
I1M2010-T24: Programación dinámica en HaskellI1M2010-T24: Programación dinámica en Haskell
I1M2010-T24: Programación dinámica en Haskell
 
Boletín informativo agosto última version
Boletín informativo agosto última versionBoletín informativo agosto última version
Boletín informativo agosto última version
 
Matemática alumnos5
Matemática alumnos5Matemática alumnos5
Matemática alumnos5
 
Publicación de contenidos en la web
Publicación de contenidos en la webPublicación de contenidos en la web
Publicación de contenidos en la web
 
JÖBSTL Firmenvorstellung 2016 (BG-EN)
JÖBSTL Firmenvorstellung 2016 (BG-EN)JÖBSTL Firmenvorstellung 2016 (BG-EN)
JÖBSTL Firmenvorstellung 2016 (BG-EN)
 
Sims bio
Sims bioSims bio
Sims bio
 
Michiel Frederik Botha Resume
Michiel Frederik Botha ResumeMichiel Frederik Botha Resume
Michiel Frederik Botha Resume
 
Olap for Trial shop
Olap for Trial shop Olap for Trial shop
Olap for Trial shop
 
AP Vita Tronic_Eng
AP Vita Tronic_EngAP Vita Tronic_Eng
AP Vita Tronic_Eng
 
Programa Semana Cultural 2014 Santa Colomba de Sanabria
Programa Semana Cultural 2014 Santa Colomba de SanabriaPrograma Semana Cultural 2014 Santa Colomba de Sanabria
Programa Semana Cultural 2014 Santa Colomba de Sanabria
 
5. PresentacióN Supersuple
5.  PresentacióN Supersuple5.  PresentacióN Supersuple
5. PresentacióN Supersuple
 
Sesion 09 Administración.
Sesion 09 Administración.Sesion 09 Administración.
Sesion 09 Administración.
 
S. Deleonibus Essderc 2009
S. Deleonibus Essderc 2009S. Deleonibus Essderc 2009
S. Deleonibus Essderc 2009
 
Lone Eagle Consulting Native American Broadband Applications
Lone Eagle Consulting Native American Broadband ApplicationsLone Eagle Consulting Native American Broadband Applications
Lone Eagle Consulting Native American Broadband Applications
 
Portfolio: Writing
Portfolio: WritingPortfolio: Writing
Portfolio: Writing
 
NADIR: the European “Network for Animal Diseases Infectiology Research” faci...
NADIR: the European “Network for Animal Diseases Infectiology Research”  faci...NADIR: the European “Network for Animal Diseases Infectiology Research”  faci...
NADIR: the European “Network for Animal Diseases Infectiology Research” faci...
 
El país de las hojas sueltas. tomo i. desde la época prehispánica hasta el fi...
El país de las hojas sueltas. tomo i. desde la época prehispánica hasta el fi...El país de las hojas sueltas. tomo i. desde la época prehispánica hasta el fi...
El país de las hojas sueltas. tomo i. desde la época prehispánica hasta el fi...
 
A farewell letter from supplier-Grunewald.gif
A farewell letter from supplier-Grunewald.gifA farewell letter from supplier-Grunewald.gif
A farewell letter from supplier-Grunewald.gif
 
Wonder World
Wonder WorldWonder World
Wonder World
 

Similaire à Rk Site Master Plan Update

Douglas E Campbell Portfolio new edition
Douglas E Campbell Portfolio new editionDouglas E Campbell Portfolio new edition
Douglas E Campbell Portfolio new edition
Douglas Campbell
 
scos_town_hall_030814_final
scos_town_hall_030814_finalscos_town_hall_030814_final
scos_town_hall_030814_final
scoschurch
 
KTS_Cincinnati_May16
KTS_Cincinnati_May16KTS_Cincinnati_May16
KTS_Cincinnati_May16
Mozika Maloba
 
Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01
hayat alishah
 
Disc Golf Course Upgrade Project 2008 -Consultation
Disc Golf Course Upgrade Project 2008 -ConsultationDisc Golf Course Upgrade Project 2008 -Consultation
Disc Golf Course Upgrade Project 2008 -Consultation
Ian Robertson
 

Similaire à Rk Site Master Plan Update (20)

Thomas Park Improvement Options
Thomas Park Improvement OptionsThomas Park Improvement Options
Thomas Park Improvement Options
 
Douglas E Campbell Portfolio new edition
Douglas E Campbell Portfolio new editionDouglas E Campbell Portfolio new edition
Douglas E Campbell Portfolio new edition
 
B5 A Miraculous Transformation
B5 A Miraculous TransformationB5 A Miraculous Transformation
B5 A Miraculous Transformation
 
2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual Review2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual Review
 
2 New Recent Projects
2 New  Recent  Projects2 New  Recent  Projects
2 New Recent Projects
 
Kuhn road pim presentation
Kuhn road pim presentationKuhn road pim presentation
Kuhn road pim presentation
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
 
Tantallon tweaks slideshow2 a
Tantallon tweaks slideshow2 aTantallon tweaks slideshow2 a
Tantallon tweaks slideshow2 a
 
scos_town_hall_030814_final
scos_town_hall_030814_finalscos_town_hall_030814_final
scos_town_hall_030814_final
 
KTS_Cincinnati_May16
KTS_Cincinnati_May16KTS_Cincinnati_May16
KTS_Cincinnati_May16
 
Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01
 
CHAIRMAN'S REPORT TO AGM 2015
CHAIRMAN'S REPORT TO AGM 2015CHAIRMAN'S REPORT TO AGM 2015
CHAIRMAN'S REPORT TO AGM 2015
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
 
Present 072219
Present 072219Present 072219
Present 072219
 
Display boards
Display boardsDisplay boards
Display boards
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Disc Golf Course Upgrade Project 2008 -Consultation
Disc Golf Course Upgrade Project 2008 -ConsultationDisc Golf Course Upgrade Project 2008 -Consultation
Disc Golf Course Upgrade Project 2008 -Consultation
 
Bdd chawl CASE STUDY
Bdd chawl CASE STUDYBdd chawl CASE STUDY
Bdd chawl CASE STUDY
 
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentation
 

Rk Site Master Plan Update

  • 1. Camp Rota KiwanCamp Rota Kiwan Master Site Plan UpdateMaster Site Plan Update
  • 2. Significant Historical Events for Rota Kiwan •1921 Initial 10-acre site on Bass Lake founded •1926 Fruitbelt Area Council formed •1935 First eight cabins erected •1938/1940 “Hill” and “Dickerson Woods” parcels were added •1944 Camp roads added by County •1952 Jackson and Littler parcels were added •1953 Gildea Farm was acquired •1961 Loving and Hammond parcels were acquired •1968 Fath parcel was obtained •1973 Three area Councils merged into Southwest Michigan Council •1979 Fath and Hammon parcels were sold •1984 Property exchange with Todd bringing the camp to its current size of 197 acres •1987 Started construction of the new Cub camp •2005 RK Strategic Plan was published
  • 3. RK Master Site Planning Overview •New camp master site planning initiative called for in the new RK Strategic Plan •Three day-long site planning meetings were held this past November and December at camp •Professional leadership of the planning process was provided by OCBA, Bosch Architectural, Prein and Newhof, Lamar Construction and Midwest Realty Group •Approximately 20 individuals joined us for these planning meetings for input – participants ranged from existing scouts, to adult leaders, to program instructors, Board members, donors, and others •Our goal is to provide a physical site concept of camp for the next 50+ years, developed from a programming perspective, while considerate of our existing infrastructure, ideally serving up to 450 participants per summer camp session •The final plan will be published for our general memberships’ review and comment for completing
  • 4. Initial Planning Discussions •Divided Cub and Boy Scout camps vs. single- purpose camp concept. •Internal traffic routing and related issues. •Primary camp access. •Primary area uses. •Existing infrastructure. •Contiguous land uses & possibility to expand. •Security issues.
  • 5. Secondary Camp Layout Considering the possibility for limited common elements like a shared dining hall and welcome center, but keeping the existing Boy and Cub Scout camps separate. Short discussion on use of 8th Street property for the relocation of the Scout Service Center.
  • 6. Camp Programming Discussion Based upon the perceived merits of a single-purpose camp concept, the following conceptual programming map was completed. •Shared improvements like main dining hall, new welcome center, shared waterfronts, new sports fields, improved gun and archery range, etc. •New entry feature with proposed land acquisition. •New “staff village” housing concept. •Demolition of several older cabins, with some being replaced.
  • 7. Our Final Vision . . . The RK Master Site Plan Designed for single-use operation with all program areas and lodging updated or replaced and the acquisition or perpetual easement of an additional 150+/- acres east of camp. This design will accommodate 450 campers weekly through each summer camp session. Total project cost including connection to municipal water and sewer is currently estimated at $12,000,000 before any donations of time or materials or the cost of a new on-site Scout Office.
  • 8. 7 – New chapel at former Cedars site. 8 – Former dining hall renovated as program center. 9 – Former admin bldg renovated for T-1 program. 11 – Replacement of Oaks cabin. 13 – Addition of new “all sports fields”. 14 – New seating added to fire bowl. 15 – Waterfront renovated as new boat livery. 16 – Eagle pavilion renovated. 17 – New main dining hall structure. 18 – New staff village cabins. 19 – New “Welcome Center”. 20 – New shared entry, signage and paved roadway. 21 – Reconfigured home site with new garage. 22 – New parking for 150 vehicles. 23 – New “Adirondack” shelters for programming. 24 – Replacement of Spruce cabin. 25 – Expansion of former cub waterfront as new swimming and training area. Exploded View
  • 9. Bird’s-Eye Perspective Conceptual of new dining hall right center, with the new staff village just left center and the new “Welcome Center” left front. Note the new sports fields in the immediate foreground.
  • 10. New Camp Entry Concept •New shared entry access with Al Sabo Trailhead. •Improved road and entry signage, landscaping and paved and lighted entry and parking. •New ‘Welcome Center’ at entry for improved property management and internal security. •Improved parking, vehicle staging and landscaping. Statue moved to front turn about.
  • 11. New “Welcome Center” Concept This new facility would include business offices, a health center, conference room and “Campmaster” quarters.
  • 12. Dining Hall Concept Initial dining hall concept to seat 300 inside and another 150 under roof outside. Full commercial kitchen, scoutmaster lounge, health area, trading post, and full walk-out basement. Post and beam construction with open ceiling and large walk-in fireplace. Ample skylights and outdoor BBQ.
  • 14. Adirondack Shelter Concept Initial concept of the program shelters to be built into the upper south ridge overlooking Baas Lake. These may also be used for off-season troop camping.
  • 15. New Cabin Proto-Type To be used to replace Oaks, Tamaracks and Spruce cabins, as well as for developing the new “Staff Village” cabins. Interior Plan 
  • 16. Common Building Materials & Colors (to be used throughout camp for all new construction and renovation work) •Stone or rock base wall with cap. •Log veneer exterior or similar design material. •Standing-seam steel roofing on 10’x12’ pitch. •Additional skylight and roof overhangs where possible. •Natural stain, brown paint, green anodized metal roofing and brown anodized metal window and door trim.
  • 17. Additional Areas Being Developed . . . •Redevelopment and expansion of the former gun range with black powder, shot gun, expanded .22 cal rifle range and buckskin sports •Renovation of former Dining Halls as year-round program centers •Development of a new ecological stations on Scouters Pond •Development of a new themed fishing camp •Redevelopment of the Boy Scout waterfront as a boat livery •Improvements to the roads and infrastructure •Addition of a new climbing tower, high copes course and wilderness camping area •Fire bowl improvements •Addition of a new all-sports activity field and equipment building •And other areas
  • 18. Next Steps . . . 1. Complete formal RK Site Master Plan by mid-March and post on our web site (http://bsa.midwestrealty.com) for comment by our general membership. Continue District meetings. 2. RK Steering Committee to conduct final meeting in April to review comments and evaluate possible final changes to the Plan prior to completing. 3. RK Site Master Plan would then be finalized and republished for the RK Steering Committee to recommend adoption of the final Plan to the Council Board for approval, which is estimated to be completed by June. Questions or Comments? Call Rick DeKam at 269-207-5430 (or post to our web site)