1. Company History
Organization Chart
Capability & Technology
Core Business
Process Package Contracting
Capability ( Products & Fabrication)
International Engineering Partner
Shop Location
2. Company Profile1
Mission & Foreword
To serve oil and gas industry with reliable and competitive engineering services with integrated qu
ality design and technology innovation, to be the prime choice of our valued customers.
Company History
Shinjin Engineering Co (SEC) is redefined on the basis of Interchem Process System Co Ltd, a reputed con
sulting team for oil/gas, petrochemical and chemical industries, which was established in 2004.
With accumulated technology, engineering capabilities and experiences, SEC is moving forward to engine
ering service in Natural Gas Processing, produced water treatment systems, Plant Pipe system / Semi Ski
d, Offshore Pipe System, Power Plant HRSG, Tank terminal piping line, Flow line Equipment and High Pres
sure Manifold.
With the above-mentioned all our past capabilities, SEC will steadily provide our valuable customers and
partners with the excellent services in the near future.
3. Organization Chart2
Auditor
Engineering
General Division
Accounting
Financing
Business / Sales
Cost Control
Exe. Vice
President
HR
General Affairs/
Labor Control
Quality Control
Management
Division
Detail & Product
Design
Commissioning
Marine & Utility
System
Overseas
Business
Division /
Supervisor
Total Customer
Service, Material
Supply Service
Quality Control
Personnel
Procurement
Comm. Procedure
Operation Manual
Schedule Control
USA
Kuwait
UAE. Qatar
Upgrade /
Conversion
Construction Control Local Total
Customer Service
for Owner &
Vendor
Field Prod.
Specialists
Inspection
Safety Control
TBD, Mgr ASIA
TBD, Mgr EMEA
Bid / Contract,
Purchase
President
Management
Division
General
Manager
QA/QC
4. Description Staff No. Experience
Process specialist 2 > 30 years
Mechanical specialist 2 > 25 years
Process engineer 3 3 – 10 years
Mechanical engineer 3 3 – 15 years
Piping engineer 9 2 – 10 years
E & I engineer 3 3 – 10 years
Structural engineer 2 5 – 10 years
Project engineer 2 2 – 8 years
Field Pipe Welder 100 5 – 10 years
Our Professionals
5. • Gas Sweetening: > 10 Units
• Gas Dehydration: > 20 Units
• Produced Water Treatment: > 20 Years
• Separators: > 20 Years
• Piping / Valve Line : > 20 Years
Professional Experiences
6. Project Reference
P R O J E C T YEAR OF BUILT Customer
EXXON MOBIL OIL PIPE SPOOL (EASTAREA)
TOTAL PIPE SPOOL
2009 Samsung Heavy
Industries
Philippine NAGA Power plant 2010 SHILOH International
POSCO Power INI ISM Power Plant External Piping 2011 POSCO
EMAL Phase II CCPP External Piping #32, #41, #51, #52 2012 SAMSUNG C&T
SAUDI ARMCO 2013 ARAMCO
[Power Generation] [Pipe Rack] [Seawater Treatment] [Oil Separation]
7. Capacity & Technology3
Phase Separation
Water Treatment
Gas Treatment
Deoiler Cyclone
Discharge
DesanderCyclone
Filtration
Gas Flotation
WATER TREATMENT
Solids Manage
ment
Solids Discharge
Gas
Oil
Water
Reinjection
3-Phase Separat
ion
Gas Sweetening
Dew Point Control
Compression
Gas Dehydrat
ion
GAS PROCESSING
Pipeline
OIL TREATMENT
Pipeline
8. Capacity & Technology4
Consulting & Engineering
Process Package
Contracting
Site Services
9. Core Business5
Process Study
Basic Design
Detailed Design
Process
Piping
Mechanical
Structural
E & I
Valve Skid
18. Capability (Fabrication Shop)9
Shop Layout
1st Fabrication Bay :
30M (W) x 20M (L) x 12M (H)
Crane 10 ton and 5 ton t
2nd Fabrication Bay :
30M (W) x 20M (L) x 12M (H)
Crane 10 ton and 5 ton 1st
4th Fabrication Bay
30M (W) x 20M (L) x 12M (H)
Crane 20 ton and 5 ton
3rd Fabrication Bay
30M (W) x 20M (L) x 12M (H)
Crane 10 ton and 5 ton 1st
5th Fabrication Bay
30M (W) x 20M (L) x 12M (H)
Crane 20 ton and 5 ton
1st Painting Moving Shelter
20M (W) x 20M (L) x 12M (H)
2nd Painting Moving Shelter
20M (W) x 20M (L) x 12M (H)
Shot Blasting shop
20M (W) x 20M (L) x 12M (H)
20. SHINJIN – KANFA
PARTNERSHIP ADVANTAGE
• KIP ( Kanfa Ingenium Process AS) has extensive expe
rience in oil/gas system design and EPC projects
• SEC ( ShinJin Engineering Co) has good capability in
detail engineering and procurement management
• KIP and SEC together will provide clients with reliabl
e process technology and cost effective professional
engineering services
10 • International Engineering Partner
21. SHINJIN – KANFA
PROJECT INTERFACE
• KIP provides basic process design
• SEC carries out detail and workshop design
• KIP reviews SEC design documents
• KIP and SEC will involve in FAT and site commissioning
10 • International Engineering Partner
23. Who We Are
KANFA is an independent offshore project execution
and process specialist within Oil & Gas and LNG.
We deliver topside process EPC contracts, equipment, FEED studies and
offshore services such as troubleshooting, revamp as well as optimisation studies.
23
24. Our History
2001 2002 2003 2005 2006 2007
KeycontractsOrganisation
2000 2009 2011
SOLDFOUNDED
Topside contract with
Fred.Olsen Producti
on (FPSO Knock Tag
gart)
Topside contract
with ConocoPhilli
ps
(FSU CoroCoro)
Topside contracts with:
− Sevan Marine (FPSO Piranema)
,
− BW Offshore (FPSO Yùum K'ak'
náab)
− Sevan Marine (FPSO Humming
bird)
Topside contract
with Fred.Olsen
Production
(FPSO Knock All
an)
Topside contract
with Sevan Mari
ne
(FPSO Voyageur)
FLNG Topside
contract with SHI
(Flex LNG Producer
1)
Topside contract wit
h Fred.Olsen Produ
ction (Borgin Dolph
in )
FEED study-Pert
h
FEED study FRA
M
AQUISITIO
N
FOUNDED
2012
Three major FEE
D studies on-goi
ng.
FOUNDED AQUISITIONS AQUISITION
We have extensive experience with executing FPSO topside EPC projects
24
25. What We Do
25
Complete proce
ss topsides
Equipmen
t
Modules/
packages
Studies
Liquid processing Gas processing
Process Improvemen
t
FEED EPC
Process
Optimization
Troubleshooting &
Debottlenecking
Process Training &
Courses
Independent engin
eering services
Oil train Water train Gas train Utilities LNG
Carbon Capt
ure
KANFA Group is a complete oil and gas processing house and EPC project execution organistat
ion
26. 26
Modules & Packages
The KANFA Group applies multi-discipline expertise to provide solutions for c
omplex module and package supply focusing on the following;
Process Systems/Packages
Gas Dehydration (TEG & Mol. Sieve)
Gas Compression (Screw, Reciprocati
ng & Centrifugal Solutions)
Chemical Injection
Metering
Separation (HP, LP & Test)
Produced Water Treatment
Vapour Recovery & VOC
Sand Treatment
Mercury Removal
Coalescers
Utility Systems/Packages
Heating / Cooling Medium
Air Compressors & Dryers
Inert Gas Generation (Nitrogen & Hydrocar
bon)
High Pressure Hot Water
27. 27
Equipment
The KANFA Group also supplies solutions for individu
al items of equipment and mechanical bulk items:
Filters & Coalescers
Process & Utility Pumps
Pressure Vessels (incl. Internals - Gas Scrubber / Knock Out V
essels)
Shell & Tube Heat Exchangers
The KANFA Group ensures:
Project Specification Compliance (including NORSOK)
Third Party Verifications
Project Documentation Compliance (including NORSOK)
Inspection and Expediting
Material Compliance including CRAs and Exotics (including NORSOK)
CE Marking & EU Directive Compliance
Our ability to fabricate at various locations globally ensures local content
requirements are met.
28. Gas Dehydration
28
KANFA Group has delivered a
Gas Dehydration Unit to the
Knock Allan FPSO for Fred Olsen
Production, comprising a glycol
contactor and a regeneration
unit.
The Contactor is a packed
column with an integrated pre-
scrubber. The rich glycol is sent
to the regeneration unit where
the water is boiled off.
Design Data:
• TEG Contactor with integrated scrubber
• Gas flow rate: 70,000 kg/h
• Temperature: 45°C
• Pressure: 80 barg
• Water content outlet: 15 mg/Sm3
Regeneration system
• TEG flow rate: 3.3 m3/h
• Lean TEG concentration: 99.88 wt%
• Stripping gas rate: 70 kg/h
• Reboiler duty: 265 kW
Engineering standards:
The design is based on KANFA in-house s
oftware, which is based on
recognised engineering guidelines such as
Shell DEP, NORSOK, GPSA Engineering Da
ta Handbook, Campbell and Dow Chemic
als.
29. Corrosion Treatment Systems
29
KANFA Group has delivered
pump packages for use on
the Troll Onshore Gas
Treatment and
Recompression Plant, which
is located at Kollsnes on the
West Coast of Norway. The
plant is operated by Statoil.
3 off Rich MEG Centrifuge Feed Pumps
• Type: Eccentric Screw Pump
• Pumping Temp (PT): 27°C
• Rated Capacity at PT: 20 m3/hr
• Discharge Pressure: 8.3 / 2.01 barg
• Suction Pressure: 1.36 / 0.2 barg
• Differential Pressure: 7.0 / 1.8 barg
2 off Treated MEG Return Pumps
• Type: Submerged Centrifugal Pumps
• Pumping Temp (PT): 27°C
• Rated Capacity at PT: 40 m3/hr
• Discharge Pressure: 12.8 / 12.8 barg
• Differential Pressure: 12.8 / 12.8 barg
• Differential Head: 126 / 126 m
Treated MEG Buffer Tank
• Atmospheric Horizontal Tank
• Code: NS 3472 and NORSOK
• Total Volume: 33 m3
• Design Temperature: -22 / 59°C
• Operating Temperature: 27°C
• Length: 5000 mm
• Width: 2000 mm
• Heigth: 3300 mm
• Material: SS316
1 off Settling Tank Return Pump
• Type: Eccentric Screw Pump
• Pumping Temp (PT): 27°C
• Rated Capacity at PT: 4 m3/hr
• Discharge Pressure: 3.0 / 1.54 barg
• Suction Pressure: 0.9 / 0.3 barg
• Differential Pressure: 2.7 / 0.7 barg
1 off Condensate Skimming Pump
• Type: Eccentric Screw Pump
• Pumping Temp (PT): 27°C
• Rated Capacity at PT: 6.50 m3/hr
• Discharge Pressure: 6.3 / 4.9 barg
• Suction Pressure: 1.4 / 0.2 barg
• Differential Pressure: 4.7 / 4.7 barg
30. Inert Gas Generation
30
KANFA has delivered a
menbrane Nitrogen
Generator for Modec
including two Nitrogen
Booster Compressors for
use on the Tupi 2 FPSO
operated by Petrobras.
Process Design Data
• Pressure: 20 – 20.2 barg
• Temp: 45°C
N2 Gas
• Flow: 200 Nm3/hr
• N2 content: 95-99%
Engineering Data
• Design code: ASME, European Directive 97/
23/EC,
• CE marked
• Size: 2300mm x 5000mm
• Weight: 4500 kg
• Main materials: SS316
Equipment
• Membranes
• Filters (Particle, Activated Carbon, Dust)
• N2 -compressor
• Aftercooler
• Package control (PLS)
Mechanical Design Data
• Pressure: 25 barg
• Temp: 260 °C
• Delivery time: 25 weeks
31. Separator - HP
31
KANFA Group has delivered
a high pressure separator to
Statoil’s K-Lab at Kårstø, as
part of the subsea
compression development
project.
Design Data
Fliud: HC Liquid / Gas / Water / MEG
Operating Pressure: 64.7 – 102.2 barg
Design Pressure: full vacuum / 140 barg
Operating Temperature: 32 oC
Design Temperature: -46/80oC
Water
Flow: 15593 kg/h
Specific Gravity: 1.08 oC
Viscosity: 2.42 cP
Mechanical Parameters
Inside Diameter: 2.1 m
Length T/T: 8.1 m
Volume: 33,000 L
Design Code: EN13445
CE Marked
PED Approved
Weight: 58,236 kg
HC Liquid
Flow: 133643 kg/h
Specific Gravity: 0.64 oC
Viscosity: 0.24 cP
Delivery time: 32 weeks
32. High Pressure Hot Water Systems
32
KANFA delivered a high
pressure hot water package
to HHI for use on the Goliat
FPSO. Goliat is located in
the cold Barents Sea on the
North Coast of Norway.
Goliat shall be operated by
ENI. Start up in 2014.
Process Design Data
• Pressure: 150 - 185 barg
• Temp: 10 - 70°C
Water
• Flow: 0 - 3 m3/hr
• Density: 975 kg/ m3
• Viscosity: 0,4 cP at T&P
Engineering Data
• Design code: NORSOK, API, PD5500
• CE marked
• Size: 2645 x 1500 x1915 mm
• Weight: 2250 kg
• Material: Duplex (for wetted parts)
Equipment
• High Pressure trpilex plunger Pump
• Motor ready for VSD control
• Accumulator
• Noise hood
• Cleaning/deicing spray guns
Mechanical Design Data
• Pressure: 220 barg
• Temp: 100 °C
• Delivery time: 30 weeks
33. Seoul Office
#1716, 12, Mapo-daero, Mapo-gu, Seoul,
121-736, South Korea
Tel :+82-2-704-5777
Fax :+82-2-704-5779
• Shop Location11
Head Office/Factory
#77, Sungju-Ro, Sungsan-Gu,
Changwon Si, Gyeongnam, 642-090 Korea
Tel: +82-55-714-8198
Fax: +82-55-714-8199