Personal Information
Entreprise/Lieu de travail
Mumbai Area, India India
Profession
Site Engineer at Lodha World One Project
Secteur d’activité
Real Estate/ Construction / Architecture
À propos
1. Approx 3 years experience in building execution and quantity estimation work.
2. Holds a B.Tech degree in civil engineering from one of UPTU ranked technical college( IIMT
Group Of Colleges).
3. Handled teams ranging from 12 resources while supervising project in panipat (TDI City
Development Project).
4. Handling Team of approx. 65 labors including fitter,carpenter & masons at LODHA Project(The World Towers) for Tenant building & Government Car Parking .
5. Undertaking 22 storey+OHT & LMR building of Area 5000 sqf & 14 floors GCP of area 20 lakhs sqf along with shore piling & Tie back anchors.
6. External & Internal plastering work, Gypsum Plaster, Block Work ...
Présentations
(1)J’aime
(27)Design and analasys of a g+2 residential building
=> No nEEd FoH WoRk , Um gOod cOnsUMer oF PArentx MOnEy
•
il y a 9 ans
Seismic retrofitting techniques & rehabilitation
Shuvam Sarkar
•
il y a 6 ans
Electrical Systems in a Building
GAURAV. H .TANDON
•
il y a 8 ans
Sewer Appurtanances
Akepati S. Reddy
•
il y a 8 ans
Asian paint ppt
Sunil Chitragar
•
il y a 13 ans
MBA Asian paints porject
Achut B Roogi
•
il y a 7 ans
Top 10 civil quantity surveyor interview questions and answers
marryweasley
•
il y a 8 ans
FALSE CEILING
Shashikant Jadhav
•
il y a 9 ans
HOME WIRING(domestic wiring)
Arshad Hussain
•
il y a 8 ans
waterproofing
modern metallurgicals
•
il y a 14 ans
Admixture of concrete
Lavanya Singh
•
il y a 8 ans
CONCRETE ADMIXTURES
Bhrigu85
•
il y a 8 ans
SPECIFICATION AND ESTIMATION
Ar Naveen Naveen
•
il y a 9 ans
G+20 Corporate House Construction & Project Management.
Neelay Khese
•
il y a 8 ans
Project Plan for Construction of School in Africa (Congo)
Alex Osborne
•
il y a 13 ans
Material Management and ABC analysis
Dr. Sonal Mandhotra
•
il y a 10 ans
Material management on construction site
Ronak Jain
•
il y a 10 ans
070 Material Management and Construction Productivity
Dr Fereidoun Dejahang
•
il y a 7 ans
022 Construction Productivity (PART 1)
Dr Fereidoun Dejahang
•
il y a 7 ans
Labor productivity improvement in construction projects using wbs obs integration.final.13.11.2014
Essam Lotffy, PMP®, CCP®
•
il y a 9 ans
1. productivity concept and calculation.
Samir Potale-sylvester
•
il y a 9 ans
Construction productivity
Sunil Manjeri
•
il y a 12 ans
Rate Analysis Site Meeting
Sanjay Patnaik
•
il y a 14 ans
analysis of high rise building
ishant_kukreja
•
il y a 10 ans
Structural systems in high rise buildings
Karthik Suresh
•
il y a 8 ans
High rise structure & core
Meer Musabber ali (joyous)
•
il y a 8 ans
High rise construction
akkshay jawlekar
•
il y a 9 ans
Personal Information
Entreprise/Lieu de travail
Mumbai Area, India India
Profession
Site Engineer at Lodha World One Project
Secteur d’activité
Real Estate/ Construction / Architecture
À propos
1. Approx 3 years experience in building execution and quantity estimation work.
2. Holds a B.Tech degree in civil engineering from one of UPTU ranked technical college( IIMT
Group Of Colleges).
3. Handled teams ranging from 12 resources while supervising project in panipat (TDI City
Development Project).
4. Handling Team of approx. 65 labors including fitter,carpenter & masons at LODHA Project(The World Towers) for Tenant building & Government Car Parking .
5. Undertaking 22 storey+OHT & LMR building of Area 5000 sqf & 14 floors GCP of area 20 lakhs sqf along with shore piling & Tie back anchors.
6. External & Internal plastering work, Gypsum Plaster, Block Work ...