• Risk assessment scenario and approaches for nuclear
power ..Project Structuring
• Challenges and issues in control and monitoring
existing proposed reactor designs for project structuring
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 1
• Consideration of high level uncertainties in the risk
study of a nuclear power plant: Project Cost Risks
• Small reactors and risk dispersion, Small Reactor
Advantages
Himadri Banerji, Former CEO, Reliance Energy –
Chairman & Managing Director, EcoUrja, India
Government - which is responsible for overall energy policy and, in some
cases, financing
Market - formed by electricity customers wanting electricity at a competitive
price
Utility (generator) - which is ultimately responsible for developing the complete
project
Stakeholders in Nuclear Power Project
project
EPC contractors - engineering, procurement and construction companies
which are responsible to the owner for delivery according to schedule and budget
Vendors - which are responsible for supplying equipment and technology to
either the owner, the EPC contractor or as part of a joint venture or consortium,
according to schedule and budget
Safety Authority - which is responsible for addressing all matters related to
protecting public safety and the environment, from the design stage to plant
operation and fuel management.Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 2
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 3
Table 2: Risk control and monitoring in nuclear power projects
Table 2 shows ways in which the risks of nuclear projects can be monitored and controlled, to match Table 1.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 4
In today’s global energy environment, nuclear power plant project (NPPP)
managers need to consider many dimensions of risk in addition to nuclear
safety-related risk.
In order to stay competitive in modern energy markets, NPPP managers
must integrate management of project, safety-related, and economic risks
in an effective way.in an effective way.
Project structuring is to achieve the most efficient application of capital and
resources.
Project risks must be assigned to the party most capable of handing their
control.
.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 5
This integrated risk management (RM) approach generates benefits that
include the following:
•Clearer criteria for decision making.
• Making effective use of investments already made in probabilistic safety
analysis (PSA) programs by applying these analyses to other areas and
contexts.
• Cost consciousness and innovation in achieving nuclear safety and
production goals.
• Communication improvement — more effective internal communication
among all levels of the NPP operating organization, and clearer communication
between the organization and its stakeholders.
• Focus on safety — ensuring an integrated focus on safety, production, and
economics during times of change in the energy environment
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 6
COST INDEX
SAFETY INDEX
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 7
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 8
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 9
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 10
Probabilistic Risk Assessment (PSA)
Comprehensive, structured, and logical analysis method
aimed at
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 11
Identifying and assessing risks in complex
technological systems
for the purpose of
Cost-effectively improving their safety and
performance.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 12
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 13
Contd from previous slide
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 14
The cost of the land upon which the nuclear power plant (NPP) is built.
Costs related to designing the NPP
Cost related to the materials from which the NPP is built.
Labour costs related to manufacture and construction.
There are eight primary sources of nuclear costs which
pose major project risks:
The cost of obtaining regulatory approval AND PERMITS LIKE WATER ETC
Investment related costs (interest, etc.)
Transportation and Access related costs
The cost of the electrical transmission system that connects the NPP to the
grid
Lost Opportunities for Combining Cycles and Improving EfficienciesPresented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 15
Land related costs can be lowered if the investor already owns the land. In the
case of NPPs, land costs can be lowered if the NPP is built on a pre-existing NPP
site.
Other, for example transportation related investments may not be required, and
access to water is very likely to be available.
NPPs can also be located on the site of obsolete coal fired power plants slated
The cost of the land upon which the
nuclear power plant (NPP) is built
NPPs can also be located on the site of obsolete coal fired power plants slated
to be shut down for technological or environmental reasons.
The same advantages of the NPP location would apply to the coal powered site,
and additional facilities – for example the turbine hall, parking lots,
administrative buildings, workshops, transformer farms, etc. - can potentially be
recycled.
The layout and size of an existing coal fired power plant may not be
appropriate for adaptation for a large nuclear plant, but a cluster of small
reactor approach would allow for far greater flexibility in facility layout,
and would be far more easy to accommodate.Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 16
Small reactors, especially advanced technology small reactors, offer
advancements in siting flexibility.
For example, clusters of small reactors can be located in former salt mines.
Serial production lowers design costs.
Costs related to designing the NPP
Design costs are largely fixed.
Design costs can be divided among all of the units produced.
If one reactor of a particular design is produced, then the recovery of the
cost of that design would be through sale of that unit.
If hundreds of units are produced, the recovery of the design cost can be
divided between all of the units.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 17
Clusters of Small Reactors
Costs related to designing the NPP
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 18
Finally, design simplification can lower nuclear costs.
The Generation IV Molten Salt Reactor design offers revolutionary design
simplification. In the Molten Salt Reactor the fuel is dissolved in the
coolant.
Thus much of the core structure is eliminated. Because the Molten Salt
Costs related to designing the NPP
Thus much of the core structure is eliminated. Because the Molten Salt
Reactor features a negative coefficient of reactivity, the reactor is highly
stable without operator control input.
Control rods can be partially or completely eliminated.
These simple features lower manufacturing costs. And lessen
manufacturing time.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 19
The material input into a NPP per watt of output typically decreases as
total reactor output rises.
Traditionally this has lead to the economies of scales argument, which
maintains that the larger the reactor output, the lower the per watt cost.
There are, however, problems with this assessment.
Cost related to the materials from which the NPP is built
There are, however, problems with this assessment.
While it is true that larger size usually means lower material costs per unit
of electrical output, there are exceptions to this rule, especially with
respect to advanced nuclear technology.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 20
For example:
The greater thermal efficiency of a reactor of similar core size might lower output
cost per unit of heat, compared to that of a similar sized, but less efficient design.
Reactor safety issues may effect materials input.
Cost related to the materials from which the NPP is built
Reactor safety issues may effect materials input.
Light Water Reactor cores and heat exchanges operate under very high pressure.
They require significant amounts of material to prevent steam explosions.
LWR outer containment structures are typically massive, and thus require large
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 21
A more compact reactor core may lower material requirements.
Thus if two reactors have the same output, the one with the smaller core
is likely to require fewer materials.
Underground reactor siting could potentially lower reactor structural
costs, by offering protection against terrorist attacks from aircraft and at
Cost related to the materials from which the NPP is built
costs, by offering protection against terrorist attacks from aircraft and at
surface levels with lower materials inputs.
.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 22
Small generation components can lower material requirements.
Thus supercritical carbon dioxide turbines are much smaller than steam
turbines used in conventional reactors.
Small turbines require fewer materials,and can be housed in smaller
turbine halls, which in turn require less material and labour input to
build.
Cost related to the materials from which the NPP is built
Thus a small advanced technology reactor with a compact core and
high thermal efficiency, that operates at a one atmosphere pressure
level, and can be sited underground might require fewer materials
inputs per unit of electrical output than a much larger conventional
reactor
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 23
In addition manufacturing costs can be lowered by simplifying reactor
design. Passive safety features can in some instances lower nuclear
costs.
For example thermo-siphoning of reactor coolant, may save the cost of
manufacturing and installing coolant pumps.
Reactor Design Lowers Manufacturing Costs
Gravity feed emergency coolant systems save on manufacturing costs
in several ways,
They do not require backup generators or pumps, thus many of the
expenses of older emergency coolant systems can be saved.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 24
The B&W mPower reactor, with its scalable, modular design, has the
capacity to provide 125 MWe to 750 MWe or more for a 4.5-year operating
cycle without refuelling, and is designed to produce clean, zero-emission
operations.
Babcock & Wilcox Nuclear Energy, Inc. will lead the development, licensing
and delivery of B&W mPower reactor projects.
Features of the B&W mPower reactor include:
mPower Reactors from B&W
Features of the B&W mPower reactor include:
Integral nuclear system design
Passive safety systems
Underground containment
4.5-year operating cycle between refueling
Scalable, modular design is flexible for local needs
Multi-unit (1 to 10+) plant
Used fuel stored in spent fuel pool for life of the reactor (60 years)
Country shop-manufactured
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 25
Labour costs can be lowered by shifting work from the field to a
factory.The more labor which can be performed in a factory, the lower
the over all costs.
Modular production is consistent with factory manufacture. Factory
manufacture lowers labor costs in several ways.
First serial production leads to the division of labor, which in turn
Labour costs related to manufacture and construction.
First serial production leads to the division of labor, which in turn
typically increases labor productivity.
The division of labor decreases the skill set required from individual
workers.
Decreased labor skill sets decrease labor wage expectations.
Factory work settings, as opposed to field work settings also decrease
wage expectations.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 26
The current nuclear regulatory environment favour serial
manufacture.
Once an example of a particular nuclear design is approved by the
NRC is approved, the approval of all subsequent reactors using the
The cost of obtaining regulatory approval and permits like for
water
design is automatic.
Environmental aspects of subsequent application, however, receive
the same attention, since they vary from facility to facility.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 27
In addition to NRC license requirements, other licenses or permits may be
required.
For example, the use of cooling water from rivers and lakes is not automatic,
and usually requires regulatory approval.
One of the advantages of recycling coal fired power plant sites, is that water
access permits may already exist, and potentially can be transferred.
The cost of obtaining regulatory approval and permits like for water
But what if obtaining a water use permit is not possible?
With small reactor designs air rather water cooling is practical, with
relatively modest efficiency penalties.
With efficient advanced reactors, the efficiency benefits may far outweigh
the efficiency losses related to air cooling.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 28
Interest accrues as nuclear power plant construction, and accrued interest may
amount to a significant percentage of NPP capital costs, especially if the
construction project stretches to half a decade or more.
Small factory built reactors are expected to have shortened construction times,
compared to large conventional reactors.
Simplified advanced reactor designs are also expected to shorten NPP
construction time.
Investment related costs (interest, etc.)
construction time.
These shortening construction time can decrease the interest component of
capital costs significantly.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 29
Interest charges may reflect the market's assessment of project risks.
The greater a projects assumed risk, the higher the interest premium the
market will assess.
By decreasing a project's size, and lowering projected
manufacturing/construction time, nuclear project builders can offer the
market lower perceived risks.
Investment related costs (interest, etc.)
market lower perceived risks.
Lower perceived risks, will lead to interest discounts compared to higher risk
large nuclear projects.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 30
Small,factory manufactured reactors offer advantages in transportation costs.
Conventional reactors include a number of very large and heavy components,
that present transportation challenges.
Components such as pressure vessels and steam generators may require
special and highly unusual transportation arrangements if they are transported
overland.
Transportation and Access Related Costs
Special huge road transportation vehicles, some capable of moving no more
than three miles an hour may disrupt highway uses in large areas over several
weeks as they transported conventional reactor steam generators and pressure
vessels to reactor sites.
In contrast, small reactor cores may be moved by trucks or by rail as ordinary
freight.
In areas where water shortages represent acute problems, small reactor access to
reliable water supplies is unnecessary. Air cooling will enable small reactors to
operate with out a reliable water supply.Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 31
Small reactor clusters located at recycled coal fire power plant locations
potentially have greatly simplified grid connections.
Not only can they be located near to the cities they are intended to serve, but
grid hook-up is facilitated by existing transformer farms, and grid
connections.
The cost of the electrical transmission system that connects the NPP
to the grid
Because they can be located close to served cities new transmission lines will
not cover long distances, thus lowering grid expansion costs.
Large reactors may require new transmission lines that are hundreds of miles
long, in order to move surplus electricity to market.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 32
Small reactor clusters located at recycled coal fire power plant
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 33
In addition to the above savings, and potential savings mentioned above there
are other potential savings that may be available with small reactors.
For example, with advanced nuclear technology, for example molten salt
reactors, combined Rankine (steam) and Brayton (gas) cycles are possible.
A bottoming desalinization cycle could be offered to the system, thus offering
Lost Opportunities for Combining Cycles and Improving Efficiencies
A bottoming desalinization cycle could be offered to the system, thus offering
formidable efficiency from small reactor packages.
A high temperature reactor can provide top cycle heat for industrial processes,
as well as producing middle cycle electricity generation, and bottom cycle heat
for electrical generation.
By adding a second generating cycle, small reactors can lower their electrical
generation costs.
Desalination would add a further revenue stream from the reactors operation
through the sale of portable water.Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 34
Shifts from conventional nuclear technology, to some advanced nuclear
technologies, also offer significant potential savings.
‘Some advanced technology savings are available to both large and small
nuclear power plants, but the flexibility of small NPPs may mean that at
least in certain situations
Benefits in Risk Management By shifting to Small Reactors
least in certain situations
Small advanced nuclear power plants may offer very significant potential
savings in comparison to large conventional NPPs.
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 35
Status of Development of Small Reactors
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 36
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 37
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 38
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 39
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 40
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 41
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
24th 2011 Singapore 42

Contenu connexe

Tendances

Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' UKTI2014
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryUKTI2014
 
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAIN
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAINIMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAIN
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAINDesignTeam8
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDana Ray Nilsson (Swalla)
 
poyry_nuclear_energy_brochure
poyry_nuclear_energy_brochurepoyry_nuclear_energy_brochure
poyry_nuclear_energy_brochureAlfonso Fox
 
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding LtdEPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding LtdNucleosys Tech
 
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)Derick Lila
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryUKTI2014
 

Tendances (16)

Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th January
 
Francis' CV
Francis' CVFrancis' CV
Francis' CV
 
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAIN
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAINIMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAIN
IMPROVING COST AND SAFETY IN EV BATTERY MANUFACTURING VALUE CHAIN
 
Summary fcne
Summary fcneSummary fcne
Summary fcne
 
CSVinjam-Resume_Contract_Oct2016
CSVinjam-Resume_Contract_Oct2016CSVinjam-Resume_Contract_Oct2016
CSVinjam-Resume_Contract_Oct2016
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
poyry_nuclear_energy_brochure
poyry_nuclear_energy_brochurepoyry_nuclear_energy_brochure
poyry_nuclear_energy_brochure
 
Atlantic Council - Randall Rush
Atlantic Council - Randall RushAtlantic Council - Randall Rush
Atlantic Council - Randall Rush
 
Atlantic Council - Victor Der
Atlantic Council - Victor DerAtlantic Council - Victor Der
Atlantic Council - Victor Der
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding LtdEPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
 
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)
HPQ Silicon Investor Deck/Corporate Presentation (Dec 2020)
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th January
 

En vedette

World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure HIMADRI BANERJI
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and CommissioningWendy Soerachman
 
Eco Urja Solar Solar Opportunity
Eco Urja Solar   Solar OpportunityEco Urja Solar   Solar Opportunity
Eco Urja Solar Solar OpportunityHIMADRI BANERJI
 
Geothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaGeothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaHIMADRI BANERJI
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial ServicesMaribel Renteria
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012HIMADRI BANERJI
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerjiHIMADRI BANERJI
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal HIMADRI BANERJI
 
Jaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptJaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptNikita Bhinde
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energyZhong Yuan
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantDr. Ramesh B
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.Enigmatic You
 

En vedette (16)

World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and Commissioning
 
Eco Urja Solar Solar Opportunity
Eco Urja Solar   Solar OpportunityEco Urja Solar   Solar Opportunity
Eco Urja Solar Solar Opportunity
 
Geothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaGeothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrja
 
Minimac oil flushing systems
Minimac oil flushing systemsMinimac oil flushing systems
Minimac oil flushing systems
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
 
Jaitapur nuclear power plant ppt
Jaitapur nuclear power plant pptJaitapur nuclear power plant ppt
Jaitapur nuclear power plant ppt
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Nuclear Power
Nuclear PowerNuclear Power
Nuclear Power
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.
 

Similaire à Risk management in nuclear projects and strategy of small reactors [compatibility mode]

Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksSmall and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksHIMADRI BANERJI
 
Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...IRJET Journal
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantKrishna Teja
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantKrishna Teja
 
Intern Report - Le Xuan Dat
Intern Report - Le Xuan DatIntern Report - Le Xuan Dat
Intern Report - Le Xuan DatDat Le Xuan
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...IJECEIAES
 
The Path to Sustainable Nuclear Energy 2005
The Path to Sustainable Nuclear Energy 2005The Path to Sustainable Nuclear Energy 2005
The Path to Sustainable Nuclear Energy 2005myatom
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Comit Projects Ltd
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfodunowoeminence2019
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Stavros Thomas
 
Introduction of Hydrogen Fuel Cell Generator in Textile Industries
Introduction of Hydrogen Fuel Cell Generator in Textile IndustriesIntroduction of Hydrogen Fuel Cell Generator in Textile Industries
Introduction of Hydrogen Fuel Cell Generator in Textile IndustriesIRJET Journal
 
2014 sandia blade workshop wind turbine reliability-iet-cas's perspective
2014 sandia blade workshop wind turbine reliability-iet-cas's perspective2014 sandia blade workshop wind turbine reliability-iet-cas's perspective
2014 sandia blade workshop wind turbine reliability-iet-cas's perspectiveXiao CHEN
 
5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdfAthimoolam M
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014Daniel Schwab
 
Nuclear power plant - IV Semester PGE Module 3- VTU
Nuclear power plant  - IV Semester PGE Module 3- VTUNuclear power plant  - IV Semester PGE Module 3- VTU
Nuclear power plant - IV Semester PGE Module 3- VTUDrCVMOHAN
 

Similaire à Risk management in nuclear projects and strategy of small reactors [compatibility mode] (20)

Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksSmall and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
 
Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...
 
bca
bcabca
bca
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
road_map (1)
road_map (1)road_map (1)
road_map (1)
 
Gvt 02
Gvt 02Gvt 02
Gvt 02
 
Intern Report - Le Xuan Dat
Intern Report - Le Xuan DatIntern Report - Le Xuan Dat
Intern Report - Le Xuan Dat
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
 
The Path to Sustainable Nuclear Energy 2005
The Path to Sustainable Nuclear Energy 2005The Path to Sustainable Nuclear Energy 2005
The Path to Sustainable Nuclear Energy 2005
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
Introduction of Hydrogen Fuel Cell Generator in Textile Industries
Introduction of Hydrogen Fuel Cell Generator in Textile IndustriesIntroduction of Hydrogen Fuel Cell Generator in Textile Industries
Introduction of Hydrogen Fuel Cell Generator in Textile Industries
 
2014 sandia blade workshop wind turbine reliability-iet-cas's perspective
2014 sandia blade workshop wind turbine reliability-iet-cas's perspective2014 sandia blade workshop wind turbine reliability-iet-cas's perspective
2014 sandia blade workshop wind turbine reliability-iet-cas's perspective
 
5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf5_Parth Nayanesh Patel_Report (002).pdf
5_Parth Nayanesh Patel_Report (002).pdf
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014
 
Nuclear power plant - IV Semester PGE Module 3- VTU
Nuclear power plant  - IV Semester PGE Module 3- VTUNuclear power plant  - IV Semester PGE Module 3- VTU
Nuclear power plant - IV Semester PGE Module 3- VTU
 

Plus de HIMADRI BANERJI

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfHIMADRI BANERJI
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...HIMADRI BANERJI
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxHIMADRI BANERJI
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfHIMADRI BANERJI
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeHIMADRI BANERJI
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning HIMADRI BANERJI
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdfHIMADRI BANERJI
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfHIMADRI BANERJI
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLHIMADRI BANERJI
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureHIMADRI BANERJI
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...HIMADRI BANERJI
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji HIMADRI BANERJI
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...HIMADRI BANERJI
 
Energy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationEnergy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationHIMADRI BANERJI
 
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...HIMADRI BANERJI
 
Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power RisksFukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power RisksHIMADRI BANERJI
 
Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...HIMADRI BANERJI
 
Feedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaFeedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaHIMADRI BANERJI
 

Plus de HIMADRI BANERJI (19)

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
 
Energy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationEnergy Intelligence Analytics and Optimization
Energy Intelligence Analytics and Optimization
 
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
 
Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power RisksFukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
 
Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...
 
Cymi Ecourja
Cymi EcourjaCymi Ecourja
Cymi Ecourja
 
Feedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaFeedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asia
 

Dernier

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Dernier (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Risk management in nuclear projects and strategy of small reactors [compatibility mode]

  • 1. • Risk assessment scenario and approaches for nuclear power ..Project Structuring • Challenges and issues in control and monitoring existing proposed reactor designs for project structuring Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 1 • Consideration of high level uncertainties in the risk study of a nuclear power plant: Project Cost Risks • Small reactors and risk dispersion, Small Reactor Advantages Himadri Banerji, Former CEO, Reliance Energy – Chairman & Managing Director, EcoUrja, India
  • 2. Government - which is responsible for overall energy policy and, in some cases, financing Market - formed by electricity customers wanting electricity at a competitive price Utility (generator) - which is ultimately responsible for developing the complete project Stakeholders in Nuclear Power Project project EPC contractors - engineering, procurement and construction companies which are responsible to the owner for delivery according to schedule and budget Vendors - which are responsible for supplying equipment and technology to either the owner, the EPC contractor or as part of a joint venture or consortium, according to schedule and budget Safety Authority - which is responsible for addressing all matters related to protecting public safety and the environment, from the design stage to plant operation and fuel management.Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 2
  • 3. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 3
  • 4. Table 2: Risk control and monitoring in nuclear power projects Table 2 shows ways in which the risks of nuclear projects can be monitored and controlled, to match Table 1. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 4
  • 5. In today’s global energy environment, nuclear power plant project (NPPP) managers need to consider many dimensions of risk in addition to nuclear safety-related risk. In order to stay competitive in modern energy markets, NPPP managers must integrate management of project, safety-related, and economic risks in an effective way.in an effective way. Project structuring is to achieve the most efficient application of capital and resources. Project risks must be assigned to the party most capable of handing their control. . Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 5
  • 6. This integrated risk management (RM) approach generates benefits that include the following: •Clearer criteria for decision making. • Making effective use of investments already made in probabilistic safety analysis (PSA) programs by applying these analyses to other areas and contexts. • Cost consciousness and innovation in achieving nuclear safety and production goals. • Communication improvement — more effective internal communication among all levels of the NPP operating organization, and clearer communication between the organization and its stakeholders. • Focus on safety — ensuring an integrated focus on safety, production, and economics during times of change in the energy environment Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 6
  • 7. COST INDEX SAFETY INDEX Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 7
  • 8. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 8
  • 9. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 9
  • 10. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 10
  • 11. Probabilistic Risk Assessment (PSA) Comprehensive, structured, and logical analysis method aimed at Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 11 Identifying and assessing risks in complex technological systems for the purpose of Cost-effectively improving their safety and performance.
  • 12. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 12
  • 13. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 13
  • 14. Contd from previous slide Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 14
  • 15. The cost of the land upon which the nuclear power plant (NPP) is built. Costs related to designing the NPP Cost related to the materials from which the NPP is built. Labour costs related to manufacture and construction. There are eight primary sources of nuclear costs which pose major project risks: The cost of obtaining regulatory approval AND PERMITS LIKE WATER ETC Investment related costs (interest, etc.) Transportation and Access related costs The cost of the electrical transmission system that connects the NPP to the grid Lost Opportunities for Combining Cycles and Improving EfficienciesPresented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 15
  • 16. Land related costs can be lowered if the investor already owns the land. In the case of NPPs, land costs can be lowered if the NPP is built on a pre-existing NPP site. Other, for example transportation related investments may not be required, and access to water is very likely to be available. NPPs can also be located on the site of obsolete coal fired power plants slated The cost of the land upon which the nuclear power plant (NPP) is built NPPs can also be located on the site of obsolete coal fired power plants slated to be shut down for technological or environmental reasons. The same advantages of the NPP location would apply to the coal powered site, and additional facilities – for example the turbine hall, parking lots, administrative buildings, workshops, transformer farms, etc. - can potentially be recycled. The layout and size of an existing coal fired power plant may not be appropriate for adaptation for a large nuclear plant, but a cluster of small reactor approach would allow for far greater flexibility in facility layout, and would be far more easy to accommodate.Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 16
  • 17. Small reactors, especially advanced technology small reactors, offer advancements in siting flexibility. For example, clusters of small reactors can be located in former salt mines. Serial production lowers design costs. Costs related to designing the NPP Design costs are largely fixed. Design costs can be divided among all of the units produced. If one reactor of a particular design is produced, then the recovery of the cost of that design would be through sale of that unit. If hundreds of units are produced, the recovery of the design cost can be divided between all of the units. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 17
  • 18. Clusters of Small Reactors Costs related to designing the NPP Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 18
  • 19. Finally, design simplification can lower nuclear costs. The Generation IV Molten Salt Reactor design offers revolutionary design simplification. In the Molten Salt Reactor the fuel is dissolved in the coolant. Thus much of the core structure is eliminated. Because the Molten Salt Costs related to designing the NPP Thus much of the core structure is eliminated. Because the Molten Salt Reactor features a negative coefficient of reactivity, the reactor is highly stable without operator control input. Control rods can be partially or completely eliminated. These simple features lower manufacturing costs. And lessen manufacturing time. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 19
  • 20. The material input into a NPP per watt of output typically decreases as total reactor output rises. Traditionally this has lead to the economies of scales argument, which maintains that the larger the reactor output, the lower the per watt cost. There are, however, problems with this assessment. Cost related to the materials from which the NPP is built There are, however, problems with this assessment. While it is true that larger size usually means lower material costs per unit of electrical output, there are exceptions to this rule, especially with respect to advanced nuclear technology. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 20
  • 21. For example: The greater thermal efficiency of a reactor of similar core size might lower output cost per unit of heat, compared to that of a similar sized, but less efficient design. Reactor safety issues may effect materials input. Cost related to the materials from which the NPP is built Reactor safety issues may effect materials input. Light Water Reactor cores and heat exchanges operate under very high pressure. They require significant amounts of material to prevent steam explosions. LWR outer containment structures are typically massive, and thus require large Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 21
  • 22. A more compact reactor core may lower material requirements. Thus if two reactors have the same output, the one with the smaller core is likely to require fewer materials. Underground reactor siting could potentially lower reactor structural costs, by offering protection against terrorist attacks from aircraft and at Cost related to the materials from which the NPP is built costs, by offering protection against terrorist attacks from aircraft and at surface levels with lower materials inputs. . Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 22
  • 23. Small generation components can lower material requirements. Thus supercritical carbon dioxide turbines are much smaller than steam turbines used in conventional reactors. Small turbines require fewer materials,and can be housed in smaller turbine halls, which in turn require less material and labour input to build. Cost related to the materials from which the NPP is built Thus a small advanced technology reactor with a compact core and high thermal efficiency, that operates at a one atmosphere pressure level, and can be sited underground might require fewer materials inputs per unit of electrical output than a much larger conventional reactor Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 23
  • 24. In addition manufacturing costs can be lowered by simplifying reactor design. Passive safety features can in some instances lower nuclear costs. For example thermo-siphoning of reactor coolant, may save the cost of manufacturing and installing coolant pumps. Reactor Design Lowers Manufacturing Costs Gravity feed emergency coolant systems save on manufacturing costs in several ways, They do not require backup generators or pumps, thus many of the expenses of older emergency coolant systems can be saved. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 24
  • 25. The B&W mPower reactor, with its scalable, modular design, has the capacity to provide 125 MWe to 750 MWe or more for a 4.5-year operating cycle without refuelling, and is designed to produce clean, zero-emission operations. Babcock & Wilcox Nuclear Energy, Inc. will lead the development, licensing and delivery of B&W mPower reactor projects. Features of the B&W mPower reactor include: mPower Reactors from B&W Features of the B&W mPower reactor include: Integral nuclear system design Passive safety systems Underground containment 4.5-year operating cycle between refueling Scalable, modular design is flexible for local needs Multi-unit (1 to 10+) plant Used fuel stored in spent fuel pool for life of the reactor (60 years) Country shop-manufactured Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 25
  • 26. Labour costs can be lowered by shifting work from the field to a factory.The more labor which can be performed in a factory, the lower the over all costs. Modular production is consistent with factory manufacture. Factory manufacture lowers labor costs in several ways. First serial production leads to the division of labor, which in turn Labour costs related to manufacture and construction. First serial production leads to the division of labor, which in turn typically increases labor productivity. The division of labor decreases the skill set required from individual workers. Decreased labor skill sets decrease labor wage expectations. Factory work settings, as opposed to field work settings also decrease wage expectations. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 26
  • 27. The current nuclear regulatory environment favour serial manufacture. Once an example of a particular nuclear design is approved by the NRC is approved, the approval of all subsequent reactors using the The cost of obtaining regulatory approval and permits like for water design is automatic. Environmental aspects of subsequent application, however, receive the same attention, since they vary from facility to facility. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 27
  • 28. In addition to NRC license requirements, other licenses or permits may be required. For example, the use of cooling water from rivers and lakes is not automatic, and usually requires regulatory approval. One of the advantages of recycling coal fired power plant sites, is that water access permits may already exist, and potentially can be transferred. The cost of obtaining regulatory approval and permits like for water But what if obtaining a water use permit is not possible? With small reactor designs air rather water cooling is practical, with relatively modest efficiency penalties. With efficient advanced reactors, the efficiency benefits may far outweigh the efficiency losses related to air cooling. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 28
  • 29. Interest accrues as nuclear power plant construction, and accrued interest may amount to a significant percentage of NPP capital costs, especially if the construction project stretches to half a decade or more. Small factory built reactors are expected to have shortened construction times, compared to large conventional reactors. Simplified advanced reactor designs are also expected to shorten NPP construction time. Investment related costs (interest, etc.) construction time. These shortening construction time can decrease the interest component of capital costs significantly. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 29
  • 30. Interest charges may reflect the market's assessment of project risks. The greater a projects assumed risk, the higher the interest premium the market will assess. By decreasing a project's size, and lowering projected manufacturing/construction time, nuclear project builders can offer the market lower perceived risks. Investment related costs (interest, etc.) market lower perceived risks. Lower perceived risks, will lead to interest discounts compared to higher risk large nuclear projects. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 30
  • 31. Small,factory manufactured reactors offer advantages in transportation costs. Conventional reactors include a number of very large and heavy components, that present transportation challenges. Components such as pressure vessels and steam generators may require special and highly unusual transportation arrangements if they are transported overland. Transportation and Access Related Costs Special huge road transportation vehicles, some capable of moving no more than three miles an hour may disrupt highway uses in large areas over several weeks as they transported conventional reactor steam generators and pressure vessels to reactor sites. In contrast, small reactor cores may be moved by trucks or by rail as ordinary freight. In areas where water shortages represent acute problems, small reactor access to reliable water supplies is unnecessary. Air cooling will enable small reactors to operate with out a reliable water supply.Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 31
  • 32. Small reactor clusters located at recycled coal fire power plant locations potentially have greatly simplified grid connections. Not only can they be located near to the cities they are intended to serve, but grid hook-up is facilitated by existing transformer farms, and grid connections. The cost of the electrical transmission system that connects the NPP to the grid Because they can be located close to served cities new transmission lines will not cover long distances, thus lowering grid expansion costs. Large reactors may require new transmission lines that are hundreds of miles long, in order to move surplus electricity to market. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 32
  • 33. Small reactor clusters located at recycled coal fire power plant Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 33
  • 34. In addition to the above savings, and potential savings mentioned above there are other potential savings that may be available with small reactors. For example, with advanced nuclear technology, for example molten salt reactors, combined Rankine (steam) and Brayton (gas) cycles are possible. A bottoming desalinization cycle could be offered to the system, thus offering Lost Opportunities for Combining Cycles and Improving Efficiencies A bottoming desalinization cycle could be offered to the system, thus offering formidable efficiency from small reactor packages. A high temperature reactor can provide top cycle heat for industrial processes, as well as producing middle cycle electricity generation, and bottom cycle heat for electrical generation. By adding a second generating cycle, small reactors can lower their electrical generation costs. Desalination would add a further revenue stream from the reactors operation through the sale of portable water.Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 34
  • 35. Shifts from conventional nuclear technology, to some advanced nuclear technologies, also offer significant potential savings. ‘Some advanced technology savings are available to both large and small nuclear power plants, but the flexibility of small NPPs may mean that at least in certain situations Benefits in Risk Management By shifting to Small Reactors least in certain situations Small advanced nuclear power plants may offer very significant potential savings in comparison to large conventional NPPs. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 35
  • 36. Status of Development of Small Reactors Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 36
  • 37. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 37
  • 38. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 38
  • 39. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 39
  • 40. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 40
  • 41. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 41
  • 42. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 42