SlideShare une entreprise Scribd logo
1  sur  58
Télécharger pour lire hors ligne
ritayan rath
portfolio 2022
PROFESSIONAL PROJECT
DOHALIVE
URBAN VOID
VOID
VOID
VOID
The proposed extensive and intensive service provision delivered by these
“urban voids” is key to the city’s future development. “Urban voids” will con-
stitute the green backbone of the new urban vision, a varying scale series of
walkways, hardscapes, open public spaces, cycle paths, circulation routes
( for collective and private pedestrian traffic) , new services provision centres
forthelocalandwidercommunities,neighbourhood programmesandsoon.
The backbone structure confirms the overall strategy of the devel-
opment plan whose underlying objective is to create greater ser-
vice density that will in turn raise the overall quality of the user’s life.
PROFESSIONAL PROJECT
Type D Bed Room
Type A, B and C Bed Room Layout
The hotel rooms are juxtaposed facing towards the open glass-
facade, that allows natural day-light to the organic interiors. The
lack of strong corners and curvilinear walls gives a dynamic and
fluid personality to the space, embracing a contemporary lifestyle.
DOHALIVE
TYPE-A_AURA ROOM
L6-22
TYPE-A_AURA ROOM
L6-23
TYPE-C_ENERGY ROOM
L6-24
TYPE-B_MODE ROOM
L6-25
+33.00 m FFL
+32.90 m SSL
+33.00 m FFL
+32.90 m SSL
+33.00 m FFL
+32.90 m SSL
+33.00 m FFL
+32.90 m SSL
PROFESSIONAL PROJECT
View of the Entrance Lounge
DOHALIVE
Ingelheim Rathaus
Ingelheim, Deutschland
Public Building, Renovation and Modernization
4 4
GEZ.
LAGEPLAN / PIKTO
OK FFB = m ü. NN
=+ 98,05
+/- 0,00
EG
TH2
TH3
TH1
C
C
F
F
A
G
A
G
B
B
H
H
D
D
E
E
2
3
2
3
1
1
N
M S
W
4
4
I
I K
K
N
Ingelheim Rathaus
Status-Under-Construction
Location - Ingelheim, Germany
Firm -		 MTP Architekten,
Frankfurt (2020-2022)
Team Work - (Ritayan Rath + RHI team)
Contribution - LPH 5
Detail Design, Architectural Details, Fen-
ster sockel detail, Sparrenaufdoppelungen
Detail, Deckenspiegel, Leuchteplanung,
Dachdetail, Sparrenplan, Wand-und Bo-
dendurchbruchplan, Baustelleneinrich-
tungsplan.
Softwares used -
Vectorworks
D
-0,03
-1,09
Sprung im
Fassade
+0,14
Sprung im
Fassade
-0,27
Ringbalken B in
Ach
se
63, 24/25
UK FUN -4,50
OK FUN -6,17
UK FUN -6,67
UKUZ -1,65
UKUZ -1,65
OK FUN -4,00
EG00.036
Büro
OG01.034
Büro
OG02.034c
WC
OG03.036
Büro
-0,10
+3,04
+6,29
+3,20
+6,45
+9,70
-0,35
-1,12
N
29
35
37 36 34 33 32 31 30 28 27
1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
88 89 91
90
96
92 93 94 95 97 98
UKUZ -0,90
+2,75
+7,25
+8,05
+1,95
G A
Zeichnungsgrenze
+9,25
+9,54
+7,25
+6,00
UKUZ
+9,25
UKUZ
+6,00
+4,00
UKUZ
+2,75
+2,75
-0,28
16
15
4,845
16
4
20
1,8725 15 18
45 1,7825 20 4 18
+9,77
Fusspfette, NH C24,
12/8, OK= + 12,83
Ringbalken, StB,
C 25/30, 20/25,
OK=+12,75, UK=+12,50
+13,09
25mm GK Dampfbremse
45
3,09 20 4 18
BD L
45/100
G
-0,03
-1,09
-0,68
-0,27
+0,14
60 20 16
4,755 24 16
Sprung Rohbau in Achse 62
STB Stüze Neu
UK RiBa
+12,49
Sparren NH C24, 10/20, a= 62,5
2%
15
°
OK RiBa
+13,00
+13,05
Achse Andruckleiste +13,33
UK FUN -4,70
UK FUN -5,00
UK FUN -5,20
UK FUN -5,33
25
2,00
73
7
Siehe Detail
DA 15
DA 20
63
6
1,81
1,44
1,81
1,44
1,83
5
1,41
5
2,64
WD E 10/10
OK=UK
Rähmholz
ANSCHLUß
SIEHE
PLAN
4014_01_5_SN_ARC_SNHH_349
OG03.036
Büro
17,24m²
(Flur/ Speicher)
NRF
LH
U 17,03m
OG03.035
Büro
17,24m²
(Flur/ Speicher)
NRF
LH
U 17,03m
OG03.034
Büro
16,35m²
(Flur/ Speicher)
NRF
LH
U 17,94m
OG03.032
Büro
15,89m²
NRF
LH
U 16,42m
OG03.045
Teeküche
13,39m²
(Büro/ Flur)
NRF
LH
U 15,52m
OG03.051
Lager
5,28m²
(Putzraum)
NRF
LH
U 11,52m
OG03.037a
Vorraum WC
3,58m²
(Flur/ Speicher)
NRF
LH
U 7,85m
OG03.037b
WC-B
6,52m²
(Flur/ Speicher)
NRF
LH
U 10,42m
OG03.038
EDV Server
22,15m²
(Flur/ Speicher)
NRF
LH
U 19,42m
OG03.044
Gesundheit
10,29m²
(Archiv)
NRF
LH
U 14,67m
OG03.043
Registratur
27,22m²
(Archiv)
NRF
LH
U 29,25m OG03.040
Flur
12,99m²
(Archiv)
NRF
LH
U 22,59m
OG03.033a
Flur
33,35m²
(Büro)
NRF
LH
U 39,16m
OG03.046
Büro
24,61m²
NRF
U
LH
20,70m
OG03.047
Büro
14,55m²
NRF
U
LH
15,70m
OG03.048
Büro
14,55m²
NRF
U
LH
15,70m
OG03.049
Büro
14,50m²
NRF
U
LH
15,26m
OG03.050
Büro
13,86m²
NRF
U
LH
15,30m
UK RD
UK FD
OK FFB
OK RFB
von +12,88 bis +13,97
+12,29
+9,75
+9,70
18 STG 18/28
BD L/K 33/98
BD B
24/116
OG03.039
Flur
11,79m²
(Büro)
NRF
LH
U 16,29m
Sprung
OK
RFB
2%
UK FD +12,50
UK Sparren +12,90
OG03.032-T01
1
- -
T90
OG03.002-T11
2
- -
T30
OG03.044-T01
1
-
-RS
T30
OG03.038-T01
1
- -RS
OG03.036-T01
1
- -
OG03.035-T01
1
- -
OG03.034-T01
1
- -
OG03.039-T01
2
-
-
OG03.039-T02
1
-
-
OG03.037b-T01
1
- -
OG03.041-T01
1
-
-RS
T30
OG03.042-T01
1
- -RS
UK RD
UK FD
OK FFB
OK RFB
von +12,88 bis +13,97
+9,75
+9,70
= +107,80 ü.NN
+12,50
HEA 180
HEA
180
Schwelle
T30
OG03.043-T01
1
-
-RS
F90 A+M
Brandwand
Brandwand
Brandwand
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90 A+M
F90 A+M
F90
A+M
F90
F90
F90
F90
STB-Stütze
Bestand
Wandscheibe
NH C24
Ständer, Schwelle,
Riegel
8/10 a≤62,5
Verkleidung des Daches
innenseitig F90A
Stütze
S235
HQ 60-4
Stütze
NH C24
10/16
STB-Stütze 24/ 24
C25/30
STB-Stütze 24/24
C25/30
STB-Stütze 24/ 24
C25/30
Stütze
S235
HQ 60-4
Stütze S235
HQ 60-4
StützeS235
HQ 60-4
Bestand Riba StB
C25/30 24/25
OK 10,262-12,716
StB-Stütze 24/ 24
C25/30
Brüstungpfette
16/18 NH C24
OK +13,35
Randpfette
Gaube 16/16
NH C24
Fusspfette 12/14 (12/8)
NH C24
4,11
5
UK RD
UK FD
OK FFB
OK RFB
von +12,88 bis +13,97
von +12,84 bis +12,90
+9,75
+9,70
Fusspfette 12/8
NH C24
STB-Ringbalken
20/25 C25/30
StB-Stütze 24/ 24
C25/30
StB-Stütze
Bestand
Konsole Auflager
Mittelpfette
UPE 180 OK UPE= u. OKFF
4x FAZ II 12/20
Firstpfette 12/8
NH C24
Stütze 10/16
NH C24
Stütze S235
HQ 60-4
Stütze S235
HQ 60-4
Ausbau
Pfeiler
MW 24/24
Gelenk
Pfette
Stütze
C25/30
Neu 24/24
Stütze
S235
HQ 60-4
Stütze 10/16
NH C24
Gelenk
Pfette
Gelenk
Pfette
Wandscheibe NHC24
Ständer, Schwelle,
Riegel 8/10 a≤62,5
Wandscheibe NH C24
Ständer, Schwelle,10/10
Riegel 8/10 a≤62,5
Stütze
S235
HQ 60-4
Ausbau
Pfeiler
MW 24/24
Ausbau
Pfeiler
MW 24/24
Ausbau
Pfeiler
MW 24/24
Ausbau
Pfeiler
MW 24/24
Ausbau
Pfeiler
MW 24/24
Firstpfetten 16/16
NH C24
OK +14,00
Mittelpfette
BSH GL 24 h
16/24
UK +12,34
Stütze S235
HQ 60-4
2x Ringanker
24/25 Bestand
UK = 11,875
UK = +13,62
Wand Neu
MW 1,51/2,175
Kopf-/
Fußplatte
Kopfplatte
St 16/10/15
Fußplatte
St 15/8/105
18
45
39
5
8
13
57
5
62
5
62
5
62
5
62
5
62
5
15
5
13
8
1,88
5
24
Mittelpfette OK 12,985
GL 24 h
16/24 cm
Sparren NH C24
8/20, a=68
18
24
4 68 68 68 68 68 14 10
Sprung OK FFB
Sprung
UK FD
Estrich ein schneiden
18
45
47
5
13
57
5
62
5
62
5
62
5
62
5
62
5
15
5
13
2,04
5
13
29
5
62
5
62
5
62
5
62
5
62
5
62
5
57
5
5
20
4
OG03.036
2ZL1AL
F01
301
TYP
OG03.035
2ZL1AL
F01
301
TYP
OG03.034
2ZL1AL
F01
301
TYP
OG03.032
2ZL1AL
F01
301
TYP
OG03.050
2ZL1AL
F01
124
TYP
OG03.049
2ZL1AL
F01
315
TYP
OG03.048
2ZL1AL
F01
315
TYP
OG03.047
2ZL1AL
F01
315
TYP
OG03.046
2ZL1AL
F02
315
TYP
OG03.046 F01
124
TYP
OG03.045
2ZL1AL
F
02
115
TYP
OG03.045
2ZL1AL
F01
153
TYP
OG03.038 F01
211
TYP
OG03.041 F01
156
TYP
OG03.040
F
02
135
TYP
OG03.044 L01
134
TYP
BS 15/450/5
16
12
5
20
13
5
1,07
5
Pfoster
10/10
Pfoster 10/10
16
1,78
5
VK RD
UK FD
+12,285
UK FD
+12,42
1,175 775
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 775
1,94 BRH 100
1,175 10
7
4
NA 100
NA 100
RA 100
RA 100
RA 100
RA 100
RA 100
NA 100
5x Oberlichter Typ215, siehe Dachgeschoss
Oberlichter
7x
Typ125,
1x
Typ126
siehe
Dachgeschoss
Sparren NH C24
8/20, a=68
11 81
1,325 BRH 80
14
M
M M
M
M
M
M
M
M
M
M
M
Knauf
W628
B.de
S09
Knauf
W628
B.de
S09
UK RD
UK FD
OK FFB
OK RFB
+11,165
+10,955
+8,145
+8,075
OG03.001 F01
140
TYP
BD L
25/110
Stütze
NH C24
10/16
T30
OG03.051-T01
1
- -RS
OG03.050-T01
1
- -
OG03.049-T01
1
- -
OG03.048-T01
1
- -
OG03.047-T01
1
- -
OG03.046-T01
1
- -
So. Strg
So. Strg
So. Strg
2,50
2,50
1,88
5
61
5
63
5
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
77
5
45
3,94
16
1,83
5
16
4,74
5
12
8
4
18
Wandscheibe
NH C24
Ständer, Schwelle,
Riegel 8/10 a≤62,5
UK FD +12,162
Sparren NH C24
8/20, a=68
Stütze S235
HQ 60-4
2x Ringbalken
StB, Bestand
Anschluss an Stütze
Gaubenwand NH C24
OSB3 Beplankung
Stiel 8/16, a = 62,5
Horizontale Rippen, NH C24, 16/8
Schwelle, NH C24, 16/16
Fusspfette Neu 12/14
Fusspfette und
STB Aufkantung Abbruch
Fusspfette und
STB Aufkantung Abbruch
STB-Stütze 24/24
C25/30
VK
RD
VK RD
Fusspfette Neu 12/14
VK RD
VK
RD
VK
RD
VK
RD
VK RD
OK Pfette 16/18
OK +13,00
Höhenangabe!
Höhenangabe!
STB Aufkantung!!!
STB Aufkantung!!!
Höhenangabe!
Höhenangabe!
Höhenangabe!
Höhenangabe!
Höhenangabe!
Höhenangabe!
Höhenangabe!
STB Aufkantung!!!
STB Aufkantung!!!
STB Aufkantung!!!
Höhenangabe!
UKD -0,13 bezogen auf
Geschossdecke
oder Treppenhaus
Höhenangabe!
Schwelle min. 20cm über Achse 82
überstehen lassen (Lastverteilung)
1,35 5
24
10
1,53 22
5
1,57
18
1,51 24
5
1,37
24
24 11
17
5
5
15
18
15
18
15
18
15
18
15
22
15
18
15
18
24 3,63 1,345 5 3,605 5 2,41 5 3,70 5 185 3,515 5 11 3,795 5 4,665 23
24
4,88
8,82
5
3,55
5
Schwelle aus Foto
_FK091121
Möglich abbruch?
Sprung UK FD
UK FD
+12,42
UK FD
+12,285
UK RD
UK FD
OK FFB
OK RFB
von +12,80 bis +12,93
von +12,74 bis +12,80
+9,75
+9,70
UK RD
UK FD
OK FFB
OK RFB
von +12,83 bis +12,91
von +12,77 bis +12,83
+9,75
+9,70
UK RD
UK FD
OK FFB
OK RFB
von +9,98 bis +12,88
von +10,47 bis +12,73
+9,75
+9,70
STB Neu Riba 24/25
C25/30
OK 13,00-13,09
Sprung UK FD
Sprung UK FD
OK Rohbau Brüstung +10,75
Holz-/
Stahlstützen
Türöffnungen
BD 25/25
BD B
20/40
Bauteilfuge
Bauteilfuge
LH ca. 2,00 m LH ca. 2,00 m
LH ca. 1,00 m LH ca. 1,00 m
SM
SM
SM
SM
SB
HY
OG03.041
Treppenhaus 2
5,47m²
NRF
LH
U 11,17m
Aufzug
1,10 x 2,10
,34
5
1,67
Sparren 8/16
Sturz
Stb
49/25
UK
+11,875
18 24 3,555 16 6,10 125 3,625 125 3,625 125 3,625 125 2,35 1,275 125 2,32 23
75
3,865 20,485 3,15 485
18 24 3,445 11 1,30 775
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00 2,75
1,94 BRH 100
1,00
2,75
1,94 BRH 100
1,00 775
1,94 BRH 100
1,275 3,58 305
3,975 20,15 3,535 2
24 3,39 19 10 3,80 1,01
2,135
1,328 125 2,478 1,01
2,135
138 125 2,553 1,01
2,135
63 125 2,54 1,01
2,135
63 15 2,54 1,01
2,135
63 125125 1,01
2,135
783 40 23
Achsenmaß
Innenmaß + Fassade
Öffnungsmaß + Rohbaumaß
Fassadenmaß
Teilmaß Außenkante
Gesamtmaß 27,68 23 1,14
1,02
5
16
3,98
16
1,86
24
3,40
22
12,33
12
5
1,02
5
16
3,98
16
1,86
9,99
5
12
5
18
1,65
3,47
1,91
5
1,85
BRH
75
14
7
3,43
8
5
8
5
47
5
88
5
3,50
11
5
4,88
5
11
5
18
1,65
1,09
12
5
2,25
5
1,88
5
2,13
5
24
85
1,01
2,13
5
1,54
22
4,89
1,01
2,13
5
6,43
12
5
3,15
2,50
5
33,73
5
3,15
5
2,50
7,60
5
26,13
18 30 15 2,72 115 2,295 125 145 1,01
2,125
145 5,12 18
20
4
18
1,90
16,85
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
2,26
2,12
5
24
1,05
5
15
1,05
5
24
18
24
2,26
24
6,04
18
18
24
1,13
5
1,01
2,13
5
11
5
24
31
1,01
2,13
5
30 1,25 615 635 1,25 1,25 1,25 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
Innenmaß + Fassade-Rohbau
LH
ca.
2,00
m
LH
ca.
1,00
m
UK
Sparren
+12,75
OK Pfette
OK FFB
OK RFB
+9,75
+9,70
+12,80
OK FirstPfette +14,07
UK Pfette
OK FFB
OK RFB
+9,75
+9,70
+12,52
UK FirstPfette +13,87
UK
Sparren
+14,00
ca.
LH
ca.
2,00
m
LH
ca.
1,00
m
OK Mittelpfette
OK FFB
OK RFB
+9,75
+9,70
+11,42
Abbruch Ringanker
Stb 115/25
UK +11,875
BD 20/20
BD 25/25
BD 35/35
BD 25/25
BD 20/20
BD 25/25
BD 15/15
BD 15/15
BD 20/30
BD B
25/25
96 10 2,24 1,44 24
96 15 1,17 15 97 1,34
25 14 1,655
1,85 BRH 75
3,195 1,56 24 585 125 1,30 24 2,23 3
3
2,44 3
3
2,42
5
5 3,67 3
3
3,67 5
5
3,49 3
3
27
30 1,745 45 5,13 125 1,30 24 3,55 1,01
2,135
14
125
14 1,01
2,135
855 36 15 5 1,01
2,135
2,55 125 6 1,01
2,135
2,53 175 5 1,01
2,135
2,48 24
Stützen
Türen
6 1,30 12 2,38 2,50 2,50 3,75 3,75 3,61 2 24
1,25 495 3,24 2,34 6
12 3,75 2,50 1,25 2,50 3,75 3,75 3,75 3,75 2,32 6 23
1,75
18
8
24
3,94
7
5
16
5
2,63
5
24
25
1,88
5
25
11
5
26
5
4,25
24
18
18
45
39
5
16
3,95
5
16
1,88
5
24
4,64
20
4
18
Bestand
Riba
24/12,50
UK=
+12,00
Bestand Riba
24/12,50
UK= +11,875
UZ Stb 24/45 UK +10,895
Wand nicht im Fotos
(nur blech)
_FK20210618
BD KB S
DN 150
BD KB S
DN 150
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60 2xBD KB H
DN 60
2xBD KB H
DN 60 2xBD KB H
DN 60 2xBD KB H
DN 60
2xBD KB H
DN 60
BD S 20/10
BD/DD KB S
DN 150
BD KB S
DN 150
BD KB S
DN 150
BD KB S
DN 150
BD KB S
DN 150
KB K DN 100
Achse ?
BD/DD KB S
DN 200
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60
2xBD KB H
DN 60 BD/DD KB S
DN 150
BD KB S
DN 100
WD L 110/30
OK=
KB L DN 200
Achse
KB S DN 100
Achse ?
KB S DN 100
Achse ?
KB S DN 100
Achse
KB S DN 100
Achse
KB S DN 170
Achse
3xKB K DN 100
Achse
WD L 77/30
OK=
KB FEU DN 160
Achse
2xBD KB L
DN 350
KB S DN 100
Achse +12,67
DD KB S
DN 150
28,63
2,14 12 12 2,26 12 12 2,26
12 12
3,51
12 12
3,51
12 12
3,51
12 12
3,51
24 2,14 24 2,26
1,00 BRH 1,75
24 2,26
1,00 BRH 1,75
24 3,51
2,00 BRH 75
24 3,51
2,00BRH 75
24 3,51
2,00 BRH 75
24 3,51
2,00BRH 75
7,505 3,26 49 3,26 49 3,26 49 3,26
24 4,70 125 2,36 15 3,61 125 3,60 175
3,54 24 3,57
2,56
5
14,28
5
21,25
Wandscheibe
68 68 68 68 68 4
3
23
18 24 3,63 9 365 365 365 855
46
46 2,83 46 46 2,83 46 46 2,83 46 46 2,83 46 46
855
365 365 365
9
5 3,56 2 23
Fusspfette
B
10/8
Tür Symbol?
STB Aufkantung B
STB Aufkantung B
STB
Aufkantung
B
STB
Aufkantung
B
Achsen Stüzen
OK STB Aufkantung
+10,00
OK Fusspfette
+10,14
OK UZ +9,77
OK
STB
Aufkantung
+10,00
OK
UZ
+
9,77
OK
Fusspfette
+10,14
Fusspfette
B
8/10
UK
Sparren
+14,00
ca.
UK RD
+12,54
2/28
UK
+12,52
tte
10/20
UK
+13,87
OK STB Aufkantung
+10,00
OK Fusspfette
+10,08
OK UZ + 9,77
WA B 30/18/30
UK +12,14
WA B 20/18/30
UK +12,57
mit MW
schließen
OK Mittelpfette
OK FFB
OK RFB
+9,75
+9,70
+11,75
2xBD KB S
DN 150
163 2,065 50 2,836 50 20 125
50 10 24
10
2,65
2
50
29
16
10
2,65
50
29
16
10
2,65
1
50
29
16
10
2,65
50
29
16
16
32
5
13
5
45
17
5
45
79
16
50
5
50
10
1,10
23
5
1,20
5
15
54
24
18
24
1,83
24
45
17
5
45
1,38
1
50
1,33
24
15
3,51
35
195 23
30 20 30 10 23
1,02 90 24
50
29
16
24 2,57 20
2xWD L 45/30
OK=UK Rähmholz
2xWD L 45/30
OK=UK Rähmholz
2xWD L 45/30
OK=UK Rähmholz
2xWD L 30/30
OK= +12,67
2xWD L 30/30
OK= +12,67
WD E 50/15
OK= +12,71
WD E 50/15
OK= +12,71
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=12,71
2xWD E 50/15
OK=
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49 WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49
WD E 5/12
OK= +10,49
WD E 20/40
OK= UK Rähmholz
WD E 20/40
OK=UK Rähmholz
WD E 20/40
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 50/15
WD E 10/10
OK=UK Rähmholz
WD E 10/10
OK=UK Rähmholz
WD E 10/10
OK=UK Rähmholz
WD E 10/10
OK=UK Rähmholz
WD E 10/10
OK=UK Rähmholz
WD E 10/10
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 50/15
OK=UK Rähmholz
WD E 10/10
OK=
WD E 50/15
OK=12,71
BD E 50/20
BD/DD E
20/80
J
K
L
M
86
87
88
89
90
91
92
93
94
95
96
97
98
99
N
H
G
40
41
G
A
N
M
G
85 84 83 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65
O P Q R
82 64 63 62
B H
B H
91
92
93
94
95
96
97
98
99
A
INGELHEIM RATHAUS
Abbruch
Überfahrt
Abbruch
4
STG
20/23
UK RD
UK FD
OK FFB
OK RFB
+13,80
+13,75
UK RD
UK FD
OK FFB + 12,98
OK RFB +12,74
T30
DG01.003-T01
1
- -RS
T30
DG01.001-T01
2
- -RS
2
S
T
G
.
1
5
/3
3
UK RD
UK FD
OK FFB
OK RFB
+13,00
+12,95
= +111,05 ü.NN
+15,50
von ca.+17,15 bis ca. +15,60
24
62
5
1,14
2,10
1,12
24
2,11
5
18
5
37
5
Aufzug
1,10 x 2,10
Brandwand
Brandwand
F90 A+M F90 A+M
F90 A+M
F90
A+M
F90
F90
F90
F90
DG01.017 F 01
127
TYP
DG01.002 F 01
127
TYP
OG03.042
F
07
125
TYP
OG03.042
F
06
125
TYP
OG03.042
F
05
125
TYP
OG03.042
F
03
125
TYP
OG03.042
F
02
125
TYP
OG03.042
F
01
125
TYP
OG03.040
F
01
126
TYP
OG03.042
F
04
125
TYP
OG03.033a F 05
215
TYP
OG03.033a F 04
215
TYP
OG03.033a F 03
215
TYP
OG03.033a F 02
215
TYP
OG03.033a F 01
215
TYP
Oberlicht Typ126, siehe Dauchaufsicht
24
4,82
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
12
1,75
5
1,07
BRH
3,05
1,13
24
2,26
12
3,75
3,75
3,75
2,38
Mittelpfette
22/26
OK=+12,80
10,40 2,32
50 ÜFFB EG 13,28
12 2,38
50 ÜFFB EG 13,28
12 2,38
50 ÜFFB EG 13,28
12 2,38
50 ÜFFB EG 13,28
12 2,32
50 ÜFFB EG 13,28
4,82
M
M
DG01.001 F 01
141
TYP
30
1,49
5
11
5
1,10
1,62
5
1,01
11
5
24
13
5
2,25
10
5
15
5
24
5
16
4,09
20
20
1
So. Strg
26
24
5
UK FD
OK FFB
OK RFB
-
+11,395
+11,325
UK RD von ca. +13,35 bis ca. +15,55
18 30 15 3,074 1,462 2,019 24133 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 133 24 253 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625133 24 16
Sparren
10/20,
a=
62,5
Sparren
10/20,
a=
62,5
Sparren
8/20,
a=
62,5
Sparren
8/20,
a=
62,5
Sparren
8/20,
a=
68
Sparren
8/20,
a=
68
Fusspfette, NH C24,12/8, OK= 12,83
STB-Ringbalken, C25/30, 20/25, OK= 12,75
STB Stutze C25/30, 24/24, OK= 12,75
Mittelpfette, BSH GL 24 h, 16/24
OK +12,95
Fusspfette Neu 12/14
Fusspfette Neu 12/14
Firstpfette, NH C24, 16/16, OK= 14,00
Pfette, 16/18, OK= 12,93
F90 Beplankung
Auflasserpfette nach angaben Statiker
Betonsteindeckung
(Frankfurter Pfanne)
30°
16
30
54
16
1,73
13
2,28
1,86
24
17
16 24 3,66 60 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 60 17 3,31
Bitumenbahn 2lagig, besplittet
Bitumenbahn 2lagig, besplittet
Betonsteindeckung
(Frankfurter Pfanne)
30°
2,14 24 2,26 24 2,26 24 3,51 24 3,51 24 3,51 24 3,51 24 2,26 24 3,51 24 16 2,10
STB
Neu
Riba
24/25,
C25/30
OK
+13,00
-
+13,09
Sparren
20/20
Sparren
20/20
Mittelpfette, BSH GL 24 h, 16/24
OK +12,95
Mittelpfette, BSH GL 24 h, 16/24
OK +12,95
Bereich mit photovoltaik anlage
gemäss angaben firma Gedea
Bereich mit photovoltaik anlage
gemäss angaben firma Gedea
2%
2%
W
in
d
ri
s
p
e
n
Windrispen
Wand
Wand
Wand
Wand
Sieh Detail
DA 10
STB
Neu
Riba
24/25,
C25/30
OK
+13,00
-
+13,09
Bestand
Riba
StB,
C25/30
24/25
OK
+10,26
2
-
+12,71
6
Bestand
Riba
StB,
C25/30
24/25
OK
+10,26
2
-
+12,71
6
F90 Beplankung
DG01.001
Treppenhaus 1
32,49m²
NRF
LH
U 40,90m
SM
SM
SB
WEISS
UK
WAT
+15,12
5
20 STG 1625/30
3,17
5
2,50
33,71
5
26,13
5
7,58
2,50
3,17
5
10,02
5
27
5,04
24
50
7
5
1,31
40
2,73
2,38
5
45
20
45
20
45
52
73
2,39
5
1,96
5
55
16,85
1,90
4,88
5
2,42
5
4,23
92
5
7,56
5
26,13
3,887 20,285 3,308
3,91 5,30 2,45 2,42 2,40 2,42 3,83 2,42 2,33 18 305
3,89 5,28 2,22 5,28 2,22 5,28 3,308 18 23
75
Achsenmaß
Abbruch
Fassadenmaß
Teilmaß Außenkante
Gesamtmaß 27,48 30 1,25
18 23 6,02 24 16 5,67 18 45
18 23 2,61 24 3,10 24 3,64 125
2,32
18 23 75
6,115 2,265 75 23 2,235 1,01
2,135
505
95 18 23 75 8,38 75 23 3,568 125
18 628 2,212
1,105
7,595 1,17
95 18
95
21,79
5
10,815
1,81
3
23
3
11
5
1,04
11
5
1,10
7
5
16
5
2,88
5
24
2,01
10
5
40
11,70
8
18,39 6,49 6,01
18,09 6,83 1,215 2,01 49 2,01
18 23 5,95 24 1,32 2,26
1,30 BRH 1,45
24 2,26
1,30 BRH 1,45
24
7,585 2,38 2,52 13,665 11,985
28
2,50
2,50
1,88
5
61
5
63
5
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
28 1,25 615 635 1,25 1,25 1,25 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
Achsenmaß
Innenmaß + Fassade
Öffnungsmaß + Rohbaumaß
Fassadenmaß
Teilmaß Außenkante
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
WD neu 76/62
Wand OG3
Wand/UZ Sprung + 15,835
IPE 160
UK +16,31
Decke Sprung
UK +16,985
1,845 7,605 18,03
UZ Stb 24/45 UK +12,50 UZ Stb 24/45 UK +12,50
ÜZ Stb 24/125 UK+15,236
Knick +15,777
OK Wand +14,34
ÜZ Stb OK +13,35
2,81 4,02 5,67
Terrasse DG
Terrasse 3OG.
Terrasse 2OG.
Decke
neu
BD KB S
DN 150
BD KB S
DN 150
BD KB S
DN 150
BD KB S
DN 220
2
D
BD KB S
DN 150
OK Wand +14,34
STB Decke
STB
Decke
STB
Decke
Mittelpfette 26/30
OK +15,93
OK STB Aufkantung
+13,25
OK Fusspfette
+13,33
OK UZ + 13,02
OK STB Aufkantung
+13,25
OK Fusspfette
+13,33
OK UZ + 13,02
24
2,63
5
25
24
1,99
12
5
4,65
20
24
2,51
16
5
7
5
VK Rohbaudecke
Attika Fertigbau OK= +13,515-
Rohbau OK= +13,35
20
4,65
12
5
1,99
24
2,88
5
16
5
7
5
2x Ringanker
24/25 Bestand
UK = 11,875
UK = +13,62
16 24 369 68 68 68 68 681 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 369
16 24 369 68 68 68 68 681 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 369
J
K
L
M
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
N
H
G
40
41
91
92
93
94
95
96
97
98
99
100
101
102
103
104
G
A A
E
G
A
G
G
N
M
G
INGELHEIM RATHAUS
Ringbalken B in
Achse 63, 24/25
Stütze
S235
QH 60-4
Stütze
NH C24
10/16
4.OG02.014
Foyer
4.OG03.014
Foyer
Luftraum
4.OG02.015
Dachterrasse
Schacht +7,80
Schacht +7,15
+6,48 +6,50
+9,75
+9,47
+9,67
+9,14
+10,75
+8,99
+9,14
Achse Andruckleiste
+13,36
+12,39
+12,50
+12,72
UKRD Aufzug
+15,90
OK FF +6,64
= 104,69 NN
OK FF +7,52
= 105,57 NN
+6,55 OK Terrasse
+104,54 +104,52
+12,92
UK FUN -1,05
OK FUN -1,05
UK FUN -3,00
UK FUN -3,70
UK FUN -4,50
OK FUN -4,00
EG00.058
Lager / Fundbüro
EG00.036
Büro
EG00.034
Flur
OG01.053
Büro
OG01.034
Büro
OG01.031
Flur
OG02.056
Büro
OG02.034c
WC
OG02.033
Flur
OG03.049
Büro
OG03.036
Büro
OG02.035
WC-B
+0,00
-0,10
UKUZ
+6,00
+3,04
+2,75
UKUZ
+2,75
+6,29
+3,25 +3,20
+6,00
UKUZ
+9,25
+6,50 +6,45
+9,25
+9,54
+9,75 +9,70
-0,35
UG ca. -4,30
OK FFB OG01 +3,25 = +101,30 NN
OK FFB EG00 ±0,00 = +98,05 NN
OK FFB -1,05 = +97,00 NN
OK FFB OG03 +9,75 = +107,80 NN
OK FFB DG01 +12,94 = +111,05 NN
Firsthöhe Bestand +14,53 = +112,58 NN
Firsthöhe Bestand +17,78 = +115,83 NN
Drainage Bestand
DN 100
WILHELM-LEUSCHNER-STRASSE
OK FFB OG02 +6,50 = 104,55 NN
+4,83
+3,20
+5,79
+4,75
Brandsperre
3,25
1,33
9
2,96
11,20
3,25
4,78
3,25
3,25
3,25
35
70
1,81
1,44
70
47
15
10
3,36
50
2,75
50
2,75
50
1,88
87
30
75
1,95
70
3,25
1,33
9
3,12
25
7
43
2,00
75
7
43
2,00
75
7
43
2,00
75
14
14
12
65
Firsthöhe Bestand +17,05 = +115,10 NN
OG03.033a
Flur
+9,25 +9,25 +9,25 +9,25
+9,54 +9,54
+7,25 +7,25
+6,29 +6,29
+6,00 +6,00 +6,00 +6,00
UKUZ
+9,25
UKUZ
+6,00
UKUZ
+9,25
UKUZ
+9,25
UKUZ
+6,00
UKUZ
+6,00
+4,00 +4,00
+0,75
+0,70
+0,40
+3,00
UKUZ
+2,75
+2,75 +2,75
+3,04
+3,04
UKUZ
+2,75
-0,28
+3,20
-0,10
-0,28
28
3,04
21
3,04
21
3,04
21
2,53
5
18
10
2,12
5
11
5
80
16
5
2,12
5
11
5
80
16
5
2,75
29
16
5
2,12
5
41
16
15
4,845
125
1,885
63
4,34
15
16
16
4
20
63
2,39
125
80
60
20
4
16
+6,45
+9,70
18 4 20 4,25 125 2,39 125 2,5225 1,8725 15 18
63 1,885 63 2,0175 45 1,7825 20 4 18
+0,25
OK FUN -0,40
+9,77
30
°
OK WEG +6,48
OK WEG +9,18
= +107,23 NN
G A
Sparren NH
C24, 8/20, a = 68
Firstpfette NH C24
16/16, OK= + 14,00
Fusspfette, NH C24, 12/8, OK= + 12,83
Ringbalken, StB, C 25/30, 20/25, UK +12,50
Fusspfette
NH C24,
12/14
OK= + 10,14
51
Stütze
S235
QH 60-4
Stütze
NH C24
10/16
Randpfette NHC24
16/16
OK +12,845
UK +12,685
18
10
2,12
5
11
5
80
16
5
2,12
5
11
5
29
16
5
2,75
29
16
5
2,67
43
+13,09 +13,09
+10,15
+14,53
25mm GK Dampfbremse
+13,24
+13,19
8 8
Abbruch Dach
8 8
1,29
15
1
24
3
16
11
13
1,59
56
7
28
8
25
21
5cm Promat
WD L 30/30
45
6 Sparren NH
C24, 8/20, a = 68
25 16 3,08 90 16 1,84 16 1,65 3,09 20 4 18
BD L
45/100
WD E 50/15
UK= +12,595
2,22
1
27
5
31
3
Neu Ringbalken in Achse 63,
StB, C 25/30 24/25
UK= von +12,763 bis +12,843
G
OK RiBa +13,09
15 1,12 16 24 4,64 24 1,885 63 80 60 20 16
15 1,28 24 4,64 24 1,885 125 4,755 24 16
STB Stüze
Neu
Gaubenwand
NH C24
OSB3 Beplankung
Stiel 8/16, a = 62,5cm
BD L
35/70
K L M N
35
39
40
41
G
H
J
38 37 36 34 33 32 31
2,50 2,50 1,885 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
86
87 88 89 91
90
92 93 94
Füllholzer
16/16,5
OK= + 12,99
Horizontale Rippen, NH C24, 16/8
Schwelle, NH C24, 16/16
UK RiBa
+12,49
WD L
30/30
Brüstungs-
pfette
NH C24,16/18
OK= + 13,28
OK Pfette 16/18
= + 12,93
Sparren NH C24, 10/20, a= 62,5
Sparren NH C24, 8/20, a= 62,5
450
300
450
300
200
400
Mittelpfette
BSH GL24h
16/24
OK= + 12,95
Füllholz 16/17
+12,285
2%
2%
1
,1
5
°
1
,1
5
°
OK RiBa
+13,00
+13,05
3 KB K Ø 100
Achse +12,67
WD E 50/15
OK= +12,784
Achse +12,705
WD L 110/30
OK= +12,76
Achse +12,61
WD L 77/30
OK= +12,71
Achse
+12,56
KB S Ø 170
Achse +12,63
8
41
8
2,04
5
Achse Andruckleiste +13,33
Sturz 49/25
UK= +11,875
+12,42
+15,777
+10,75
Ringbalken B in
Achse 63, 24/25
Stütze
S235
QH 60-4
Stütze
NH C24
10/16
4.OG02.015
Dachterrasse
20
18
OG02.034c
OG02.033
OG03.036
Büro
OG02.035
+9,25
+9,70
OG03.033a
Flur
+9,25 +9,25
+9,54 +9,54
+7,25
UKUZ
+9,25
UKUZ
+9,25
UKUZ
+9,25
3,04
21
2,53
5
2,75
29
16
5
2,12
5
41
2,39 125 2,5225 1,8725 15 18
63 1,885 63 2,0175 45 1,7825 20 4 18
+9,77
30
°
Sparren NH
C24, 8/20, a = 68
Firstpfette NH C24
16/16, OK= + 14,00
Fusspfette, NH C24, 12/8, OK= + 12,83
Ringbalken, StB, C 25/30, 20/25, UK +12,50
Stütze
S235
QH 60-4
Stütze
NH C24
10/16
+13,09
+14,53
25mm GK Dampfbremse
+13,24
+13,19
8 8
Abbruch Dach
8 8
5cm Promat
WD L 30/30
45
90 16 1,84 16 1,65 3,09 20 4 18
BD L
45/100
Neu Ringbalken in Achse 63,
StB, C 25/30 24/25
UK= von +12,763 bis +12,843
OK RiBa +13,09
STB Stüze
Neu
UK RiBa
+12,49
WD L
30/30
Brüstungs-
pfette
NH C24,16/18
OK= + 13,28
OK Pfette 16/18
= + 12,93
Sparren NH C24, 10/20, a= 62,5
450
300
450
300
200
400
Mittelpfette
BSH GL24h
16/24
OK= + 12,95
Füllholz 16/17
+12,285
2%
1
,1
5
°
OK RiBa
+13,00
+13,05
3 KB K Ø 100
Achse +12,67
WD E 50/15
OK= +12,784
Achse +12,705
WD L 110/30
OK= +12,76
Achse +12,61
WD L 77/30
OK= +12,71
Achse
+12,56
KB S Ø 170
Achse +12,63
8
41
8
2,04
5
Achse Andruckleiste +13,33
Sturz 49/25
UK= +11,875
+15,777
UKUZ
+9,25
+9,52
+9,70
+9,25
+9,75
+12,79
UKUZ
+12,10
+9,68
OG03.032
Besprechung
OG02.032
OG02.002a
+9,54
UKUZ +12,50
OG03.002
Flur
4.OG02.014
Foyer
4.OG03.014
Foyer
Luftraum
4.OG02.015
Dachterrasse
Schacht +7,80
Schacht +7,15
+9,75
+9,47
+9,67
+9,14
+10,75
+8,99
+9,14
Achse Andruckleiste
+13,36
+12,39
+12,50
3,13 7,63
18 20 1,98 20 4,46 20
20
18
20
+12,72
UKRD Aufzug
+15,90
OK FF +7,52
= 105,57 NN
OK FF +8,72
= +106,77 NN
+12,92
16
28
20
33
5,89
3,67
17
10
18
20
33
1,64
1,00
8
53
2,64
43
20
3,05
20
25
2,72
65
1,45
2,74
43
2,78
50
2,75
4,52
45
1,95
80
7
43
1,95
+12,40
+7,25
+9,25 +9,25
+7,30
+9,25
+10,55
+12,10
+13,35
+12,95
UK UZ
+9,25
+12,50
+9,77
+15,236
OK +16,085
+17,47
26
7
8
2
36
2,64
5
16
29
2,00
1,18
1,25
2,35
5
2
16
27
51
11
5
2,12
5
3,34
88
3,25
15
OK WEG +9,18
= +107,23 NN
G
+17,78
Bestand Ringbalken in
Achse 63, 55, 24/25
WD L 160/30
UK= +12,50
Achse 60
WD L 40/30
UK= +12,47
Achse 60
WD L
110/28
11
11
5
2,12
5
5
UK Riba
12,50/11,50
+11.875
3 KB K Ø 100
UK= +12,62
OK +15,78
OK Rohbau
Bestand+14,34
+15,97
+13,00
+15,45
+15,63
+15,93
Mittelpfette
26/30 OK +15,56
+15,42
+15,64
+13,15
+12,30
18 30 15 1,435 12 1,02 12 1,11 75 165 2,885 24 1,885 125 215
31
48
2
90
45
21
7
18
5
2,28
6
16
29
2,75
1,91
3,06
25
2,57
18 24 75 1,57 12 559 12 1,57 12 571 175 1,885 2,50 125 4,755 20 22
KB S Ø 170
UK= +12,609
Achse 60
UK FD +12,25
UK RiBa
Achse 63
+12,49
WD E 50/15
UK= +12,65
Achse 60
+17,135
8
2
25
Sturz 49/25
UK= +11,875
Sparren NH C24, 10/20, a= 62,5
OK Pfette 16/18
= + 12,93
Füllholz 16/17
INGELHEIM RATHAUS
INGELHEIM RATHAUS
DATUM BAUVORHABEN
wilhelm-kobelt-straße 1
mtp architekten gmbh
06.12.2021_
vm
Modernisierung und Erweiterung
Rathaus Ingelheim
+10,15
+9,75
K
+9,70
3
0
°
2
23
32
20
4 2 12 4 20 8 20
4 4 10 4 8 12 8 20
DT_ARC_03
5
11
1,00
5
16
29
1 4 4 40 15 39 16 12
+10,75
+10,14
+10,00
17
Sperrschicht
Kniestock/
Gaubenwand v.a.n.i.:
OSB3-Platte für
Feuchte geeignet
Dampfsperre
Zwischen-
dämmung 16cm
Vertikale Pfosten,
NH C24, 8x16
Horizontale Pfosten,
NH C24, 8x16
Dampfsperre
Gipskarton-
beplankung 2x12,5
Fusspfette
NH C24
12/14
Pultdach v.o.n.u.:
Betonsteindeckung (Frankfurter Pfanne)
Lattung und Konterlattung 30x50mm
Unterspannbahn
Zwischendämmung 20 cm, (Mineralwolle,
nicht brennbar MLG 035)
Sparren NH C24 8/20 cm
OSB3-Platte (für Feuchte geeignet)
Dampfsperre
Heizkörper
157 x 300
Kabelkanal 66 x 170
Zuluft-Nach-
strömung
Aeromat DS2
250 x 100 x L
Alu-Fensterbank
Führungsschiene
Raffstore
Fensterbank
Aluminium
Aluminium Blech
Sockelleiste
Teppichboden
Fliesengitter
Wandaufbau v.a.n.i:
Natursteinplatte 4cm
Hinterlüftung 4 cm
Dämmung 10 cm
StB Wand (Sturz)
Drainlet-Notablauf
DN70
10
10
7 3
3
3
3
275
15
245
15
125 22 125
15
27.10.2021_ Modernisierung und Erweiterung
+14,53
39 M 86
+13,28
+12,93
68
57
40
55
5
3
+13,18
25
168 7 3
HK-
Stütze
VK-
Stütze
2% Gefälle
3
0
°
+14,00
25
13 16 24
25
13 8 8 24
25 08 16 13 75 35
25
08
5 6
08
25
25 125
25
VK-
GK-Wand
175
3
2
15
2
6
20
2
+13,33 Achse
Andruckleiste
OK
Pfette
OK
Brütungspfette
OK
Firstpfette
3
12
37
16
8
33
16
18
17
18
47
OK First
HK-
GK-Wand
UK
abgehängte
Decke
Pultdach v.o.n.u.:
Betonsteindeckung (Frankfurter Pfanne)
Lattung und Konterlattung 30x50mm
Unterspannbahn
Zwischendämmung 20 cm
Sparren NH C24 8/20 cm
Dampfsperre
25/40 mm Unterkonstruktion
2x 12,5 mm Gipskartonbeplankung
Metallfassade v.a.n.i.:
Metall Aluminium
Hinterlüftung
Wärmedämmung 13 cm
Dampfsperre
Firstpfette NH C24, 16/16
12,5/ 25 mm Unterkonstruktion
2x 12,5 mm Gipskartonbeplankung
Pfette
NH C24
16/18
Stütze
S 235
QH 60-4
Kopfplatte
B1 160x100x15
Flachdach-Aufbau v.o.n.u.:
Bitumenbahn 2lagig, besplittet
22 mm OSB3-Beplanung
60/80 m Lattung für Hinterlüftung
Unterspannbahn
Sparren, NH C24, 8/ 20
20 cm Zwischensparrendämmung Mineralwolle,
nichtbrennbar, MLG 035
18 mm OSB3- Beplankung (aussteifende Scheibe
gemäß Statik)
Dampfsperre
abgehängte Decke v.o.n.u.:
Abhänger
Installationsraum
Unterkonstruktion
2x 12,5 mm Gipskarton-
beplankung
Firstpfette
NH C24
16/16
Pultfirststein
GK-Wand 16 cm
Unterkonstruktion
2xCW Profil 50 mm
Brüstungs-
pfette
NH C24
16/18
Schattennut
WD L
30x30
Flüllholz
NH C24
16/17
+3,25
+6,50
+9,75
+9,25
+6,43
+6,29
+6,00
+3,18
+3,00
+2,75
-0,14
UK FD +12,50
Firsthöhe Bestand +17,78 = +115,83 NN
OG02.032
Warten
OG01.031
Besprechung
EG00.002
Foyer
+9,33
+2,64
+5,89
+9,14
Bestand RiBa, 24/25, OK 10,26
2 bis
12,71
6
OK RiBa
+13,00
UK RiBa
+12,49
2%
OK Rohbau
Bestand+16,00
OK Rohbau
Bestand+14,34
+14,53
+15,968
+13,09
+13,35
+13,15
+12,30
+15,75
UK UZ +12,10
+0,00
+11,85
+10,05
+9,49
+10,20
+9,70
+9,54
+12,25
+12,58
Riba
12,50/11,50
UK= +11,875
+9,52
+9,70
+9,75
+12,74
+12,79
+12,95
+2,75
+3,02
Wand MW
d=24
UZ 24/61,50
UK= +12,125
DG01.001
TH1
Bestand Riba
StB
24/25
20 505 16 2,055 17 24 1,559
10/12
14 10
+2,75
OG03.002
Flur
OG02.002a
Flur
OG01.002a
Foyer
EG00.005
Flur
+13,00
Wand MW
d=24
Wand MW
d=24
Wand MW
d=24
+9,68
+6,80
+7,00
+6,24
+6,08
HEA 450
+6,60
+6,50
L
M
N
35 39 40 41
G H
38
37
36
34
33
32
31
30
2,50
1,885
615
635
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
86
87
88
89
91
90
92
93
94
95
181 24 2,26 16 2,16 30 1,885
+9,25
+2,75
+6,00
Ringbalken
24/12,50
UK= +11,875
26
63
46
37
25
80
25
1,30
1,45
5
16
29
25
2,50
7
16
27
2,75
7
16
27
2,75
7
16
27
2,75
14
16
3,79
95
18
T30
DG01.001-T01
2
- -RS
T90
OG03.002-T11
2
- -
T90
OG01.030-T05
1
- -
T90
EG00.004-T02
2
- -RS
26
6
71
4
80
25
1,30
1,50
21
26
6
1,76
4
1,30
89
9
20
1
20
85
20
25
1,65
3
14
7
80
2,00
64
9
10
6,50
14
16
3,80
18
2017 7 11 2,00 15 17 7 11 1,46 18 505 16 2,055 17 24 1,885 26
OK RiBa
+13,09
Sparren NH C24, 10/20, a= 62,5
+3,25
+6,50
+9,25
+6,43
+6,29
+6,00
+3,18
+3,00
+2,75
-0,14
OG02.032
Warten
OG01.031
Besprechung
EG00.002
Empfang
+9,33
+13,15
+12,30
+0,00
UK UZ
+11,85
+10,05
+9,49
+10,20
+9,70
+9,54
+12,25
+12,58
+6,80
+7,00
+6,24
+6,08
+9,75
+12,74
+2,75
+6,27
+6,00
DG01.001
TH1
Bestand Riba
StB
24/25
24 575 1,31 24 17
10/12
24 1,885 10
14
17
1,13 3,75 365 2,01 546
+12,79
+12,95
+13,00
IPE 400
+6,60
+6,50
UZ Stb 24/45 UK +2,73
UZ Stb 24/45
UK +2,73
+6,45
+6,29
L M N
29
35
39
40
41
G
H
38 37 36 34 33 32 31 30 28
2,50 1,885 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
86
87 88 89 91
90
96
92 93 94 95 97
12 30 2,16 16 2,26 24
+9,52
+9,68
+2,75
+9,25
26
6
71
4
80
25
1,30
1,50
16
21
2,90
16
19
2,90
16
19
2,90
16
27
62
5
2,26
5
15
26
35
3,20
18
26
63
71
37
87
30
18
1,00
1,45
5
16
21
33
37
5
2,12
5
7
16
27
62
5
2,12
5
7
16
27
62
5
2,12
5
7
16
27
62
5
2,12
5
14
16
3,79
95
18
-4,10
-0,55
26 1,885 24 17 2,105 11 505 20 1,44 11
7
17 15 2,00 11 24 20
+12,10
+2,13
+3,70
OK Brüstung
Neu +4,25
+3,70
+3,18
Mit schalpläne
Prüfen
_FK 20210917
Mit Statiker
Prüfen Abbruch
_FK 20210917
Mit Statiker
Prüfen Abbruch
_FK 20210917
Sprung
UZ In Achse 53
Noch in Bearbeitung
FK20210917
Pos. Stuze Prüfen
FK20210917
Bemassung Prüfen
FK20210917
OK UZ
+13,35
UZ/ÜZ Stb 24/125
UK +6,00
+6,00
16
25
5
7
5
UZ Stb 24/45 UK +2,73
Schnitt I-I Schnitt K-K
INGELHEIM RATHAUS
3,53
O
+12,95
Rückkühler
+17,78
+14,48
+16,25
+13,39
+13,83
+15,28
+15,89
+16,09
+16,25
+16,22
+14,48
+15,58
+17,78
7,56
1,46
3,10
1,77
3,86 1,58 1,19 5,92
3,93 3,31
3,02
5,05
3,83
12 STG 16.6/30
10 STG 163/30
26 STG 165/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
26 STG 165/30
+9,68
+6,43
+3,18
+6,29
+9,47
+12,79
+2,95
-1,19
+13,40
UK FUN -5,95
OK RFB -4,60
UK FUN -5,16
+8,06
+4,81
+1,16
+1,36
+4,60
+7,85
+11,10
+11,31
+12,95
+9,68
+6,43
+3,18
+6,22
-1,19
+9,47
+12,79
+2,95
+8,06
+4,81
+1,16
+1,36
+4,60
+7,85
+11,10
+11,31
+12,95
+9,68
+6,43
+3,18
+6,22
-1,19
+9,47
+12,79
+2,95
+3,02
+6,27
+9,52
+12,79
Zeichnungsgrenze
Zeichnungsgrenze
Zeichnungsgrenze
Zeichnungsgrenze
-1,07
1,22
376 967 968 587 1,25 1,25 519
1,85
1,40
1,85
1,40
1,85
1,40
1,85
1,40
1,85
1,40
46
1,583
1,21
2
2,09
69
1,195
1,772
1,338
1,195
56
56
56
56
56
4,33
+17,78
+16,25
Zeichnungsgrenze
85 3,48
61 1,02
+8,06
+4,81
+1,16
+14,48
+16,25
+1,36
+4,60
+7,85
+11,10
+11,33
-1,19 -1,07
10 STG 163/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
10 STG 163/30
OK KD +0,77
OK Weg -0,06
Feurwehr zufahrt
O
Rampe
OK Pflaster -1,07
UK Fun Bestand -1,84
UK KS Bestand -8,30
UK Fun Bestand -7,10
OK Fun Bestand -5,00
Leitungsverlauf prüfen
Kanal
UK KS Bestand -6,05
UK Fun Treppe Best
UK Magererbeton -2,98
OK FFB OG01 +3,25 = +101,30 NN
OK FFB OG02 +6,50 = 104,55 NN
OK FFB OG03 +9,75 = +107,80 NN
OK FFB DG01 +13,00 = +111,05 NN
UK BoPla -1,34 = +96,71 NN
OK FFB EG00 -1,05 = +97,00 NN
OK FFB EG00 ±0,00 = +98,05 NN
UK Fun -2,71 = +95,34 NN
1,53
1,77
H
=
14,48
Firsthöhe TPH Süd +16,24
= +114,29 NN
4,38
H
=
10,15
4,32
Firsthöhe Bestand +17,78 = +115,83 NN
Traufhöhe = H
OK BoPla -5,00 = +93,05 NN
UK BoPla -5,15 = +93,20 NN
UK Fun -8,10 = +89,95 NN
OK Fun -6,25 = +91,80 NN
2,46
2,32
94
2,32
93
2,32
93
2,32
93
1,84
1,05
6,17
8,28
2,19
1,50
68
ANSCHLUß
SIEHE
PLAN
4014_01_5_FA_ARC_FANW_365
INGELHEIM RATHAUS
PROFESSIONAL PROJECT
Exploded Isometric View of a Facade Panel
Aluminium Sheet
Aluminium Sheet
Structural Members
Glass Panels
Space for LED
Sectional View of a Facade Panel
300 cm
300 cm
17.2°
17.2°
10.6°
X
cm
45.0°
4
5
.0
°
R1000
300 cm
The dynamic facade of Porsche consists of 4 transitioning panels in each row, represented in Red, Yellow and Orange
color, helps to get natural light and makes a visual connection between interior and exterior. The opening in the aluminium
facade widens as we go down from the apex of the building to the entrance. The bottom of each row is connected with red
LED lights to signify the entrance.
PROFESSIONAL PROJECT
View of Porsche Center Hangzhou, China
Lighting Plan Reflected Ceiling Plan (RCL)
PROFESSIONAL PROJECT
The juxtaposition of the wooden boxes
one on top of each other with metallic
columns to support is the primary lan-
guage used to produce the vernacular
and rusty effect to the ambience of the
restaurant.
In the gap between the boxes of Un-
der-arm counter is highlighted with LED
line to show the mix of metal and wood.
Exploded isometric view of the pizza
counter showing the material specification
Lincontro Italian Restaurant
Main Bar/ Pizza Counter Details
Juice Bar Details
PROFESSIONAL PROJECT
Lincontro Italian Restaurant
Plan
The stacking of wooden boxes in waiter station
creates two major spaces: Interior & Exterior.
The former has various ways of accesing as
the shutters has different directions of opening
whereas the later has an open envelop of steel
columns.
Waiter Station Details
PROFESSIONAL PROJECT
PROFESSIONAL PROJECT
Haus Leicht
PROFESSIONAL PROJECT
OVERLOOK PODS
ROYAL CARIBBEAN | ICON | DECEMBER 5TH
2019
AQUADOME - OVERLOOK AREA
19_1205_RCI_ICON_AquAdOme_OveRlOOk_POds
3deluxe  design systems d.s. GmbH, Wiesbaden, Germany © 2019
3DELUXE
OVERVIEW FRONTAL
8
SEATER
PODS
6
SEATER
PODS
6
SEATER
PODS
ENTRANCE
TO PODS
UPPER BAR
PLAN: Deck 15, Deck 16
Three 6-seater pods and two
8-seater pods are arranged
facing the vast ocean. It acts
as a transition between the
theatre and the Ocean.
Each pod can be classified
into: Interior Arc and Exterior
Wrap. The interior arc is an
open oval loop allowing the
movement to enter, be seated
and relax on a comfortable
sofa, embraced by a floating
table. and exit. The wrap is
composed of two layers: Solid
segmented face that holds and
lifts the pods to different levels
and Coral surface which cov-
ers each pod bringing it to the
aquatic family.
PLAN: Deck 15 PLAN: Deck 16
PROFESSIONAL PROJECT
View of the 8-seater high pod
OVERLOOK PODS
An Architecture Portfolio
An Architecture Portfolio
An Architecture Portfolio
An Architecture Portfolio
An Architecture Portfolio
An Architecture Portfolio
An Architecture Portfolio

Contenu connexe

En vedette

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

En vedette (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

An Architecture Portfolio

  • 2.
  • 3.
  • 4.
  • 5.
  • 6. PROFESSIONAL PROJECT DOHALIVE URBAN VOID VOID VOID VOID The proposed extensive and intensive service provision delivered by these “urban voids” is key to the city’s future development. “Urban voids” will con- stitute the green backbone of the new urban vision, a varying scale series of walkways, hardscapes, open public spaces, cycle paths, circulation routes ( for collective and private pedestrian traffic) , new services provision centres forthelocalandwidercommunities,neighbourhood programmesandsoon. The backbone structure confirms the overall strategy of the devel- opment plan whose underlying objective is to create greater ser- vice density that will in turn raise the overall quality of the user’s life.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. PROFESSIONAL PROJECT Type D Bed Room Type A, B and C Bed Room Layout The hotel rooms are juxtaposed facing towards the open glass- facade, that allows natural day-light to the organic interiors. The lack of strong corners and curvilinear walls gives a dynamic and fluid personality to the space, embracing a contemporary lifestyle. DOHALIVE TYPE-A_AURA ROOM L6-22 TYPE-A_AURA ROOM L6-23 TYPE-C_ENERGY ROOM L6-24 TYPE-B_MODE ROOM L6-25 +33.00 m FFL +32.90 m SSL +33.00 m FFL +32.90 m SSL +33.00 m FFL +32.90 m SSL +33.00 m FFL +32.90 m SSL
  • 17. PROFESSIONAL PROJECT View of the Entrance Lounge DOHALIVE
  • 18. Ingelheim Rathaus Ingelheim, Deutschland Public Building, Renovation and Modernization 4 4 GEZ. LAGEPLAN / PIKTO OK FFB = m ü. NN =+ 98,05 +/- 0,00 EG TH2 TH3 TH1 C C F F A G A G B B H H D D E E 2 3 2 3 1 1 N M S W 4 4 I I K K N
  • 19. Ingelheim Rathaus Status-Under-Construction Location - Ingelheim, Germany Firm - MTP Architekten, Frankfurt (2020-2022) Team Work - (Ritayan Rath + RHI team) Contribution - LPH 5 Detail Design, Architectural Details, Fen- ster sockel detail, Sparrenaufdoppelungen Detail, Deckenspiegel, Leuchteplanung, Dachdetail, Sparrenplan, Wand-und Bo- dendurchbruchplan, Baustelleneinrich- tungsplan. Softwares used - Vectorworks D -0,03 -1,09 Sprung im Fassade +0,14 Sprung im Fassade -0,27 Ringbalken B in Ach se 63, 24/25 UK FUN -4,50 OK FUN -6,17 UK FUN -6,67 UKUZ -1,65 UKUZ -1,65 OK FUN -4,00 EG00.036 Büro OG01.034 Büro OG02.034c WC OG03.036 Büro -0,10 +3,04 +6,29 +3,20 +6,45 +9,70 -0,35 -1,12 N 29 35 37 36 34 33 32 31 30 28 27 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 88 89 91 90 96 92 93 94 95 97 98 UKUZ -0,90 +2,75 +7,25 +8,05 +1,95 G A Zeichnungsgrenze +9,25 +9,54 +7,25 +6,00 UKUZ +9,25 UKUZ +6,00 +4,00 UKUZ +2,75 +2,75 -0,28 16 15 4,845 16 4 20 1,8725 15 18 45 1,7825 20 4 18 +9,77 Fusspfette, NH C24, 12/8, OK= + 12,83 Ringbalken, StB, C 25/30, 20/25, OK=+12,75, UK=+12,50 +13,09 25mm GK Dampfbremse 45 3,09 20 4 18 BD L 45/100 G -0,03 -1,09 -0,68 -0,27 +0,14 60 20 16 4,755 24 16 Sprung Rohbau in Achse 62 STB Stüze Neu UK RiBa +12,49 Sparren NH C24, 10/20, a= 62,5 2% 15 ° OK RiBa +13,00 +13,05 Achse Andruckleiste +13,33 UK FUN -4,70 UK FUN -5,00 UK FUN -5,20 UK FUN -5,33 25 2,00 73 7 Siehe Detail DA 15 DA 20 63 6 1,81 1,44 1,81 1,44 1,83 5 1,41 5 2,64 WD E 10/10 OK=UK Rähmholz ANSCHLUß SIEHE PLAN 4014_01_5_SN_ARC_SNHH_349
  • 20. OG03.036 Büro 17,24m² (Flur/ Speicher) NRF LH U 17,03m OG03.035 Büro 17,24m² (Flur/ Speicher) NRF LH U 17,03m OG03.034 Büro 16,35m² (Flur/ Speicher) NRF LH U 17,94m OG03.032 Büro 15,89m² NRF LH U 16,42m OG03.045 Teeküche 13,39m² (Büro/ Flur) NRF LH U 15,52m OG03.051 Lager 5,28m² (Putzraum) NRF LH U 11,52m OG03.037a Vorraum WC 3,58m² (Flur/ Speicher) NRF LH U 7,85m OG03.037b WC-B 6,52m² (Flur/ Speicher) NRF LH U 10,42m OG03.038 EDV Server 22,15m² (Flur/ Speicher) NRF LH U 19,42m OG03.044 Gesundheit 10,29m² (Archiv) NRF LH U 14,67m OG03.043 Registratur 27,22m² (Archiv) NRF LH U 29,25m OG03.040 Flur 12,99m² (Archiv) NRF LH U 22,59m OG03.033a Flur 33,35m² (Büro) NRF LH U 39,16m OG03.046 Büro 24,61m² NRF U LH 20,70m OG03.047 Büro 14,55m² NRF U LH 15,70m OG03.048 Büro 14,55m² NRF U LH 15,70m OG03.049 Büro 14,50m² NRF U LH 15,26m OG03.050 Büro 13,86m² NRF U LH 15,30m UK RD UK FD OK FFB OK RFB von +12,88 bis +13,97 +12,29 +9,75 +9,70 18 STG 18/28 BD L/K 33/98 BD B 24/116 OG03.039 Flur 11,79m² (Büro) NRF LH U 16,29m Sprung OK RFB 2% UK FD +12,50 UK Sparren +12,90 OG03.032-T01 1 - - T90 OG03.002-T11 2 - - T30 OG03.044-T01 1 - -RS T30 OG03.038-T01 1 - -RS OG03.036-T01 1 - - OG03.035-T01 1 - - OG03.034-T01 1 - - OG03.039-T01 2 - - OG03.039-T02 1 - - OG03.037b-T01 1 - - OG03.041-T01 1 - -RS T30 OG03.042-T01 1 - -RS UK RD UK FD OK FFB OK RFB von +12,88 bis +13,97 +9,75 +9,70 = +107,80 ü.NN +12,50 HEA 180 HEA 180 Schwelle T30 OG03.043-T01 1 - -RS F90 A+M Brandwand Brandwand Brandwand F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 F90 A+M F90 A+M F90 A+M F90 F90 F90 F90 STB-Stütze Bestand Wandscheibe NH C24 Ständer, Schwelle, Riegel 8/10 a≤62,5 Verkleidung des Daches innenseitig F90A Stütze S235 HQ 60-4 Stütze NH C24 10/16 STB-Stütze 24/ 24 C25/30 STB-Stütze 24/24 C25/30 STB-Stütze 24/ 24 C25/30 Stütze S235 HQ 60-4 Stütze S235 HQ 60-4 StützeS235 HQ 60-4 Bestand Riba StB C25/30 24/25 OK 10,262-12,716 StB-Stütze 24/ 24 C25/30 Brüstungpfette 16/18 NH C24 OK +13,35 Randpfette Gaube 16/16 NH C24 Fusspfette 12/14 (12/8) NH C24 4,11 5 UK RD UK FD OK FFB OK RFB von +12,88 bis +13,97 von +12,84 bis +12,90 +9,75 +9,70 Fusspfette 12/8 NH C24 STB-Ringbalken 20/25 C25/30 StB-Stütze 24/ 24 C25/30 StB-Stütze Bestand Konsole Auflager Mittelpfette UPE 180 OK UPE= u. OKFF 4x FAZ II 12/20 Firstpfette 12/8 NH C24 Stütze 10/16 NH C24 Stütze S235 HQ 60-4 Stütze S235 HQ 60-4 Ausbau Pfeiler MW 24/24 Gelenk Pfette Stütze C25/30 Neu 24/24 Stütze S235 HQ 60-4 Stütze 10/16 NH C24 Gelenk Pfette Gelenk Pfette Wandscheibe NHC24 Ständer, Schwelle, Riegel 8/10 a≤62,5 Wandscheibe NH C24 Ständer, Schwelle,10/10 Riegel 8/10 a≤62,5 Stütze S235 HQ 60-4 Ausbau Pfeiler MW 24/24 Ausbau Pfeiler MW 24/24 Ausbau Pfeiler MW 24/24 Ausbau Pfeiler MW 24/24 Ausbau Pfeiler MW 24/24 Firstpfetten 16/16 NH C24 OK +14,00 Mittelpfette BSH GL 24 h 16/24 UK +12,34 Stütze S235 HQ 60-4 2x Ringanker 24/25 Bestand UK = 11,875 UK = +13,62 Wand Neu MW 1,51/2,175 Kopf-/ Fußplatte Kopfplatte St 16/10/15 Fußplatte St 15/8/105 18 45 39 5 8 13 57 5 62 5 62 5 62 5 62 5 62 5 15 5 13 8 1,88 5 24 Mittelpfette OK 12,985 GL 24 h 16/24 cm Sparren NH C24 8/20, a=68 18 24 4 68 68 68 68 68 14 10 Sprung OK FFB Sprung UK FD Estrich ein schneiden 18 45 47 5 13 57 5 62 5 62 5 62 5 62 5 62 5 15 5 13 2,04 5 13 29 5 62 5 62 5 62 5 62 5 62 5 62 5 57 5 5 20 4 OG03.036 2ZL1AL F01 301 TYP OG03.035 2ZL1AL F01 301 TYP OG03.034 2ZL1AL F01 301 TYP OG03.032 2ZL1AL F01 301 TYP OG03.050 2ZL1AL F01 124 TYP OG03.049 2ZL1AL F01 315 TYP OG03.048 2ZL1AL F01 315 TYP OG03.047 2ZL1AL F01 315 TYP OG03.046 2ZL1AL F02 315 TYP OG03.046 F01 124 TYP OG03.045 2ZL1AL F 02 115 TYP OG03.045 2ZL1AL F01 153 TYP OG03.038 F01 211 TYP OG03.041 F01 156 TYP OG03.040 F 02 135 TYP OG03.044 L01 134 TYP BS 15/450/5 16 12 5 20 13 5 1,07 5 Pfoster 10/10 Pfoster 10/10 16 1,78 5 VK RD UK FD +12,285 UK FD +12,42 1,175 775 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 775 1,94 BRH 100 1,175 10 7 4 NA 100 NA 100 RA 100 RA 100 RA 100 RA 100 RA 100 NA 100 5x Oberlichter Typ215, siehe Dachgeschoss Oberlichter 7x Typ125, 1x Typ126 siehe Dachgeschoss Sparren NH C24 8/20, a=68 11 81 1,325 BRH 80 14 M M M M M M M M M M M M Knauf W628 B.de S09 Knauf W628 B.de S09 UK RD UK FD OK FFB OK RFB +11,165 +10,955 +8,145 +8,075 OG03.001 F01 140 TYP BD L 25/110 Stütze NH C24 10/16 T30 OG03.051-T01 1 - -RS OG03.050-T01 1 - - OG03.049-T01 1 - - OG03.048-T01 1 - - OG03.047-T01 1 - - OG03.046-T01 1 - - So. Strg So. Strg So. Strg 2,50 2,50 1,88 5 61 5 63 5 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 77 5 45 3,94 16 1,83 5 16 4,74 5 12 8 4 18 Wandscheibe NH C24 Ständer, Schwelle, Riegel 8/10 a≤62,5 UK FD +12,162 Sparren NH C24 8/20, a=68 Stütze S235 HQ 60-4 2x Ringbalken StB, Bestand Anschluss an Stütze Gaubenwand NH C24 OSB3 Beplankung Stiel 8/16, a = 62,5 Horizontale Rippen, NH C24, 16/8 Schwelle, NH C24, 16/16 Fusspfette Neu 12/14 Fusspfette und STB Aufkantung Abbruch Fusspfette und STB Aufkantung Abbruch STB-Stütze 24/24 C25/30 VK RD VK RD Fusspfette Neu 12/14 VK RD VK RD VK RD VK RD VK RD OK Pfette 16/18 OK +13,00 Höhenangabe! Höhenangabe! STB Aufkantung!!! STB Aufkantung!!! Höhenangabe! Höhenangabe! Höhenangabe! Höhenangabe! Höhenangabe! Höhenangabe! Höhenangabe! STB Aufkantung!!! STB Aufkantung!!! STB Aufkantung!!! Höhenangabe! UKD -0,13 bezogen auf Geschossdecke oder Treppenhaus Höhenangabe! Schwelle min. 20cm über Achse 82 überstehen lassen (Lastverteilung) 1,35 5 24 10 1,53 22 5 1,57 18 1,51 24 5 1,37 24 24 11 17 5 5 15 18 15 18 15 18 15 18 15 22 15 18 15 18 24 3,63 1,345 5 3,605 5 2,41 5 3,70 5 185 3,515 5 11 3,795 5 4,665 23 24 4,88 8,82 5 3,55 5 Schwelle aus Foto _FK091121 Möglich abbruch? Sprung UK FD UK FD +12,42 UK FD +12,285 UK RD UK FD OK FFB OK RFB von +12,80 bis +12,93 von +12,74 bis +12,80 +9,75 +9,70 UK RD UK FD OK FFB OK RFB von +12,83 bis +12,91 von +12,77 bis +12,83 +9,75 +9,70 UK RD UK FD OK FFB OK RFB von +9,98 bis +12,88 von +10,47 bis +12,73 +9,75 +9,70 STB Neu Riba 24/25 C25/30 OK 13,00-13,09 Sprung UK FD Sprung UK FD OK Rohbau Brüstung +10,75 Holz-/ Stahlstützen Türöffnungen BD 25/25 BD B 20/40 Bauteilfuge Bauteilfuge LH ca. 2,00 m LH ca. 2,00 m LH ca. 1,00 m LH ca. 1,00 m SM SM SM SM SB HY OG03.041 Treppenhaus 2 5,47m² NRF LH U 11,17m Aufzug 1,10 x 2,10 ,34 5 1,67 Sparren 8/16 Sturz Stb 49/25 UK +11,875 18 24 3,555 16 6,10 125 3,625 125 3,625 125 3,625 125 2,35 1,275 125 2,32 23 75 3,865 20,485 3,15 485 18 24 3,445 11 1,30 775 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 2,75 1,94 BRH 100 1,00 775 1,94 BRH 100 1,275 3,58 305 3,975 20,15 3,535 2 24 3,39 19 10 3,80 1,01 2,135 1,328 125 2,478 1,01 2,135 138 125 2,553 1,01 2,135 63 125 2,54 1,01 2,135 63 15 2,54 1,01 2,135 63 125125 1,01 2,135 783 40 23 Achsenmaß Innenmaß + Fassade Öffnungsmaß + Rohbaumaß Fassadenmaß Teilmaß Außenkante Gesamtmaß 27,68 23 1,14 1,02 5 16 3,98 16 1,86 24 3,40 22 12,33 12 5 1,02 5 16 3,98 16 1,86 9,99 5 12 5 18 1,65 3,47 1,91 5 1,85 BRH 75 14 7 3,43 8 5 8 5 47 5 88 5 3,50 11 5 4,88 5 11 5 18 1,65 1,09 12 5 2,25 5 1,88 5 2,13 5 24 85 1,01 2,13 5 1,54 22 4,89 1,01 2,13 5 6,43 12 5 3,15 2,50 5 33,73 5 3,15 5 2,50 7,60 5 26,13 18 30 15 2,72 115 2,295 125 145 1,01 2,125 145 5,12 18 20 4 18 1,90 16,85 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 2,26 2,12 5 24 1,05 5 15 1,05 5 24 18 24 2,26 24 6,04 18 18 24 1,13 5 1,01 2,13 5 11 5 24 31 1,01 2,13 5 30 1,25 615 635 1,25 1,25 1,25 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 Innenmaß + Fassade-Rohbau LH ca. 2,00 m LH ca. 1,00 m UK Sparren +12,75 OK Pfette OK FFB OK RFB +9,75 +9,70 +12,80 OK FirstPfette +14,07 UK Pfette OK FFB OK RFB +9,75 +9,70 +12,52 UK FirstPfette +13,87 UK Sparren +14,00 ca. LH ca. 2,00 m LH ca. 1,00 m OK Mittelpfette OK FFB OK RFB +9,75 +9,70 +11,42 Abbruch Ringanker Stb 115/25 UK +11,875 BD 20/20 BD 25/25 BD 35/35 BD 25/25 BD 20/20 BD 25/25 BD 15/15 BD 15/15 BD 20/30 BD B 25/25 96 10 2,24 1,44 24 96 15 1,17 15 97 1,34 25 14 1,655 1,85 BRH 75 3,195 1,56 24 585 125 1,30 24 2,23 3 3 2,44 3 3 2,42 5 5 3,67 3 3 3,67 5 5 3,49 3 3 27 30 1,745 45 5,13 125 1,30 24 3,55 1,01 2,135 14 125 14 1,01 2,135 855 36 15 5 1,01 2,135 2,55 125 6 1,01 2,135 2,53 175 5 1,01 2,135 2,48 24 Stützen Türen 6 1,30 12 2,38 2,50 2,50 3,75 3,75 3,61 2 24 1,25 495 3,24 2,34 6 12 3,75 2,50 1,25 2,50 3,75 3,75 3,75 3,75 2,32 6 23 1,75 18 8 24 3,94 7 5 16 5 2,63 5 24 25 1,88 5 25 11 5 26 5 4,25 24 18 18 45 39 5 16 3,95 5 16 1,88 5 24 4,64 20 4 18 Bestand Riba 24/12,50 UK= +12,00 Bestand Riba 24/12,50 UK= +11,875 UZ Stb 24/45 UK +10,895 Wand nicht im Fotos (nur blech) _FK20210618 BD KB S DN 150 BD KB S DN 150 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 BD S 20/10 BD/DD KB S DN 150 BD KB S DN 150 BD KB S DN 150 BD KB S DN 150 BD KB S DN 150 KB K DN 100 Achse ? BD/DD KB S DN 200 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 2xBD KB H DN 60 BD/DD KB S DN 150 BD KB S DN 100 WD L 110/30 OK= KB L DN 200 Achse KB S DN 100 Achse ? KB S DN 100 Achse ? KB S DN 100 Achse KB S DN 100 Achse KB S DN 170 Achse 3xKB K DN 100 Achse WD L 77/30 OK= KB FEU DN 160 Achse 2xBD KB L DN 350 KB S DN 100 Achse +12,67 DD KB S DN 150 28,63 2,14 12 12 2,26 12 12 2,26 12 12 3,51 12 12 3,51 12 12 3,51 12 12 3,51 24 2,14 24 2,26 1,00 BRH 1,75 24 2,26 1,00 BRH 1,75 24 3,51 2,00 BRH 75 24 3,51 2,00BRH 75 24 3,51 2,00 BRH 75 24 3,51 2,00BRH 75 7,505 3,26 49 3,26 49 3,26 49 3,26 24 4,70 125 2,36 15 3,61 125 3,60 175 3,54 24 3,57 2,56 5 14,28 5 21,25 Wandscheibe 68 68 68 68 68 4 3 23 18 24 3,63 9 365 365 365 855 46 46 2,83 46 46 2,83 46 46 2,83 46 46 2,83 46 46 855 365 365 365 9 5 3,56 2 23 Fusspfette B 10/8 Tür Symbol? STB Aufkantung B STB Aufkantung B STB Aufkantung B STB Aufkantung B Achsen Stüzen OK STB Aufkantung +10,00 OK Fusspfette +10,14 OK UZ +9,77 OK STB Aufkantung +10,00 OK UZ + 9,77 OK Fusspfette +10,14 Fusspfette B 8/10 UK Sparren +14,00 ca. UK RD +12,54 2/28 UK +12,52 tte 10/20 UK +13,87 OK STB Aufkantung +10,00 OK Fusspfette +10,08 OK UZ + 9,77 WA B 30/18/30 UK +12,14 WA B 20/18/30 UK +12,57 mit MW schließen OK Mittelpfette OK FFB OK RFB +9,75 +9,70 +11,75 2xBD KB S DN 150 163 2,065 50 2,836 50 20 125 50 10 24 10 2,65 2 50 29 16 10 2,65 50 29 16 10 2,65 1 50 29 16 10 2,65 50 29 16 16 32 5 13 5 45 17 5 45 79 16 50 5 50 10 1,10 23 5 1,20 5 15 54 24 18 24 1,83 24 45 17 5 45 1,38 1 50 1,33 24 15 3,51 35 195 23 30 20 30 10 23 1,02 90 24 50 29 16 24 2,57 20 2xWD L 45/30 OK=UK Rähmholz 2xWD L 45/30 OK=UK Rähmholz 2xWD L 45/30 OK=UK Rähmholz 2xWD L 30/30 OK= +12,67 2xWD L 30/30 OK= +12,67 WD E 50/15 OK= +12,71 WD E 50/15 OK= +12,71 WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=12,71 2xWD E 50/15 OK= WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 5/12 OK= +10,49 WD E 20/40 OK= UK Rähmholz WD E 20/40 OK=UK Rähmholz WD E 20/40 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 50/15 WD E 10/10 OK=UK Rähmholz WD E 10/10 OK=UK Rähmholz WD E 10/10 OK=UK Rähmholz WD E 10/10 OK=UK Rähmholz WD E 10/10 OK=UK Rähmholz WD E 10/10 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 50/15 OK=UK Rähmholz WD E 10/10 OK= WD E 50/15 OK=12,71 BD E 50/20 BD/DD E 20/80 J K L M 86 87 88 89 90 91 92 93 94 95 96 97 98 99 N H G 40 41 G A N M G 85 84 83 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 O P Q R 82 64 63 62 B H B H 91 92 93 94 95 96 97 98 99 A INGELHEIM RATHAUS
  • 21. Abbruch Überfahrt Abbruch 4 STG 20/23 UK RD UK FD OK FFB OK RFB +13,80 +13,75 UK RD UK FD OK FFB + 12,98 OK RFB +12,74 T30 DG01.003-T01 1 - -RS T30 DG01.001-T01 2 - -RS 2 S T G . 1 5 /3 3 UK RD UK FD OK FFB OK RFB +13,00 +12,95 = +111,05 ü.NN +15,50 von ca.+17,15 bis ca. +15,60 24 62 5 1,14 2,10 1,12 24 2,11 5 18 5 37 5 Aufzug 1,10 x 2,10 Brandwand Brandwand F90 A+M F90 A+M F90 A+M F90 A+M F90 F90 F90 F90 DG01.017 F 01 127 TYP DG01.002 F 01 127 TYP OG03.042 F 07 125 TYP OG03.042 F 06 125 TYP OG03.042 F 05 125 TYP OG03.042 F 03 125 TYP OG03.042 F 02 125 TYP OG03.042 F 01 125 TYP OG03.040 F 01 126 TYP OG03.042 F 04 125 TYP OG03.033a F 05 215 TYP OG03.033a F 04 215 TYP OG03.033a F 03 215 TYP OG03.033a F 02 215 TYP OG03.033a F 01 215 TYP Oberlicht Typ126, siehe Dauchaufsicht 24 4,82 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 12 1,75 5 1,07 BRH 3,05 1,13 24 2,26 12 3,75 3,75 3,75 2,38 Mittelpfette 22/26 OK=+12,80 10,40 2,32 50 ÜFFB EG 13,28 12 2,38 50 ÜFFB EG 13,28 12 2,38 50 ÜFFB EG 13,28 12 2,38 50 ÜFFB EG 13,28 12 2,32 50 ÜFFB EG 13,28 4,82 M M DG01.001 F 01 141 TYP 30 1,49 5 11 5 1,10 1,62 5 1,01 11 5 24 13 5 2,25 10 5 15 5 24 5 16 4,09 20 20 1 So. Strg 26 24 5 UK FD OK FFB OK RFB - +11,395 +11,325 UK RD von ca. +13,35 bis ca. +15,55 18 30 15 3,074 1,462 2,019 24133 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 133 24 253 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625133 24 16 Sparren 10/20, a= 62,5 Sparren 10/20, a= 62,5 Sparren 8/20, a= 62,5 Sparren 8/20, a= 62,5 Sparren 8/20, a= 68 Sparren 8/20, a= 68 Fusspfette, NH C24,12/8, OK= 12,83 STB-Ringbalken, C25/30, 20/25, OK= 12,75 STB Stutze C25/30, 24/24, OK= 12,75 Mittelpfette, BSH GL 24 h, 16/24 OK +12,95 Fusspfette Neu 12/14 Fusspfette Neu 12/14 Firstpfette, NH C24, 16/16, OK= 14,00 Pfette, 16/18, OK= 12,93 F90 Beplankung Auflasserpfette nach angaben Statiker Betonsteindeckung (Frankfurter Pfanne) 30° 16 30 54 16 1,73 13 2,28 1,86 24 17 16 24 3,66 60 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 60 17 3,31 Bitumenbahn 2lagig, besplittet Bitumenbahn 2lagig, besplittet Betonsteindeckung (Frankfurter Pfanne) 30° 2,14 24 2,26 24 2,26 24 3,51 24 3,51 24 3,51 24 3,51 24 2,26 24 3,51 24 16 2,10 STB Neu Riba 24/25, C25/30 OK +13,00 - +13,09 Sparren 20/20 Sparren 20/20 Mittelpfette, BSH GL 24 h, 16/24 OK +12,95 Mittelpfette, BSH GL 24 h, 16/24 OK +12,95 Bereich mit photovoltaik anlage gemäss angaben firma Gedea Bereich mit photovoltaik anlage gemäss angaben firma Gedea 2% 2% W in d ri s p e n Windrispen Wand Wand Wand Wand Sieh Detail DA 10 STB Neu Riba 24/25, C25/30 OK +13,00 - +13,09 Bestand Riba StB, C25/30 24/25 OK +10,26 2 - +12,71 6 Bestand Riba StB, C25/30 24/25 OK +10,26 2 - +12,71 6 F90 Beplankung DG01.001 Treppenhaus 1 32,49m² NRF LH U 40,90m SM SM SB WEISS UK WAT +15,12 5 20 STG 1625/30 3,17 5 2,50 33,71 5 26,13 5 7,58 2,50 3,17 5 10,02 5 27 5,04 24 50 7 5 1,31 40 2,73 2,38 5 45 20 45 20 45 52 73 2,39 5 1,96 5 55 16,85 1,90 4,88 5 2,42 5 4,23 92 5 7,56 5 26,13 3,887 20,285 3,308 3,91 5,30 2,45 2,42 2,40 2,42 3,83 2,42 2,33 18 305 3,89 5,28 2,22 5,28 2,22 5,28 3,308 18 23 75 Achsenmaß Abbruch Fassadenmaß Teilmaß Außenkante Gesamtmaß 27,48 30 1,25 18 23 6,02 24 16 5,67 18 45 18 23 2,61 24 3,10 24 3,64 125 2,32 18 23 75 6,115 2,265 75 23 2,235 1,01 2,135 505 95 18 23 75 8,38 75 23 3,568 125 18 628 2,212 1,105 7,595 1,17 95 18 95 21,79 5 10,815 1,81 3 23 3 11 5 1,04 11 5 1,10 7 5 16 5 2,88 5 24 2,01 10 5 40 11,70 8 18,39 6,49 6,01 18,09 6,83 1,215 2,01 49 2,01 18 23 5,95 24 1,32 2,26 1,30 BRH 1,45 24 2,26 1,30 BRH 1,45 24 7,585 2,38 2,52 13,665 11,985 28 2,50 2,50 1,88 5 61 5 63 5 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 28 1,25 615 635 1,25 1,25 1,25 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 Achsenmaß Innenmaß + Fassade Öffnungsmaß + Rohbaumaß Fassadenmaß Teilmaß Außenkante 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 WD neu 76/62 Wand OG3 Wand/UZ Sprung + 15,835 IPE 160 UK +16,31 Decke Sprung UK +16,985 1,845 7,605 18,03 UZ Stb 24/45 UK +12,50 UZ Stb 24/45 UK +12,50 ÜZ Stb 24/125 UK+15,236 Knick +15,777 OK Wand +14,34 ÜZ Stb OK +13,35 2,81 4,02 5,67 Terrasse DG Terrasse 3OG. Terrasse 2OG. Decke neu BD KB S DN 150 BD KB S DN 150 BD KB S DN 150 BD KB S DN 220 2 D BD KB S DN 150 OK Wand +14,34 STB Decke STB Decke STB Decke Mittelpfette 26/30 OK +15,93 OK STB Aufkantung +13,25 OK Fusspfette +13,33 OK UZ + 13,02 OK STB Aufkantung +13,25 OK Fusspfette +13,33 OK UZ + 13,02 24 2,63 5 25 24 1,99 12 5 4,65 20 24 2,51 16 5 7 5 VK Rohbaudecke Attika Fertigbau OK= +13,515- Rohbau OK= +13,35 20 4,65 12 5 1,99 24 2,88 5 16 5 7 5 2x Ringanker 24/25 Bestand UK = 11,875 UK = +13,62 16 24 369 68 68 68 68 681 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 369 16 24 369 68 68 68 68 681 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 369 J K L M 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 N H G 40 41 91 92 93 94 95 96 97 98 99 100 101 102 103 104 G A A E G A G G N M G INGELHEIM RATHAUS
  • 22. Ringbalken B in Achse 63, 24/25 Stütze S235 QH 60-4 Stütze NH C24 10/16 4.OG02.014 Foyer 4.OG03.014 Foyer Luftraum 4.OG02.015 Dachterrasse Schacht +7,80 Schacht +7,15 +6,48 +6,50 +9,75 +9,47 +9,67 +9,14 +10,75 +8,99 +9,14 Achse Andruckleiste +13,36 +12,39 +12,50 +12,72 UKRD Aufzug +15,90 OK FF +6,64 = 104,69 NN OK FF +7,52 = 105,57 NN +6,55 OK Terrasse +104,54 +104,52 +12,92 UK FUN -1,05 OK FUN -1,05 UK FUN -3,00 UK FUN -3,70 UK FUN -4,50 OK FUN -4,00 EG00.058 Lager / Fundbüro EG00.036 Büro EG00.034 Flur OG01.053 Büro OG01.034 Büro OG01.031 Flur OG02.056 Büro OG02.034c WC OG02.033 Flur OG03.049 Büro OG03.036 Büro OG02.035 WC-B +0,00 -0,10 UKUZ +6,00 +3,04 +2,75 UKUZ +2,75 +6,29 +3,25 +3,20 +6,00 UKUZ +9,25 +6,50 +6,45 +9,25 +9,54 +9,75 +9,70 -0,35 UG ca. -4,30 OK FFB OG01 +3,25 = +101,30 NN OK FFB EG00 ±0,00 = +98,05 NN OK FFB -1,05 = +97,00 NN OK FFB OG03 +9,75 = +107,80 NN OK FFB DG01 +12,94 = +111,05 NN Firsthöhe Bestand +14,53 = +112,58 NN Firsthöhe Bestand +17,78 = +115,83 NN Drainage Bestand DN 100 WILHELM-LEUSCHNER-STRASSE OK FFB OG02 +6,50 = 104,55 NN +4,83 +3,20 +5,79 +4,75 Brandsperre 3,25 1,33 9 2,96 11,20 3,25 4,78 3,25 3,25 3,25 35 70 1,81 1,44 70 47 15 10 3,36 50 2,75 50 2,75 50 1,88 87 30 75 1,95 70 3,25 1,33 9 3,12 25 7 43 2,00 75 7 43 2,00 75 7 43 2,00 75 14 14 12 65 Firsthöhe Bestand +17,05 = +115,10 NN OG03.033a Flur +9,25 +9,25 +9,25 +9,25 +9,54 +9,54 +7,25 +7,25 +6,29 +6,29 +6,00 +6,00 +6,00 +6,00 UKUZ +9,25 UKUZ +6,00 UKUZ +9,25 UKUZ +9,25 UKUZ +6,00 UKUZ +6,00 +4,00 +4,00 +0,75 +0,70 +0,40 +3,00 UKUZ +2,75 +2,75 +2,75 +3,04 +3,04 UKUZ +2,75 -0,28 +3,20 -0,10 -0,28 28 3,04 21 3,04 21 3,04 21 2,53 5 18 10 2,12 5 11 5 80 16 5 2,12 5 11 5 80 16 5 2,75 29 16 5 2,12 5 41 16 15 4,845 125 1,885 63 4,34 15 16 16 4 20 63 2,39 125 80 60 20 4 16 +6,45 +9,70 18 4 20 4,25 125 2,39 125 2,5225 1,8725 15 18 63 1,885 63 2,0175 45 1,7825 20 4 18 +0,25 OK FUN -0,40 +9,77 30 ° OK WEG +6,48 OK WEG +9,18 = +107,23 NN G A Sparren NH C24, 8/20, a = 68 Firstpfette NH C24 16/16, OK= + 14,00 Fusspfette, NH C24, 12/8, OK= + 12,83 Ringbalken, StB, C 25/30, 20/25, UK +12,50 Fusspfette NH C24, 12/14 OK= + 10,14 51 Stütze S235 QH 60-4 Stütze NH C24 10/16 Randpfette NHC24 16/16 OK +12,845 UK +12,685 18 10 2,12 5 11 5 80 16 5 2,12 5 11 5 29 16 5 2,75 29 16 5 2,67 43 +13,09 +13,09 +10,15 +14,53 25mm GK Dampfbremse +13,24 +13,19 8 8 Abbruch Dach 8 8 1,29 15 1 24 3 16 11 13 1,59 56 7 28 8 25 21 5cm Promat WD L 30/30 45 6 Sparren NH C24, 8/20, a = 68 25 16 3,08 90 16 1,84 16 1,65 3,09 20 4 18 BD L 45/100 WD E 50/15 UK= +12,595 2,22 1 27 5 31 3 Neu Ringbalken in Achse 63, StB, C 25/30 24/25 UK= von +12,763 bis +12,843 G OK RiBa +13,09 15 1,12 16 24 4,64 24 1,885 63 80 60 20 16 15 1,28 24 4,64 24 1,885 125 4,755 24 16 STB Stüze Neu Gaubenwand NH C24 OSB3 Beplankung Stiel 8/16, a = 62,5cm BD L 35/70 K L M N 35 39 40 41 G H J 38 37 36 34 33 32 31 2,50 2,50 1,885 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 86 87 88 89 91 90 92 93 94 Füllholzer 16/16,5 OK= + 12,99 Horizontale Rippen, NH C24, 16/8 Schwelle, NH C24, 16/16 UK RiBa +12,49 WD L 30/30 Brüstungs- pfette NH C24,16/18 OK= + 13,28 OK Pfette 16/18 = + 12,93 Sparren NH C24, 10/20, a= 62,5 Sparren NH C24, 8/20, a= 62,5 450 300 450 300 200 400 Mittelpfette BSH GL24h 16/24 OK= + 12,95 Füllholz 16/17 +12,285 2% 2% 1 ,1 5 ° 1 ,1 5 ° OK RiBa +13,00 +13,05 3 KB K Ø 100 Achse +12,67 WD E 50/15 OK= +12,784 Achse +12,705 WD L 110/30 OK= +12,76 Achse +12,61 WD L 77/30 OK= +12,71 Achse +12,56 KB S Ø 170 Achse +12,63 8 41 8 2,04 5 Achse Andruckleiste +13,33 Sturz 49/25 UK= +11,875 +12,42 +15,777 +10,75 Ringbalken B in Achse 63, 24/25 Stütze S235 QH 60-4 Stütze NH C24 10/16 4.OG02.015 Dachterrasse 20 18 OG02.034c OG02.033 OG03.036 Büro OG02.035 +9,25 +9,70 OG03.033a Flur +9,25 +9,25 +9,54 +9,54 +7,25 UKUZ +9,25 UKUZ +9,25 UKUZ +9,25 3,04 21 2,53 5 2,75 29 16 5 2,12 5 41 2,39 125 2,5225 1,8725 15 18 63 1,885 63 2,0175 45 1,7825 20 4 18 +9,77 30 ° Sparren NH C24, 8/20, a = 68 Firstpfette NH C24 16/16, OK= + 14,00 Fusspfette, NH C24, 12/8, OK= + 12,83 Ringbalken, StB, C 25/30, 20/25, UK +12,50 Stütze S235 QH 60-4 Stütze NH C24 10/16 +13,09 +14,53 25mm GK Dampfbremse +13,24 +13,19 8 8 Abbruch Dach 8 8 5cm Promat WD L 30/30 45 90 16 1,84 16 1,65 3,09 20 4 18 BD L 45/100 Neu Ringbalken in Achse 63, StB, C 25/30 24/25 UK= von +12,763 bis +12,843 OK RiBa +13,09 STB Stüze Neu UK RiBa +12,49 WD L 30/30 Brüstungs- pfette NH C24,16/18 OK= + 13,28 OK Pfette 16/18 = + 12,93 Sparren NH C24, 10/20, a= 62,5 450 300 450 300 200 400 Mittelpfette BSH GL24h 16/24 OK= + 12,95 Füllholz 16/17 +12,285 2% 1 ,1 5 ° OK RiBa +13,00 +13,05 3 KB K Ø 100 Achse +12,67 WD E 50/15 OK= +12,784 Achse +12,705 WD L 110/30 OK= +12,76 Achse +12,61 WD L 77/30 OK= +12,71 Achse +12,56 KB S Ø 170 Achse +12,63 8 41 8 2,04 5 Achse Andruckleiste +13,33 Sturz 49/25 UK= +11,875 +15,777 UKUZ +9,25 +9,52 +9,70 +9,25 +9,75 +12,79 UKUZ +12,10 +9,68 OG03.032 Besprechung OG02.032 OG02.002a +9,54 UKUZ +12,50 OG03.002 Flur 4.OG02.014 Foyer 4.OG03.014 Foyer Luftraum 4.OG02.015 Dachterrasse Schacht +7,80 Schacht +7,15 +9,75 +9,47 +9,67 +9,14 +10,75 +8,99 +9,14 Achse Andruckleiste +13,36 +12,39 +12,50 3,13 7,63 18 20 1,98 20 4,46 20 20 18 20 +12,72 UKRD Aufzug +15,90 OK FF +7,52 = 105,57 NN OK FF +8,72 = +106,77 NN +12,92 16 28 20 33 5,89 3,67 17 10 18 20 33 1,64 1,00 8 53 2,64 43 20 3,05 20 25 2,72 65 1,45 2,74 43 2,78 50 2,75 4,52 45 1,95 80 7 43 1,95 +12,40 +7,25 +9,25 +9,25 +7,30 +9,25 +10,55 +12,10 +13,35 +12,95 UK UZ +9,25 +12,50 +9,77 +15,236 OK +16,085 +17,47 26 7 8 2 36 2,64 5 16 29 2,00 1,18 1,25 2,35 5 2 16 27 51 11 5 2,12 5 3,34 88 3,25 15 OK WEG +9,18 = +107,23 NN G +17,78 Bestand Ringbalken in Achse 63, 55, 24/25 WD L 160/30 UK= +12,50 Achse 60 WD L 40/30 UK= +12,47 Achse 60 WD L 110/28 11 11 5 2,12 5 5 UK Riba 12,50/11,50 +11.875 3 KB K Ø 100 UK= +12,62 OK +15,78 OK Rohbau Bestand+14,34 +15,97 +13,00 +15,45 +15,63 +15,93 Mittelpfette 26/30 OK +15,56 +15,42 +15,64 +13,15 +12,30 18 30 15 1,435 12 1,02 12 1,11 75 165 2,885 24 1,885 125 215 31 48 2 90 45 21 7 18 5 2,28 6 16 29 2,75 1,91 3,06 25 2,57 18 24 75 1,57 12 559 12 1,57 12 571 175 1,885 2,50 125 4,755 20 22 KB S Ø 170 UK= +12,609 Achse 60 UK FD +12,25 UK RiBa Achse 63 +12,49 WD E 50/15 UK= +12,65 Achse 60 +17,135 8 2 25 Sturz 49/25 UK= +11,875 Sparren NH C24, 10/20, a= 62,5 OK Pfette 16/18 = + 12,93 Füllholz 16/17 INGELHEIM RATHAUS
  • 23. INGELHEIM RATHAUS DATUM BAUVORHABEN wilhelm-kobelt-straße 1 mtp architekten gmbh 06.12.2021_ vm Modernisierung und Erweiterung Rathaus Ingelheim +10,15 +9,75 K +9,70 3 0 ° 2 23 32 20 4 2 12 4 20 8 20 4 4 10 4 8 12 8 20 DT_ARC_03 5 11 1,00 5 16 29 1 4 4 40 15 39 16 12 +10,75 +10,14 +10,00 17 Sperrschicht Kniestock/ Gaubenwand v.a.n.i.: OSB3-Platte für Feuchte geeignet Dampfsperre Zwischen- dämmung 16cm Vertikale Pfosten, NH C24, 8x16 Horizontale Pfosten, NH C24, 8x16 Dampfsperre Gipskarton- beplankung 2x12,5 Fusspfette NH C24 12/14 Pultdach v.o.n.u.: Betonsteindeckung (Frankfurter Pfanne) Lattung und Konterlattung 30x50mm Unterspannbahn Zwischendämmung 20 cm, (Mineralwolle, nicht brennbar MLG 035) Sparren NH C24 8/20 cm OSB3-Platte (für Feuchte geeignet) Dampfsperre Heizkörper 157 x 300 Kabelkanal 66 x 170 Zuluft-Nach- strömung Aeromat DS2 250 x 100 x L Alu-Fensterbank Führungsschiene Raffstore Fensterbank Aluminium Aluminium Blech Sockelleiste Teppichboden Fliesengitter Wandaufbau v.a.n.i: Natursteinplatte 4cm Hinterlüftung 4 cm Dämmung 10 cm StB Wand (Sturz) Drainlet-Notablauf DN70 10 10 7 3 3 3 3 275 15 245 15 125 22 125 15 27.10.2021_ Modernisierung und Erweiterung +14,53 39 M 86 +13,28 +12,93 68 57 40 55 5 3 +13,18 25 168 7 3 HK- Stütze VK- Stütze 2% Gefälle 3 0 ° +14,00 25 13 16 24 25 13 8 8 24 25 08 16 13 75 35 25 08 5 6 08 25 25 125 25 VK- GK-Wand 175 3 2 15 2 6 20 2 +13,33 Achse Andruckleiste OK Pfette OK Brütungspfette OK Firstpfette 3 12 37 16 8 33 16 18 17 18 47 OK First HK- GK-Wand UK abgehängte Decke Pultdach v.o.n.u.: Betonsteindeckung (Frankfurter Pfanne) Lattung und Konterlattung 30x50mm Unterspannbahn Zwischendämmung 20 cm Sparren NH C24 8/20 cm Dampfsperre 25/40 mm Unterkonstruktion 2x 12,5 mm Gipskartonbeplankung Metallfassade v.a.n.i.: Metall Aluminium Hinterlüftung Wärmedämmung 13 cm Dampfsperre Firstpfette NH C24, 16/16 12,5/ 25 mm Unterkonstruktion 2x 12,5 mm Gipskartonbeplankung Pfette NH C24 16/18 Stütze S 235 QH 60-4 Kopfplatte B1 160x100x15 Flachdach-Aufbau v.o.n.u.: Bitumenbahn 2lagig, besplittet 22 mm OSB3-Beplanung 60/80 m Lattung für Hinterlüftung Unterspannbahn Sparren, NH C24, 8/ 20 20 cm Zwischensparrendämmung Mineralwolle, nichtbrennbar, MLG 035 18 mm OSB3- Beplankung (aussteifende Scheibe gemäß Statik) Dampfsperre abgehängte Decke v.o.n.u.: Abhänger Installationsraum Unterkonstruktion 2x 12,5 mm Gipskarton- beplankung Firstpfette NH C24 16/16 Pultfirststein GK-Wand 16 cm Unterkonstruktion 2xCW Profil 50 mm Brüstungs- pfette NH C24 16/18 Schattennut WD L 30x30 Flüllholz NH C24 16/17
  • 24. +3,25 +6,50 +9,75 +9,25 +6,43 +6,29 +6,00 +3,18 +3,00 +2,75 -0,14 UK FD +12,50 Firsthöhe Bestand +17,78 = +115,83 NN OG02.032 Warten OG01.031 Besprechung EG00.002 Foyer +9,33 +2,64 +5,89 +9,14 Bestand RiBa, 24/25, OK 10,26 2 bis 12,71 6 OK RiBa +13,00 UK RiBa +12,49 2% OK Rohbau Bestand+16,00 OK Rohbau Bestand+14,34 +14,53 +15,968 +13,09 +13,35 +13,15 +12,30 +15,75 UK UZ +12,10 +0,00 +11,85 +10,05 +9,49 +10,20 +9,70 +9,54 +12,25 +12,58 Riba 12,50/11,50 UK= +11,875 +9,52 +9,70 +9,75 +12,74 +12,79 +12,95 +2,75 +3,02 Wand MW d=24 UZ 24/61,50 UK= +12,125 DG01.001 TH1 Bestand Riba StB 24/25 20 505 16 2,055 17 24 1,559 10/12 14 10 +2,75 OG03.002 Flur OG02.002a Flur OG01.002a Foyer EG00.005 Flur +13,00 Wand MW d=24 Wand MW d=24 Wand MW d=24 +9,68 +6,80 +7,00 +6,24 +6,08 HEA 450 +6,60 +6,50 L M N 35 39 40 41 G H 38 37 36 34 33 32 31 30 2,50 1,885 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 86 87 88 89 91 90 92 93 94 95 181 24 2,26 16 2,16 30 1,885 +9,25 +2,75 +6,00 Ringbalken 24/12,50 UK= +11,875 26 63 46 37 25 80 25 1,30 1,45 5 16 29 25 2,50 7 16 27 2,75 7 16 27 2,75 7 16 27 2,75 14 16 3,79 95 18 T30 DG01.001-T01 2 - -RS T90 OG03.002-T11 2 - - T90 OG01.030-T05 1 - - T90 EG00.004-T02 2 - -RS 26 6 71 4 80 25 1,30 1,50 21 26 6 1,76 4 1,30 89 9 20 1 20 85 20 25 1,65 3 14 7 80 2,00 64 9 10 6,50 14 16 3,80 18 2017 7 11 2,00 15 17 7 11 1,46 18 505 16 2,055 17 24 1,885 26 OK RiBa +13,09 Sparren NH C24, 10/20, a= 62,5 +3,25 +6,50 +9,25 +6,43 +6,29 +6,00 +3,18 +3,00 +2,75 -0,14 OG02.032 Warten OG01.031 Besprechung EG00.002 Empfang +9,33 +13,15 +12,30 +0,00 UK UZ +11,85 +10,05 +9,49 +10,20 +9,70 +9,54 +12,25 +12,58 +6,80 +7,00 +6,24 +6,08 +9,75 +12,74 +2,75 +6,27 +6,00 DG01.001 TH1 Bestand Riba StB 24/25 24 575 1,31 24 17 10/12 24 1,885 10 14 17 1,13 3,75 365 2,01 546 +12,79 +12,95 +13,00 IPE 400 +6,60 +6,50 UZ Stb 24/45 UK +2,73 UZ Stb 24/45 UK +2,73 +6,45 +6,29 L M N 29 35 39 40 41 G H 38 37 36 34 33 32 31 30 28 2,50 1,885 615 635 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 86 87 88 89 91 90 96 92 93 94 95 97 12 30 2,16 16 2,26 24 +9,52 +9,68 +2,75 +9,25 26 6 71 4 80 25 1,30 1,50 16 21 2,90 16 19 2,90 16 19 2,90 16 27 62 5 2,26 5 15 26 35 3,20 18 26 63 71 37 87 30 18 1,00 1,45 5 16 21 33 37 5 2,12 5 7 16 27 62 5 2,12 5 7 16 27 62 5 2,12 5 7 16 27 62 5 2,12 5 14 16 3,79 95 18 -4,10 -0,55 26 1,885 24 17 2,105 11 505 20 1,44 11 7 17 15 2,00 11 24 20 +12,10 +2,13 +3,70 OK Brüstung Neu +4,25 +3,70 +3,18 Mit schalpläne Prüfen _FK 20210917 Mit Statiker Prüfen Abbruch _FK 20210917 Mit Statiker Prüfen Abbruch _FK 20210917 Sprung UZ In Achse 53 Noch in Bearbeitung FK20210917 Pos. Stuze Prüfen FK20210917 Bemassung Prüfen FK20210917 OK UZ +13,35 UZ/ÜZ Stb 24/125 UK +6,00 +6,00 16 25 5 7 5 UZ Stb 24/45 UK +2,73 Schnitt I-I Schnitt K-K INGELHEIM RATHAUS
  • 25. 3,53 O +12,95 Rückkühler +17,78 +14,48 +16,25 +13,39 +13,83 +15,28 +15,89 +16,09 +16,25 +16,22 +14,48 +15,58 +17,78 7,56 1,46 3,10 1,77 3,86 1,58 1,19 5,92 3,93 3,31 3,02 5,05 3,83 12 STG 16.6/30 10 STG 163/30 26 STG 165/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 26 STG 165/30 +9,68 +6,43 +3,18 +6,29 +9,47 +12,79 +2,95 -1,19 +13,40 UK FUN -5,95 OK RFB -4,60 UK FUN -5,16 +8,06 +4,81 +1,16 +1,36 +4,60 +7,85 +11,10 +11,31 +12,95 +9,68 +6,43 +3,18 +6,22 -1,19 +9,47 +12,79 +2,95 +8,06 +4,81 +1,16 +1,36 +4,60 +7,85 +11,10 +11,31 +12,95 +9,68 +6,43 +3,18 +6,22 -1,19 +9,47 +12,79 +2,95 +3,02 +6,27 +9,52 +12,79 Zeichnungsgrenze Zeichnungsgrenze Zeichnungsgrenze Zeichnungsgrenze -1,07 1,22 376 967 968 587 1,25 1,25 519 1,85 1,40 1,85 1,40 1,85 1,40 1,85 1,40 1,85 1,40 46 1,583 1,21 2 2,09 69 1,195 1,772 1,338 1,195 56 56 56 56 56 4,33 +17,78 +16,25 Zeichnungsgrenze 85 3,48 61 1,02 +8,06 +4,81 +1,16 +14,48 +16,25 +1,36 +4,60 +7,85 +11,10 +11,33 -1,19 -1,07 10 STG 163/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 10 STG 163/30 OK KD +0,77 OK Weg -0,06 Feurwehr zufahrt O Rampe OK Pflaster -1,07 UK Fun Bestand -1,84 UK KS Bestand -8,30 UK Fun Bestand -7,10 OK Fun Bestand -5,00 Leitungsverlauf prüfen Kanal UK KS Bestand -6,05 UK Fun Treppe Best UK Magererbeton -2,98 OK FFB OG01 +3,25 = +101,30 NN OK FFB OG02 +6,50 = 104,55 NN OK FFB OG03 +9,75 = +107,80 NN OK FFB DG01 +13,00 = +111,05 NN UK BoPla -1,34 = +96,71 NN OK FFB EG00 -1,05 = +97,00 NN OK FFB EG00 ±0,00 = +98,05 NN UK Fun -2,71 = +95,34 NN 1,53 1,77 H = 14,48 Firsthöhe TPH Süd +16,24 = +114,29 NN 4,38 H = 10,15 4,32 Firsthöhe Bestand +17,78 = +115,83 NN Traufhöhe = H OK BoPla -5,00 = +93,05 NN UK BoPla -5,15 = +93,20 NN UK Fun -8,10 = +89,95 NN OK Fun -6,25 = +91,80 NN 2,46 2,32 94 2,32 93 2,32 93 2,32 93 1,84 1,05 6,17 8,28 2,19 1,50 68 ANSCHLUß SIEHE PLAN 4014_01_5_FA_ARC_FANW_365 INGELHEIM RATHAUS
  • 26.
  • 27.
  • 28. PROFESSIONAL PROJECT Exploded Isometric View of a Facade Panel Aluminium Sheet Aluminium Sheet Structural Members Glass Panels Space for LED Sectional View of a Facade Panel 300 cm 300 cm 17.2° 17.2° 10.6° X cm 45.0° 4 5 .0 ° R1000 300 cm The dynamic facade of Porsche consists of 4 transitioning panels in each row, represented in Red, Yellow and Orange color, helps to get natural light and makes a visual connection between interior and exterior. The opening in the aluminium facade widens as we go down from the apex of the building to the entrance. The bottom of each row is connected with red LED lights to signify the entrance.
  • 29. PROFESSIONAL PROJECT View of Porsche Center Hangzhou, China
  • 30.
  • 31.
  • 32. Lighting Plan Reflected Ceiling Plan (RCL)
  • 33. PROFESSIONAL PROJECT The juxtaposition of the wooden boxes one on top of each other with metallic columns to support is the primary lan- guage used to produce the vernacular and rusty effect to the ambience of the restaurant. In the gap between the boxes of Un- der-arm counter is highlighted with LED line to show the mix of metal and wood. Exploded isometric view of the pizza counter showing the material specification Lincontro Italian Restaurant Main Bar/ Pizza Counter Details
  • 35. PROFESSIONAL PROJECT Lincontro Italian Restaurant Plan The stacking of wooden boxes in waiter station creates two major spaces: Interior & Exterior. The former has various ways of accesing as the shutters has different directions of opening whereas the later has an open envelop of steel columns. Waiter Station Details
  • 36.
  • 37.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50. PROFESSIONAL PROJECT OVERLOOK PODS ROYAL CARIBBEAN | ICON | DECEMBER 5TH 2019 AQUADOME - OVERLOOK AREA 19_1205_RCI_ICON_AquAdOme_OveRlOOk_POds 3deluxe design systems d.s. GmbH, Wiesbaden, Germany © 2019 3DELUXE OVERVIEW FRONTAL 8 SEATER PODS 6 SEATER PODS 6 SEATER PODS ENTRANCE TO PODS UPPER BAR PLAN: Deck 15, Deck 16 Three 6-seater pods and two 8-seater pods are arranged facing the vast ocean. It acts as a transition between the theatre and the Ocean. Each pod can be classified into: Interior Arc and Exterior Wrap. The interior arc is an open oval loop allowing the movement to enter, be seated and relax on a comfortable sofa, embraced by a floating table. and exit. The wrap is composed of two layers: Solid segmented face that holds and lifts the pods to different levels and Coral surface which cov- ers each pod bringing it to the aquatic family. PLAN: Deck 15 PLAN: Deck 16
  • 51. PROFESSIONAL PROJECT View of the 8-seater high pod OVERLOOK PODS